CN101707335A - Large cable laying device - Google Patents

Large cable laying device Download PDF

Info

Publication number
CN101707335A
CN101707335A CN200910212285A CN200910212285A CN101707335A CN 101707335 A CN101707335 A CN 101707335A CN 200910212285 A CN200910212285 A CN 200910212285A CN 200910212285 A CN200910212285 A CN 200910212285A CN 101707335 A CN101707335 A CN 101707335A
Authority
CN
China
Prior art keywords
cable
cable laying
laying device
pay
large cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910212285A
Other languages
Chinese (zh)
Inventor
王桂生
连献功
张宏博
王敏生
贾新刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Xinxing Ductile Iron Pipes Co Ltd
Original Assignee
Wuhu Xinxing Ductile Iron Pipes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Xinxing Ductile Iron Pipes Co Ltd filed Critical Wuhu Xinxing Ductile Iron Pipes Co Ltd
Priority to CN200910212285A priority Critical patent/CN101707335A/en
Publication of CN101707335A publication Critical patent/CN101707335A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a large cable laying device which comprises a pay-off reel (2). The large cable laying device is provided with a pay-off rack (1), and the center of the pay-off reel (2) is provided with a roller (5), wherein the roller (5) is coincident with the axis of the pay-off reel (2), and both ends of the roller (5) extend out from both end faces of the pay-off reel (2) and are supported on a vertical clamping groove of the pay-off rack (1). By adopting the technical scheme, the cable laying construction process is improved, thereby improving the cable laying speed and quality, slipping the leash caused by adopting a crane to match and lay cables, guaranteeing the safety of constructors and reducing the construction cost.

