CN205531260U - Novel scaffold frame for fitment - Google Patents

Novel scaffold frame for fitment Download PDF

Info

Publication number
CN205531260U
CN205531260U CN201620089897.4U CN201620089897U CN205531260U CN 205531260 U CN205531260 U CN 205531260U CN 201620089897 U CN201620089897 U CN 201620089897U CN 205531260 U CN205531260 U CN 205531260U
Authority
CN
China
Prior art keywords
support bar
bracing piece
construction layer
diagonal brace
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620089897.4U
Other languages
Chinese (zh)
Inventor
赵典取
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Haocheng Construction Co Ltd
Original Assignee
Zhejiang Haocheng Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Haocheng Construction Co Ltd filed Critical Zhejiang Haocheng Construction Co Ltd
Priority to CN201620089897.4U priority Critical patent/CN205531260U/en
Application granted granted Critical
Publication of CN205531260U publication Critical patent/CN205531260U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model belongs to the technical field of the scaffold frame, a novel scaffold frame for fitment is provided, its characterized in that: including upper chord, lower chord, I -steel truss and angle iron frame, the upper chord is established on the lower chord, the upper chord passes through the I -steel truss with lower chord fixed connection, the upper chord with be provided with the bracing piece between the lower chord, the angle steel sets up the bracing piece bottom, the angle iron frame with bracing piece fixed connection, be provided with bracing and electronic jack between the bracing piece, the bracing piece passes through the mutual fixed connection of bracing, bracing piece one side is provided with the wall body, be provided with the construction layer on the wall body, construction layer one side is provided with the outrigger, the construction layer is passed through the outrigger with bracing piece fixed connection, this novel scaffold frame for fitment simple to operate, structural stability is high, can promote the efficiency of construction, and especially adapted high -rise building uses.

Description

A kind of novel finishing scaffold
Technical field
The utility model belongs to Construction Formwork & Scaffold Technology field, particularly relates to a kind of novel finishing scaffold.
Background technology
The object with certain geometrical shape that the techniques such as section bar is iron or steel and has the material (such as plastics, aluminium, glass fibre etc.) of some strength and toughness by rolling, extrudes, casting are made.Different according to the smelting quality of steel, shaped steel is divided into common shaped steel and high-quality shaped steel.Common shaped steel is divided into again heavy section steel, medium shape, light section by existing metal product catalogue.Common shaped steel can be divided into again I-steel, channel-section steel, angle steel, round steel etc. by its section configuration.
Scaffold refers to that job site is operative and solves vertically and horizontally to transport the various supports set up.Field is primarily referred to as on construction site being used in the higher place that cannot directly construct of exterior wall, inside fitting or floor height.Mainly for the upper and lower operation of workmen or perimeter security net are gone along with sb. to guard him and high-altitude installation component.The scaffold of current existing finishing is when skyscraper, and structural stability is poor, and safety can not be guaranteed, and causes efficiency of construction relatively low.
Utility model content
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, it is provided that a kind of easy for installation, structural stability is high, it is possible to lifting construction efficiency, is especially suitable for the novel finishing scaffold that skyscraper uses.
A kind of novel finishing scaffold that the utility model is realized in, including top boom, lower boom, I-steel truss and slotted-angle shelving, described top boom is located on described lower boom, described top boom is connected by described I-steel truss and described lower boom are fixing, it is provided with support bar between described top boom and described lower boom, described slotted-angle shelving is located at bottom described support bar, described slotted-angle shelving is fixing with described support bar to be connected, diagonal brace and motor-driven chain hoist it is provided with between described support bar, described support bar is mutually permanently connected by described diagonal brace, described support bar side is provided with body of wall, it is provided with construction layer on described body of wall, described construction layer side is provided with outrigger, described construction layer is connected by described outrigger and described support bar are fixing.
Described diagonal brace is interlaced setting, and diagonal brace ensure that support bar stress equalization, and structural stability is higher.
Being provided with flower basket bolt in the middle part of described diagonal brace, flower basket bolt is put hundred and is received adjusting elasticity.
Described diagonal brace is connected by described flower basket bolt and described construction layer are fixing, and flower basket bolt ensures that diagonal brace is installed compact with construction layer.
Between described support bar, spacing is 0.8-1m, and this spacing ensure that easy to operate, takes up room little simultaneously.
The beneficial effects of the utility model are: the top boom of setting and lower boom can keep easy for installation, and structural stability is high;The slotted-angle shelving arranged ensure that overall structure consolidates;The motor-driven chain hoist arranged ensure that means of transport efficiency is high, is suitable for skyscraper;The support bar arranged can be easily installed in enterprising enforcement of skyscraper and use;I-steel truss, diagonal brace and the flower basket bolt arranged can keep scaffold overall structure to consolidate.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical solution of the utility model, the accompanying drawing used required in embodiment will be briefly described below, apparently, accompanying drawing in describing below is only embodiments more of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the left view structure chart of a kind of novel finishing scaffold that the utility model embodiment provides.
Fig. 2 be the utility model embodiment provide a kind of novel finishing scaffold face structure chart.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described.
nullAs depicted in figs. 1 and 2,A kind of novel finishing scaffold,Including top boom 1、Lower boom 2、I-steel truss 3 and slotted-angle shelving 4,Top boom 1 is located on lower boom 2,Top boom 1 is connected by I-steel truss 3 is fixing with lower boom 2,Support bar 5 it is provided with between top boom 1 and lower boom 2,Slotted-angle shelving 4 is located at bottom support bar 5,Slotted-angle shelving 4 is fixing with support bar 5 to be connected,Diagonal brace 6 and motor-driven chain hoist 7 it is provided with between support bar 5,Diagonal brace 6 is in interlaced setting,Flower basket bolt 8 it is provided with in the middle part of diagonal brace 6,Support bar 5 is mutually permanently connected by diagonal brace 6,Between support bar 5, spacing is 0.8-1m,Support bar 5 side is provided with body of wall 9,Construction layer 10 it is provided with on body of wall 9,Diagonal brace 6 is connected by flower basket bolt 8 is fixing with construction layer 10,Construction layer 10 side is provided with outrigger 11,Construction layer 10 is connected by outrigger 11 is fixing with support bar 5.
The beneficial effects of the utility model are: the top boom 1 of setting and lower boom 2 can keep easy for installation, and structural stability is high;The slotted-angle shelving 4 arranged ensure that overall structure consolidates;The motor-driven chain hoist 7 arranged ensure that means of transport efficiency is high, is suitable for skyscraper;The support bar 5 arranged can be easily installed in enterprising enforcement of skyscraper and use;I-steel truss 3, diagonal brace 6 and the flower basket bolt 8 arranged can keep scaffold overall structure to consolidate.
The above is preferred embodiment of the present utility model; it should be pointed out that, for those skilled in the art, on the premise of without departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications are also considered as protection domain of the present utility model.

