CN105464358B CN201610019015.1A CN201610019015A CN105464358B CN 105464358 B CN105464358 B CN 105464358B CN 201610019015 A CN201610019015 A CN 201610019015A CN 105464358 B CN105464358 B CN 105464358B
Authority
CN
China
Prior art keywords
workbench
support
construction
steel wire
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610019015.1A
Other languages
Chinese (zh)
Other versions
CN105464358A (en
Inventor
李新明
才永发
李艳阳
郭艳召
李银焜
曾庆平
刘二虎
张慧
熊建武
胡方华
黎学皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN201610019015.1A priority Critical patent/CN105464358B/en
Publication of CN105464358A publication Critical patent/CN105464358A/en
Application granted granted Critical
Publication of CN105464358B publication Critical patent/CN105464358B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables

Abstract

The present invention provides a kind of multilayer construction hanging basket, including support, support are provided with least two layers of workbench, working stand are provided between workbench;The roller for being used for sliding along construction is provided with the back side of support.The both ends of workbench are provided with the flexible workbench being flexibly connected with workbench, are constructed for stretching into gate slot.By setting the barrel structure with multilayer working platform, it instead of the arrangement and method for construction for setting up multistage builder's jack in emergency gate slot in the prior art as job platform, reduce that builder's jack construction is artificial and material cost, eliminate top-bottom cross job safety hidden danger, improve gate slot technical pattern and civil engineering efficiency, and dam concrete is poured into top in advance, save the dam major project construction period.

