CN105507340A - 一种山区桥梁桩基施工方法 - Google Patents
一种山区桥梁桩基施工方法 Download PDFInfo
- Publication number
- CN105507340A CN105507340A CN201510910806.9A CN201510910806A CN105507340A CN 105507340 A CN105507340 A CN 105507340A CN 201510910806 A CN201510910806 A CN 201510910806A CN 105507340 A CN105507340 A CN 105507340A
- Authority
- CN
- China
- Prior art keywords
- parts
- powder
- concrete
- construction method
- bridges
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510910806.9A CN105507340B (zh) | 2015-12-10 | 2015-12-10 | 一种山区桥梁桩基施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510910806.9A CN105507340B (zh) | 2015-12-10 | 2015-12-10 | 一种山区桥梁桩基施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105507340A true CN105507340A (zh) | 2016-04-20 |
CN105507340B CN105507340B (zh) | 2017-05-24 |
Family
ID=55715617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510910806.9A Active CN105507340B (zh) | 2015-12-10 | 2015-12-10 | 一种山区桥梁桩基施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105507340B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120721A (zh) * | 2016-08-19 | 2016-11-16 | 化学工业岩土工程有限公司 | 一种多层扩底人工挖孔灌注桩及施工方法 |
CN106368231A (zh) * | 2016-10-08 | 2017-02-01 | 张献斌 | 一种山区陡坡地段公路桥梁桩基施工方法 |
CN106812150A (zh) * | 2017-03-14 | 2017-06-09 | 王岐 | 一种山区陡坡地段公路桥梁桩基施工方法 |
CN107354952A (zh) * | 2017-09-12 | 2017-11-17 | 李建龙 | 一种山区陡坡地段公路桥梁桩基的安装方法 |
CN107989057A (zh) * | 2017-12-12 | 2018-05-04 | 马亮 | 一种桥梁桩基施工方法 |
CN109826221A (zh) * | 2019-03-27 | 2019-05-31 | 华北水利水电大学 | 一种桩承载力高的大型桥梁桩基施工方法 |
CN111005397A (zh) * | 2019-12-25 | 2020-04-14 | 惠州市新业建筑工程有限公司 | 桩基施工方法 |
CN113502747A (zh) * | 2021-07-09 | 2021-10-15 | 杭州市城市建设基础工程有限公司 | 一种水量变化大山区桥梁施工方法 |
CN113959285A (zh) * | 2021-11-16 | 2022-01-21 | 中铁十二局集团有限公司 | 一种高原桥梁桩基花岗岩斜岩浅眼钻芯爆破施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61186654A (ja) * | 1985-02-15 | 1986-08-20 | 大成建設株式会社 | スチ−ルフアイバ芯体強化鉄筋コンクリ−ト部材 |
JP2001049676A (ja) * | 1999-08-06 | 2001-02-20 | Shimizu Corp | コンクリート杭と基礎スラブとの接合構造 |
CN101761089A (zh) * | 2010-01-08 | 2010-06-30 | 南京工业大学 | 纤维筋混凝土抗拔桩 |
CN201835276U (zh) * | 2010-03-01 | 2011-05-18 | 张继红 | 预制扩孔桩 |
CN202369997U (zh) * | 2011-12-29 | 2012-08-08 | 机械工业勘察设计研究院 | 柔性袋式防腐桩 |
CN102875092A (zh) * | 2012-10-19 | 2013-01-16 | 天津宝丰混凝土桩杆有限公司 | 一种管桩头与承台用纤维混凝土 |
-
2015
- 2015-12-10 CN CN201510910806.9A patent/CN105507340B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61186654A (ja) * | 1985-02-15 | 1986-08-20 | 大成建設株式会社 | スチ−ルフアイバ芯体強化鉄筋コンクリ−ト部材 |
JP2001049676A (ja) * | 1999-08-06 | 2001-02-20 | Shimizu Corp | コンクリート杭と基礎スラブとの接合構造 |
CN101761089A (zh) * | 2010-01-08 | 2010-06-30 | 南京工业大学 | 纤维筋混凝土抗拔桩 |
CN201835276U (zh) * | 2010-03-01 | 2011-05-18 | 张继红 | 预制扩孔桩 |
CN202369997U (zh) * | 2011-12-29 | 2012-08-08 | 机械工业勘察设计研究院 | 柔性袋式防腐桩 |