Description

Large cable laying device
Technical field
The invention belongs to the power construction apparatus technology, relate to the construction technique and the equipment thereof of cable laying, more particularly, the present invention relates to a kind of large cable laying device.
Background technology
All the time, cable protection is a great problem of electric engineering construction during the laying and lay of big model cable, and subject matter is:
The first, big cable is very heavy, and whole dish weighs more than ten ton, must cooperate and could construct by crane when laying, and whether the cooperation of machinery is restricting construction schedule;
The second, because the cable deal is heavy, need great amount of manpower when laying.As lay one 185 cable, and with per 5 meters 1 people,, need people more than 40 usually with 200 meters calculating of a cable, if lay in the high-altitude, personnel can be more, labour cost consumption is big, also has many hidden danger on the safety;
The 3rd, the high-altitude cabling is wayward, and insulating barrier subjects to damage, and the cable laying quality descends.
Summary of the invention
Problem to be solved by this invention provides a kind of large cable laying device, its objective is to improve cable laying speed and laying quality.
To achieve these goals, the technical scheme taked of the present invention is:
Large cable laying device provided by the present invention, comprise draw drum, described large cable laying device is established pay off rack, roller bearing is established at the center of described draw drum, the dead in line of described roller bearing and draw drum, and the two ends of described roller bearing are stretched out and are bearing on the vertical draw-in groove of described pay off rack from the both ends of the surface of described draw drum.
Described pay off rack is two of symmetry, is located at respectively outside the both ends of the surface of described draw drum.
Establish jack on the described pay off rack, the piston rod supporting of the two ends of described roller bearing by described jack, and the piston rod of described jack stretch out direction for up with the direction of described roller bearing jack-up.
Described large cable laying device is established setting reeler, and described setting reeler is fixed on the cable testing bridge by rolling stand, and cable slides on the outer round surface of described setting reeler.
The turning of described cable testing bridge, if fourfold block, the periphery of the four rolling of described fourfold block are the curved surface of mid diameter less than the two ends diameter, described four rolling parallel axes distributes, the outer round surface of described roller constitutes cable passage, and described cable passes from cable passage.
Described large cable laying device is established the cable pulling net, and described cable pulling net and described cable ends are fixed.
Described large cable laying device is established hoist engine, and the steel wire rope head of described hoist engine is connected with described cable pulling net.
Described large cable laying device is established frequency converter, and described frequency converter is used to control the motor of hoist engine.
The present invention adopts technique scheme, realizes the improvement to the cable laying construction technology, has improved cable laying speed, has improved laying quality, has broken away from owing to adopt the constraint of crane cooperation cabling, guarantees workmen's safety, reduces construction cost.
Description of drawings
Below expressed content of each width of cloth accompanying drawing of this specification and the mark among the figure are made brief description:
Fig. 1 is the draw drum among the present invention and the structural representation of pay off rack;
Fig. 2 is the structural representation of the fourfold block among the present invention;
Fig. 3 is the structural representation of the setting reeler among the present invention;
Fig. 4 is the structural representation of the wire-unfolding rack among the present invention.
Be labeled as among the figure:
1, pay off rack, 2, draw drum, 3, setting reeler, 4, fourfold block, 5, roller bearing, 6, jack, 7, rolling stand, 8, cable testing bridge,
Embodiment
Contrast accompanying drawing below, by description to embodiment, to effect and operation principle, the manufacturing process of the mutual alignment between the shape of the specific embodiment of the present invention such as related each member, structure, the each several part and annexation, each several part and manipulate method etc., be described in further detail, inventive concept of the present invention, technical scheme had more complete, accurate and deep understanding to help those skilled in the art.
The of the present invention structure expressed as Fig. 1 to Fig. 4, the present invention is a kind of large cable laying device, comprises draw drum 2.Cable winding is on draw drum 2.
One, in order to solve the problem that exists at the described present known technology of this specification background technology part and to overcome its defective, realization is to the improvement of cable laying construction technology, improve cable laying speed, improve laying quality, break away from constraint that crane cooperates cabling, guarantee the workmen safely, the goal of the invention that reduces cost, the key of the concrete technical scheme of employing is:
Large cable laying device provided by the present invention, described large cable laying device is established pay off rack 1, roller bearing 5 is established at the center of described draw drum 2, the dead in line of described roller bearing 5 and draw drum 2, and the two ends of described roller bearing 5 are stretched out and are bearing on the vertical draw-in groove of described pay off rack 1 from the both ends of the surface of described draw drum 2.
Described roller bearing 5 is bearing on the pay off rack 1, and roller bearing 5 contacts with the draw-in groove of pay off rack 1 both sides, and roller bearing 5 can rotate in the pay off rack draw-in groove.
Draw drum 2 rises to certain altitude at pay off rack 1 with roller bearing 5, and behind the draw drum 2 built on stilts certain altitudes, draw drum 2 can 360 ° of rotations on roller bearing 5.
Because adopted pay off rack 1 supporting, fixing draw drum 2, draw drum 2 can be unsettled, makes things convenient for it to rotate freely, and carries out unwrapping wire, effectively resistance is laid in minimizing.
Two, pay off rack is for being symmetrical arranged:
Above-described pay off rack 1 is two of symmetry, is located at respectively outside the both ends of the surface of described draw drum 2.Described pay off rack 1 is used for fixing draw drum 2.
Because the two ends of roller bearing 5 all need supporting, like this could be steady, thus adopt two pay off racks 1 that are symmetrically distributed, and the installation of draw drum 2 also is convenient in 1 two distributions of pay off rack.
Roller bearing 5 relies on the jack vertical lifting to rise with draw-in groove, make draw drum 2 break away from ground, cable is easy to draw from draw drum 2 and delivers to the job location like this. by the structure of pay off rack, do not need crane to cooperate, manually can independently construct, process is convenient to control, and reaches the effect that reduces the mechanical stage student contributions pooled to pay for class activities.
Three, the climbing structure of draw drum 2:
Establish jack 6 on the pay off rack 1 of the present invention, the piston rod supporting of the two ends of described roller bearing 5 by described jack 6, and the piston rod of described jack 6 stretch out direction for up with the direction of described roller bearing 5 jack-up.
Described roller bearing 5 relies on jack 6 vertical lifting to rise with draw-in groove, makes draw drum 2 break away from ground.
Four, setting reeler structure:
As shown in Figure 3 and Figure 4, large cable laying device of the present invention is established setting reeler 3, and described setting reeler 3 is fixed on the cable testing bridge 8 by rolling stand 7, and cable slides on the outer round surface of described setting reeler 3.
Cable lays on cable testing bridge 8 by setting reeler 3.Setting reeler 3 is used for the rolling friction replacement cable of cable and cylinder and the sliding friction of crane span structure, effectively reduces and lays resistance.Setting reeler 3 relies on rolling stand 7 to be fixed on the cable testing bridge 8, and cable travels forward on setting reeler 3, replaces the sliding friction of prior cable and crane span structure with the rolling friction of cable and cylinder 3.
With the rolling friction replacement cable of cable and cylinder and the sliding friction of crane span structure, reduce and lay resistance, guarantee laying quality.Each cylinder can reach the effect that replaces a people.185 cables with one 200 meters long are example, just can construct about 20 people, reach the damage of avoiding cable insulation, the effect that reduces labour cost and raising job safety hidden danger.
Five, fourfold block structure:
As shown in Figure 2, the turning of cable testing bridge 8 of the present invention, if fourfold block 4, the periphery of the four rolling of described fourfold block 4 is the curved surface of mid diameter less than the two ends diameter, described four rolling parallel axes distributes, the outer round surface of described roller constitutes cable passage, and described cable passes from cable passage.
Above-described fourfold block 4 is positioned at cable testing bridge 8 turnings, and the cable turning changes direction by fourfold block 4.So fourfold block 4 changes cable and is laying direction of travel, plays the effect that cable is turned flexibly and protected the cable insulation skin.
Six, cable pulling nets structure:
Large cable laying device of the present invention is established the cable pulling net, and described cable pulling net and described cable ends are fixed.
Cable links with hoisting rope by the cable pulling net; The cable pulling net is enclosed within cable end, trailing cable.The cable pulling net is connected with elevator.
Described cable pulling net is enclosed within cable end, and hoisting rope is connected with the traction net more then, is convenient to the elevator trailing cable like this.
Seven, the actuating unit of cable pulling:
Large cable laying device of the present invention is established hoist engine, and the steel wire rope head of described hoist engine is connected with described cable pulling net.
The hoist engine steel wire rope head is connected with the cable pulling net, and cable laying tractive effort is provided.
Described employing elevator replaces the power of artificial cabling, and people's task difficulty reduces greatly thus, and the cabling personnel can be not overtired, and coefficient of safety improves greatly, and efficiency of construction also increases exponentially.It is good just passable that the workmen need only tens meter amperes arranges a personal monitoring.
Eight, the control system of large cable laying device:
Large cable laying device of the present invention is established frequency converter, and described frequency converter is used to control the motor of hoist engine.
Frequency converter is used to control the elevator motor, with frequency converter elevator is carried out the speed of travel that speed governing reaches effective control cable.
The utilization of described frequency converter, mainly be to consider the core of large cable laying device is how to control the speed of elevator, directly say to be exactly the speed of travel of control cable on crane span structure, because cable is very big very heavy, if speed can not effectively be controlled, just in case cable blocks in the crane span structure somewhere, must cause the generation of accident.With frequency converter timing in range of motor speeds any one speed we can both be transferred to; and frequency converter self-protection function is very strong; sensitivity is also very high; the excessive frequency converter of line current outage automatically when running into the stuck phenomenon motor rotation blockage; and can accomplish to want to stop just stopping; think to think slowly just slowly, and also have the rotating function soon just soon.Therefore the problem of all solutions has just all solved.
In conjunction with the accompanying drawings the present invention has been carried out exemplary description above; obviously specific implementation of the present invention is not subjected to the restriction of aforesaid way; as long as adopted the improvement of the various unsubstantialities that method of the present invention design and technical scheme carry out; or design of the present invention and technical scheme are directly applied to other occasion without improving, all within protection scope of the present invention.

