CN105490213A - Equipment and method for installing wires of overhead power transmission line - Google Patents

Equipment and method for installing wires of overhead power transmission line Download PDF

Info

Publication number
CN105490213A
CN105490213A CN201510950415.XA CN201510950415A CN105490213A CN 105490213 A CN105490213 A CN 105490213A CN 201510950415 A CN201510950415 A CN 201510950415A CN 105490213 A CN105490213 A CN 105490213A
Authority
CN
China
Prior art keywords
steel wire
wire rope
electric pole
hydrogen balloon
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510950415.XA
Other languages
Chinese (zh)
Other versions
CN105490213B (en
Inventor
周杰
梅莎莎
张红伟
祖二军
毛卫东
金涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510950415.XA priority Critical patent/CN105490213B/en
Publication of CN105490213A publication Critical patent/CN105490213A/en
Application granted granted Critical
Publication of CN105490213B publication Critical patent/CN105490213B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses equipment and a method for installing wires of an overhead power transmission line, and belongs to the technical field of cable or electric wire installation. The equipment for installing the wires of the overhead power transmission line comprises an aircraft, a steel wire rope, pulley assemblies, a take-up and payoff device and a wire installation device, wherein the pulley assemblies are installed on a first electric pole and a second electric pole at two ends of a construction area section; the steel wire rope is dragged by the aircraft to bypass the pulley assemblies, and the two ends of the steel wire rope are used for controlling the tensioning force through the take-up and payoff device; and the wire installation device walks along the steel wire rope so as to drag the wires to span the overhead of the complicated construction area section. According to the equipment for installing the wires of the overhead power transmission line disclosed by the invention, the installation of the wires of the overhead power transmission line spanning the complicated area sections such as rivers and mountains is realized, the construction cost is reduced, the work efficiency is improved, the construction period is shortened, and the damages for the wires in the installation process are avoided.

