CN106094149A - The device and method that in a kind of mountain forest, optical fiber is laid - Google Patents
The device and method that in a kind of mountain forest, optical fiber is laid Download PDFInfo
- Publication number
- CN106094149A CN106094149A CN201610484910.0A CN201610484910A CN106094149A CN 106094149 A CN106094149 A CN 106094149A CN 201610484910 A CN201610484910 A CN 201610484910A CN 106094149 A CN106094149 A CN 106094149A
- Authority
- CN
- China
- Prior art keywords
- optical fiber
- mountain forest
- laid
- load
- intelligent flight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G02—OPTICS
- G02B—OPTICAL ELEMENTS, SYSTEMS OR APPARATUS
- G02B6/00—Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
- G02B6/46—Processes or apparatus adapted for installing or repairing optical fibres or optical cables
- G02B6/48—Overhead installation
Abstract
The invention provides the device and method that in a kind of mountain forest, optical fiber is laid, described device includes Intelligent flight device, sea fishline, load-bearing wires, nylon rope, fixing device, optical fibre reel, in mountain forest, in optical fiber process of deployment, Intelligent flight device is connected with one end of sea fishline, from the first optical fiber mount point, fly to the second optical fiber mount point, the other end of sea fishline and one end of a load-bearing wires are connected, and by traction, are fixed at steel wire two ends at two optical fiber mount points;Same Intelligent flight device connects nylon wire one end and flies to opposite mount point, and the nylon wire other end connects optical fiber one end, by applying pulling force, optical fiber one end is drawn to opposite mount point, then fix optical fiber laying by two ends.Described laying method simple and fast, it is to avoid traditional cut green grass or young crops when laying, substantially increases construction speed, the most cost-effective, and the most time-consuming and labour force has higher using value and application prospect.
Description
Technical field
The present invention relates to the device and method that in a kind of mountain forest, optical fiber is laid.
Background technology
Optical fiber telecommunications system is with light as carrier wave, utilizes the glass-pulling of very high purity to become superfine optical fibers as biography
Defeated medium, by light-to-current inversion, uses up the communication system of the information of transmission.At full speed along with Internet business and communication industry
Development, the information-based development giving world production power and human society brings promotion greatly.Fiber optic communication is as informationalized
One of major technique pillar, will become 21 century most important strategic industry.
Optical fiber is fibre-optic abbreviation.From principle, the base substance key element constituting fiber optic communication is optical fiber, light
Source and photodetector.Optical fiber is in addition to classifying by manufacturing process, material composition and optical characteristics, in the application, and optical fiber
Often classify by purposes, optical fiber communication and sensing optical fiber can be divided into.Transmission medium optical fiber is divided into again general with special two
Kind, functional device optical fiber then refers to for completing the functions such as the amplification of light wave, shaping, frequency dividing, frequency multiplication, modulation and light generation
Optical fiber, and often occur with the form of certain functional device.
Along with the fast development of optoelectronic information, more and more to information transmission application, the application of optical fiber is more universal, mountain area
Laying optical fiber cable and there is certain difficulty, mountain forest mountain area kind is implanted with substantial amounts of trees, and landform is dangerously steep, wants to set up optical fiber light
Cable, trees along the line must be cut down i.e. cuts green grass or young crops, otherwise cannot fiber plant, therefore, set up optical fiber not only this kind of landform
Green grass or young crops cut by needs, wastes national resources, and there is serious manpower loss and potential safety hazard, therefore finds one safely, conveniently
Lay the method for optical fiber or a kind of Intelligent Installation device has higher social meaning.
Summary of the invention
For the problems referred to above of existence of the prior art, the present invention provides the device and side that in a kind of mountain forest, optical fiber is laid
Method, assisted the optical fiber in continuous mountain forest or Duo Shu area to lay by Intelligent flight device, it is to avoid traditional cutting when laying
Green grass or young crops, substantially increases construction speed, reduces potential safety hazard.