Description

Multilayer construction hanging basket
Technical field
It is the second stage of in oblique door groove in particularly a kind of water power, construction the present invention relates to Construction for Hydroelectric Project field The multilayer construction hanging basket of concrete and built-in fitting construction field.
Background technology
Construction hanging basket is typically used for building trade, especially multilayer external decoration of high-rise building finishing, curtain wall installation etc. Work high above the ground, such a exterior wall hanging basket mainly by the use of hanging basket as construction platform, instead of traditional external scaffolding, can reduce scaffold peace Artificial, the Master Cost torn open, operating efficiency is improved, so as to substantially reduce construction cost.Some hydropower station dome dam monolith cloth 4 low-leveled outlets, the vertical discrepancy in elevation 86m of low-leveled outlet emergency gate slot are equipped with, emergency gate slot is slope than 1:0.15 oblique door groove, gate slot Domestic demand carries out door track built-in fitting and its Concrete Construction of Powerhouse.Former scheme refers to similar engineering construction experience, using setting up multistage Builder's jack carries out embedded parts and Concrete Construction of Powerhouse as construction platform, and gate slot construction is same with dam concrete construction Shi Jinhang, scaffold building hysteresis dam concrete construction about 20m.The problem of existing be:
1st, single gate slot, which sets up scaffold, needs the steel such as steel pipe, cantilever tripod about 35t, and material consumption is larger;
2nd, scaffold construction difficulty is big, and the structure such as construction passage, security protection is not easy to arrange;
3rd, door track installation of embedded parts and second stage concrete pour segmentation and constructed, and construction quality is difficult to control;
4th, construction is carried out simultaneously with dam concrete in gate slot, upper and lower cross-operation, potential safety hazard be present;
5th, gate slot segmentation operation metal structure and second stage concrete pouring construction are less efficient, and mutually dry with dam construction Disturb, mutually restrict, influence engineering integral construction progress.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of multilayer construction hanging basket, can be used as dam flood-discharge deep hole thing Therefore the job platform of gate slot door track embedded part and Concrete Construction of Powerhouse, be adapted at least upper and lower two working faces and meanwhile construction It is required that.In preferable scheme, the installation needs in the gate slot of oblique door groove are disclosure satisfy that, and be able to ensure that security.
In order to solve the above technical problems, the technical solution adopted in the present invention is:A kind of multilayer construction hanging basket, including branch Frame, support are provided with least two layers of workbench, working stand are provided between workbench;
The roller for being used for sliding along construction is provided with the back side of support.
The both ends of workbench are provided with the flexible workbench being flexibly connected with workbench, are applied for stretching into gate slot Work.
The adjustable locating wheel spacing for hanging basket for pointing to both sides is provided with support or workbench.
The bottom plate of workbench is horizontally disposed.
Winding plant is installed with support, winding plant is connected by steel wire rope with hanger.
In described winding plant, the elevator motor being installed on support is connected with worm gear reducer, worm and wormwheel The output shaft of decelerator is connected with steel wire rope roller, and wire rope roll is wound on steel wire rope roller.
Described steel wire penetrating is installed in the limit for tonnage safety lock on support.
In described limit for tonnage safety lock, the first round, the second wheel and straining pulley interlaced arrangement, wherein straining pulley position from top to bottom Between the first round and the second wheel, state is successively around the first round, straining pulley and the second wheel into a bent shape for steel wire rope, on straining pulley Provided with force snesor.
The structure of force snesor is:The wheel shaft of straining pulley is located in slotted eye, and wheel shaft side is provided with spring, so that tension force wheel load To steel wire rope, pressure sensor is provided with wheel shaft, or wheel shaft is connected with fixed pulling force sensor.
The structure of force snesor is:The wheel shaft of straining pulley is located in slotted eye, and wheel shaft side is provided with spring, so that tension force wheel load To steel wire rope, the travel switch by straining pulley or wheel shaft triggering is additionally provided with, powers off elevator motor after travel switch triggering.
A kind of multilayer construction hanging basket provided by the invention, by setting the barrel structure with multilayer working platform, instead of Set up arrangement and method for construction of the multistage builder's jack as job platform in emergency gate slot in the prior art, reduce pin of encorbelmenting Hand cradle construction is artificial and material cost, eliminates top-bottom cross job safety hidden danger, improves gate slot technical pattern and civil engineering Efficiency, and dam concrete is poured into top in advance, save the dam major project construction period.The flexible work set is put down Job platform can extend into gate slot and be constructed by platform.Winding plant is arranged on hanging basket, is easy to execute-in-place control. The limit for tonnage safety lock of setting, it can be ensured that the construction safety of barrel structure.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the side structure schematic view of the present invention.
Fig. 3 is the main structure diagram of flexible workbench in the present invention.
Fig. 4 is the overlooking the structure diagram of flexible workbench in the present invention.
Fig. 5 is the overlooking the structure diagram of workbench at the middle and upper levels of the invention.
Fig. 6 is the overlooking the structure diagram of lower floor's workbench in the present invention.
Fig. 7 is the side structure schematic view of hanger in the present invention.
Fig. 8 is the main structure diagram of hanger in the present invention.
Fig. 9 is the structural representation of limit for tonnage safety lock in the present invention.
In figure:Support 1, working stand 2, upper strata workbench 3, working stand import 31, lower floor's workbench 4, work of stretching Platform 5, elevator motor 6, limit for tonnage safety lock 7, pedestal 71, the first round 72, force snesor 73, the second wheel 74, straining pulley 75, slotted eye 76, spring 77, wheel shaft 78, steel wire rope 8, guardrail 9, bottom plate 10, worm gear reducer 11, scalable roller 12, locating wheel 13, Hanger 14.
Embodiment
In Fig. 1,2, a kind of multilayer construction hanging basket, including support 1, support 1 are provided with least two layers of workbench, work Working stand 2 is provided between platform;Working stand import 31 is provided with upper strata workbench 3, is easy to personnel to enter, in Fig. 5,6 It is shown.
Be provided with the back side of support 1 and be used for the roller that is slided along construction, the construction in this example have one it is inclined Cell wall, the roller of setting make whole hanging basket be slided in lifting process along cell wall, and the roller in this example is leaned on using telescopic Wheel, can by stretch roller, to adjust the inclined degree of whole hanging basket, in favor of making workbench keep level state, just In putting for constructing operation and equipment.By above-mentioned structure, realize multiple benches face while construct.