Description

A kind of overhead transmission line conductor erection unit and method
Technical field
The present invention relates to a kind of wire erection unit and method, especially a kind of erection unit and method being applicable to the overhead transmission line conductor crossing over the complex ground such as river, mountain range, belongs to the mounting technique field of cable or electric wire.
Background technology
In overhead transmission line erection process, how realizing crossing over the traction of the complex ground wire such as river, mountain range and installation is one of thorny problem of running into of workmen, because above-mentioned operating environment is severe, difficulty of construction is large, generally need complete by Special lifting device, bring the buying (or lease) of special equipment, transport and in-site installation problem thus, not only increase construction cost, and extend construction period.
Summary of the invention
An object of the present invention is the drawback for prior art, a kind of overhead transmission line conductor erection unit is provided, to realize the installation of the overhead transmission line conductor crossing over the complex ground such as river, mountain range, be intended to reduce construction cost, increase work efficiency, shorten construction period.
Above-mentioned purpose of the present invention is achieved through the following technical solutions:
A kind of overhead transmission line conductor erection unit, comprises aircraft, steel wire rope, pulley assembly, reel and code fixing apparatus; On the first electric pole that described pulley assembly is arranged on construction site two ends and the second electric pole; Described steel wire rope is led around pulley assembly by aircraft, and its two ends control tensioning dynamics by reel; Described code fixing apparatus is walked along steel wire rope, the overhead in traction leads span complicated construction location.
Above-mentioned overhead transmission line conductor erection unit, is also provided with hydrogen balloon, hydrogen balloon releasing device and hydrogen balloon breaker; Described hydrogen balloon is provided with the hook mated with wirerope diameter, setting-in magnet on the inwall of described hook, and hook outer wall applies light sensitive layer.
Above-mentioned overhead transmission line conductor erection unit, one group of photosensitive mark that described hydrogen balloon releasing device comprises the first photoelectric sensor, hydrogen balloon release and arranges on a steel cord, described first photoelectric sensor is arranged on the top of the first electric pole, described hydrogen balloon release is arranged on the first electric pole, is positioned at the below of steel wire rope; Described photosensitive mark keeps at a certain distance away and evenly arranges.
Above-mentioned overhead transmission line conductor erection unit, described hydrogen balloon breaker comprises the second photoelectric sensor and ejecting gun, and described second photoelectric sensor is arranged on the top of the second electric pole, and described ejecting gun is arranged on the second electric pole, is positioned at the below of steel wire rope.
Above-mentioned overhead transmission line conductor erection unit, described code fixing apparatus comprises power wheel unit, supporting roller unit, pull rope and power line; Described power wheel unit is driven by motor, and described motor is communicated with portable power source by power line; Described supporting roller unit bottom is connected with power wheel unit by pull rope, supporting roller unit arranges wire through chamber.
Overhead transmission line conductor erection unit of the present invention crosses over the overhead in complicated construction location by aircraft haulage cable, and make steel wire rope walk around the pulley assembly of the first electric pole and the second electric pole upper end, the take-up and pay-off device arranged by two ends by steel wire tensioning, therefore for code fixing apparatus provides a walking track; Then code fixing apparatus drives pull rope to move on a steel cord, pull rope two ends are separately fixed on the first electric pole and the second electric pole through behind complicated construction location, recycling power line draws wire to be installed and arrives the second electric pole end by the first electric pole end, wire two ends is fixed on wiring place of suspension insulator; Remove steel wire rope, code fixing apparatus and pull rope, complete the installation exercise of wire.As can be seen here, overhead transmission line conductor erection unit of the present invention achieves the installation of the overhead transmission line conductor crossing over the complex ground such as river, mountain range, not only reduce construction cost, improve operating efficiency, shorten construction period, and avoid in installation process damage is caused to wire.