The present invention solves technical problem and adopts the following technical scheme that
The present invention relates to the device that in a kind of mountain forest, optical fiber is laid, described device includes Intelligent flight device, sea fishline, carrying steel
Silk, nylon rope, fixing device, optical fibre reel, described Intelligent flight device with sea fishline be connected, described Intelligent flight device also with Buddhist nun
Dragon rope connects, and described load-bearing wires is fixed between two optical fiber mount points by sea fishline traction, and described fixing device is arranged on
On load-bearing wires, and it is connected with nylon rope and optical fiber respectively.
Preferably, described Intelligent flight device is four rotor unmanned aircrafts, and described Intelligent flight device bottom is provided with installing hole
Position.
Preferably, described fixing device is a collar fixture, is connected with at nylon wire and optical fiber interface respectively, described
Collar fixture can slide by non-resistance on load-bearing wires
The invention still further relates to a kind of method that in mountain forest, optical fiber is laid, described method comprises the steps: consolidating of (1) load-bearing wires
Fixed traction;(2) traction of optical fiber draught line nylon wire.
Preferably, the step of described (1) including: connected one end of sea fishline by Intelligent flight device, from the first optical fiber peace
Decorate, the second optical fiber mount point of flying to;The other end of sea fishline connects load-bearing wires, and staff will be held by traction sea fishline
The one end carrying steel wire is drawn to opposite, and the two ends of load-bearing wires are fixed at two optical fiber mount points by two sides staff respectively.
Preferably, the step of described (2) including: one end of nylon rope connects Intelligent flight device, the other end and the one of optical fiber
End is connected, and Intelligent flight device is from the first optical fiber mount point, and the second optical fiber mount point of flying to, staff will by traction nylon wire
One end of optical fiber is drawn to opposite, and the two ends of optical fiber are fixed by two ends staff respectively, completes to lay.
Preferably, the length of described nylon wire is more than the distance between two optical fiber mount points.
Preferably, described optical fiber mount point is arranged in mountain forest at higher point.
Compared with prior art, the present invention has a following beneficial effect:
The device and method that in a kind of mountain forest of the present invention, optical fiber is laid, has assisted continuous mountain by Intelligent flight device
The optical fiber in woods or Duo Shu area is laid, simple and fast, it is to avoid traditional cut green grass or young crops when laying, and reduces danger, is greatly improved
Construction speed, the most cost-effective, the most time-consuming and labour force, there is higher using value and application prospect.
Accompanying drawing explanation
By the detailed description non-limiting example made with reference to the following drawings of reading, the further feature of the present invention,
Purpose and advantage will become more apparent upon:
Fig. 1 is intelligent apparatus figure of the present invention;
Fig. 2 is that optical fiber of the present invention draws schematic diagram.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is expanded on further.These embodiments are merely to illustrate the present invention and need not
In limiting the scope of the present invention.
The present embodiment relates to the device and method that in a kind of mountain forest, optical fiber is laid;
As depicted in figs. 1 and 2, in a kind of mountain forest of the preferred embodiment of the present invention optical fiber lay device and method, described in include
Intelligent flight device 1, sea fishline 2, load-bearing wires 3, nylon rope 4, fixing device 5, optical fibre reel 6, described Intelligent flight device 1 is
Four rotor unmanned aircrafts, described Intelligent flight device 1 bottom is provided with mounting hole site 1 ', and described Intelligent flight device 1 is with sea fishline 2 even
Connecing, described Intelligent flight device 1 is also connected with nylon rope 4, and described load-bearing wires 3 is fixed on two optical fiber by sea fishline 2 traction pacifies
Between decorateeing, described fixing device 5 is arranged on load-bearing wires 3, and is connected with nylon rope 4 and optical fiber respectively.
Described load-bearing wires is provided with a collar fixture 5, is connected with at nylon rope 4 and optical fiber interface respectively, ring-type
Fixing device 5 can be slided on load-bearing wires 3.
Described Intelligent flight device 1 is mainly used in following two aspects in mountain forest optical fiber process of deployment:
(1) fixed traction of load-bearing wires: connected one end of sea fishline 2 by Intelligent flight device 1, from the first optical fiber mount point 7,
Fly to the second optical fiber mount point 8;The other end of sea fishline 2 connects load-bearing wires 3, and staff will be held by traction sea fishline 2
The one end carrying steel wire 3 is drawn to mountain forest opposite 8, and the two ends of load-bearing wires 3 are fixed on two optical fiber peaces by two ends staff respectively
Decorate place;
(2) traction of optical fiber draught line nylon wire: one end of nylon rope 4 connects one end of Intelligent flight device 1, the other end and optical fiber
Being connected, Intelligent flight device 1 is from the first optical fiber mount point 7, and the second optical fiber mount point 8 of flying to, staff is by traction nylon rope 4
Being launched from optical fibre reel 6 by optical fiber and draw to mountain forest opposite 8, the two ends of optical fiber are fixed on by two ends staff respectively
At two optical fiber mount points, complete to lay, as shown in Figure 2.
The length of described nylon rope 4 is more than the distance between two optical fiber mount points, and described optical fiber mount point is arranged on mountain forest
At middle higher point.
Described Intelligent flight device 1 flies in lower wind direction.
The device and method that in a kind of mountain forest provided by the present invention, optical fiber is laid, has been assisted even by Intelligent flight device
The optical fiber in ideotype mountain forest or Duo Shu area is laid, simple and fast, it is to avoid traditional cut green grass or young crops when laying, and reduces danger, greatly
Improve greatly construction speed, the most cost-effective, the most time-consuming and labour force, there is higher using value and application prospect.
Above the specific embodiment of the present invention is described.It is to be appreciated that the invention is not limited in above-mentioned
Particular implementation, those skilled in the art can make various deformation or amendment within the scope of the claims, this not shadow
Ring the flesh and blood of the present invention.
Claims (8)
1. the device that in a mountain forest, optical fiber is laid, it is characterised in that: described device includes Intelligent flight device, sea fishline, carrying
Steel wire, nylon rope, fixing device, optical fibre reel, described Intelligent flight device with sea fishline be connected, described Intelligent flight device also with
Nylon rope connects, and described load-bearing wires is fixed between two optical fiber mount points by sea fishline traction, and described fixing device is installed
On load-bearing wires, and it is connected with nylon rope and optical fiber respectively.
The device that in mountain forest the most according to claim 1, optical fiber is laid, it is characterised in that: described Intelligent flight device is four rotations
Wing unmanned vehicle, described Intelligent flight device bottom is provided with mounting hole site.
The device that in mountain forest the most according to claim 1, optical fiber is laid, it is characterised in that: described fixing device is one ring-type
Fixing device, is connected with at nylon wire and optical fiber interface respectively, and described collar fixture can be slided by non-resistance on load-bearing wires
Dynamic.
4. the method laid according to optical fiber in the mountain forest described in any one of claim 1 ~ 3, it is characterised in that: described method
Comprise the steps: the fixed traction of (1) load-bearing wires;(2) traction of optical fiber draught line nylon wire.
The method that in mountain forest the most according to claim 4, optical fiber is laid, it is characterised in that: the step of described (1) including: logical
Cross Intelligent flight device and connect one end of sea fishline, from the first optical fiber mount point, the second optical fiber mount point of flying to;Sea fishline another
End connects load-bearing wires, and one end of load-bearing wires is drawn to opposite by staff by traction sea fishline, two sides staff
Respectively the two ends of load-bearing wires are fixed at two optical fiber mount points.
The method that in mountain forest the most according to claim 4, optical fiber is laid, it is characterised in that: the step of described (2) including: Buddhist nun
One end of dragon rope connects Intelligent flight device, and the other end is connected with one end of optical fiber, and Intelligent flight device, from the first optical fiber mount point, flies
Toward the second optical fiber mount point, one end of optical fiber is drawn to opposite by staff by traction nylon wire, and two ends staff divide
The two ends of optical fiber are not fixed, complete to lay.
The method that in mountain forest the most according to claim 4, optical fiber is laid, it is characterised in that: the length of described nylon wire is more than
Distance between two optical fiber mount points.
The method that in mountain forest the most according to claim 4, optical fiber is laid, it is characterised in that: described optical fiber mount point is arranged on
In mountain forest at higher point.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610484910.0A CN106094149A (en) | 2016-06-29 | 2016-06-29 | The device and method that in a kind of mountain forest, optical fiber is laid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610484910.0A CN106094149A (en) | 2016-06-29 | 2016-06-29 | The device and method that in a kind of mountain forest, optical fiber is laid |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106094149A true CN106094149A (en) | 2016-11-09 |
Family
ID=57215453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610484910.0A Withdrawn CN106094149A (en) | 2016-06-29 | 2016-06-29 | The device and method that in a kind of mountain forest, optical fiber is laid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106094149A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201229429Y (en) * | 2008-07-11 | 2009-04-29 | 付胜利 | Optical cable laying device |
CN102064493A (en) * | 2010-11-02 | 2011-05-18 | 北京交通大学 | Method for paying off overhead transmission line by unmanned helicopter |
CN203688889U (en) * | 2014-01-21 | 2014-07-02 | 河北昌通通信工程有限公司 | Common optical cable electrical laying apparatus |
CN105256724A (en) * | 2015-09-28 | 2016-01-20 | 中交二公局第二工程有限公司 | Method of drawing pilot rope by unmanned aerial vehicle for river-crossing construction |
CN105490213A (en) * | 2015-12-18 | 2016-04-13 | 国家电网公司 | Equipment and method for installing wires of overhead power transmission line |
-
2016
- 2016-06-29 CN CN201610484910.0A patent/CN106094149A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201229429Y (en) * | 2008-07-11 | 2009-04-29 | 付胜利 | Optical cable laying device |
CN102064493A (en) * | 2010-11-02 | 2011-05-18 | 北京交通大学 | Method for paying off overhead transmission line by unmanned helicopter |
CN203688889U (en) * | 2014-01-21 | 2014-07-02 | 河北昌通通信工程有限公司 | Common optical cable electrical laying apparatus |
CN105256724A (en) * | 2015-09-28 | 2016-01-20 | 中交二公局第二工程有限公司 | Method of drawing pilot rope by unmanned aerial vehicle for river-crossing construction |
CN105490213A (en) * | 2015-12-18 | 2016-04-13 | 国家电网公司 | Equipment and method for installing wires of overhead power transmission line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105891993A (en) | Method for erecting aerial optical cable | |
CN106094149A (en) | The device and method that in a kind of mountain forest, optical fiber is laid | |
CN105866910A (en) | Method for laying river-crossing optical cable | |
CN105891989A (en) | Optical fiber laying method | |
CN205539627U (en) | Can improve cable configuration that receives force intensity | |
CN106094151A (en) | A kind of Apparatus and method for of optical cable laying in plantation | |
CN105891994A (en) | Optical fiber paving method | |
CN105891990A (en) | Method for paving optical fiber in mountain forest | |
CN105866912A (en) | Method of laying optical fiber in botanic garden | |
CN106125244A (en) | The device and method that a kind of cross a river optical fiber is laid | |
CN106185667A (en) | A kind of communication iron tower installs equipment and application | |
CN105891988A (en) | Method for laying optical fibers in plantation | |
CN105905551A (en) | Device for transporting optical cable | |
CN106094148A (en) | A kind of device in built on stilts optical fiber process of deployment | |
CN106094150A (en) | A kind of method that cross a river optical fiber is laid | |
CN105891992A (en) | Optical fiber mounting and fixing device | |
CN205005622U (en) | Branch draws a device | |
CN103513363A (en) | Air-blown optical cable without central reinforcement member | |
CN204556932U (en) | A kind of rodent-resistant cable | |
CN206321846U (en) | The device that optical fiber tangles is prevented in a kind of aerial optical cable laying | |
CN208459651U (en) | A kind of optical fiber head structure with well | |
CN208616198U (en) | A kind of unmanned plane cross a river cable-laying device | |
CN206225051U (en) | A kind of cable with rfid card | |
CN205581354U (en) | Novel bull optic fibre | |
CN204028420U (en) | There is the inside cable of plastic optical fiber mark |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20161109 |
|
WW01 | Invention patent application withdrawn after publication |