CN102875092A (zh) * | 2012-10-19 | 2013-01-16 | 天津宝丰混凝土桩杆有限公司 | 一种管桩头与承台用纤维混凝土 |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120721A (zh) * | 2016-08-19 | 2016-11-16 | 化学工业岩土工程有限公司 | 一种多层扩底人工挖孔灌注桩及施工方法 |
CN106120721B (zh) * | 2016-08-19 | 2018-12-25 | 化学工业岩土工程有限公司 | 一种多层扩底人工挖孔灌注桩及施工方法 |
CN106368231A (zh) * | 2016-10-08 | 2017-02-01 | 张献斌 | 一种山区陡坡地段公路桥梁桩基施工方法 |
CN106812150A (zh) * | 2017-03-14 | 2017-06-09 | 王岐 | 一种山区陡坡地段公路桥梁桩基施工方法 |
CN107354952A (zh) * | 2017-09-12 | 2017-11-17 | 李建龙 | 一种山区陡坡地段公路桥梁桩基的安装方法 |
CN107354952B (zh) * | 2017-09-12 | 2018-03-09 | 李建龙 | 一种山区陡坡地段公路桥梁桩基的安装方法 |
CN107989057A (zh) * | 2017-12-12 | 2018-05-04 | 马亮 | 一种桥梁桩基施工方法 |
CN109826221A (zh) * | 2019-03-27 | 2019-05-31 | 华北水利水电大学 | 一种桩承载力高的大型桥梁桩基施工方法 |
CN111005397A (zh) * | 2019-12-25 | 2020-04-14 | 惠州市新业建筑工程有限公司 | 桩基施工方法 |
CN113502747A (zh) * | 2021-07-09 | 2021-10-15 | 杭州市城市建设基础工程有限公司 | 一种水量变化大山区桥梁施工方法 |
CN113959285A (zh) * | 2021-11-16 | 2022-01-21 | 中铁十二局集团有限公司 | 一种高原桥梁桩基花岗岩斜岩浅眼钻芯爆破施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105507340B (zh) | 2017-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105507340B (zh) | 一种山区桥梁桩基施工方法 | |
CN103889918B (zh) | 可用在地下井作业中的包含金属硅化物的泡沫水泥组合物 | |
CN100572683C (zh) | 大直径超深入岩钻孔扩底灌注桩施工方法 | |
CN101748741B (zh) | 一种混凝土支护结构的施工方法 | |
CN104411891A (zh) | 复合基础构造物及其施工方法 | |
WO2005095300A1 (ja) | コンクリート組成物とその製造方法、粘性調整方法、及び、このコンクリート組成物を用いた場所打ちコンクリート杭の構築方法 | |
KR101333502B1 (ko) | 앵커 보강용 주입재 조성물 | |
JP2016205111A (ja) | 既製杭埋込み工法 | |
CN111004008A (zh) | 一种用于预控顶房柱法矿柱加固、补强的方法 | |
CN106638579A (zh) | 一种珊瑚砂地基膨胀水泥砂浆注浆桩的施工方法 | |
KR20060027442A (ko) | 고압분사 그라우트재 주입장치 및 이를 이용한 지반개량공법 | |
CN104762957A (zh) | 一种螺旋成孔夯扩cfg桩的施工方法 | |
CN104762950B (zh) | 公路采空区治理方法 | |
CN102704478B (zh) | 一种建筑锚杆施工工艺 | |
Argal | Modern Technologies and Problems of Ground Stabilization by Injection. | |
CN109235440B (zh) | 一种全风化花岗岩地层的防渗灌浆方法 | |
CN106192987A (zh) | 一种对桩周边破碎地质加固的施工方法 | |
KR20130132282A (ko) | 복합 기초구조물 및 그 시공방법 | |
King et al. | Symposium on Grouting: Grouting of granular materials | |
CN210597405U (zh) | 古建筑隔震屏障 | |
CN104895327A (zh) | 一种高层建筑地下室混凝土自防水施工工艺 | |
CN110821550A (zh) | 一种煤巷瓦斯抽放方法 | |
CN110005377A (zh) | 一种垂直井井底腔室的建造方法 | |
KR200332284Y1 (ko) | 폐구조물 내부공동 충전구조 | |
CN109111198A (zh) | 自碎裂型硫磺锚固砂浆、制备方法及其应用 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Shujun Inventor after: Xie Yuhui Inventor after: Shao Haitao Inventor after: Chen Ke Inventor after: Xu Liuzhong Inventor after: Ren Linghui Inventor after: Shi Lei Inventor after: Zhang Bin Inventor after: Zhang Pei Inventor before: Zhang Shujun Inventor before: Xie Yuhui Inventor before: Shao Haitao Inventor before: Chen Ke Inventor before: Xu Liuzhong Inventor before: Ren Linghui Inventor before: Shi Lei Inventor before: Zhang Bin Inventor before: Zhang Pei |
|
CB03 | Change of inventor or designer information |