Another object of the present invention is to provide a kind of overhead transmission line conductor installation method, and described wire installation method completes the installation of the overhead transmission line conductor crossing over the complex ground such as river, mountain range by above-mentioned overhead transmission line conductor erection unit.
Above-mentioned purpose of the present invention is achieved through the following technical solutions:
A kind of overhead transmission line conductor installation method, adopts above-mentioned overhead transmission line conductor erection unit, follows these steps to operation:
A, cross over the overhead in complicated construction location by aircraft haulage cable;
B, the reel that arranged by construction site two ends are by steel wire tensioning;
C, by the power wheel cellular installation of code fixing apparatus at steel wire rope first electric pole end, motor drive under along steel wire rope advance, in power wheel unit lower end, pull rope is set;
D, when after power wheel cell moving certain distance, at the first electric pole end, one group of supporting roller unit is installed, described fixing with moving cell lower end and pull rope is assembled, when power wheel cell moving to the second electric pole end, arrange some groups of supporting roller unit on a steel cord, the power line be connected with motor organizes the wire of supporting roller unit through chamber through each;
E, pull rope two ends are separately fixed on the first electric pole and the second electric pole, again power line one end is pulled down from portable power source, and power line is connected with wire to be installed, power line is pulled from the second electric pole, traction wire arrives the second electric pole end by the first electric pole end, wire two ends is fixed on wiring place of suspension insulator;
F, by steel wire rope, power wheel unit, supporting roller unit and pull rope remove, complete the installation exercise of wire.
Above-mentioned overhead transmission line conductor installation method, in a step, collect the photosensitive identification information on steel wire rope when the first photoelectric sensor after, to hydrogen balloon release signal transmission, discharge a hydrogen balloon, its hook inwall magnet and steel wire rope adhesive when hydrogen balloon rises, by hydrogen balloon to steel wire rope applying pulling force upwards.
Above-mentioned overhead transmission line conductor installation method, in a step, when the second photoelectric sensor to collect on hydrogen balloon hook outer wall after light sensitive layer information, to ejecting gun signal transmission, hydrogen balloon breaks up by ejecting gun startup, hydrogen balloon comes off, and after the pulley assembly on the second electric pole walked around by aircraft haulage cable, then the reel arranged by two ends is by steel wire tensioning.
Above-mentioned overhead transmission line conductor installation method, in b step, after steel wire tensioning, breaks up the hydrogen balloon on steel wire rope, hydrogen balloon is come off from steel wire rope.
The beneficial effect of overhead transmission line conductor installation method of the present invention is identical with above-mentioned overhead transmission line conductor erection unit, does not repeat them here.
Accompanying drawing explanation
Fig. 1 is overhead transmission line conductor erection unit schematic diagram of the present invention;
Fig. 2 is the power wheel cellular construction schematic diagram of code fixing apparatus;
Fig. 3 is the supporting roller cellular construction schematic diagram of code fixing apparatus;
Fig. 4 is that overhead, complicated construction location schematic diagram crossed over by aircraft haulage cable;
Fig. 5 is hydrogen balloon structural representation;
Fig. 6 is steel wire tensioning view;
Fig. 7 to Figure 10 is code fixing apparatus course of work schematic diagram;
Fig. 8 is code fixing apparatus course of work schematic diagram (power unit arrives the second electric pole place);
Fig. 9 is code fixing apparatus course of work schematic diagram (wire two ends are fixed on wiring place of suspension insulator).
In figure, each list of reference numerals is: 1, first electric pole, 2, second electric pole, 3, steel wire rope, 3-1, photosensitive mark, 4, pulley assembly, 5, reel, 6, code fixing apparatus, 6-1, power wheel unit, 6-1-1, motor, 6-2, supporting roller unit, 6-2-1, wire is through chamber, 6-3, power line, 7, pull rope, 8, portable power source, 9, aircraft, 10, hydrogen balloon, 10-1, hook, 10-2, magnet, 10-3, light sensitive layer, 11, hydrogen balloon release, 12, first photoelectric sensor, 13, second photoelectric sensor, 14, ejecting gun, 15, wire.
Embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