The both ends of workbench are provided with the flexible workbench 5 being flexibly connected with workbench, are applied for stretching into gate slot Work.As shown in Fig. 1,3,4, left side in figure is structure when flexible workbench 5 does not extend out, and the right side in figure is flexible work Make structure when platform 5 stretches out.
The locating wheel 13 for pointing to both sides is provided with support 1 or workbench.Thus structure, the right position of hanging basket is limited, Whole hanging basket is avoided to be swung in construction.
Emergency gate slot is slope than 1:0.15 oblique door groove, gate slot domestic demand carry out door track built-in fitting construction, for ease of constructing, this The bottom plate 10 of workbench in example be it is horizontally disposed, i.e., the bottom plate 10 of the workbench in this example relative to support out of plumb, But corresponding inclination angle is had according to the angle of inclination of oblique door groove, so that the bottom plate 10 of workbench is level, be easy to personnel to walk, Construction and putting equipment.
In Fig. 1,2,7,8, winding plant is installed with support 1, winding plant is connected by steel wire rope 8 and hanger 14 Connect.Thus structure, the descending operation of whole hanging basket is realized, winding plant is arranged on to the operation at the scene of being more convenient on support 1.
In Fig. 1,2, in described winding plant, the elevator motor 6 and worm gear reducer 11 that are installed on support 1 Connection, the output shaft of worm gear reducer 11 are connected with steel wire rope roller, and steel wire rope 8 is on steel wire rope roller.Set Worm gear reducer 11 be easy to implement self-locking, improve security.
In Fig. 1,2, described steel wire rope 8 passes through the limit for tonnage safety lock 7 being installed on support 1.Thus structure, when whole When hanging basket exceedes the safe bearing load of setting, limit for tonnage safety lock 7 can pin winding plant, and alarm, so that it is guaranteed that construction safety.
In Fig. 9, in described limit for tonnage safety lock 7, the first round 72, second wheel 74 and straining pulley 75 from top to bottom interlock cloth Put, wherein straining pulley 75 be located at the first round 72 and second wheel 74 between, steel wire rope 8 into a bent shape state successively around the first round 72, The wheel of straining pulley 75 and second 74, is provided with force snesor 73 on straining pulley 75.Thus structure, when the pulling force that steel wire rope 8 receives adds Greatly, then the bending degree of steel wire rope 8 reduces, and obtains this change by force snesor 73, reaches setting value, you can disconnects elevator The power supply of device, in preferable scheme and locking steel wire rope.
The structure of force snesor 73 is:The wheel shaft 78 of straining pulley 75 is located in slotted eye 76, and the side of wheel shaft 78 is provided with spring 77, So that straining pulley 75 presses to steel wire rope 8, pressure sensor, or wheel shaft 78 and fixed pulling force sensor are provided with wheel shaft 78 Connection.Force snesor 73 is connected with the control device of winding plant, such as PLC, when PLC receives the number of the acquisition of force snesor 73 According to being compared with default data, when beyond preset value, then PLC disconnects the power supply of elevator motor 6, worm gear reducer 11 self-lockings, same to alarm, it is ensured that construction safety.
In another optional scheme, the structure of force snesor 73 is:The wheel shaft 78 of straining pulley 75 is located in slotted eye 76, wheel shaft 78 sides are provided with spring 77, so that straining pulley 75 presses to steel wire rope 8, are additionally provided with the stroke triggered by straining pulley 75 or wheel shaft 78 and open Close, power off elevator motor 6 after travel switch triggering, such as travel switch is arranged on to the position of spring 77 in Fig. 9, work as steel wire Rope 8, which stretches, to be reached to a certain degree, then triggers travel switch, power off elevator motor 6, and it is electric to obtain siren.Using the structure, It then can be achieved without using PLC, advantageously reduce use cost.
Embodiment:
The user of construction hanging basket of the invention is specifically described by taking the construction of certain arch dam deep hole emergency gate slot embedded part as an example Method:
Some hydropower station is dome dam, is disposed with 4 low-leveled outlets, the vertical discrepancy in elevation 86m of low-leveled outlet emergency gate slot, accident Gate slot is slope than 1:0.15 oblique door groove, gate slot domestic demand carry out door track built-in fitting construction.It is as follows using the solution of the present invention:
Hanging basket is double-decker, high 7.5 meters, wide about 5.5 meters, sets upper strata workbench 3 and lower floor's workbench 4, on The both ends of layer workbench 3 and lower floor's workbench 4 are fixedly connected with support 1, and design nominal load capacity is 1000KG.Hanging basket The back side arrange 6 scalable rollers 12 enable hanging basket slope ratio be 1:Slided up and down in 0.15 oblique door groove, referring to Fig. 4 hanging baskets front end Both sides set 4 adjustable locating wheels 13 spacing for hanging basket, prevent hanging basket from being swung in oblique door groove.The lifting of hanging basket Speed is 9.3 ± 0.5m/min, and hanging basket is installed above emergency gate slot using truck crane and is put into gate slot, again with having welded after being put into The hanger 14 of good triangle support frame and I-shaped gooseneck composition is fixed, and bottom plate 10 and the horizontal plane of suspension work platform are put down OK, multiple standard knot compositions are designed to, are made in order to circulate into 81.5 degree of angles, the support and workbench of hanging basket with big dam facing With, and limit for tonnage safety lock 7 is set.The left and right both ends of hanging basket are working face, and the bottom plate 10 of workbench is surrounded by height 150 Mm baffle plates, baffle plate are not more than 5mm with bottom plate gap.The fixed 1.2m high safeties guardrail of forward and backward setting of workbench, left, The right side is provided with flexible workbench 5, and upper strata workbench 3 and lower floor's workbench 4 use dismountable connected mode, be easy to other Position only needs the construction needs of one layer of workbench, can also increase the construction platform of more layers, winding plant cloth according to operating mode Put in upper strata workbench 3, be highly 2 meters, on upper strata, workbench 3 and the middle of lower floor's workbench 4 set working stand 2, Guard rail is with outside working stand 2, is needed for construction later, working stand 2 will be easy to remove, it is impossible to influence applying for the right and left personnel Work.Through experiment, the present invention has the advantages of materials are easy, equipment is simple, cost is low, work efficiency is high, construction safety.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as the limitation for the present invention, this hair Technical characteristic described in bright, on the premise of not conflicting, use can be combined with each other, protection scope of the present invention should be with right It is required that the equivalents of technical characteristic are protection model in the technical scheme recorded, including the technical scheme of claim record Enclose.Equivalent substitution i.e. within this range is improved, also within protection scope of the present invention.

Claims (1)

1. a kind of multilayer construction hanging basket, including support(1), it is characterized in that:Support(1)It is provided with least two layers of workbench, work Make to be provided with working stand between platform(2);
In support(1)The back side be provided with and be used for the roller that is slided along construction;
The both ends of workbench are provided with the flexible workbench being flexibly connected with workbench(5), constructed for stretching into gate slot;
In support(1)Or workbench is provided with the adjustable locating wheel spacing for hanging basket for pointing to both sides(13);
The bottom plate of workbench(10)It is horizontally disposed;
In support(1)On be installed with winding plant, winding plant passes through steel wire rope(8)With hanger(14)Connection;
Described steel wire rope(8)Through being installed in support(1)On limit for tonnage safety lock(7);
Described limit for tonnage safety lock(7)In, the first round(72), second wheel(74)And straining pulley(75)Interlaced arrangement from top to bottom, Wherein straining pulley(75)Positioned at the first round(72)With the second wheel(74)Between, steel wire rope(8)State bypasses first successively into a bent shape Wheel(72), straining pulley(75)With the second wheel(74), in straining pulley(75)It is provided with force snesor(73);
Force snesor(73)Structure be:Straining pulley(75)Wheel shaft(78)Positioned at slotted eye(76)It is interior, wheel shaft(78)Side is provided with Spring(77), so that straining pulley(75)Press to steel wire rope(8), in wheel shaft(78)It is provided with pressure sensor, or wheel shaft(78) It is connected with fixed pulling force sensor;
In described winding plant, support is installed in(1)On elevator motor(6)With worm gear reducer(11)Connection, snail Worm and wormwheel decelerator(11)Output shaft be connected with steel wire rope roller, steel wire rope(8)On steel wire rope roller.
CN201610019015.1A 2016-01-13 2016-01-13 Multilayer construction hanging basket Expired - Fee Related CN105464358B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610019015.1A CN105464358B (en) 2016-01-13 2016-01-13 Multilayer construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610019015.1A CN105464358B (en) 2016-01-13 2016-01-13 Multilayer construction hanging basket

Publications (2)

Publication Number Publication Date
CN105464358A CN105464358A (en) 2016-04-06
CN105464358B true CN105464358B (en) 2018-02-27

Family

ID=55602473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610019015.1A Expired - Fee Related CN105464358B (en) 2016-01-13 2016-01-13 Multilayer construction hanging basket

Country Status (1)

Country Link
CN (1) CN105464358B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105776093A (en) * 2016-05-09 2016-07-20 艾和美 Double-layer safety temporarily installed suspended access equipment for detection working at height for special equipment
CN106430008A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Double-layer hanging basket
JP6929078B2 (en) * 2017-02-09 2021-09-01 中国電力株式会社 Scaffolding device
CN108190719A (en) * 2018-01-03 2018-06-22 江阴职业技术学院 The detachable multilayer hanging-basket of working at height
CN109025234A (en) * 2018-07-28 2018-12-18 北京建工集团有限责任公司 A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk
CN112096048A (en) * 2020-09-14 2020-12-18 中国建筑第八工程局有限公司 Double-layer integral lifting operation platform for high-rise building construction
CN114775990B (en) * 2022-05-26 2023-08-04 广州城市职业学院 Safety type externally hung operation platform for assembled building

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200430674Y1 (en) * 2006-08-21 2006-11-10 (주)조은곤도라 High place working gondola in building
CN201268937Y (en) * 2008-09-05 2009-07-08 高智鹏 Double-layer hanging cradle for working aloft
CN201593300U (en) * 2009-12-08 2010-09-29 无锡华科机械设备有限公司 Overload protecting device
CN203514754U (en) * 2013-08-16 2014-04-02 中建七局第四建筑有限公司 Cradle for large-slope decoration construction
CN205276845U (en) * 2016-01-13 2016-06-01 中国葛洲坝集团第一工程有限公司 Multilayer construction hanging flower basket

Also Published As

Publication number Publication date
CN105464358A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN105464358B (en) Multilayer construction hanging basket
CN205172096U (en) Two -way sideslip of going up and down does not have and dodges secret stereo garage
CN209957260U (en) Hoisting frame for mechanical equipment
CN206667719U (en) A kind of building hanging basket
CN210480669U (en) Auxiliary steel bar hoisting device for assembly type columns in constructional engineering
CN203684656U (en) Construction device with mobile attached wall
CN203794533U (en) Light portable mobile lifting equipment
CN113968543B (en) Assembled building hoisting accessory
CN205276845U (en) Multilayer construction hanging flower basket
CN110565937A (en) Door type integral lifting steel platform
CN106812360A (en) One kind lifting is two-way traversing without avoidance underground three-dimensional garage
CN217516506U (en) Auxiliary device for dense gas ground gathering and transporting maintenance
CN215326566U (en) Explosion-proof electric spiral arm crane
CN210766416U (en) Bridge cylinder mound construction platform
CN209567730U (en) A kind of small-sized lattice dead man steel construction
CN211257773U (en) Door type integral lifting steel platform
CN211228103U (en) Suspension type bridge maintenance work platform
CN210738056U (en) Adjustable hanging flower basket system
CN207245143U (en) A kind of fixation elevating mechanism painted for external wall of house
CN107558752A (en) A kind of automatic dabbing machine of facade
CN214232466U (en) Light fireproof curtain lifting system for stage
CN207863438U (en) Lifting scaffold device suitable for variable section structure column
CN209829420U (en) Oil immersion tank
CN202729527U (en) Vertical conveying device
CN211664597U (en) Gallows structure is used in building engineering construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Xinming

Inventor after: Hu Fanghua

Inventor after: Li Xuehao

Inventor after: Just forever

Inventor after: Li Yanyang

Inventor after: Guo Yanzhao

Inventor after: Li Yinkun

Inventor after: Zeng Qingping

Inventor after: Liu Erhu

Inventor after: Zhang Hui

Inventor after: Xiong Jianwu

Inventor before: Li Xinming

Inventor before: Li Xuehao

Inventor before: Li Yinkun

Inventor before: Li Yanyang

Inventor before: Guo Yanzhao

Inventor before: Zeng Qingping

Inventor before: Liu Erhu

Inventor before: Zhang Hui

Inventor before: Xiong Jianwu

Inventor before: Hu Fanghua

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

CF01 Termination of patent right due to non-payment of annual fee