CN113152873A - Heightening hanging basket system - Google Patents

Heightening hanging basket system Download PDF

Info

Publication number
CN113152873A
CN113152873A CN202110375299.9A CN202110375299A CN113152873A CN 113152873 A CN113152873 A CN 113152873A CN 202110375299 A CN202110375299 A CN 202110375299A CN 113152873 A CN113152873 A CN 113152873A
Authority
CN
China
Prior art keywords
suspender
parapet
roof
basket system
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110375299.9A
Other languages
Chinese (zh)
Inventor
刘少瑜
连珍
徐永刚
殷峰
李芬
夏永新
浦聿聪
徐梓杰
罗青蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN202110375299.9A priority Critical patent/CN113152873A/en
Publication of CN113152873A publication Critical patent/CN113152873A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention provides a heightening hanging basket system, which comprises: the balancing weight is arranged on the roof; the bottom of the rear pillar is fixedly connected with a balancing weight; the top end of the rear support is connected with the rear end of the suspender; the parapet is arranged at the edge of the roof, the parapet is higher than the roof, and the front end of the suspender extends out of the roof and the parapet; the front support is fixed at the top of the parapet wall, the middle of the suspender supports the top of the front support, and the middle of the suspender is positioned between the rear end of the suspender and the front end of the suspender; and the hanging basket platform is connected with the hanging rod through a working steel wire rope. The hanging basket can solve the problem that the hanging basket at the position of the parapet wall which is very high on the roof is difficult to use, the hanging basket which is higher than the roof by more than 2 meters can be free from taking a scaffold, so that the construction cost is reduced, and the working efficiency is greatly improved. The hanging basket is flexible to operate, easy to shift, convenient, practical, safe and reliable.