Referring to Fig. 1, overhead transmission line conductor erection unit of the present invention comprises aircraft 9, steel wire rope 3, pulley assembly 4, reel 5 and code fixing apparatus 6; On the first electric pole 1 that described pulley assembly 4 is arranged on construction site two ends and the second electric pole 2; Described steel wire rope 3 is led around pulley assembly 4 by aircraft 9, and its two ends control tensioning dynamics by reel 5; Described code fixing apparatus 6 is walked along steel wire rope 3, and the overhead in complicated construction location crossed over by traction wire 15.
Referring to Fig. 2, Fig. 3, in overhead transmission line conductor erection unit of the present invention, described code fixing apparatus 6 comprises power wheel unit 6-1, supporting roller unit 6-2, power line 6-3 and pull rope 7; Described power wheel unit 6-1 is driven by motor 6-1-1, and described motor 6-1-1 is communicated with portable power source 8 by power line 6-3; Be connected with power wheel unit 6-1 by pull rope 7 bottom described supporting roller unit 6-2, supporting roller unit 6-2 arrange wire through chamber 6-2-1.
Referring to Fig. 4, Fig. 5, in overhead transmission line conductor erection unit of the present invention, be also provided with hydrogen balloon 10, hydrogen balloon releasing device and hydrogen balloon breaker; Described hydrogen balloon 10 is provided with the hook 10-1 with steel wire rope 3 diameter matches, and setting-in magnet 10-2 on the inwall of described hook 10-1, hook 10-1 outer wall applies light sensitive layer 10-3; One group of photosensitive mark 3-1 that described hydrogen balloon releasing device comprises the first photoelectric sensor 12, hydrogen balloon release 11 and arranges on a steel cord, described first photoelectric sensor 12 is arranged on the top of the first electric pole 1, described hydrogen balloon release 11 is arranged on the first electric pole 1, be positioned at the below of steel wire rope 3, described photosensitive mark 3-1 keeps at a certain distance away and evenly arranges; Described hydrogen balloon breaker comprises the second photoelectric sensor 13 and ejecting gun 14, and described second photoelectric sensor 13 and ejecting gun 14 are installed in the top of the second electric pole 2, are positioned at the below of steel wire rope.
Referring to Fig. 4 to Figure 10, overhead transmission line conductor installation method of the present invention adopts above-mentioned overhead transmission line conductor erection unit, follows these steps to operation:
A, crossed over the overhead in complicated construction location by aircraft 9 haulage cable 3, in the process, collect the photosensitive mark 3-1 information on steel wire rope 3 when the first photoelectric sensor 12 after, to hydrogen balloon release 11 signal transmission, discharge a hydrogen balloon 10, its hook 10-1 inwall magnet 10-2 and steel wire rope 3 adhesive when described hydrogen balloon 10 rises, the pulling force applying upwards by hydrogen balloon 10 pairs of steel wire ropes 3; When after light sensitive layer 10-3 information on the hook 10-1 outer wall that the second photoelectric sensor 13 collects hydrogen balloon 10, to ejecting gun 14 signal transmission, ejecting gun 14 starts and is broken up by hydrogen balloon 10, and hydrogen balloon 10 comes off, and the pulley assembly 4 on the second electric pole 2 walked around by aircraft 9 haulage cable 3.
Hydrogen balloon 10 on steel wire rope 3 by steel wire rope 3 tensioning, then breaks up by b, the reel 5 that arranged by construction site two ends, hydrogen balloon 10 is come off, for code fixing apparatus 6 provides track of walking smoothly from steel wire rope 3;
C, the power wheel unit 6-1 of code fixing apparatus 6 is arranged on steel wire rope first electric pole end, advances along steel wire rope 3 under motor 6-1-1 drives, pull rope 7 is set in power wheel unit 6-1 lower end;
D, after power wheel unit 6-1 moves a certain distance, at the first electric pole end, one group of supporting roller unit 6-2 is installed, described fixing with moving cell 6-2 lower end and pull rope 7 is assembled, when power wheel unit 6-1 moves to the second electric pole end, steel wire rope 3 arranges some groups of supporting roller unit 6-2, and the power line 6-3 be connected with motor 6-1-1 organizes the wire of supporting roller unit 6-2 through chamber 6-2-1 through each;
E, pull rope 7 two ends are separately fixed on the first electric pole 1 and the second electric pole 2, again power line 6-3 one end is pulled down from portable power source 8, and power line 6-3 is connected with wire 15 to be installed, power line 6-3 is pulled from the second electric pole 2, traction wire 15 arrives the second electric pole end by the first electric pole end, wire 15 two ends is fixed on wiring place of suspension insulator;
F, steel wire rope 3, power wheel unit 6-1, supporting roller unit 6-2 and pull rope 7 to be removed, complete the installation exercise of wire.