Claims (8)

1. large cable laying device, comprise draw drum (2), it is characterized in that: described large cable laying device is established pay off rack (1), roller bearing (5) is established at the center of described draw drum (2), the dead in line of described roller bearing (5) and draw drum (2), and the two ends of described roller bearing (5) are stretched out and are bearing on the vertical draw-in groove of described pay off rack (1) from the both ends of the surface of described draw drum (2).
2. according to the described large cable laying device of claim 1, it is characterized in that: described pay off rack (1) is located at respectively outside the both ends of the surface of described draw drum (2) for two of symmetry.
3. according to the described large cable laying device of claim 2, it is characterized in that: establish jack (6) on the described pay off rack (1), the piston rod supporting of the two ends of described roller bearing (5) by described jack (6), and the piston rod of described jack (6) stretch out direction for up with the direction of described roller bearing (5) jack-up.
4. according to claim 1 or 2 or 3 described large cable laying devices, it is characterized in that: described large cable laying device is established setting reeler (3), described setting reeler (3) is fixed on the cable testing bridge (8) by rolling stand (7), and cable slides on the outer round surface of described setting reeler (3).
5. according to the described large cable laying device of claim 4, it is characterized in that: the turning of described cable testing bridge (8), if fourfold block (4), the periphery of the four rolling of described fourfold block (4) is the curved surface of mid diameter less than the two ends diameter, described four rolling parallel axes distributes, the outer round surface of described roller constitutes cable passage, and described cable passes from cable passage.
6. according to claim 1 or 2 or 3 or 5 described large cable laying devices, it is characterized in that: described large cable laying device is established the cable pulling net, and described cable pulling net and described cable ends are fixed.
7. according to the described large cable laying device of claim 1, it is characterized in that: described large cable laying device is established hoist engine, and the steel wire rope head of described hoist engine is connected with described cable pulling net.
8. according to the described large cable laying device of claim 1, it is characterized in that: described large cable laying device is established frequency converter, and described frequency converter is used to control the motor of hoist engine.
CN200910212285A 2009-11-12 2009-11-12 Large cable laying device Pending CN101707335A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910212285A CN101707335A (en) 2009-11-12 2009-11-12 Large cable laying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910212285A CN101707335A (en) 2009-11-12 2009-11-12 Large cable laying device

