CN105421198A - 一种露天煤矿修筑斜坡道的方法 - Google Patents
一种露天煤矿修筑斜坡道的方法 Download PDFInfo
- Publication number
- CN105421198A CN105421198A CN201510946579.5A CN201510946579A CN105421198A CN 105421198 A CN105421198 A CN 105421198A CN 201510946579 A CN201510946579 A CN 201510946579A CN 105421198 A CN105421198 A CN 105421198A
- Authority
- CN
- China
- Prior art keywords
- ramp
- coal mine
- builds
- stone
- blasting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C21/00—Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
Abstract
本发明公开了一种露天煤矿修筑斜坡道的方法,包括以下步骤:沿斜坡道布置爆破线,所述爆破线将所述斜坡道分为左右两部分;对一侧所述斜坡道进行松动爆破;将一侧松动爆破后的石土运到排土场;对另一侧所述斜坡道进行抛掷爆破,将另一侧的石土抛掷到一侧;推土机整平所述斜坡道。本发明由于将另一侧的石土通过抛掷爆破的方式抛掷到一侧的斜坡道中,省去了将另一侧石土运到排土场的工作,节省了大量运输推运土石的工作,缩短了工期,降低了成本,并且不需要电铲采掘缺口。
Description
技术领域
本发明涉及露天煤矿开采的技术领域,尤其涉及一种露天煤矿修筑斜坡道的方法。
背景技术
我矿由于受东宝煤矿征地滞后的影响,各采掘平盘比较狭窄,有些作业区域电铲如果通过采掘坡道缺口位置来修筑坡道,上部平盘宽度不够。在部分平盘,如果通过松动爆破采掘缺口,无法保障作业的平盘宽度,电铲无法插勺。并且,松动爆破后,推土机的工作量较大,造成工期长、成本高。
因此,有必要发明一种不需要电铲采掘缺口、工期短、成本低的露天煤矿修筑斜坡道的方法。
发明内容
本发明的目的在于克服现有技术的不足,提供一种不需要电铲采掘缺口、工期短、成本低的露天煤矿修筑斜坡道的方法。
本发明的技术方案提供一种露天煤矿修筑斜坡道的方法,包括以下步骤:
沿斜坡道布置爆破线,所述爆破线将所述斜坡道分为左右两部分;
对一侧所述斜坡道进行松动爆破;
将一侧松动爆破后的石土运到排土场;
对另一侧所述斜坡道进行抛掷爆破,将另一侧的石土抛掷到一侧;
推土机整平所述斜坡道。
进一步地,所述爆破线为所述斜坡道的中线。
进一步地,所述爆破线为所述斜坡道的对角线。
进一步地,所述斜坡道为岩石层或煤层的斜坡道。
进一步地,一侧是左侧,另一侧是右侧。
进一步地,对一侧所述斜坡道进行松动爆破的步骤前还包括:
利用钻机沿所述爆破线的一侧钻出多个钻孔;
在所述钻孔内装药。
进一步地,对另一侧所述斜坡道进行抛掷爆破的步骤前还包括:
利用钻机沿所述爆破线的另一侧钻出多个钻孔,控制所述钻孔的方向,使得抛掷爆破时,另一侧的石土能够抛掷到一侧;
在所述钻孔内装药。
进一步地,根据所述斜坡到的长度和高度,来设定相邻所述钻孔之间的间距。
采用上述技术方案后,具有如下有益效果:本发明由于将另一侧的石土通过抛掷爆破的方式抛掷到一侧的斜坡道中,省去了将另一侧石土运到排土场的工作,节省了大量运输推运土石的工作,缩短了工期,降低了成本,并且不需要电铲采掘缺口。
附图说明
图1是本发明一实施例中露天煤矿修筑斜坡道的方法的流程图;
图2是本发明最佳实施例中露天煤矿修筑斜坡道的方法的流程图;
图3是本发明最佳实施例中修筑露天煤矿斜坡道的施工示意图;
图4是传统的修筑露天煤矿斜坡道的施工示意图。
具体实施方式
下面结合附图来进一步说明本发明的具体实施方式。
如图1所示,本发明一实施例中露天煤矿修筑斜坡道的方法,包括以下步骤:
步骤S101:沿斜坡道布置爆破线,所述爆破线将所述斜坡道分为左右两部分;
步骤S102:对一侧所述斜坡道进行松动爆破;
步骤S103:将一侧松动爆破后的石土运到排土场;
步骤S104:对另一侧所述斜坡道进行抛掷爆破,将另一侧的石土抛掷到一侧;
步骤S105:推土机整平所述斜坡道。
其中,松动爆破后斜坡道一侧的石土松动,方便卡车将松动的石土运到排土场。运送完成后,一侧的斜坡道的高度低于另一侧斜坡道的高度。当另一侧斜坡到抛掷爆破后,另一侧的石土被直接抛掷到一侧斜坡道上,此时左右侧的斜坡道的高度差不多。最后,再通过推土机将左右侧的斜坡道整平。
由于将另一侧的石土通过抛掷爆破的方式抛掷到一侧的斜坡道中,省去了将另一侧石土运到排土场的工作,节省了大量运输推运土石的工作,缩短了工期,降低了成本,并且不需要电铲采掘缺口。
优选地,所述爆破线为所述斜坡道的对角线。
较佳地,所述爆破线为所述斜坡道的中线。
对角线和中线均能将斜坡道分为左右两部分。
优选地,所述斜坡道为岩石层的斜坡道。由于岩石层较为坚硬,很难用推土机直接挖掘,因此需要通过爆破来松动或抛掷石土。
较佳地,所述斜坡道也可以为煤层的斜坡道,用于修筑煤层。
优选地,一侧是左侧,另一侧是右侧。
较佳地,也可以一侧是右侧,另一侧是左侧。先将右侧的斜坡道进行松动爆破,然后再将左侧的斜坡道进行抛掷爆破,并将左侧的石土抛掷到右侧。
优选地,对一侧所述斜坡道进行松动爆破的步骤前还包括:
利用钻机沿所述爆破线的一侧钻出多个钻孔;
在所述钻孔内装药。
优选地,对另一侧所述斜坡道进行抛掷爆破的步骤前还包括:
利用钻机沿所述爆破线的另一侧钻出多个钻孔,控制所述钻孔的方向,使得抛掷爆破时,另一侧的石土能够抛掷到一侧;
在所述钻孔内装药。
较佳地,根据所述斜坡到的长度和高度,来设定相邻所述钻孔之间的间距。
如图2-3所示,本发明的最佳实施例中露天煤矿修筑斜坡道的方法,包括以下步骤:
步骤S201:沿斜坡道1布置对角线2,对角线2将斜坡道1分为左右两部分;
步骤S202:利用钻机沿对角线2的左侧钻出多个钻孔;
步骤S203:在钻孔内装药;
步骤S204:对左侧斜坡道1进行松动爆破;
步骤S205:将左侧松动爆破后的石土运到排土场;
步骤S206:利用钻机沿对角线2的右侧钻出多个钻孔,控制钻孔的方向,使得抛掷爆破时,右侧的石土能够抛掷到左侧;
步骤S207:在钻孔内装药;
步骤S208:对右侧斜坡道1进行抛掷爆破,将右侧的石土抛掷到左侧;
步骤S209:推土机整平斜坡道1。
由于东宝煤矿的滞后影响,采场南部各平盘相对滞后,南帮980平盘急需要推进,实现露煤。
如图4所示,传统的斜坡道修筑方法,先将长方形的斜坡道分为上下两部分,将斜坡道的下半部松动爆破,然后运走下半部的石土,最后利用推土机推走上半部的石土。由于980平盘宽度为40米,如果采用传统的方式爆破,炮堆伸出为20米,爆破后平盘宽度为20米,电铲无法快速采掘坡道缺口,只能通过由北向南旋采,采至坡道缺口,坡道形成大约需要20天。且在这20天内,剥离量必须拉运至远处。这样不仅影响露煤,且剥离量运距远。
如图3所示,本发明采取在采场南部,直接沿坡道的对角线布孔、爆破,直接修筑坡道。这样坡道形成时间约为3天,且剥离量运距最近。在经济上及工程上都达到很好的效益。
表1
通过上面的表1可知,传统的方法只采用松动爆破,在炸药单耗上节省成本,但是推土机工程量比改进后的方法增加了1.2万m3,总体成本改进后比传统的方法节省1.64万元,并且坡道修筑时间节省约为25%,设备效率增加。
另外,我矿由于受东宝煤矿征地滞后的影响,各采掘平盘比较狭窄,有些作业区域电铲如果通过采掘坡道缺口位置来修筑坡道,上部平盘宽度不够。采用沿斜坡道对角线直接抛掷的方式,电铲就不需要采掘缺口,也可以满足上部平盘有足够的宽度。
以上所述的仅是本发明的原理和较佳的实施例。应当指出,对于本领域的普通技术人员来说,在本发明原理的基础上,还可以做出若干其它变型,也应视为本发明的保护范围。
Claims (8)
1.一种露天煤矿修筑斜坡道的方法,其特征在于,包括以下步骤:
沿斜坡道布置爆破线,所述爆破线将所述斜坡道分为左右两部分;
对一侧所述斜坡道进行松动爆破;
将一侧松动爆破后的石土运到排土场;
对另一侧所述斜坡道进行抛掷爆破,将另一侧的石土抛掷到一侧;
推土机整平所述斜坡道。
2.根据权利要求1所述的露天煤矿修筑斜坡道的方法,其特征在于,所述爆破线为所述斜坡道的中线。
3.根据权利要求1所述的露天煤矿修筑斜坡道的方法,其特征在于,所述爆破线为所述斜坡道的对角线。
4.根据权利要求1所述的露天煤矿修筑斜坡道的方法,其特征在于,所述斜坡道为岩石层或煤层的斜坡道。
5.根据权利要求1-4任一项所述的露天煤矿修筑斜坡道的方法,其特征在于,一侧是左侧,另一侧是右侧。
6.根据权利要求5所述的露天煤矿修筑斜坡道的方法,其特征在于,对一侧所述斜坡道进行松动爆破的步骤前还包括:
利用钻机沿所述爆破线的一侧钻出多个钻孔;
在所述钻孔内装药。
7.根据权利要求5所述的露天煤矿修筑斜坡道的方法,其特征在于,对另一侧所述斜坡道进行抛掷爆破的步骤前还包括:
利用钻机沿所述爆破线的另一侧钻出多个钻孔,控制所述钻孔的方向,使得抛掷爆破时,另一侧的石土能够抛掷到一侧;
在所述钻孔内装药。
8.根据权利要求6或7所述的露天煤矿修筑斜坡道的方法,其特征在于,根据所述斜坡到的长度和高度,来设定相邻所述钻孔之间的间距。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510946579.5A CN105421198B (zh) | 2015-12-16 | 2015-12-16 | 一种露天煤矿修筑斜坡道的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510946579.5A CN105421198B (zh) | 2015-12-16 | 2015-12-16 | 一种露天煤矿修筑斜坡道的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105421198A true CN105421198A (zh) | 2016-03-23 |
CN105421198B CN105421198B (zh) | 2017-06-16 |
Family
ID=55499714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510946579.5A Active CN105421198B (zh) | 2015-12-16 | 2015-12-16 | 一种露天煤矿修筑斜坡道的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105421198B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971609A (zh) * | 2016-06-03 | 2016-09-28 | 华能伊敏煤电有限责任公司 | 电铲采掘的坡道置换方式 |
CN106761759A (zh) * | 2016-12-28 | 2017-05-31 | 中国神华能源股份有限公司 | 一种露天煤矿的采煤方法 |
CN108868773A (zh) * | 2018-06-11 | 2018-11-23 | 中国神华能源股份有限公司 | 露天煤矿排土方法 |
CN110206543A (zh) * | 2019-06-13 | 2019-09-06 | 中国神华能源股份有限公司 | 露天煤矿运输方法 |
CN111006561A (zh) * | 2019-12-19 | 2020-04-14 | 中国水利水电第七工程局有限公司 | 一种强抛掷超深孔台阶爆破方法 |
CN113482621A (zh) * | 2021-07-01 | 2021-10-08 | 中国神华能源股份有限公司哈尔乌素露天煤矿 | 一种露天矿端帮斜坡道修筑方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4301731A (en) * | 1979-09-12 | 1981-11-24 | Zeto Industries, Inc. | Air shooting system for the mining of coal or the like |
CN102331212A (zh) * | 2011-09-07 | 2012-01-25 | 薛世忠 | 露天金属矿山损失贫化控制爆破方法 |
CN102607341A (zh) * | 2012-02-27 | 2012-07-25 | 薛世忠 | 一种露天矿边坡稳定控制爆破方法 |
CN102967191A (zh) * | 2012-12-11 | 2013-03-13 | 中国神华能源股份有限公司 | 处理采空区的爆破方法 |
CN103216237A (zh) * | 2012-12-28 | 2013-07-24 | 中国神华能源股份有限公司 | 一种露天煤矿开采工艺 |
-
2015
- 2015-12-16 CN CN201510946579.5A patent/CN105421198B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4301731A (en) * | 1979-09-12 | 1981-11-24 | Zeto Industries, Inc. | Air shooting system for the mining of coal or the like |
CN102331212A (zh) * | 2011-09-07 | 2012-01-25 | 薛世忠 | 露天金属矿山损失贫化控制爆破方法 |
CN102607341A (zh) * | 2012-02-27 | 2012-07-25 | 薛世忠 | 一种露天矿边坡稳定控制爆破方法 |
CN102967191A (zh) * | 2012-12-11 | 2013-03-13 | 中国神华能源股份有限公司 | 处理采空区的爆破方法 |
CN103216237A (zh) * | 2012-12-28 | 2013-07-24 | 中国神华能源股份有限公司 | 一种露天煤矿开采工艺 |
Non-Patent Citations (1)
Title |
---|
闫凌: "哈尔乌素露天煤矿推土机修筑坡道量化方案的应用", 《神华科技》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971609A (zh) * | 2016-06-03 | 2016-09-28 | 华能伊敏煤电有限责任公司 | 电铲采掘的坡道置换方式 |
CN106761759A (zh) * | 2016-12-28 | 2017-05-31 | 中国神华能源股份有限公司 | 一种露天煤矿的采煤方法 |
CN106761759B (zh) * | 2016-12-28 | 2019-03-22 | 中国神华能源股份有限公司 | 一种露天煤矿的采煤方法 |
CN108868773A (zh) * | 2018-06-11 | 2018-11-23 | 中国神华能源股份有限公司 | 露天煤矿排土方法 |
CN110206543A (zh) * | 2019-06-13 | 2019-09-06 | 中国神华能源股份有限公司 | 露天煤矿运输方法 |
CN111006561A (zh) * | 2019-12-19 | 2020-04-14 | 中国水利水电第七工程局有限公司 | 一种强抛掷超深孔台阶爆破方法 |
CN111006561B (zh) * | 2019-12-19 | 2022-02-22 | 中国水利水电第七工程局有限公司 | 一种强抛掷超深孔台阶爆破方法 |
CN113482621A (zh) * | 2021-07-01 | 2021-10-08 | 中国神华能源股份有限公司哈尔乌素露天煤矿 | 一种露天矿端帮斜坡道修筑方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105421198B (zh) | 2017-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421198B (zh) | 一种露天煤矿修筑斜坡道的方法 | |
WO2016045440A1 (zh) | 一种采矿方法 | |
CN103216238B (zh) | 一种露天煤矿开采工艺 | |
CN102086765B (zh) | 一种极薄铜矿体高分段多分层采矿方法 | |
CN103216237B (zh) | 一种露天煤矿开采工艺 | |
CN104131829B (zh) | 一种固体充填采煤液压支架撤架方法 | |
CN103590830B (zh) | 多矿体露天地下时空同步开采方法 | |
CN106223958A (zh) | 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法 | |
CN103527196B (zh) | 一种黄土充填回收房式煤柱的方法 | |
CN103557002A (zh) | 一种盘区机械化集中溜井上向水平分层充填采矿法 | |
CN103437768B (zh) | 一种不留顶底柱预置空间充填采矿法 | |
CN103470262A (zh) | 一种露天煤田近水平矿床倒堆内排的开采方法 | |
CN106869936A (zh) | 一种适于陡坡地形的露天采矿新方法 | |
CN105626073A (zh) | 一种基于充填采矿法预留切割槽的采矿方法 | |
CN103388478B (zh) | 露天煤矿应用吊斗铲的运输道路形成方法 | |
WO2019178838A1 (zh) | 一种适用于煤炭资源流态化开采的井田布局方法 | |
AU2014393189A1 (en) | Method for filling open stope with aeolian sand in shallow coal seam in western desertified mining areas | |
CN104453994A (zh) | 一种放顶矸巷旁充填沿空留巷方法 | |
JP6684922B2 (ja) | ぼたゼロ排出短切羽無支柱石炭採掘方法 | |
CN105507947A (zh) | 一种网络化矸石充填方法 | |
CN105442621A (zh) | 一种复杂地质条件状态下的料场开采方法 | |
CN101158285A (zh) | 一种铜矿的地下开采方法 | |
CN103993884A (zh) | 中深孔采矿切割天井以切代掘一次成井及维护方法 | |
RU2563895C1 (ru) | Способ открыто-подземной разработки свиты крутонаклонных угольных пластов | |
CN212272289U (zh) | “三下”压煤区域充填置换开采设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Yueting Inventor after: Lu Yunfeng Inventor after: Zhang Batu Inventor before: Liu Yueting |