Claims (5)

1. a novel finishing scaffold, it is characterized in that: include top boom, lower boom, I-steel truss and slotted-angle shelving, described top boom is located on described lower boom, described top boom is connected by described I-steel truss and described lower boom are fixing, it is provided with support bar between described top boom and described lower boom, described slotted-angle shelving is located at bottom described support bar, described slotted-angle shelving is fixing with described support bar to be connected, diagonal brace and motor-driven chain hoist it is provided with between described support bar, described support bar is mutually permanently connected by described diagonal brace, described support bar side is provided with body of wall, it is provided with construction layer on described body of wall, described construction layer side is provided with outrigger, described construction layer is connected by described outrigger and described support bar are fixing.
A kind of novel finishing scaffold the most according to claim 1, it is characterised in that: described diagonal brace is interlaced setting.
A kind of novel finishing scaffold the most according to claim 1, it is characterised in that: it is provided with flower basket bolt in the middle part of described diagonal brace.
A kind of novel finishing scaffold the most according to claim 3, it is characterised in that: described diagonal brace is connected by described flower basket bolt and described construction layer are fixing.
A kind of novel finishing scaffold the most according to claim 1, it is characterised in that: between described support bar, spacing is 0.8-1m.
CN201620089897.4U 2016-01-29 2016-01-29 Novel scaffold frame for fitment Expired - Fee Related CN205531260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620089897.4U CN205531260U (en) 2016-01-29 2016-01-29 Novel scaffold frame for fitment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620089897.4U CN205531260U (en) 2016-01-29 2016-01-29 Novel scaffold frame for fitment

Publications (1)

Publication Number Publication Date
CN205531260U true CN205531260U (en) 2016-08-31

Family

ID=56773210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620089897.4U Expired - Fee Related CN205531260U (en) 2016-01-29 2016-01-29 Novel scaffold frame for fitment

Country Status (1)

Country Link
CN (1) CN205531260U (en)

Similar Documents

Publication Publication Date Title
CN113152873A (en) Heightening hanging basket system
CN105464358A (en) Multi-layer construction basket
CN207332288U (en) Rod-pulling type hanging basket suspension device on roof frame girder
CN207245138U (en) Boat scaffold adjustable in pitch
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN205531260U (en) Novel scaffold frame for fitment
CN205077842U (en) Multi -use architecture support
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN204001702U (en) A kind of J-shaped wall plastic formwork
CN204676865U (en) A kind of building scaffold
CN203531345U (en) Movable cantilever frame
CN105696784A (en) Novel decoration scaffold
CN204357138U (en) Simple steel structure lifting upending frame
CN201502170U (en) Horizontal supporting device of building external frame
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN204282796U (en) Collapsible hanging basket
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN208456101U (en) A kind of housing construction scaffold
CN106917498A (en) A kind of Portable scaffold
CN207739605U (en) A kind of elevator solid construction protection system
CN207314895U (en) The totally-enclosed system in external wall hole
CN209161290U (en) The suspender of multiple concrete prefabricated beams capable of hoisting
CN208749071U (en) A kind of reinforcing heightening type hanging basket connection system
CN207348787U (en) One kind maintenance cat ladder platform
CN205677224U (en) A kind of scaffold being readily disassembled

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20180129