Publications (1)

Publication Number Publication Date
CN101707335A true CN101707335A (en) 2010-05-12

Family

ID=42377537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910212285A Pending CN101707335A (en) 2009-11-12 2009-11-12 Large cable laying device

Country Status (1)

Country Link
CN (1) CN101707335A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102070042A (en) * 2010-12-01 2011-05-25 河南省电力公司南阳供电公司 Adjustable pay-off stand
CN102403675A (en) * 2011-11-10 2012-04-04 河南省电力公司漯河供电公司 Conductor payoff rack
CN102437543A (en) * 2011-12-12 2012-05-02 河南省电力公司洛阳供电公司 Electric hydraulic cable pay-off device
CN102593760A (en) * 2012-03-14 2012-07-18 中国海洋石油总公司 Submarine cable drawing and guiding device
CN103423521A (en) * 2013-08-31 2013-12-04 中国建筑第七工程局有限公司 Disk cable jacking bracket device
CN109217181A (en) * 2018-09-21 2019-01-15 中国葛洲坝集团电力有限责任公司 Method suitable for the laying of height of water shipping shore power system service cable

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102070042A (en) * 2010-12-01 2011-05-25 河南省电力公司南阳供电公司 Adjustable pay-off stand
CN102403675A (en) * 2011-11-10 2012-04-04 河南省电力公司漯河供电公司 Conductor payoff rack
CN102437543A (en) * 2011-12-12 2012-05-02 河南省电力公司洛阳供电公司 Electric hydraulic cable pay-off device
CN102593760A (en) * 2012-03-14 2012-07-18 中国海洋石油总公司 Submarine cable drawing and guiding device
CN103423521A (en) * 2013-08-31 2013-12-04 中国建筑第七工程局有限公司 Disk cable jacking bracket device
CN103423521B (en) * 2013-08-31 2015-11-18 中国建筑第七工程局有限公司 A kind of jacking disk cable support device
CN109217181A (en) * 2018-09-21 2019-01-15 中国葛洲坝集团电力有限责任公司 Method suitable for the laying of height of water shipping shore power system service cable

Similar Documents

Publication Publication Date Title
CN110890717B (en) Method for releasing and laying cable from cable reel
CN101707335A (en) Large cable laying device
CN102290742B (en) Tension stringing construction technology
CN203668775U (en) Hydraulic sleeper replacing machine
CN103790113B (en) A kind of steel strand stay cable reeving device and method of reeving thereof
CN110803589A (en) Cable winding and unwinding and hoisting integrated combined vehicle
KR101261458B1 (en) many cable pulling equipment of underground cable
CN103410125B (en) Integral U-shaped anchor rope embedded duct and mounting method thereof
CN203813337U (en) Power cable transmitting apparatus
CN106099768A (en) Outdoor complicated piping lane cable laying of bridge frame method
CN201663387U (en) Large cable laying device
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN211034762U (en) Cable winding and unwinding and hoisting integrated combined vehicle
CN213484378U (en) Cable laying device used in bridge
CN104836156A (en) Synthetic insulator simple ladder
CN210926884U (en) Major diameter cable laying device
CN201910607U (en) Suspension type multi-cable traverse
CN101892745B (en) Upper-air obstacle-traversing in position method of large-sized prestress steel cable
CN201191731Y (en) Electric tackle
CN108233275B (en) Auxiliary traction system for cable to pass through CSE cylinder
CN112531570A (en) Cable rod feeding device
CN204732779U (en) Synthetic insulator Simple crawling ladder
CN105207119B (en) Electrified span construction method for high-voltage wires and protective device of construction
CN218562081U (en) Cable climbing machine
CN204290168U (en) A kind of frequency conversion cabling equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100512