Claims (9)

1. an overhead transmission line conductor erection unit, is characterized in that, described wire erection unit comprises aircraft (9), steel wire rope (3), pulley assembly (4), reel (5) and code fixing apparatus (6); On the first electric pole (1) that described pulley assembly (4) is arranged on construction site two ends and the second electric pole (2); Described steel wire rope (3) is led around pulley assembly (4) by aircraft (9), and its two ends control tensioning dynamics by reel (5); Described code fixing apparatus (6) is along steel wire rope (3) walking, and the overhead in complicated construction location is crossed in traction wire (15).
2. overhead transmission line conductor erection unit according to claim 1, is characterized in that, described wire erection unit is also provided with hydrogen balloon (10), hydrogen balloon releasing device and hydrogen balloon breaker; Described hydrogen balloon (10) is provided with the hook (10-1) with steel wire rope (3) diameter matches, setting-in magnet (10-2) on the inwall of described hook (10-1), and hook (10-1) outer wall applies light sensitive layer (10-3).
3. overhead transmission line conductor erection unit according to claim 2, it is characterized in that, one group of photosensitive mark (3-1) that described hydrogen balloon releasing device comprises the first photoelectric sensor (12), hydrogen balloon release (11) and arranges on a steel cord, described first photoelectric sensor (12) is arranged on the top of the first electric pole (1), described hydrogen balloon release (11) is arranged on the first electric pole (1), is positioned at the below of steel wire rope (3); Described photosensitive mark (3-1) keeps at a certain distance away and evenly arranges.
4. overhead transmission line conductor erection unit according to claim 3, it is characterized in that, described hydrogen balloon breaker comprises the second photoelectric sensor (13) and ejecting gun (14), described second photoelectric sensor (13) and ejecting gun (14) are installed in the top of the second electric pole (2), are positioned at the below of steel wire rope.
5. overhead transmission line conductor erection unit according to any one of claim 1 to 4, is characterized in that, described code fixing apparatus (6) comprises power wheel unit (6-1), supporting roller unit (6-2), power line (6-3) and pull rope (7); Described power wheel unit (6-1) is driven by motor (6-1-1), and described motor (6-1-1) is communicated with portable power source (8) by power line (6-3); Described supporting roller unit (6-2) bottom is connected with power wheel unit (6-1) by pull rope (7), supporting roller unit (6-2) arranges wire through chamber (6-2-1).
6. an overhead transmission line conductor installation method, is characterized in that, adopts the overhead transmission line conductor erection unit according to any one of claim 1 to 5, follows these steps to operation:
A, cross over the overhead in complicated construction location by aircraft (9) haulage cable (3);
B, the reel (5) that arranged by construction site two ends are by steel wire rope (3) tensioning;
C, the power wheel unit (6-1) of code fixing apparatus (6) is arranged on steel wire rope first electric pole end, advance along steel wire rope (3) under motor (6-1-1) drives, pull rope (7) is set in power wheel unit (6-1) lower end;
D, after power wheel unit (6-1) moves a certain distance, at the first electric pole end, one group of supporting roller unit (6-2) is installed, described fixing with moving cell (6-2) lower end and pull rope (7) is assembled, when power wheel unit (6-1) moves to the second electric pole end, steel wire rope (3) arranges some groups of supporting roller unit (6-2), and the power line (6-3) be connected with motor (6-1-1) organizes the wire of supporting roller unit (6-2) through chamber (6-2-1) through each;
E, pull rope (7) two ends are separately fixed on the first electric pole (1) and the second electric pole (2), again power line (6-3) one end is pulled down from portable power source (8), and power line (6-3) is connected with wire to be installed (15), power line (6-3) is pulled from the second electric pole (2), traction wire (15) arrives the second electric pole end by the first electric pole end, wire (15) two ends is fixed on wiring place of suspension insulator;
F, by steel wire rope (3), power wheel unit (6-1), supporting roller unit (6-2) and pull rope (7) remove, complete the installation exercise of wire.
7. overhead transmission line conductor installation method according to claim 6, it is characterized in that, in a step, collect photosensitive mark (3-1) information on steel wire rope (3) when the first photoelectric sensor (12) after, to hydrogen balloon release (11) signal transmission, discharge a hydrogen balloon (10), its hook (10-1) inwall magnet (10-2) and steel wire rope (3) adhesive when described hydrogen balloon (10) rises, by hydrogen balloon (10) to steel wire rope (3) applying pulling force upwards.
8. overhead transmission line conductor installation method according to claim 6, it is characterized in that, in a step, when after light sensitive layer (10-3) information on hook (10-1) outer wall that the second photoelectric sensor (13) gathers hydrogen balloon (10), to ejecting gun (14) signal transmission, hydrogen balloon (10) breaks up by ejecting gun (14) startup, hydrogen balloon (10) comes off, after the pulley assembly (4) on the second electric pole (2) walked around by aircraft (9) haulage cable (3), then the reel (5) arranged by two ends is by steel wire rope (3) tensioning.
9. overhead transmission line conductor installation method according to claim 6, is characterized in that, in b step, after steel wire rope (3) tensioning, is broken up by the hydrogen balloon (10) on steel wire rope (3), hydrogen balloon (10) is come off from steel wire rope (3).
CN201510950415.XA 2015-12-18 2015-12-18 A kind of overhead transmission line conductor installs device and method Active CN105490213B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510950415.XA CN105490213B (en) 2015-12-18 2015-12-18 A kind of overhead transmission line conductor installs device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510950415.XA CN105490213B (en) 2015-12-18 2015-12-18 A kind of overhead transmission line conductor installs device and method