Description

Heightening hanging basket system
Technical Field
The invention relates to a heightening hanging basket system.
Background
The development of the building curtain wall in the building industry of China begins in the 80 th 20 th century, and the marked buildings at that time mainly comprise Shanghai friendship buildings and Beijing great wall restaurants. Particularly, with the enhancement of ecological energy conservation and environmental protection consciousness of people and the continuous improvement of living quality requirements, the market demand of the building curtain wall industry is continuously expanded, and the development power of the building curtain wall industry in China is greatly increased. Building curtain of super large volume will be accomplished in the short time, and along with the development of science and technology, more and more can dismantle repeatedly usable's hanging flower basket has obtained a large amount of uses in building curtain's installation now.
The hanging basket is a construction machine for high-altitude operation in construction engineering, and is used for curtain wall installation and outer wall cleaning. The hanging basket is a novel high-altitude operation device which can replace a traditional scaffold, reduce labor intensity, improve working efficiency and be repeatedly used. The use of the construction hanging basket has gradually become a trend, and the construction hanging basket is widely accepted in high-rise and multi-storey high-rise building outer wall construction, curtain wall installation, heat preservation construction, maintenance and cleaning of outer walls and other high-rise operations, and can be used for the operation of large-scale tank bodies, bridges, dams and other projects.
The front end of the frame body of the existing hanging basket is a low rod, the rear end of the frame body is a high rod, the highest height of the high rod is 5 meters, and when the height of a curtain wall exceeds the roof by 2.5 meters and more than 2.5 meters, the existing hanging basket cannot be installed and used.
Disclosure of Invention
The invention aims to provide a heightened hanging basket system.
In order to solve the above problems, the present invention provides a heightened basket system, including:
the balancing weight is arranged on the roof;
the bottom of the rear pillar is fixedly connected with a balancing weight;
the top end of the rear support is connected with the rear end of the suspender;
the parapet is arranged at the edge of the roof, the parapet is higher than the roof, and the front end of the suspender extends out of the roof and the parapet;
the front support is fixed at the top of the parapet wall, the middle of the suspender supports the top of the front support, and the middle of the suspender is positioned between the rear end of the suspender and the front end of the suspender;
and the hanging basket platform is connected with the hanging rod through a working steel wire rope.
Further, in the raised basket system described above, the front pillar includes:
a pillar body;
a connecting plate connected to the bottom of the pillar body, the connecting plate being connected to the top of the parapet wall;
connect in the spacing portion at the top of pillar body, the middle part of jib supports spacingly and is fixed in on the spacing portion.
Further, in the heightened hanging basket system, a reinforcing plate is connected between the bottom of the support body and the connecting plate.
Further, in the heightening hanging basket system, an embedded part is arranged at the top of the parapet wall.
Further, in the heightening basket system, the embedded part is connected with the connecting plate.
Further, in the heightening hanging basket system, a plurality of connecting holes are formed in the connecting plate, and the embedded part is connected with the connecting plate through bolts penetrating through the connecting holes.
Further, in the heightened hanging basket system, the connecting hole is a waist-shaped hole.
Further, in the heightening hanging basket system, the embedded part is welded and connected with the connecting plate.
Further, in above-mentioned increase hanging flower basket system, spacing portion is U type groove, the fixed orifices has been seted up on the lateral wall in U type groove, erect in the middle part of jib in U type inslot, the jib through passing the bolt of fixed orifices with U type groove is connected.
Further, in the heightening basket system, the basket platform is connected with the suspension rod through the safety steel wire rope.
Compared with the prior art, the invention comprises the following steps: the balancing weight is arranged on the roof; the bottom of the rear pillar is fixedly connected with a balancing weight; the top end of the rear support is connected with the rear end of the suspender; the parapet is arranged at the edge of the roof, the parapet is higher than the roof, and the front end of the suspender extends out of the roof and the parapet; the front support is fixed at the top of the parapet wall, the middle of the suspender supports the top of the front support, and the middle of the suspender is positioned between the rear end of the suspender and the front end of the suspender; and the hanging basket platform is connected with the hanging rod through a working steel wire rope. The hanging basket can solve the problem that the hanging basket at the position of the parapet wall which is very high on the roof is difficult to use, the hanging basket which is higher than the roof by more than 2 meters can be free from a scaffold, the construction cost is reduced, the construction cost is 28 percent of that of the traditional scaffold, and the working efficiency is greatly improved. The hanging basket is flexible to operate, easy to shift, convenient, practical, safe and reliable.
Drawings
FIG. 1 is a block diagram of a basket according to an embodiment of the present invention;
FIG. 2 is a schematic view of a front pillar of one embodiment of the present invention;
fig. 3 is an enlarged view illustrating the installation of the front pillar of fig. 1.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in further detail below.
As shown in fig. 1 to 3, the present invention provides a heightened basket system, including:
a balancing weight 2 arranged on the roof 1;
the bottom of the rear pillar 3 is fixedly connected with the balancing weight 2;
here, the rear support of the basket does not exceed 5 meters, and the lower part of the support is fixed by a special counterweight block for the basket (the total weight of the counterweight block is 1 ton;
the top end of the rear pillar 4 is connected with the rear end of the suspender 4;
the parapet 5 is arranged at the edge of the roof 1, the parapet 5 is higher than the roof, and the front end of the suspender 4 extends out of the roof 1 and the parapet 5;
the parapet wall can be 4.5 meters higher than the roof, and then a glass curtain wall can be installed on the parapet wall higher than the roof;
a front pillar 6, said front pillar 6 being fixed to the top of said parapet 5, the middle of said boom 4 supporting the top of said front pillar 6, the middle of said boom 4 being located between the rear end of said boom 4 and the front end of said boom 4;
and the hanging basket platform 7 is connected with the hanging rod 4 through a working steel wire rope 8.
Here, use this system, can solve the use of the especially high parapet position department hanging flower basket on the roofing problem just more difficult, realize exceeding the roofing and can exempt from to take the scaffold frame by the elevating hanging flower basket of 2 meters, make construction cost reduce, and the operating cost is 28% of traditional scaffold frame, and work efficiency improves by a wide margin moreover. The hanging basket is flexible to operate, easy to shift, convenient, practical, safe and reliable.
As shown in fig. 1 to 3, in an embodiment of the present invention, the front pillar 6 includes:
a pillar body 62;
a connecting plate 63 connected to the bottom of the pillar body 62, the connecting plate 63 being connected to the top of the parapet wall 5;
and the middle part of the suspension rod 4 supports, limits and is fixed on the limiting part 61.
In an embodiment of the heightened basket system of the invention, as shown in fig. 1-3, a reinforcing plate 64 is further connected between the bottom of the pillar body 62 and the connecting plate 63.
The front support column can be produced in batch, and fire safety and quality hidden dangers caused by field welding are avoided. The lifting height of the hanging basket can be improved through the front support columns, and the hanging basket is particularly suitable for a non-standard hanging basket mode with increased height. The integral stability of the hanging basket can be enhanced through the front support columns, the safety performance is improved, and the hanging basket and the building main body structure can be perfectly combined.
In an embodiment of the heightened hanging basket system, the top of the parapet wall 5 is provided with embedded parts.
In an embodiment of the heightened hanging basket system, the embedded part is connected with the connecting plate 63.
In an embodiment of a heightened basket system according to the present invention, as shown in fig. 3, a plurality of connection holes 66 are provided on the connection plate 63, and the embedded parts are connected to the connection plate 63 by bolts passing through the connection holes 66.
The connecting plates can be connected with the embedded parts through 4M 16 chemical bolts, and the stability of the heightening hanging basket system is guaranteed.
In an embodiment of the heightened hanging basket system, the embedded part is welded with the connecting plate.
Here, if the built-in fitting is the steel construction, can with the connecting plate lug weld on the steel construction, can guarantee the stability of a height hanging flower basket system equally.
In an embodiment of the raised basket system of the present invention, as shown in fig. 3, the connecting holes 66 are waist-shaped holes.
As shown in fig. 2 and 3, in an embodiment of the heightened hanging basket system of the present invention, the limiting portion is a U-shaped groove, a fixing hole 65 is formed on a side wall of the U-shaped groove, the middle portion of the suspension rod 4 is erected in the U-shaped groove, and the suspension rod 4 is connected to the U-shaped groove through a bolt passing through the fixing hole 65.
As shown in fig. 1, in an embodiment of the heightened basket system of the present invention, the heightened basket system further includes a safety wire 9, and the basket platform 7 is connected with the suspension rod 4 through the safety wire 9 to ensure safety.
The embodiments are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments can be referred to each other.
It will be apparent to those skilled in the art that various changes and modifications may be made in the invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (10)

1. A raised basket system, comprising:
the balancing weight is arranged on the roof;
the bottom of the rear pillar is fixedly connected with a balancing weight;
the top end of the rear support is connected with the rear end of the suspender;
the parapet is arranged at the edge of the roof, the parapet is higher than the roof, and the front end of the suspender extends out of the roof and the parapet;
the front support is fixed at the top of the parapet wall, the middle of the suspender supports the top of the front support, and the middle of the suspender is positioned between the rear end of the suspender and the front end of the suspender;
and the hanging basket platform is connected with the hanging rod through a working steel wire rope.
2. A raised basket system as claimed in claim 1, wherein said front support includes:
a pillar body;
a connecting plate connected to the bottom of the pillar body, the connecting plate being connected to the top of the parapet wall;
connect in the spacing portion at the top of pillar body, the middle part of jib supports spacingly and is fixed in on the spacing portion.
3. A raised basket system as claimed in claim 2, wherein a reinforcing plate is also connected between the bottom of the pillar body and the connecting plate.
4. A raised basket system as claimed in claim 2, wherein the top of the parapet is provided with embedments.
5. The raised basket system of claim 4, wherein said embedment is connected to said connection plate.
6. A heightened basket system according to claim 5, wherein a plurality of connecting holes are provided in the connecting plate, and the embedded pieces are connected to the connecting plate by bolts passing through the connecting holes.
7. An elevated basket system according to claim 6, wherein the connecting holes are waist-shaped holes.
8. The heightened basket system according to claim 1, wherein the embedded parts are welded to the connecting plates.
9. The heightening basket system according to claim 2, wherein the limiting portion is a U-shaped groove, a fixing hole is formed in a side wall of the U-shaped groove, a middle portion of the hanger rod is erected in the U-shaped groove, and the hanger rod is connected with the U-shaped groove through a bolt passing through the fixing hole.
10. A raised basket system as claimed in claim 1, wherein said basket platform is connected to a boom by said safety line.
CN202110375299.9A 2021-04-08 2021-04-08 Heightening hanging basket system Pending CN113152873A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110375299.9A CN113152873A (en) 2021-04-08 2021-04-08 Heightening hanging basket system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110375299.9A CN113152873A (en) 2021-04-08 2021-04-08 Heightening hanging basket system

Publications (1)

Publication Number Publication Date
CN113152873A true CN113152873A (en) 2021-07-23

Family

ID=76889219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110375299.9A Pending CN113152873A (en) 2021-04-08 2021-04-08 Heightening hanging basket system

Country Status (1)

Country Link
CN (1) CN113152873A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719108A (en) * 2021-09-02 2021-11-30 上海建工七建集团有限公司 Hanging basket fixing device and method on steel structure frame beam
CN113756558A (en) * 2021-09-30 2021-12-07 北京建工集团有限责任公司 High-rise assembled steel structure system externally hung hanging basket installation structure and construction method thereof
CN113775165A (en) * 2021-10-18 2021-12-10 上海同济建设有限公司 Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof
CN113922740A (en) * 2021-09-24 2022-01-11 中冶集团武汉勘察研究院有限公司 Flexible photovoltaic support using flat roof parapet as support and installation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07165381A (en) * 1993-12-15 1995-06-27 Taisei Corp Gondola erection method and gondola erection foundation structure
CN204311721U (en) * 2014-12-04 2015-05-06 中国建筑第二工程局有限公司 Double-support hanging basket overhanging device
CN211974274U (en) * 2020-04-14 2020-11-20 深圳泛华工程集团有限公司 No counter weight hanging flower basket structure for construction
CN212002185U (en) * 2020-04-28 2020-11-24 安徽水安建设集团股份有限公司 Construction equipment is increased to landing leg behind hanging flower basket
CN112411994A (en) * 2020-11-13 2021-02-26 中如建工集团有限公司 Embrace arc roof beam and do not have counter weight hanging flower basket suspension mechanism
CN216042530U (en) * 2021-04-08 2022-03-15 上海市建筑装饰工程集团有限公司 Heightening hanging basket system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07165381A (en) * 1993-12-15 1995-06-27 Taisei Corp Gondola erection method and gondola erection foundation structure
CN204311721U (en) * 2014-12-04 2015-05-06 中国建筑第二工程局有限公司 Double-support hanging basket overhanging device
CN211974274U (en) * 2020-04-14 2020-11-20 深圳泛华工程集团有限公司 No counter weight hanging flower basket structure for construction
CN212002185U (en) * 2020-04-28 2020-11-24 安徽水安建设集团股份有限公司 Construction equipment is increased to landing leg behind hanging flower basket
CN112411994A (en) * 2020-11-13 2021-02-26 中如建工集团有限公司 Embrace arc roof beam and do not have counter weight hanging flower basket suspension mechanism
CN216042530U (en) * 2021-04-08 2022-03-15 上海市建筑装饰工程集团有限公司 Heightening hanging basket system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719108A (en) * 2021-09-02 2021-11-30 上海建工七建集团有限公司 Hanging basket fixing device and method on steel structure frame beam
CN113922740A (en) * 2021-09-24 2022-01-11 中冶集团武汉勘察研究院有限公司 Flexible photovoltaic support using flat roof parapet as support and installation method thereof
CN113922740B (en) * 2021-09-24 2023-06-02 中冶集团武汉勘察研究院有限公司 Flexible photovoltaic bracket using parapet wall of flat roof as support and mounting method thereof
CN113756558A (en) * 2021-09-30 2021-12-07 北京建工集团有限责任公司 High-rise assembled steel structure system externally hung hanging basket installation structure and construction method thereof
CN113775165A (en) * 2021-10-18 2021-12-10 上海同济建设有限公司 Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof

Similar Documents

Publication Publication Date Title
CN113152873A (en) Heightening hanging basket system
CN209011528U (en) An all-steel attached lifting scaffold
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN216042530U (en) Heightening hanging basket system
CN202575670U (en) Prefabricated member hoisting tool type lifting beam
CN208071235U (en) A kind of bearing and lifting system of steel truss frame integral hoisting
CN201502170U (en) Horizontal supporting device of building external frame
CN211173007U (en) Novel tripod of encorbelmenting
CN220014395U (en) Can have enough to meet need mounting bracket by intelligent integrated platform system bailey frame of equipping
CN218149656U (en) Operating platform in lighting well
CN212583196U (en) Floor drilling steel pipe fixed bolster bears hanging flower basket device
CN214656461U (en) An assembled hanging basket high-altitude work protection device
CN213329975U (en) Steel pull rod hanging and pulling overhanging bearing steel beam structure
CN203129553U (en) Unit type hanging scaffold
CN219753919U (en) Hanging plate type hanging basket support column
CN217557613U (en) Hanging basket supporting structure for inclined roof
CN217759925U (en) BIM-based steel operating platform for light production well
CN113023591A (en) Large-scale circular construction method for small-dismantling of flat-arm type internal-climbing tower crane
CN217106064U (en) Elevator shaft hanging scaffold
CN207131062U (en) A kind of job platform
CN219429514U (en) Climbing frame dismantling support
CN218176130U (en) Beam rising column joint
CN208220169U (en) Packaged type construction operation platform in a kind of elevator shaft
CN205242626U (en) A base for mobile home
CN216305342U (en) Suspension cage for installing external climbing tower crane oblique beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination