CN105447576A - Equipment management system - Google Patents

Equipment management system Download PDF

Info

Publication number
CN105447576A
CN105447576A CN201510976384.5A CN201510976384A CN105447576A CN 105447576 A CN105447576 A CN 105447576A CN 201510976384 A CN201510976384 A CN 201510976384A CN 105447576 A CN105447576 A CN 105447576A
Authority
CN
China
Prior art keywords
equipment
module
submodule
maintenance
spare part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510976384.5A
Other languages
Chinese (zh)
Inventor
张世聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengang Steel Plates Co Ltd
Original Assignee
Bengang Steel Plates Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengang Steel Plates Co Ltd filed Critical Bengang Steel Plates Co Ltd
Priority to CN201510976384.5A priority Critical patent/CN105447576A/en
Publication of CN105447576A publication Critical patent/CN105447576A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/34Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
    • G06F11/3442Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment for planning or managing the needed capacity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Finance (AREA)
  • Development Economics (AREA)
  • Accounting & Taxation (AREA)
  • Computer Hardware Design (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an equipment management system. The equipment management system comprises an equipment point inspection module, an inspection and maintenance module, a technical archive module and a spare part management module, wherein the equipment point inspection module comprises a planned point inspection sub-module and a daily overhaul item sub-module; the planned point inspection sub-module automatically filters and displays working items of the day, reminding a user of key work of the day and displays faulted item names in the daily overhaul item sub-module; the inspection and maintenance module is used for displaying all the overhauling items; the technical archive module displays all the equipment information, including, equipment maintenance records, technical parameters, equipment lubrication, equipment degradation tendency and spare part information; the spare part management module comprises a spare part setting sub-module and an reported part planning sub-module, and is used for management and control of the number of the spare parts. According to the method of the equipment management system, a hint can be given when abnormality is found, labor intensity of workers is lightened, equipment accidents are reduced, a maintenance cost is reduced, equipment operating reliability is improved, and labor intensity of workers is reduced.

Description

A kind of equipment management system
Technical field
The present invention relates to a kind of device management techniques, specifically a kind of equipment management system.
Background technology
Along with the scale of enterprise is grown gradually, business equipment also maximizes, complicated, run in the working environment that much equipment is all large at load intensity, severe, thus the fault occurred also gets more and more, when equipment breaks down, maintenance department generally adopts the means of correction maintenance, the method is time-consuming, effort not only, and economic drain is large, can not predict imminent fault, have impact on the continuous running of production, cost is improved.
Current existing equipment record is all by manual typing, the worker of equipment control department carries heavy task, huge workload, a large amount of data statisticss, analysis, calculating etc. bring very large trouble to work, add work difficulty, and the labour intensity that works long hours is large, easily make mistakes, reduce work efficiency.
Summary of the invention
Maintenance for business equipment in prior art exists can not predict imminent fault, have impact on the continuous running of production, cost is improved, reduce the deficiencies such as work efficiency, the technical problem to be solved in the present invention is to provide a kind of by carrying out preventive inspection to equipment, reduces the equipment management system that equipment breakdown occurs, reduces maintenance cost.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
A kind of equipment management system of the present invention, comprise equipment point-detecting module, checking maintenance module, technology files module and spare parts management module, wherein equipment point-detecting module comprises plan spot check submodule and maintenance repair project submodule, the automatic fitration of plan spot check submodule demonstrates the job on the same day, the focus of reminding user today, and in ordinary maintenance project submodule, show the project name of fault; Checking maintenance module is for showing the project of complete overhaul; Technology files module show all equipment comprise equipment maintenance record, technical parameter, equipment lubrication, equipment deterioration and spare part information; Spare parts management module comprises spare part and arranges submodule and report part plan submodule, for control and the management of spare part quantity.
Described checking maintenance module comprises to be selected overhauling project submodule and checks test item submodule, by tree-like selection equipment in overhauling project submodule, or select repair apparatus by data window, each selection equipment all sorts according to putting in order of equipment, and is kept at and checks in test item submodule.
The present invention also has newly-increased amendment overhauling project submodule, when a newly-increased record, automatically automatically adds project name according to device name.
Overhauling project, after overhauling project has inputted, is aggregated in technology files by technology files module automatically.
In spare parts management module, if consume spare part in maintenance, record spare part quantity and reduce in spare parts management module, if the quantity of spare part is lower than tank farm stock of the most end, then automatically prompting user carries out spare part and declares plan.
If the quantity of spare part is higher than maximum quantity of stores, then this part warehouse storage of automatically prompting user is enough.
The life cycle of technology files module automatic-prompting equipment, to provide on equipment machine to the working time on the same day simultaneously, and prompting repair time next time.
The present invention has following beneficial effect and advantage:
1. the inventive method carries out preventive inspection to equipment, by the typing of data, and automatically and sequenced detection standard contrast, note abnormalities, can prompting be provided, alleviate the labour intensity of staff greatly, reduce equipment breakdown to occur, reduce maintenance cost, improve equipment reliability of operation, decrease the labour intensity of staff, improve equipment modernization management level.
2. the inventive method is in equipment day-to-day operation; to routine testing to data carry out necessary storage, according to routine use record, work out daily servicing plan; reduce because plant issue causes shutdown; when equipment has an accident, registration accident record, and record emergency maintenance table; according to emergency maintenance table and day-to-day operation data; determine maintenance standard and requirement, to carry out in time, reasonably keeping in repair.
Accompanying drawing explanation
Fig. 1 is present system management flow chart;
Fig. 2 is the main surface chart of present system;
Fig. 3 is equipment point-detecting surface chart in present system;
Fig. 4 is checking maintenance surface chart in present system;
Fig. 5 is technology files surface chart in present system.
Embodiment
Below in conjunction with Figure of description, the present invention is further elaborated.
As shown in Figure 1, a kind of equipment management system of the present invention, comprise equipment point-detecting module, checking maintenance module, technology files module and spare parts management module, wherein equipment point-detecting module comprises plan spot check submodule and maintenance repair project submodule, the automatic fitration of plan spot check submodule demonstrates the job on the same day, the focus of reminding user today, and in ordinary maintenance project submodule, show the project name of fault; Checking maintenance module is for showing the project of complete overhaul; Technology files module show all equipment comprise equipment maintenance record, technical parameter, equipment lubrication, equipment deterioration and spare part information; Spare parts management module comprises spare part and arranges submodule and report part plan submodule, for control and the management of spare part quantity.
Described checking maintenance module comprises to be selected overhauling project submodule and checks test item submodule, by tree-like selection equipment in overhauling project submodule, or select repair apparatus by data window, each selection equipment all sorts according to putting in order of equipment, and is kept at and checks in test item submodule.
For preventing data corruption, present system is also provided with newly-increased amendment overhauling project submodule in checking maintenance module, when a newly-increased record, automatically automatically adds project name according to device name.
Overhauling project, after overhauling project has inputted, is aggregated in technology files by clicking " gathering technology files " by technology files module automatically.The life cycle of technology files module automatic-prompting equipment, to provide on equipment machine to the working time on the same day simultaneously, and prompting repair time next time.
The present invention also has in spare parts management module, if consume spare part in maintenance, records spare part quantity and reduce in spare parts management module, if the quantity of spare part is lower than tank farm stock of the most end, then automatically prompting user carries out spare part and declares plan.If the quantity of spare part is higher than maximum quantity of stores, then this part warehouse storage of automatically prompting user is enough.
The life cycle of technology files module automatic-prompting equipment, to provide on equipment machine to the working time on the same day simultaneously, and prompting repair time next time.
The present invention operationally, first enters interface as shown in Figure 2, selects the module that will enter, and then enter the submodule under this module in master menu, selects the interfaces windows that will check or operate to carry out checking or operating.
As shown in Figure 3, be equipment point-detecting surface chart, equipment point-detecting module comprises plan spot check and maintenance repair project two submodules, and plan spot check automatic fitration can demonstrate the job on the same day, the focus of reminding user today.If broken down in plan spot check project submodule, the project name of fault can be shown in maintenance repair project submodule.
In the present embodiment, " today increases newly " button control is selected to enter newly-increased amendment overhauling project submodule, except a newly-increased record, before the stipulated time (as 8:00 every day), if do not complete overhauling project, the project newly-increased record automatically that can will do not complete.
As shown in Figure 4, after maintenance repair project has inputted, by clicking " gathering technology files " button control, overhauling project is aggregated in technology files automatically.If consumption spare part, spare part quantity reduces, if the quantity of spare part is lower than tank farm stock, then automatically prompting user carries out spare part and declares plan, the quantity of spare part is higher than maximum quantity of stores else if, then this part warehouse storage of automatically prompting user is enough, need not again buyable spare parts in order to avoid cause irrational fund allocation.
In checking maintenance module, if select " determining to report optional equipment " button control, then report the time that can show in the repair time and report, to prevent from repeating selection equipment, and export to the data newly-increased title automatically of EXCEL file, Lookup protocol col width, and can according to name and overhauling project auto-sequencing, when a newly-increased record, automatically automatically can add project name according to device name, prevent data corruption.
As shown in Figure 5, in technology files module, when clicking " lower machine equipment operates altogether (my god) " button control, system software then calculates the cycle of operation of equipment voluntarily, show intuitively to user one, select " repair time " button control can calculate the later time operated to the same day of machine on equipment.
Present system adopts VisualFoxpro6.0 database design tool software to develop design, VisualFoxpro6.0 is current at the most popular mini-relational database system design tool of China, is adapted to the various types of information management system of design and development or carries out the maintenance of database.The information management system using VisualFoxpro6.0 to develop is less demanding to software and hardware configuration, is very worthwhile economically.
Database bottom adopts basic data list structure, and application button control piece realizes each menu item management function.
Use present system to routine testing to data carry out necessary storage, according to routine use record, work out daily servicing plan, reduce because plant issue causes shutdown, when equipment has an accident, registration accident record, and record emergency maintenance table.According to emergency maintenance table and day-to-day operation data, determine maintenance standard and requirement, to carry out launching maintenance job in time, reasonably.

Claims (7)

1. an equipment management system, it is characterized in that: comprise equipment point-detecting module, checking maintenance module, technology files module and spare parts management module, wherein equipment point-detecting module comprises plan spot check submodule and maintenance repair project submodule, the automatic fitration of plan spot check submodule demonstrates the job on the same day, the focus of reminding user today, and in ordinary maintenance project submodule, show the project name of fault; Checking maintenance module is for showing the project of complete overhaul; Technology files module show all equipment comprise equipment maintenance record, technical parameter, equipment lubrication, equipment deterioration and spare part information; Spare parts management module comprises spare part and arranges submodule and report part plan submodule, for control and the management of spare part quantity.
2. by equipment management system according to claim 1, it is characterized in that: described checking maintenance module comprises to be selected overhauling project submodule and checks test item submodule, by tree-like selection equipment in overhauling project submodule, or select repair apparatus by data window, each selection equipment all sorts according to putting in order of equipment, and is kept at and checks in test item submodule.
3. by equipment management system according to claim 1, it is characterized in that: also there is newly-increased amendment overhauling project submodule, when a newly-increased record, automatically automatically add project name according to device name.
4., by equipment management system according to claim 1, it is characterized in that: overhauling project, after overhauling project has inputted, is aggregated in technology files by technology files module automatically.
5. by equipment management system according to claim 1, it is characterized in that: in spare parts management module, if consume spare part in maintenance, record spare part quantity in spare parts management module and reduce, if the quantity of spare part is lower than tank farm stock of the most end, then automatically prompting user carries out spare part and declares plan.
6., by equipment management system according to claim 5, it is characterized in that: if the quantity of spare part is higher than maximum quantity of stores, then this part warehouse storage of automatically prompting user is enough.
7. by equipment management system according to claim 1, it is characterized in that: the life cycle of technology files module automatic-prompting equipment, to provide on equipment machine to the working time on the same day simultaneously, and prompting repair time next time.
CN201510976384.5A 2015-12-23 2015-12-23 Equipment management system Pending CN105447576A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510976384.5A CN105447576A (en) 2015-12-23 2015-12-23 Equipment management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510976384.5A CN105447576A (en) 2015-12-23 2015-12-23 Equipment management system

Publications (1)

Publication Number Publication Date
CN105447576A true CN105447576A (en) 2016-03-30

Family

ID=55557731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510976384.5A Pending CN105447576A (en) 2015-12-23 2015-12-23 Equipment management system

Country Status (1)

Country Link
CN (1) CN105447576A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106600009A (en) * 2016-12-01 2017-04-26 武汉大思想信息股份有限公司 Cloud computing platform-based equipment operation management method and system
CN107527164A (en) * 2016-06-21 2017-12-29 上海天齐建设股份有限公司 Equipment management system
CN109102170A (en) * 2018-07-24 2018-12-28 广东电网有限责任公司 Device model title modification method, device and storage medium based on OMS
CN110175776A (en) * 2019-05-25 2019-08-27 上海臻友设备工程技术有限公司 A kind of equipment management system
CN110383326A (en) * 2017-03-17 2019-10-25 三菱日立电力系统株式会社 Application plan producing device, application plan manufacturing system, application plan production method and program
CN110942162A (en) * 2019-12-09 2020-03-31 南京讷敏电力科技有限公司 Intelligent maintenance overall plan management system for mechanical equipment based on big data
CN112070242A (en) * 2019-06-10 2020-12-11 北京昊恩星美科技有限公司 Maintenance implementation system based on standardization
CN112270474A (en) * 2020-10-28 2021-01-26 贵阳铝镁设计研究院有限公司 Based on aluminium oxide production facility management system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101763582A (en) * 2009-09-17 2010-06-30 宁波北电源兴电力工程有限公司 Scheduled overhaul management module for EAM system of power plant
CN103093320A (en) * 2013-02-07 2013-05-08 上海长合信息技术有限公司 Management method of equipment in metro operation network
CN103559594A (en) * 2013-11-26 2014-02-05 武钢集团昆明钢铁股份有限公司 Management system and method for having control over procurement plan according to inventory level of spare parts
CN104850968A (en) * 2015-06-15 2015-08-19 中冶赛迪电气技术有限公司 Equipment asset operation and maintenance management system for iron and steel enterprises
CN104932481A (en) * 2015-05-22 2015-09-23 中国石油化工股份有限公司 Oil refining chemical equipment fault control and check-maintenance optimization system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101763582A (en) * 2009-09-17 2010-06-30 宁波北电源兴电力工程有限公司 Scheduled overhaul management module for EAM system of power plant
CN103093320A (en) * 2013-02-07 2013-05-08 上海长合信息技术有限公司 Management method of equipment in metro operation network
CN103559594A (en) * 2013-11-26 2014-02-05 武钢集团昆明钢铁股份有限公司 Management system and method for having control over procurement plan according to inventory level of spare parts
CN104932481A (en) * 2015-05-22 2015-09-23 中国石油化工股份有限公司 Oil refining chemical equipment fault control and check-maintenance optimization system
CN104850968A (en) * 2015-06-15 2015-08-19 中冶赛迪电气技术有限公司 Equipment asset operation and maintenance management system for iron and steel enterprises

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107527164A (en) * 2016-06-21 2017-12-29 上海天齐建设股份有限公司 Equipment management system
CN106600009A (en) * 2016-12-01 2017-04-26 武汉大思想信息股份有限公司 Cloud computing platform-based equipment operation management method and system
CN110383326A (en) * 2017-03-17 2019-10-25 三菱日立电力系统株式会社 Application plan producing device, application plan manufacturing system, application plan production method and program
CN109102170A (en) * 2018-07-24 2018-12-28 广东电网有限责任公司 Device model title modification method, device and storage medium based on OMS
CN110175776A (en) * 2019-05-25 2019-08-27 上海臻友设备工程技术有限公司 A kind of equipment management system
CN112070242A (en) * 2019-06-10 2020-12-11 北京昊恩星美科技有限公司 Maintenance implementation system based on standardization
CN110942162A (en) * 2019-12-09 2020-03-31 南京讷敏电力科技有限公司 Intelligent maintenance overall plan management system for mechanical equipment based on big data
CN112270474A (en) * 2020-10-28 2021-01-26 贵阳铝镁设计研究院有限公司 Based on aluminium oxide production facility management system

Similar Documents

Publication Publication Date Title
CN105447576A (en) Equipment management system
CN108320069B (en) Production and manufacturing execution system
CN104219315B (en) A kind of operation monitoring system of power information acquisition system and method for supervising thereof
CN106779096B (en) Power distribution network reports situation active forewarning system for repairment
CN102915479A (en) Power plant asset management system
CN112132443A (en) Reliability distribution network power supply management and control system
CN103543697B (en) Traffic tunnel device clusters formula intelligent control method
CN108280532A (en) A kind of improved power equipment asset management system and method
CN110633916A (en) Energy efficiency control system for coal mine enterprise
CN109840601B (en) Operation management method combining wind power plant equipment monitoring and production management
CN105825314A (en) Monitoring information analysis method and system based on centralized operation and maintenance mode
CN104156888A (en) Power system operation risk monitoring method based on comprehensive risk evaluation model
CN116822926A (en) Delay statistics and analysis method and device, electronic equipment and storage medium
CA3047763A1 (en) System and method for monitoring fleet performance
CN110705787A (en) Aircraft maintenance task optimization method
CN111369022A (en) Railway station operation and maintenance monitoring platform and device
CN112052965A (en) Visual electric power equipment online management system and management method
CN110826926A (en) Intelligent manufacturing execution system for surface assembly production line
CN108376324B (en) System and method for managing metering assets of carrier collector
CN110989511A (en) Tool life visual early warning method
CN110175776A (en) A kind of equipment management system
CN115775145A (en) Intelligent auxiliary decision-making method for state maintenance of power equipment
CN116051070A (en) Ship maintenance progress management system
TW201421386A (en) Continuously data quality controlling and auditing system
CN103559595A (en) Management system and method for having control over procurement plan according to monthly average consumption of spare parts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160330

RJ01 Rejection of invention patent application after publication