Publications (2)

Publication Number Publication Date
CN105490213A true CN105490213A (en) 2016-04-13
CN105490213B CN105490213B (en) 2018-01-09

Family

ID=55677034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510950415.XA Active CN105490213B (en) 2015-12-18 2015-12-18 A kind of overhead transmission line conductor installs device and method

Country Status (1)

Country Link
CN (1) CN105490213B (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105866910A (en) * 2016-06-29 2016-08-17 安徽电信工程有限责任公司 Method for laying river-crossing optical cable
CN105866912A (en) * 2016-06-29 2016-08-17 安徽电信工程有限责任公司 Method of laying optical fiber in botanic garden
CN105891988A (en) * 2016-06-29 2016-08-24 安徽电信工程有限责任公司 Method for laying optical fibers in plantation
CN105891993A (en) * 2016-07-05 2016-08-24 安徽电信工程有限责任公司 Method for erecting aerial optical cable
CN105891994A (en) * 2016-07-05 2016-08-24 安徽电信工程有限责任公司 Optical fiber paving method
CN105891990A (en) * 2016-06-29 2016-08-24 安徽电信工程有限责任公司 Method for paving optical fiber in mountain forest
CN105896435A (en) * 2016-05-30 2016-08-24 河南昊方通信工程技术有限公司 Overhead implementation method for communication pipeline
CN105891989A (en) * 2016-06-29 2016-08-24 安徽电信工程有限责任公司 Optical fiber laying method
CN105929514A (en) * 2016-05-31 2016-09-07 河南宏骏通信工程有限公司 Tension control system for optical cable laying
CN106099749A (en) * 2016-07-06 2016-11-09 枣庄力源电力设计有限公司 A kind of for power circuitry engineering construction floatation type actinobacillus device
CN106094149A (en) * 2016-06-29 2016-11-09 安徽电信工程有限责任公司 The device and method that in a kind of mountain forest, optical fiber is laid
CN106094150A (en) * 2016-06-29 2016-11-09 安徽电信工程有限责任公司 A kind of method that cross a river optical fiber is laid
CN106094148A (en) * 2016-06-29 2016-11-09 安徽电信工程有限责任公司 A kind of device in built on stilts optical fiber process of deployment
CN106094151A (en) * 2016-06-29 2016-11-09 安徽电信工程有限责任公司 A kind of Apparatus and method for of optical cable laying in plantation
CN106125244A (en) * 2016-06-29 2016-11-16 安徽电信工程有限责任公司 The device and method that a kind of cross a river optical fiber is laid
CN106961086A (en) * 2017-05-17 2017-07-18 苏州高精特专信息科技有限公司 A kind of electric wire stringing method for messenger stay-supported between mountain top
CN106961085A (en) * 2017-05-17 2017-07-18 国网湖北省电力公司荆门供电公司 A kind of electric wire stringing method being used between mountain top
CN106972415A (en) * 2017-05-17 2017-07-21 苏州高精特专信息科技有限公司 A kind of electric wire stringing method for exchanging stay-supported between mountain top
CN106972416A (en) * 2017-05-17 2017-07-21 国网湖北省电力公司荆门供电公司 A kind of electric wire wire-binding device being used between mountain top
CN107147039A (en) * 2017-07-25 2017-09-08 蒋志斌 Floated Electric wire support lifting device
CN107740628A (en) * 2017-11-14 2018-02-27 佛山杰致信息科技有限公司 A kind of safe electric pole
CN108011203A (en) * 2017-11-01 2018-05-08 王亚苹 A kind of retractable line part of high-voltage line separated time road
CN108258617A (en) * 2018-01-16 2018-07-06 国网新疆电力公司塔城供电公司 A kind of more changing device that formula overhanging golden tool is twisted for transmission line of electricity aerial condutor
CN109449648A (en) * 2018-11-02 2019-03-08 泉州创源机电科技有限公司 A kind of high-altitude wiring device and its mode of connection
CN109904788A (en) * 2019-03-29 2019-06-18 国网河北省电力有限公司沧州供电分公司 Wire replacing method
CN110796935A (en) * 2019-10-13 2020-02-14 国网山东省电力公司莱芜供电公司 Indoor overhead transmission line model
CN111130012A (en) * 2018-08-14 2020-05-08 国网山东省电力公司莒南县供电公司 Method for preventing high-voltage line from falling
CN113629639A (en) * 2021-10-12 2021-11-09 江苏昕讯线缆科技有限公司 Cable support capable of resisting impact of atmospheric air flow

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS573508A (en) * 1980-06-09 1982-01-09 Fujimoto Jinpei Method of laying string by balloon
JPS6115505A (en) * 1984-06-29 1986-01-23 昭和電線電纜株式会社 Method of extending aerial transmission line
CN101789569A (en) * 2010-03-19 2010-07-28 江苏省送变电公司 Construction method of unfolding preliminary leading rope with remotely pilotless helicopter
CN104134950A (en) * 2014-07-28 2014-11-05 国家电网公司 Method for releasing guide rope of aircraft
CN104682268A (en) * 2013-11-26 2015-06-03 国网江西省电力公司经济技术研究院 Method for constructing compact double-loop overhead line by adoption of flying powered parachute
CN105162034A (en) * 2015-09-10 2015-12-16 国家电网公司 Lead removing and changing device for overhead transmission line
CN205429584U (en) * 2015-12-18 2016-08-03 国家电网公司 Overhead transmission line cable mounting equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS573508A (en) * 1980-06-09 1982-01-09 Fujimoto Jinpei Method of laying string by balloon
JPS6115505A (en) * 1984-06-29 1986-01-23 昭和電線電纜株式会社 Method of extending aerial transmission line
CN101789569A (en) * 2010-03-19 2010-07-28 江苏省送变电公司 Construction method of unfolding preliminary leading rope with remotely pilotless helicopter
CN104682268A (en) * 2013-11-26 2015-06-03 国网江西省电力公司经济技术研究院 Method for constructing compact double-loop overhead line by adoption of flying powered parachute
CN104134950A (en) * 2014-07-28 2014-11-05 国家电网公司 Method for releasing guide rope of aircraft
CN105162034A (en) * 2015-09-10 2015-12-16 国家电网公司 Lead removing and changing device for overhead transmission line
CN205429584U (en) * 2015-12-18 2016-08-03 国家电网公司 Overhead transmission line cable mounting equipment

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105896435A (en) * 2016-05-30 2016-08-24 河南昊方通信工程技术有限公司 Overhead implementation method for communication pipeline
CN105896435B (en) * 2016-05-30 2018-09-21 福建泉州远方致远自动化科技有限公司 A kind of aerial implementation of communication pipe
CN105929514A (en) * 2016-05-31 2016-09-07 河南宏骏通信工程有限公司 Tension control system for optical cable laying
CN106094148A (en) * 2016-06-29 2016-11-09 安徽电信工程有限责任公司 A kind of device in built on stilts optical fiber process of deployment
CN105891990A (en) * 2016-06-29 2016-08-24 安徽电信工程有限责任公司 Method for paving optical fiber in mountain forest
CN105891989A (en) * 2016-06-29 2016-08-24 安徽电信工程有限责任公司 Optical fiber laying method
CN105891988A (en) * 2016-06-29 2016-08-24 安徽电信工程有限责任公司 Method for laying optical fibers in plantation
CN106094149A (en) * 2016-06-29 2016-11-09 安徽电信工程有限责任公司 The device and method that in a kind of mountain forest, optical fiber is laid
CN106094150A (en) * 2016-06-29 2016-11-09 安徽电信工程有限责任公司 A kind of method that cross a river optical fiber is laid
CN105866910A (en) * 2016-06-29 2016-08-17 安徽电信工程有限责任公司 Method for laying river-crossing optical cable
CN106094151A (en) * 2016-06-29 2016-11-09 安徽电信工程有限责任公司 A kind of Apparatus and method for of optical cable laying in plantation
CN106125244A (en) * 2016-06-29 2016-11-16 安徽电信工程有限责任公司 The device and method that a kind of cross a river optical fiber is laid
CN105866912A (en) * 2016-06-29 2016-08-17 安徽电信工程有限责任公司 Method of laying optical fiber in botanic garden
CN105891994A (en) * 2016-07-05 2016-08-24 安徽电信工程有限责任公司 Optical fiber paving method
CN105891993A (en) * 2016-07-05 2016-08-24 安徽电信工程有限责任公司 Method for erecting aerial optical cable
CN106099749A (en) * 2016-07-06 2016-11-09 枣庄力源电力设计有限公司 A kind of for power circuitry engineering construction floatation type actinobacillus device
CN106972416A (en) * 2017-05-17 2017-07-21 国网湖北省电力公司荆门供电公司 A kind of electric wire wire-binding device being used between mountain top
WO2018210011A1 (en) * 2017-05-17 2018-11-22 苏州中顺瑞泰汽车检具有限公司 Method employing cord and cable driving mechanisms to perform electric cable installation between mountain tops
CN106961085A (en) * 2017-05-17 2017-07-18 国网湖北省电力公司荆门供电公司 A kind of electric wire stringing method being used between mountain top
CN107834439A (en) * 2017-05-17 2018-03-23 尚宇新 The electric wire stringing method of messenger bracing wire is used between a kind of mountain top
CN106961085B (en) * 2017-05-17 2018-04-13 国网湖北省电力有限公司荆门供电公司 A kind of electric wire stringing method being used between mountain top
CN106972416B (en) * 2017-05-17 2018-04-17 国网湖北省电力有限公司荆门供电公司 A kind of electric wire wire-binding device being used between mountain top
CN106972415A (en) * 2017-05-17 2017-07-21 苏州高精特专信息科技有限公司 A kind of electric wire stringing method for exchanging stay-supported between mountain top
CN106961086A (en) * 2017-05-17 2017-07-18 苏州高精特专信息科技有限公司 A kind of electric wire stringing method for messenger stay-supported between mountain top
CN107147039A (en) * 2017-07-25 2017-09-08 蒋志斌 Floated Electric wire support lifting device
CN107147039B (en) * 2017-07-25 2018-09-28 黄成勇 Floated Electric wire support lifting device
CN108011203A (en) * 2017-11-01 2018-05-08 王亚苹 A kind of retractable line part of high-voltage line separated time road
CN107740628A (en) * 2017-11-14 2018-02-27 佛山杰致信息科技有限公司 A kind of safe electric pole
CN108258617A (en) * 2018-01-16 2018-07-06 国网新疆电力公司塔城供电公司 A kind of more changing device that formula overhanging golden tool is twisted for transmission line of electricity aerial condutor
CN111130012A (en) * 2018-08-14 2020-05-08 国网山东省电力公司莒南县供电公司 Method for preventing high-voltage line from falling
CN109449648A (en) * 2018-11-02 2019-03-08 泉州创源机电科技有限公司 A kind of high-altitude wiring device and its mode of connection
CN109904788A (en) * 2019-03-29 2019-06-18 国网河北省电力有限公司沧州供电分公司 Wire replacing method
CN109904788B (en) * 2019-03-29 2020-11-17 国网河北省电力有限公司沧州供电分公司 Wire replacement method
CN110796935A (en) * 2019-10-13 2020-02-14 国网山东省电力公司莱芜供电公司 Indoor overhead transmission line model
CN113629639A (en) * 2021-10-12 2021-11-09 江苏昕讯线缆科技有限公司 Cable support capable of resisting impact of atmospheric air flow
CN113629639B (en) * 2021-10-12 2021-12-17 江苏昕讯线缆科技有限公司 Cable support capable of resisting impact of atmospheric air flow

Also Published As

Publication number Publication date
CN105490213B (en) 2018-01-09

Similar Documents

Publication Publication Date Title
CN105490213A (en) Equipment and method for installing wires of overhead power transmission line
CN205429584U (en) Overhead transmission line cable mounting equipment
CN102942067B (en) Belt installing method and changing method of belt conveyor and installing or changing system thereof
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN103441451B (en) A kind of overhead transmission line crosses over wire laying device
CN102761083A (en) Arrangement and method for installing cables
CN103390869B (en) A kind of high-tension cable repairing crossing frame
CN101707335A (en) Large cable laying device
CN204190260U (en) A kind of high pressure power transmission and distribution cable sets up facility across road
CN201215595Y (en) Remote controlled electric trolley for installing special optical cable on electric line
CN103708371B (en) The Huan Sheng mechanism that rope drives
CN204732114U (en) A kind of up-down billboard
CN107238907A (en) Aerial optical cable laying system and aerial optical cable laying method
JP3692409B2 (en) Overhead wire transfer method and transfer device
CN105826891A (en) Wire deicing device
CN207375527U (en) One kind smashes stove vehicle cable reel installation
CN203612868U (en) Cable-driven rope exchange mechanism
CN103048759A (en) Paying-off robot and application thereof on erecting optical cables on 110kV circuit
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN114901943B (en) Installing cables and other components in a wind turbine tower
CN107555266A (en) One kind smashes stove car cable reel installation
CN102416885A (en) One-time erecting construction method for electrified railway reformed contact network bearing lead
CN103683132B (en) The damaged insulating barrier restorative procedure of transmission pressure
CN206892421U (en) Aerial optical cable laying system
CN107840211B (en) Data line wiring device and method for FAST cable network structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant