CN105426994A - 配电网备选建设项目的优化选择方法 - Google Patents

配电网备选建设项目的优化选择方法 Download PDF

Info

Publication number
CN105426994A
CN105426994A CN201510778643.3A CN201510778643A CN105426994A CN 105426994 A CN105426994 A CN 105426994A CN 201510778643 A CN201510778643 A CN 201510778643A CN 105426994 A CN105426994 A CN 105426994A
Authority
CN
China
Prior art keywords
formula
voltage
project
newly
effect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510778643.3A
Other languages
English (en)
Inventor
何禹清
徐超
刘菁菁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hunan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hunan Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Hunan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510778643.3A priority Critical patent/CN105426994A/zh
Publication of CN105426994A publication Critical patent/CN105426994A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种配电网备选建设项目的优化选择方法,包括确定备选项目所在区域,收集备选区域的电网现状指标;对各备选项目对所在区域带来的成效进行量化评价;对成效进行归一化评分;对备选项目制定规划目标;建立备选项目成效与规划指标的映射关系,调整成效权重,计算各备选项目的评分;根部各备选项目的评分、各备选项目资金需求和可用资金总额,获得最优的备选建设项目的选择结果。本发明由于制定了项目成效属性和量化规则,建立归一化方法和映射关系,动态调整成效的权重及评分,并基于可用资金总额约束和规划目标约束获得最优的配电网备选建设项目的选择方案,因此提高了项目成效与规划目标的关联性,优化了分配效率,提高了资源利用率。

Description

配电网备选建设项目的优化选择方法
技术领域
本发明具体涉及一种配电网备选建设项目的优化选择方法。
背景技术
我国电力市场的逐步形成和电力企业体制改革的不断深化,对配电网的可靠供电和经济运行提出了更高的要求。同时,由于配电网建设周期长、参与方众多、对于备选的建设项目的决策评价过程复杂和不确定因素增加等特点,对待建设项目的优化选择提出了新的挑战。
目前,配电网各阶段(各年度)的规划目标非常明确,涉及配电网的各项规划指标都以导则等形式加以了量化。在投资规模无严格限制、投资资金充分的情况下,实现规划目标压力不大。但事实上,最近几年投资规模远达不到预期需求,致使涉及配电网的主要规划指标难以实现、部分指标甚至相差甚远,这一方面是由于配网建设投资相对滞后于地区的经济发展造成的,但项目投资缺乏完善的评价指标体系和方法,投资额在不同类型项目、不同电压等级、不同地区间的分布不合理导致的配网建设项目的重复投资等也是重要的一个方面。
发明内容
本发明的目的在于提供一种项目成效与规划目标关联性好、能够优化配电网建设分配效率的配电网备选建设项目的优化选择方法。
本发明提供的这种配电网备选建设项目的优化选择方法,主要包括如下步骤:
S1.确定配电网备选建设项目的建设区域,收集备选项目所在区域电网的现状指标;
S2.对各个备选项目对所在区域带来的成效,逐一进行量化评价;
S3.根据步骤S2的量化评价结果,对备选项目的成效逐一进行归一化评分;
S4.对备选项目制定规划目标;
S5.根据步骤S4的规划目标,建立备选项目的成效与规划指标的映射关系,调整成效的权重,并计算各个备选项目的评分;
S6.根据步骤S5得到的各个备选项目的评分、各个备选项目的资金需求和可用资金总额,计算得到最优的配电网备选项目的优化选择结果。
步骤1所述现状指标,包括电压等级、供电能力、供电质量、电网结构、电网设备、地区政策和效率效益。
步骤2所述的成效,包括新增变电容量、新增配变容量、解决高压重载线路、解决高压重载主变、解决中压重载线路、改善变电站均衡度、改善高压线路负载均衡度、改善中压线路负载均衡度、改善中压配变负载均衡度、解决低电压用户数、改善电压质量、减少系统平均停电时间、减少用户平均停电时间、解决单线单变、新增变电站、缩短中压供电半径、解决高压配电网N-1、解决中压配电线路N-1、新增电缆长度、新增绝缘线路长度、更换高损配变台数、新增非晶合金配变台数、改造未改村、改造完善村、改造电气化村、满足新能源送出、降低线损、增供负荷、增供电量和工程投资。
步骤2所述的量化评价为采用分级评价、数值评价和逻辑评价三种:
所述的分级评价为采用模糊语言评价,分为“显著、明显、一般、微小、无”;采用分级评价的成效属性有:改善变电站均衡度、改善高压线路负载均衡度、改善中压线路负载均衡度、改善中压配变负载均衡度、改善电压质量、减少系统平均停电时间、减少用户平均停电时间、缩短中压供电半径和降低线损;
所述的数值评价为采用该属性直接解决问题的数量;采用数值评价的成效有:新增变电容量、新增配变容量、解决高压重载线路、解决高压重载主变、解决中压重载线路、解决低电压用户、解决单线单变、解决高压配电网N-1、解决中压配电线路N-1、新增电缆长度、新增绝缘线路长度、更换高损配变台数、新增非晶合金配变台数、增供负荷、增供电量和工程投资;
所述的逻辑评价为采用二值逻辑评价,分为“是”和“否”;采用逻辑评价的成效属有:新增变电站、改造未改村、改造完善村、改造电气化村和满足新能源送出。
步骤S3所述的归一化评分,包括如下步骤:
1)对采用分级评价的成效,规定第i个项目对应于第j个成效的分级评价为“显著、明显、一般、微小、无”,则其归一化评分为“1、0.8、0.5、0.2、0”;
2)对采用数值评价的成效,采用隶属函数进行归一化评分,包括如下步骤:
①成本型隶属函数:工程投资采用成本型隶属函数;
第i个项目的第j个成效的归一化值为 V i , j = - 1 12 d x + 1 0 < x < 1.2 d - 2 d x + 3.3 1.2 d &le; x &le; 1.5 d - 9 5 d + 3.6 1.5 d < x < 2 d
式中x为评价的成效数值,即为备选项目的总造价;d为项目的平均造价;
②效益型隶属函数:解决高压重载线路、解决高压重载主变、解决中压重载线路、解决低电压用户、解决单线单变、解决高压配电网N-1、解决中压配电线路N-1、更换高损配变台数、增供负荷和增供电量的成效采用效益型隶属函数;
第i个项目的第j个成效的归一化值为
V i , j = 1 d 1 &CenterDot; x 0 < x < d 1 v 2 - v 1 d 2 - d 1 x + v 2 - d 2 ( v 2 - v 1 ) d 2 - d 1 d 1 &le; x &le; d 2 v 2 - 1 d 2 - d 3 x + 1 - d 3 ( v 2 - 1 ) d 2 - d 3 d 2 < x < d 3
式中,x为成效的评价数值,d1、d2、d3、v1和v2的取值如下表1所示:
表1效益型隶属函数主要参数取值表
③适中型隶属函数:新增变电容量、新增配变容量、新增电缆长度、新增绝缘线路长度和新增非晶合金配变台数的成效采用适中型隶属函数;
第i个项目的第j个成效的归一化值为
V i , j = 1 d 1 &CenterDot; x 0 < x < d 1 1 d 1 &le; x &le; d 2 1 d 2 - d 3 x + 1 - d 2 d 2 - d 3 d 2 < x < d 3
式中,x为成效的评价数值,d1、d2、d3、v1和v2的取值如下表2所示:
表2效益型隶属函数主要参数取值表
3)对采用逻辑评价的成效,第i个项目的第j个成效的归一化值为
步骤S4所述的规划目标,包括容载比、户均配变容量、高压重载线路占比、高压重载主变占比、中压重载线路占比、变电站负载均衡度、高压线路负载均衡度、中压线路负载均衡度、中压配变负载均衡度、低电压用户数占比、电压合格率、供电可靠率、单线单变占比、高压供电半径、中压供电半径、高压配电网N-1通过率、中压配电线路N-1通过率、电缆化率、绝缘化率、高损配变占比、非晶合金配变占比、未改村改造率、完善村改造率、电气化县个数、分布式电源接入率、线损率、单位投资增供负荷和单位投资增供电量。
步骤S5所述的建立备选项目的成效与规划指标的映射关系,调整成效的权重,并计算各个备选项目的评分,包括如下步骤:
1)确定规划指标与成效的函数关系Fi=f(P1,…,Pj,…,Pm),具体包括:
F1=(P1+P1,0)/Q1
式中:F1为容载比,P1为新增变电容量,P1,0为该电压等级已有变电容量,Q1为该电压等级预测的最大网供负荷;
F2=(P2+P2,0)/Q2
式中:F2为户均配变容量,P2为新增配变容量,P2,0为原有配变容量,Q2为用户户数;
F3=(P3,0-P3)/Q3
式中:F3为高压重载线路占比,P3为解决高压重载线路条数,P3,0为原有高压重载线路条数,Q3为高压线路总条数;
F4=(P4,0-P4)/Q4
式中:F4为高压重载主变占比,P4为解决高压重载主变台数,P4,0为原有高压重载主变台数,Q4为主变总台数;
F5=(P5,0-P5)/Q5
式中:F5为中压重载线路占比,P5为解决中压重载线路条数,P5,0为原有中压重载线路条数,Q5为中压线路总条数;
F6=(P6,0*Q6+P6)/Q6
式中:F6为变电站负载均衡度,P6为改善变电站均衡度,P6,0为原变电站负载均衡度,Q6为变电站座数;
F7=(P7,0*Q7+P7)/Q7
式中:F7为高压线路负载均衡度,P7为改善高压线路负载均衡度,P7,0为原高压线路负载均衡度,Q7为高压线路条数;
F8=(P8,0*Q8+P8)/Q8
式中:F8为中压线路负载均衡度,P8为改善中压线路负载均衡度,P8,0为原中压线路负载均衡度,Q8为中压线路条数;
F9=(P9,0*Q9+P9)/Q9
式中:F9为中压配变负载均衡度,P9为改善中压配变负载均衡度,P9,0为原中压配变负载均衡度,Q9为配变台数;
F10=(P10,0-P10)/Q10
式中:F10为“低电压”用户数占比,P10为解决低电压用户,P10,0为原有低电压用户数,Q10为用户总数;
F11=(P11,0*Q11+P11)/Q11
式中:F11为电压合格率,P11为改善电压质量,P11,0为原电压合格率,Q11为系统监测点个数;
F12=(P12,0*Q12-P12*Q13)/Q12
式中:F12为供电可靠率,P12为减少系统平均停电时间,P12,0为原供电可靠率,Q12为系统用户,Q13为项目影响用户数;
F13=(P13,0-P13)/Q14
式中:F13为单线单变占比,P13为解决单线单变台数,P13,0为原单线单变台数;Q14为变压器总台数;
F 14 = S / ( ( P 14 , 0 + P 14 ) * &pi; )
式中:F14为高压供电半径,P14为新增变电站座数,P14,0为原有变电站座数;S为供电总面积;
F15=(P15,0*Q15-(P15,0-P15)*Q16)/(Q15+Q16)
式中:F15为中压供电半径,P15为缩短中压供电半径长度,P15,0为原中压供电半径;Q15为原线路总条数;Q16为新增线路条数;
F16=1-(P16,0-P16)/Q17
式中:F16为高压配电网N-1通过率,P16为解决高压配电网N-1条数,P16,0为高压配电网N-1未通过条数;Q17为高压线路总条数;
F17=1-(P17,0-P17)/Q18
式中:F17为中压配电线路N-1通过率,P17为解决中压配电线路N-1条数,P17,0为中压配电网N-1未通过条数;Q18为中压线路总条数;
F18=(P18,0+P18)/Q19
式中:F18为电缆化率,P18为新增电缆长度,P18,0为原有电缆线路长度;Q19为总线路长度;
F19=(P19,0+P19)/Q20
式中:F19为绝缘化率,P19为新增绝缘线路长度,P19,0为原有绝缘化线路长度;Q20为总线路长度;
F20=(P20,0-P20)/Q21
式中:F20为高损配变占比,P20为更换高损配变台数,P20,0为原有高损配变台数;Q21为配变总台数;
F21=(P21,0+P21)/Q22
式中:F21为非晶合金配变占比,P21为新增非晶合金配变台数,P20,0为原有非晶合金配变台数;Q22为配变总台数;
F22=(P22,0-P22)/P22,0
式中:F22为未改村改造率,P22为改造未改村个数,P22,0为原有未改村个数;
F23=(P23,0-P23)/P23,0
式中:F23为完善村改造率,P23为改造完善村个数,P23,0为原有完善村个数;
F24=ROUND(P24/Q23*3,0)
式中:F24为电气化县个数,P24为改造电气化村个数,Q23为县域行政村个数,ROUND()为取0,1运算,当P24/Q23*3的值大于1时,F24取值为1,否则取值为0;
F25=P25/Q24
式中:F25为分布式电源接入率,P25为满足新能源送出,Q24为新能源接入个数需求;
F26=P26*Q25*Q26
式中:F26为线损率,P26为降低线损,Q25为单体项目历史平均降损电量;Q26为项目的规模系数,由项目造价除以历史平均造价得到;
F27=P27/P29
式中:F27为单位投资增供负荷,P27为增供负荷,P29为工程投资;
F28=P28/P29
式中:F28为单位投资增供电量,P28为增供电量;
2)根据各规划指标的现状与预期值,确定规划指标的重要程度:
&lambda; i = &Delta;F i &Sigma; j n &Delta;F j = F i , 1 - F i , 0 F i , 0 &Sigma; j n F j , 1 - F j , 0 F j , 0
式中:Fi,1、Fi,0分别为规划指标Fi的目标值和现状值;
3)根据各规划目标的重要程度及成效属性的函数关系,确定各成效属性权重:
&sigma; &OverBar; i = &Sigma; j = 1 n &lambda; j &part; f ( P 1 , ... , P j , ... , P m ) &part; P i
&sigma; i = &sigma; &OverBar; i &Sigma; j = 1 m &sigma; &OverBar; j
式中:σi为成效属性权重;n为规划指标的个数;
4)计算各个备选项目的评分:
V i = &Sigma; j = 1 m &sigma; j * V i , j
式中:Vi为项目i的综合评分;Vi,j为项目i在对应于成效属性j的归一化评分。
步骤S6所述的获取最优的配电网备选项目的优化选择结果,具体方法为:
max V t = &Sigma; i = 1 k V i
s . t . &Sigma; i = 1 k I i &le; I t
式中:k为选中的项目个数;Vt为选中项目的综合评分之和;Ii为单个项目的资金需求额度,It为可用资金总额度;通过求解上述优化方程,得到最优的配电网备选项目的优化选择结果。
本发明提供的这种配电网备选建设项目的优化选择方法,由于制定了单个项目的成效属性和效果量化规则,建立项目成效属性的归一化方法,建立项目属性与规划目标的映射关系,形成随着规划目标动态调整项目成效属性的权重及评分,最后基于可用资金总额约束和规划目标约束实现最优的配电网备选建设项目的选择方案,因此能够解决项目成效与规划目标之间关联性不好的问题,通过量化指标来确定备选的建设项目,优化了项目分配效率,优化了分配效率,提高了资源利用率。
附图说明
图1为本发明的流程图。
图2为本发明的规划目标体系示意图。
图3为本发明的成效属性示意图。
具体实施方式
如图1所示,为本发明的配电网备选建设项目的优化选择方法的流程图:本发明提供的这种配电网备选建设项目的优化选择方法,主要包括如下步骤:
S1.确定配电网备选建设项目的建设区域,收集待建设区域的电网的现状指标:
待建设区域的电网的现状指标与规划目标体系相同,均如图2所示,具体包括电压等级、供电能力、供电质量、电网结构、电网设备、地区政策和效率效益等;
S2.对各个待建设项目对待建设区域带来的成效,逐一进行量化评价:
成效属性体系如图3所示,具体包括提高功能能力属性(包括新增变电容量、新增配变容量、解决高压重载线路、解决高压重载主变、解决中压重载线路、改善变电站均衡度、改善高压线路负载均衡度、改善中压线路负载均衡度、改善中压配变负载均衡度等)、改善供电质量(包括解决低电压用户数、改善电压质量、减少系统平均停电时间、减少用户平均停电时间等)、优化电网结构(包括解决单线单变、新增变电站、缩短中压供电半径、解决高压配电网N-1、解决中压配电线路N-1等)、提升电网设备(包括新增电缆长度、新增绝缘线路长度、更换高损配变台数、新增非晶合金配变台数等)、满足地区政策(包括改造未改村、改造完善村、改造电气化村、满足新能源送出等)和提升效率效益(包括降低线损、增供负荷、增供电量和工程投资等);
所述的量化评价为采用分级评价、数值评价和逻辑评价三种。
分级评价为采用模糊语言评价,分为“显著、明显、一般、微小、无”;采用分级评价的成效属性有:改善变电站均衡度、改善高压线路负载均衡度、改善中压线路负载均衡度、改善中压配变负载均衡度、改善电压质量、减少系统平均停电时间、减少用户平均停电时间、缩短中压供电半径和降低线损。
数值评价为采用该属性直接解决问题的数量;采用数值评价的成效有:新增变电容量、新增配变容量、解决高压重载线路、解决高压重载主变、解决中压重载线路、解决低电压用户、解决单线单变、解决高压配电网N-1、解决中压配电线路N-1、新增电缆长度、新增绝缘线路长度、更换高损配变台数、新增非晶合金配变台数、增供负荷、增供电量和工程投资。
逻辑评价为采用二值逻辑评价,分为“是”和“否”;采用逻辑评价的成效属有:新增变电站、改造未改村、改造完善村、改造电气化村和满足新能源送出。
S3.根据步骤S2的量化评价结果,对待建设项目的成效逐一进行归一化评分:主要包括如下步骤:
1)对采用分级评价的成效,规定第i个项目对应于第j个成效的分级评价为“显著、明显、一般、微小、无”,则其归一化评分为“1、0.8、0.5、0.2、0”;
2)对采用数值评价的成效,采用隶属函数进行归一化评分,包括如下步骤:
①成本型隶属函数:工程投资采用成本型隶属函数;
第i个项目的第j个成效的归一化值为 V i , j = - 1 12 d x + 1 0 < x < 1.2 d - 2 d x + 3.3 1.2 d &le; x &le; 1.5 d - 9 5 d + 3.6 1.5 d < x < 2 d
式中x为评价的成效数值,即为待投资项目的总造价;d为项目的平均造价;
②效益型隶属函数:解决高压重载线路、解决高压重载主变、解决中压重载线路、解决低电压用户、解决单线单变、解决高压配电网N-1、解决中压配电线路N-1、更换高损配变台数、增供负荷和增供电量的成效采用效益型隶属函数;
第i个项目的第j个成效的归一化值为
V i , j = 1 d 1 &CenterDot; x 0 < x < d 1 v 2 - v 1 d 2 - d 1 x + v 2 - d 2 ( v 2 - v 1 ) d 2 - d 1 d 1 &le; x &le; d 2 v 2 - 1 d 2 - d 3 x + 1 - d 3 ( v 2 - 1 ) d 2 - d 3 d 2 < x < d 3
式中,x为成效的评价数值,d1、d2、d3、v1和v2的取值如下表1所示:
表1效益型隶属函数主要参数取值表
③适中型隶属函数:新增变电容量、新增配变容量、新增电缆长度、新增绝缘线路长度和新增非晶合金配变台数的成效采用适中型隶属函数;
第i个项目的第j个成效的归一化值为
V i , j = 1 d 1 &CenterDot; x 0 < x < d 1 1 d 1 &le; x &le; d 2 1 d 2 - d 3 x + 1 - d 2 d 2 - d 3 d 2 < x < d 3
式中,x为成效的评价数值,d1、d2、d3、v1和v2的取值如下表2所示:
表2效益型隶属函数主要参数取值表
3)对采用逻辑评价的成效,第i个项目的第j个成效的归一化值为
S4.对待建设项目制定规划目标:
规划目标体系如图2所示,主要包括供电能力(主要有容载比、户均配变容量、高压重载线路占比、高压重载主变占比、中压重载线路占比、变电站负载均衡度、高压线路负载均衡度、中压线路负载均衡度、中压配变负载均衡度等)、供电质量(主要有低电压用户数占比、电压合格率、供电可靠率等)、电网结构(主要有单线单变占比、高压供电半径、中压供电半径、高压配电网N-1通过率、中压配电线路N-1通过率等)、电网设备(主要有电缆化率、绝缘化率、高损配变占比、非晶合金配变占比等)、地区政策(主要有未改村改造率、完善村改造率、电气化县个数、分布式电源接入率等)、效率效益(主要有线损率、单位投资增供负荷、单位投资增供电量等)等;
S5.根据步骤S4的规划目标,建立待建设项目的成效与规划指标的映射关系,调整成效的权重,并计算各个待建设项目的评分:主要包括如下步骤:
1)确定规划指标与成效的函数关系Fi=f(P1,…,Pj,…,Pm),具体包括:
F1=(P1+P1,0)/Q1
式中:F1为容载比,P1为新增变电容量,P1,0为该电压等级已有变电容量,Q1为该电压等级预测的最大网供负荷;
F2=(P2+P2,0)/Q2
式中:F2为户均配变容量,P2为新增配变容量,P2,0为原有配变容量,Q2为用户户数;
F3=(P3,0-P3)/Q3
式中:F3为高压重载线路占比,P3为解决高压重载线路条数,P3,0为原有高压重载线路条数,Q3为高压线路总条数;
F4=(P4,0-P4)/Q4
式中:F4为高压重载主变占比,P4为解决高压重载主变台数,P4,0为原有高压重载主变台数,Q4为主变总台数;
F5=(P5,0-P5)/Q5
式中:F5为中压重载线路占比,P5为解决中压重载线路条数,P5,0为原有中压重载线路条数,Q5为中压线路总条数;
F6=(P6,0*Q6+P6)/Q6
式中:F6为变电站负载均衡度,P6为改善变电站均衡度,P6,0为原变电站负载均衡度,Q6为变电站座数;
F7=(P7,0*Q7+P7)/Q7
式中:F7为高压线路负载均衡度,P7为改善高压线路负载均衡度,P7,0为原高压线路负载均衡度,Q7为高压线路条数;
F8=(P8,0*Q8+P8)/Q8
式中:F8为中压线路负载均衡度,P8为改善中压线路负载均衡度,P8,0为原中压线路负载均衡度,Q8为中压线路条数;
F9=(P9,0*Q9+P9)/Q9
式中:F9为中压配变负载均衡度,P9为改善中压配变负载均衡度,P9,0为原中压配变负载均衡度,Q9为配变台数;
F10=(P10,0-P10)/Q10
式中:F10为“低电压”用户数占比,P10为解决低电压用户,P10,0为原有低电压用户数,Q10为用户总数;
F11=(P11,0*Q11+P11)/Q11
式中:F11为电压合格率,P11为改善电压质量,P11,0为原电压合格率,Q11为系统监测点个数;
F12=(P12,0*Q12-P12*Q13)/Q12
式中:F12为供电可靠率,P12为减少系统平均停电时间,P12,0为原供电可靠率,Q12为系统用户,Q13为项目影响用户数;
F13=(P13,0-P13)/Q14
式中:F13为单线单变占比,P13为解决单线单变台数,P13,0为原单线单变台数;Q14为变压器总台数;
F 14 = S / ( ( P 14 , 0 + P 14 ) * &pi; )
式中:F14为高压供电半径,P14为新增变电站座数,P14,0为原有变电站座数;S为供电总面积;
F15=(P15,0*Q15-(P15,0-P15)*Q16)/(Q15+Q16)
式中:F15为中压供电半径,P15为缩短中压供电半径长度,P15,0为原中压供电半径;Q15为原线路总条数;Q16为新增线路条数;
F16=1-(P16,0-P16)/Q17
式中:F16为高压配电网N-1通过率,P16为解决高压配电网N-1条数,P16,0为高压配电网N-1未通过条数;Q17为高压线路总条数;
F17=1-(P17,0-P17)/Q18
式中:F17为中压配电线路N-1通过率,P17为解决中压配电线路N-1条数,P17,0为中压配电网N-1未通过条数;Q18为中压线路总条数;
F18=(P18,0+P18)/Q19
式中:F18为电缆化率,P18为新增电缆长度,P18,0为原有电缆线路长度;Q19为总线路长度;
F19=(P19,0+P19)/Q20
式中:F19为绝缘化率,P19为新增绝缘线路长度,P19,0为原有绝缘化线路长度;Q20为总线路长度;
F20=(P20,0-P20)/Q21
式中:F20为高损配变占比,P20为更换高损配变台数,P20,0为原有高损配变台数;Q21为配变总台数;
F21=(P21,0+P21)/Q22
式中:F21为非晶合金配变占比,P21为新增非晶合金配变台数,P20,0为原有非晶合金配变台数;Q22为配变总台数;
F22=(P22,0-P22)/P22,0
式中:F22为未改村改造率,P22为改造未改村个数,P22,0为原有未改村个数;
F23=(P23,0-P23)/P23,0
式中:F23为完善村改造率,P23为改造完善村个数,P23,0为原有完善村个数;
F24=ROUND(P24/Q23*3,0)
式中:F24为电气化县个数,P24为改造电气化村个数,Q23为县域行政村个数,ROUND()为取0,1运算,当P24/Q23*3的值大于1时,F24取值为1,否则取值为0;
F25=P25/Q24
式中:F25为分布式电源接入率,P25为满足新能源送出,Q24为新能源接入个数需求;
F26=P26*Q25*Q26
式中:F26为线损率,P26为降低线损,Q25为单体项目历史平均降损电量;Q26为项目的规模系数,由项目造价除以历史平均造价得到;
F27=P27/P29
式中:F27为单位投资增供负荷,P27为增供负荷,P29为工程投资;
F28=P28/P29
式中:F28为单位投资增供电量,P28为增供电量;
2)根据各规划指标的现状与预期值,确定规划指标的重要程度:
&lambda; i = &Delta;F i &Sigma; j n &Delta;F j = F i , 1 - F i , 0 F i , 0 &Sigma; j n F j , 1 - F j , 0 F j , 0
式中:Fi,1、Fi,0分别为规划指标Fi的目标值和现状值;
3)根据各规划目标的重要程度及成效属性的函数关系,确定各成效属性权重:
&sigma; &OverBar; 1 = &Sigma; j = 1 n &lambda; j &part; f ( P 1 , ... , P j , ... , P m ) &part; P i
&sigma; i = &sigma; &OverBar; i &Sigma; j = 1 m &sigma; &OverBar; j
式中:σi为成效属性权重;n为规划指标的个数;
4)计算各个待建设项目的评分:
V i = &Sigma; j = 1 m &sigma; j * V i , j
式中:Vi为项目i的综合评分;Vi,j为项目i在对应于成效属性j的归一化评分。
S6.根部各个待建设项目的评分、各个待建设项目的资金需求和可用资金总额,计算得到最优的配电网备选建设项目的优化选择结果,具体方法为:
max V t = &Sigma; i = 1 k V i
s . t . &Sigma; i = 1 k I i &le; I t
式中:k为选中的项目个数;Vt为选中项目的综合评分之和;Ii为单个项目的资金需求额度,It为可用资金总额;通过采用线性规划等方法求解上述优化方程,得到最优的配电网备选建设项目的选择方案。

Claims (8)

1.一种配电网备选建设项目的优化选择方法,主要包括如下步骤:
S1.确定配电网备选建设项目的建设区域,收集备选项目所在区域电网的现状指标;
S2.对各个备选项目对所在区域带来的成效,逐一进行量化评价;
S3.根据步骤S2的量化评价结果,对备选项目的成效逐一进行归一化评分;
S4.对备选项目制定规划目标;
S5.根据步骤S4的规划目标,建立备选项目的成效与规划指标的映射关系,调整成效的权重,并计算各个备选项目的评分;
S6.根部各个备选项目的评分、各个备选项目的资金需求和可用资金总额,计算得到最优的配电网备选项目的优化选择结果。
2.根据权利要求1所述的配电网备选建设项目的优化选择方法,其特征在于步骤1所述现状指标,包括电压等级、供电能力、供电质量、电网结构、电网设备、地区政策和效率效益。
3.根据权利要求1或2所述的配电网备选建设项目的优化选择方法,其特征在于步骤2所述的成效,包括新增变电容量、新增配变容量、解决高压重载线路、解决高压重载主变、解决中压重载线路、改善变电站均衡度、改善高压线路负载均衡度、改善中压线路负载均衡度、改善中压配变负载均衡度、解决低电压用户数、改善电压质量、减少系统平均停电时间、减少用户平均停电时间、解决单线单变、新增变电站、缩短中压供电半径、解决高压配电网N-1、解决中压配电线路N-1、新增电缆长度、新增绝缘线路长度、更换高损配变台数、新增非晶合金配变台数、改造未改村、改造完善村、改造电气化村、满足新能源送出、降低线损、增供负荷、增供电量和工程投资。
4.根据权利要求1或2所述的配电网备选建设项目的优化选择方法,其特征在于步骤2所述的量化评价为采用分级评价、数值评价和逻辑评价三种:
所述的分级评价为采用模糊语言评价,分为“显著、明显、一般、微小、无”;采用分级评价的成效属性有:改善变电站均衡度、改善高压线路负载均衡度、改善中压线路负载均衡度、改善中压配变负载均衡度、改善电压质量、减少系统平均停电时间、减少用户平均停电时间、缩短中压供电半径和降低线损;
所述的数值评价为采用该属性直接解决问题的数量;采用数值评价的成效有:新增变电容量、新增配变容量、解决高压重载线路、解决高压重载主变、解决中压重载线路、解决低电压用户、解决单线单变、解决高压配电网N-1、解决中压配电线路N-1、新增电缆长度、新增绝缘线路长度、更换高损配变台数、新增非晶合金配变台数、增供负荷、增供电量和工程投资;
所述的逻辑评价为采用二值逻辑评价,分为“是”和“否”;采用逻辑评价的成效属有:新增变电站、改造未改村、改造完善村、改造电气化村和满足新能源送出。
5.根据权利要求1或2所述的配电网备选建设项目的优化选择方法,其特征在于步骤S3所述的归一化评分,包括如下步骤:
1)对采用分级评价的成效,规定第i个项目对应于第j个成效的分级评价为“显著、明显、一般、微小、无”,则其归一化评分为“1、0.8、0.5、0.2、0”;
2)对采用数值评价的成效,采用隶属函数进行归一化评分,包括如下步骤:
①成本型隶属函数:工程投资采用成本型隶属函数;
第i个项目的第j个成效的归一化值为
式中x为评价的成效数值,即为备选项目的总造价;d为项目的平均造价;
②效益型隶属函数:解决高压重载线路、解决高压重载主变、解决中压重载线路、解决低电压用户、解决单线单变、解决高压配电网N-1、解决中压配电线路N-1、更换高损配变台数、增供负荷和增供电量的成效采用效益型隶属函数;
第i个项目的第j个成效的归一化值为
式中,x为成效的评价数值,d1、d2、d3、v1和v2的取值如下表1所示:
表1效益型隶属函数主要参数取值表
③适中型隶属函数:新增变电容量、新增配变容量、新增电缆长度、新增绝缘线路长度和新增非晶合金配变台数的成效采用适中型隶属函数;
第i个项目的第j个成效的归一化值为
式中,x为成效的评价数值,d1、d2、d3、v1和v2的取值如下表2所示:
表2效益型隶属函数主要参数取值表
3)对采用逻辑评价的成效,第i个项目的第j个成效的归一化值为
6.根据权利要求1或2所述的配电网备选建设项目的优化选择方法,其特征在于步骤S4所述的规划目标,包括容载比、户均配变容量、高压重载线路占比、高压重载主变占比、中压重载线路占比、变电站负载均衡度、高压线路负载均衡度、中压线路负载均衡度、中压配变负载均衡度、低电压用户数占比、电压合格率、供电可靠率、单线单变占比、高压供电半径、中压供电半径、高压配电网N-1通过率、中压配电线路N-1通过率、电缆化率、绝缘化率、高损配变占比、非晶合金配变占比、未改村改造率、完善村改造率、电气化县个数、分布式电源接入率、线损率、单位投资增供负荷和单位投资增供电量。
7.根据权利要求1或2所述的配电网备选建设项目的优化选择方法,其特征在于步骤S5所述的建立备选项目的成效与规划指标的映射关系,调整成效的权重,并计算各个备选项目的评分,包括如下步骤:
1)确定规划指标与成效的函数关系Fi=f(P1,…,Pj,…,Pm),具体包括:
F1=(P1+P1,0)/Q1
式中:F1为容载比,P1为新增变电容量,P1,0为该电压等级已有变电容量,Q1为该电压等级预测的最大网供负荷;
F2=(P2+P2,0)/Q2
式中:F2为户均配变容量,P2为新增配变容量,P2,0为原有配变容量,Q2为用户户数;
F3=(P3,0-P3)/Q3
式中:F3为高压重载线路占比,P3为解决高压重载线路条数,P3,0为原有高压重载线路条数,Q3为高压线路总条数;
F4=(P4,0-P4)/Q4
式中:F4为高压重载主变占比,P4为解决高压重载主变台数,P4,0为原有高压重载主变台数,Q4为主变总台数;
F5=(P5,0-P5)/Q5
式中:F5为中压重载线路占比,P5为解决中压重载线路条数,P5,0为原有中压重载线路条数,Q5为中压线路总条数;
F6=(P6,0*Q6+P6)/Q6
式中:F6为变电站负载均衡度,P6为改善变电站均衡度,P6,0为原变电站负载均衡度,Q6为变电站座数;
F7=(P7,0*Q7+P7)/Q7
式中:F7为高压线路负载均衡度,P7为改善高压线路负载均衡度,P7,0为原高压线路负载均衡度,Q7为高压线路条数;
F8=(P8,0*Q8+P8)/Q8
式中:F8为中压线路负载均衡度,P8为改善中压线路负载均衡度,P8,0为原中压线路负载均衡度,Q8为中压线路条数;
F9=(P9,0*Q9+P9)/Q9
式中:F9为中压配变负载均衡度,P9为改善中压配变负载均衡度,P9,0为原中压配变负载均衡度,Q9为配变台数;
F10=(P10,0-P10)/Q10
式中:F10为“低电压”用户数占比,P10为解决低电压用户,P10,0为原有低电压用户数,Q10为用户总数;
F11=(P11,0*Q11+P11)/Q11
式中:F11为电压合格率,P11为改善电压质量,P11,0为原电压合格率,Q11为系统监测点个数;
F12=(P12,0*Q12-P12*Q13)/Q12
式中:F12为供电可靠率,P12为减少系统平均停电时间,P12,0为原供电可靠率,Q12为系统用户,Q13为项目影响用户数;
F13=(P13,0-P13)/Q14
式中:F13为单线单变占比,P13为解决单线单变台数,P13,0为原单线单变台数;Q14为变压器总台数;
式中:F14为高压供电半径,P14为新增变电站座数,P14,0为原有变电站座数;S为供电总面积;
F15=(P15,0*Q15-(P15,0-P15)*Q16)/(Q15+Q16)
式中:F15为中压供电半径,P15为缩短中压供电半径长度,P15,0为原中压供电半径;Q15为原线路总条数;Q16为新增线路条数;
F16=1-(P16,0-P16)/Q17
式中:F16为高压配电网N-1通过率,P16为解决高压配电网N-1条数,P16,0为高压配电网N-1未通过条数;Q17为高压线路总条数;
F17=1-(P17,0-P17)/Q18
式中:F17为中压配电线路N-1通过率,P17为解决中压配电线路N-1条数,P17,0为中压配电网N-1未通过条数;Q18为中压线路总条数;
F18=(P18,0+P18)/Q19
式中:F18为电缆化率,P18为新增电缆长度,P18,0为原有电缆线路长度;Q19为总线路长度;
F19=(P19,0+P19)/Q20
式中:F19为绝缘化率,P19为新增绝缘线路长度,P19,0为原有绝缘化线路长度;Q20为总线路长度;
F20=(P20,0-P20)/Q21
式中:F20为高损配变占比,P20为更换高损配变台数,P20,0为原有高损配变台数;Q21为配变总台数;
F21=(P21,0+P21)/Q22
式中:F21为非晶合金配变占比,P21为新增非晶合金配变台数,P20,0为原有非晶合金配变台数;Q22为配变总台数;
F22=(P22,0-P22)/P22,0
式中:F22为未改村改造率,P22为改造未改村个数,P22,0为原有未改村个数;
F23=(P23,0-P23)/P23,0
式中:F23为完善村改造率,P23为改造完善村个数,P23,0为原有完善村个数;
F24=ROUND(P24/Q23*3,0)
式中:F24为电气化县个数,P24为改造电气化村个数,Q23为县域行政村个数,ROUND()为取0,1运算,当P24/Q23*3的值大于1时,F24取值为1,否则取值为0;
F25=P25/Q24
式中:F25为分布式电源接入率,P25为满足新能源送出,Q24为新能源接入个数需求;
F26=P26*Q25*Q26
式中:F26为线损率,P26为降低线损,Q25为单体项目历史平均降损电量;Q26为项目的规模系数,由项目造价除以历史平均造价得到;
F27=P27/P29
式中:F27为单位投资增供负荷,P27为增供负荷,P29为工程投资;
F28=P28/P29
式中:F28为单位投资增供电量,P28为增供电量;
2)根据各规划指标的现状与预期值,确定规划指标的重要程度:
式中:Fi,1、Fi,0分别为规划指标Fi的目标值和现状值;
3)根据各规划目标的重要程度及成效属性的函数关系,确定各成效属性权重:
式中:σi为成效属性权重;n为规划指标的个数;
4)计算各个备选项目的评分:
式中:Vi为项目i的综合评分;Vi,j为项目i在对应于成效属性j的归一化评分。
8.根据权利要求1或2所述的配电网备选建设项目的优化选择方法,其特征在于步骤S6所述的获取最优的配电网备选项目的优化选择结果,具体方法为:
式中:k为选中的项目个数;Vt为选中项目的综合评分之和;Ii为单个项目的资金需求额度,It为可用资金总额度;通过求解上述优化方程,得到最优的配电网备选项目的优化选择结果。
CN201510778643.3A 2015-11-13 2015-11-13 配电网备选建设项目的优化选择方法 Pending CN105426994A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510778643.3A CN105426994A (zh) 2015-11-13 2015-11-13 配电网备选建设项目的优化选择方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510778643.3A CN105426994A (zh) 2015-11-13 2015-11-13 配电网备选建设项目的优化选择方法

Publications (1)

Publication Number Publication Date
CN105426994A true CN105426994A (zh) 2016-03-23

Family

ID=55505188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510778643.3A Pending CN105426994A (zh) 2015-11-13 2015-11-13 配电网备选建设项目的优化选择方法

Country Status (1)

Country Link
CN (1) CN105426994A (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107274054A (zh) * 2017-05-03 2017-10-20 国网辽宁省电力有限公司 基于同层设备最大可供能力的配电网运行效率评价方法
CN109492874A (zh) * 2018-10-15 2019-03-19 国家电网有限公司 一种三层级配电网投资决策体系的决策方法
CN110289616A (zh) * 2019-06-29 2019-09-27 国家电网有限公司 一种基于网络分析的高压配电网项目动态选择方法
CN110334846A (zh) * 2019-05-07 2019-10-15 国网湖南省电力有限公司 规划效果最优的最小投资测算方法
CN111461582A (zh) * 2020-05-15 2020-07-28 广东电网有限责任公司湛江供电局 电网建设项目方案选定方法、系统及存储介质
CN111950782A (zh) * 2020-07-31 2020-11-17 国网上海市电力公司 一种基于模糊评价的电力市场调度方法
CN112288240A (zh) * 2020-10-15 2021-01-29 国网江西省电力有限公司电力科学研究院 一种配电网建设项目成效评价方法
WO2021073118A1 (zh) * 2019-10-18 2021-04-22 平安科技(深圳)有限公司 基于强化学习的信息处理方法、装置、设备和存储介质
CN114091947A (zh) * 2021-11-29 2022-02-25 深圳供电局有限公司 一种用户地区特征评价方法及系统
CN114880617A (zh) * 2021-12-22 2022-08-09 长沙理工大学 基于动态权重的配电网差异化投资决策方法
RU2798689C2 (ru) * 2021-12-01 2023-06-23 Федеральное государственное бюджетное образовательное учреждение высшего образования "Поволжский государственный университет телекоммуникаций и информатики" Устройство для проектирования сложной системы

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101540018A (zh) * 2009-01-23 2009-09-23 浙江师范大学 一种企业信息技术应用程度评价方法及系统
CN102129627A (zh) * 2011-03-24 2011-07-20 江苏电力信息技术有限公司 一种基于权重调整的绩效评估方法
CN103679544A (zh) * 2012-11-27 2014-03-26 江苏省电力公司南京供电公司 一种智能配电网运行综合评估方法
CN103778575A (zh) * 2014-03-04 2014-05-07 国网浙江宁波市鄞州区供电公司 变压器状态评估方法及系统

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101540018A (zh) * 2009-01-23 2009-09-23 浙江师范大学 一种企业信息技术应用程度评价方法及系统
CN102129627A (zh) * 2011-03-24 2011-07-20 江苏电力信息技术有限公司 一种基于权重调整的绩效评估方法
CN103679544A (zh) * 2012-11-27 2014-03-26 江苏省电力公司南京供电公司 一种智能配电网运行综合评估方法
CN103778575A (zh) * 2014-03-04 2014-05-07 国网浙江宁波市鄞州区供电公司 变压器状态评估方法及系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张博文等: "专家评分法在国际工程投标决策中的应用", 《河北建筑科技学院学报》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107274054B (zh) * 2017-05-03 2021-05-14 国网辽宁省电力有限公司 基于同层设备最大可供能力的配电网运行效率评价方法
CN107274054A (zh) * 2017-05-03 2017-10-20 国网辽宁省电力有限公司 基于同层设备最大可供能力的配电网运行效率评价方法
CN109492874A (zh) * 2018-10-15 2019-03-19 国家电网有限公司 一种三层级配电网投资决策体系的决策方法
CN109492874B (zh) * 2018-10-15 2022-01-11 国家电网有限公司 一种三层级配电网投资决策体系的决策方法
CN110334846A (zh) * 2019-05-07 2019-10-15 国网湖南省电力有限公司 规划效果最优的最小投资测算方法
CN110289616B (zh) * 2019-06-29 2021-06-15 国家电网有限公司 一种基于网络分析的高压配电网项目动态选择方法
CN110289616A (zh) * 2019-06-29 2019-09-27 国家电网有限公司 一种基于网络分析的高压配电网项目动态选择方法
WO2021073118A1 (zh) * 2019-10-18 2021-04-22 平安科技(深圳)有限公司 基于强化学习的信息处理方法、装置、设备和存储介质
CN111461582A (zh) * 2020-05-15 2020-07-28 广东电网有限责任公司湛江供电局 电网建设项目方案选定方法、系统及存储介质
CN111950782A (zh) * 2020-07-31 2020-11-17 国网上海市电力公司 一种基于模糊评价的电力市场调度方法
CN112288240A (zh) * 2020-10-15 2021-01-29 国网江西省电力有限公司电力科学研究院 一种配电网建设项目成效评价方法
CN112288240B (zh) * 2020-10-15 2023-07-04 国网江西省电力有限公司电力科学研究院 一种配电网建设项目成效评价方法
CN114091947A (zh) * 2021-11-29 2022-02-25 深圳供电局有限公司 一种用户地区特征评价方法及系统
RU2798689C2 (ru) * 2021-12-01 2023-06-23 Федеральное государственное бюджетное образовательное учреждение высшего образования "Поволжский государственный университет телекоммуникаций и информатики" Устройство для проектирования сложной системы
CN114880617A (zh) * 2021-12-22 2022-08-09 长沙理工大学 基于动态权重的配电网差异化投资决策方法

Similar Documents

Publication Publication Date Title
CN105426994A (zh) 配电网备选建设项目的优化选择方法
Kishore et al. Optimal economic planning of power transmission lines: A review
Soroudi et al. A distribution network expansion planning model considering distributed generation options and techo-economical issues
Sharma et al. A demand side management control strategy using Whale optimization algorithm
Roldán-Blay et al. Improving the benefits of demand response participation in facilities with distributed energy resources
Valinejad et al. Generation expansion planning in electricity markets: A novel framework based on dynamic stochastic MPEC
Babu et al. Multi-objective optimal allocation of electric vehicle charging stations in radial distribution system using teaching learning based optimization
Dehnavi et al. Congestion management through distributed generations and energy storage systems
CN106779277A (zh) 一种配电网网损的分类评估方法及装置
CN109409770A (zh) 一种基于神经网络的农村电网智能水平评价方法
CN107294081B (zh) 线损率影响因素的相关性确定方法
Orosz et al. Analysis of the green power transition on optimal power transformer designs
CN106709626A (zh) 一种基于贝叶斯网络的电网发展动态综合评价方法
CN105488589A (zh) 一种基于遗传模拟退火算法的电网线损管理评价方法
Wang et al. Modeling of energy transformation pathways under current policies, NDCs and enhanced NDCs to achieve 2-degree target
CN104573857A (zh) 一种基于智能算法优化组合的电网负荷率预测方法
CN104102840A (zh) 配电网对光伏电源接纳能力的测评方法
Ahmadpour et al. Investigation of capacitor placement in variable loads to reduce the power loss of distribution systems using mixed–integer linear programming algorithm and Re–gradation of loads
CN108280599A (zh) 一种基于公共服务价值模型的农配网投入产出评估方法
CN109193683A (zh) 基于线充比率的变电站感性无功充裕度评价方法
CN103700034A (zh) 一种基于边际成本理论的配电网网架规划方法
O'Connell et al. Controlled charging of electric vehicles in residential distribution networks
Babazadeh et al. Optimal Planning of Smart Distribution Network Based on Efficiency Evaluation Using Data Envelopment Analysis.
CN105243513A (zh) 自下而上的县域电网资金优化配置方法
Xiao et al. Application of geometrical observation of security region in distribution network enhancement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160323

RJ01 Rejection of invention patent application after publication