CN105404243A - Process control and manufacturing execution system in industrial production line - Google Patents

Process control and manufacturing execution system in industrial production line Download PDF

Info

Publication number
CN105404243A
CN105404243A CN201410431237.5A CN201410431237A CN105404243A CN 105404243 A CN105404243 A CN 105404243A CN 201410431237 A CN201410431237 A CN 201410431237A CN 105404243 A CN105404243 A CN 105404243A
Authority
CN
China
Prior art keywords
server
central database
application server
tpok
workstation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410431237.5A
Other languages
Chinese (zh)
Other versions
CN105404243B (en
Inventor
康乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TT Electronics Integrated Manufacturing Services Suzhou Co Ltd
Original Assignee
TT Electronics Integrated Manufacturing Services Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TT Electronics Integrated Manufacturing Services Suzhou Co Ltd filed Critical TT Electronics Integrated Manufacturing Services Suzhou Co Ltd
Priority to CN201410431237.5A priority Critical patent/CN105404243B/en
Publication of CN105404243A publication Critical patent/CN105404243A/en
Application granted granted Critical
Publication of CN105404243B publication Critical patent/CN105404243B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a process control and manufacturing execution system in an industrial production line, and the system comprises a central server which comprises a TPOK central database server and a main application server; a client service platform connected to the main application server; a base data and report query platform connected to the main application server; a test file server connected to the main application server; an information collection terminal connected to the main application server; and an ERP central database server connected to the TPOK central database server. The mutual transmission between the information of the main application server and the test file server and the information of the TPOK central database server is carried out. The system combines an internal coding method, a client coding method and a method of internal coding and client coding integration, completely meets the customization requirements of a client for a bar code, avoids the repeating of bar code information to the greatest extent, improves the production precision and information query speed, and achieves the traceability of raw materials and products.

Description

Row control in industrial production line and manufacturing execution system
Technical field
The present invention relates to the Row control in a kind of industrial production line and manufacturing execution system, for the Systematical control in the production procedure of electronics Integrated manufacture.
Background technology
In electronics foundry industry, particularly SMT manufacturing, the requirement of cost and accuracy is improved day by day, particularly for the manufacturing type enterprise of short run multi items, especially outstanding to the requirement of lean product.Reach the production of the product of short run multi items, need product category, production scheduling, during material drops into and chases after, processing procedure, test process, quality and human input carry out strict management and control, for the machine that different customer demand and different designs require, if depend merely on hand-kept and hand-written traveler processes, very difficult realization becomes more meticulous production, particularly for the company that a short run multi items manufactures, tens of kinds of processing procedures, hundreds of testing tool, thousands of kinds of machines, starting material up to ten thousand, one production control system is particularly important targetedly, the outstanding problem that this system solves is in following several respects:
Production management: a complete production procedure comprises material loading point, surface mounted placement machines, several check points and several test points (AOI/FCT/ICT), when multiple product is produced simultaneously, the station needing each machine to select may be identical, also may be different, if completely manage by manual and review the information of missing the stop, the possibility of makeing mistakes is very high, for the PCB that type is yoke plate or dual platen, complexity cannot by hand-kept mode production control and reviewing exactly;
Handling of goods and materials: for SMT machine, once material loading is wrong, significantly will improve product repair rate and starting material material casting rate, also wants expensive manpower to test and keep in repair, and during SMT Manual feeding, is difficult to guarantee accuracy completely by hand inspection;
In addition, for aviation and medical or similar products, material information needs strict reviewing, and these information is difficult to be recorded by manual;
Sequence number manages: as foundry, required by client also has respective bar code, how the different machines for multiple client avoid sequence number to repeat also to be solved by hand-kept;
Test and management: test is the key means of electronic product Mass Control, if be by test man's visual observation and hand-kept, be difficult to avoid test leakage and erroneous judgement, three kinds of main tests are AOI, ICT, FCT, wherein AOI test pattern is stronger with standardization, but how to need to confirm according to the test result of system for the sequence number of yoke plate and positive and negative panel;
Production capacity and yield analysis: after the production of batch terminates, the average turnaround on airport at each station, the rate of missing the stop of unit interval, yield and once bad analysis etc. must based on the situation of missing the stop of actual sequence number.
Summary of the invention
For solving the problems of the technologies described above, the invention provides the Row control in a kind of industrial production line and manufacturing execution system, during production for the product of short run multi items, to product category, production scheduling, material drop into chase after in, processing procedure, test process, quality and human input carry out strict management and control.
First, before detailed description is carried out to technical scheme, the correlation technique that the present invention relates to is introduced.
TPOK is a kind of MES (ManufactureExecutiveSystem) manufacturing execution system, divide according to different industries demand, flow process and concrete enforcement of MES are not quite similar, and TPOK is the platform of a kind of customized exploitation of the electronic manufacture laying particular emphasis on short run multi items inside MES most.
TPOK system comprises two parts from framework: 1) basic data maintenance and the report query page; 2) data acquisition and equipments of recording (as miss the stop, test and packet assembler).The former develops based on EXTASP.net Open Framework, major function has the management of personnel's authorization role, workstation, product line, the bad management with keeping in repair the Back ground Informations such as Classification Management, work order, item number, processing procedure and sequence number, and these information are beginnings of SN life cycle; This page platform additionally provides the inquiry of production data and tracing information in addition.The latter is the procedure set of various data acquisition and front-end operations, develop based on the WindowForm/Mobile of .Net2.0, comprise miss the stop, pack, keep in repair, test, material loading and rank associated program etc. up and down, this part mainly provides user to complete the collection of production and material data, safeguard in complete processing procedure at one, any sequence number all must miss the stop according to the process sequence pre-defined, and rear station card is set out in advance to make arrangements.In addition, automatic test result collection is comprised in data acquisition module, prevent human error from affecting the accuracy of test result, test file is thrown central testing server automatically, under the process of multithread programs, complete next stop status monitoring, test result analysis, finally test data is synchronized in database.
For achieving the above object, technical scheme of the present invention is as follows:
Row control in industrial production line and a manufacturing execution system, comprising:
One central server, it comprises based on the TPOK central database server of SQLServer and the master application server based on .NetframkWork, wherein said TPOK central database server is for storing the related data information coming from each operation, and described master application server is then for controlling the production run of each operation;
One client service platform, described client service platform is connected to described master application server; It is connected with acquisition workstation, service workstations, packing work station and crosses station equipment, for information acquisition, maintenance of equipment, the missing the stop of the packing of product and product; Described acquisition workstation and packing work station are all connected with bar code printer, and for automatic printing number label, rewinding label, shipping labels, and label related by online complement material;
One basic data and report query platform, described basic data and report query platform are connected to described master application server; It is connected with supvr's panel board workstation, for report query; It is connected with system maintenance person works station, safeguards for Back ground Informations such as work order, item number, sequence number, processing procedures;
One test file server, it is arranged on central office and is connected to described master application server, process for throwing to various workstation the test procedure come, it is connected with multiple testing workstation, and each described testing workstation is all connected with corresponding testing apparatus;
One ERP central database server, described ERP central database is connected to described TPOK central database server; Described TPOK central database server is uploaded to again after being wherein uploaded to described ERP central database based on the field data of scheduling information that work order, item number are synchronous; Wherein, described TPOK central database server is uploaded to again after the material major key for starting material tracking produced during rewinding is uploaded to described ERP central database;
One information acquisition terminal, described information acquisition terminal is connected to described master application server, and it is for the scanning material major key when material loading, and online complement material major key label;
Information and the described TPOK central database server of described master application server and test file server pass mutually.
Wherein, described information acquisition terminal adopts wireless collection functional module, and it is that barcode scanner fixed by one/two-dimensional bar code rifle, WinMobilePDA or streamline.
Wherein, described acquisition workstation, service workstations, packing work station and testing workstation include computer or terminal, and described terminal is fixed terminal or hand-held mobile terminal.
Wherein, also comprise requestor, described requestor is arranged in every platform computer of each workstation, and described computer and workstation can pass through the data needed for Web page inquiry of enterprises, as sequence number current location, bad detail, material association situation etc.
Pass through technique scheme, Row control in industrial production line provided by the invention and manufacturing execution system, by the analysis to Customer design demand, concrete processing procedure is defined according to machine, in the arranging of processing procedure, adopt virtual processing procedure and sub-processing procedure to guarantee controlling and trackability of production stage, the information of each sequence number is associated in systems in which by bar code, the formatting flexibility of bar code is particularly important for the production of the many clients of multi-product, connecting inner coding of the present invention, encoder client and in-line coding are in conjunction with methods such as barcode clients, meet the customization requirement of client to bar code completely, at utmost avoid the repetition of bar code information, provide the degree of accuracy of production and the speed of information inquiry, in the selection of label, the label of small size (0.7*0.7cm) can be attached in the less PCBA board in space, and the size of bar code does not affect the accuracy of scanning simultaneously, in material tracking, the material led has had bar code also just to mean, and each product has truly had unique identities label, this label information can always with whole production life cycle, namely from produce to product turnout, even be assembled on final products and also can retain this information, really accomplished that product can be reviewed, each label pastes on PCBA or certain core component by the production preparatory stage, bind at production link system requirements starting material and label, whether system meeting automatic Verification starting material attribute, material loading position meet the requirements in this process, also achieve like this and review raw-material, product associates with Product labelling with maintenance record in each test result of test phase.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below.
The structural principle schematic diagram that Fig. 1 is the Row control in the industrial production line disclosed in the embodiment of the present invention and manufacturing execution system;
The principle of work schematic diagram that Fig. 2 is the Row control in the industrial production line disclosed in the embodiment of the present invention and manufacturing execution system;
The material related job principle schematic that Fig. 3 is the Row control in the industrial production line disclosed in the embodiment of the present invention and manufacturing execution system;
The automatic test that Fig. 4 is the Row control in the industrial production line disclosed in the embodiment of the present invention and manufacturing execution system and time management and control test job principle schematic;
The principle of work schematic diagram of the packaging warehouse-in flow process that Fig. 5 is the Row control in the industrial production line disclosed in the embodiment of the present invention and manufacturing execution system.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described.
Based on Fig. 1, basic structure of the present invention is:
Row control in industrial production line and manufacturing execution system, comprising:
One central server, it comprises based on the TPOK central database server of SQLServer and the master application server based on .NetframkWork, wherein said TPOK central database server is for storing the related data information coming from each operation, and described master application server is then for controlling the production run of each operation;
One client service platform, described client service platform is connected to described master application server; It is connected with acquisition workstation, service workstations, packing work station and crosses station equipment, for information acquisition, maintenance of equipment, the missing the stop of the packing of product and product; Described acquisition workstation and packing work station are all connected with bar code printer, and for automatic printing number label, rewinding label, shipping labels, and label related by online complement material;
One basic data and report query platform, described basic data and report query platform are connected to described master application server; It is connected with supvr's panel board workstation, for report query; It is connected with system maintenance person works station, safeguards for Back ground Informations such as work order, item number, sequence number, processing procedures;
One test file server, it is arranged on central office and is connected to described master application server, process for throwing to various workstation the test procedure come, it is connected with multiple testing workstation, and each described testing workstation is all connected with corresponding testing apparatus;
One ERP central database server, described ERP central database is connected to described TPOK central database server; Described TPOK central database server is uploaded to again after being wherein uploaded to described ERP central database based on the field data of scheduling information that work order, item number are synchronous; Wherein, described TPOK central database server is uploaded to again after the material major key for starting material tracking produced during rewinding is uploaded to described ERP central database;
One information acquisition terminal, described information acquisition terminal is connected to described master application server, and it is for the scanning material major key when material loading, and online complement material major key label;
Information and the described TPOK central database server of described master application server and test file server pass mutually.
Wherein, described information acquisition terminal adopts wireless collection functional module, and it is that barcode scanner fixed by one/two-dimensional bar code rifle, WinMobilePDA or streamline.
Wherein, described acquisition workstation, service workstations, packing work station and testing workstation include computer or terminal, and described terminal is fixed terminal or hand-held mobile terminal.
Wherein, also comprise requestor, described requestor is arranged in every platform computer of each workstation, and described computer and workstation can pass through the data needed for Web page inquiry of enterprises, as sequence number current location, bad detail, material association situation etc.
Based on the workflow diagram described in Fig. 2, the TPOK operating process of the Row control in industrial production line disclosed by the invention and manufacturing execution system is:
(1) maintenance of basic data:
These information such as Production Engineer and system engineer's needs are first other line, workstation, terminal computer, operator numbering, flame, maintenance code are all safeguarded into TPOK;
Work order and finished product item number information are synchronized to TPOK by background script from ERP system, quantity every night, and the result of version and BOM is also saved; In addition, according to the classification of plan to work order, the workshop (SMT, Integrated manufacture, or cable manufacturing) that this work order is processed can be known;
(2) production lot information is safeguarded:
Work order and finished product item number need to safeguard work order information after synchronously coming, and mainly comprise processing procedure information, finished product characteristic and sequence number three aspects:
First after processing procedure information, work order and finished product item number are imported into TPOK, need the production schedule and Production Engineer select in systems in which throw the plate time and production line other, according to the suggestion of system, find optimal line other, or self-defined applicable sub-line is other, as the semi-manufacture of certain product perhaps client, hand is only needed to weld and test, Production Engineer oneself can choose hand weldering and test, independently sub-line is other to create one, this customizable process set scheme, farthest meets the various demands of client, reaches maximum dirigibility;
Then finished product characteristic, finished product is likely PCBA board, rack, cable etc., their information is missed the stop on sequence number and is also had vital impact, plank may be veneer or yoke plate, pros and cons or one side, if yoke plate requires when missing the stop or test, once by all sequences number in yoke plate; In addition, also have packaging type and Tracing Material type, these all can be introduced when follow-up introduction packaging and Tracing Material;
Next be sequence number, TPOK requires that in a finished product item number, sequence number is unique in logic, thus avoid the repetition of sequence number, based on this requirement, TPOK allows to use inner bar code and barcode client, according to the single registration sequence number of each Zhang Gong under product, in multiple barcode standard, what the present invention adopted is the little label of water-fastness resistant to elevated temperatures 0.7cm*0.7cm, for the printing of Quick Response Code, have employed specific coding rule, both avoided sequence number and repeated, neatly the production time has been shown again; Sequence number form is specified by Production Engineer, when carrying out sequence number and distributing, bar code printing personnel only need to input quantity, sequence number can produce automatically according to quantity, and by network bar code printer automatic printing bar code, has saved the running time, reduce the possibility of makeing mistakes (such as: TIMS-is fixing input, represent in bracket that special format [Y, 2] represents the year of two, as 14=2014; [W, 2] represented the week of two, as 32 weeks; [S, 10#10#10#10#10], S represents serial number, and 10# represents tens digit 0-9, and as 00032, the sequence number spelled out according to this rule is: TIMS-143200032); Bar code is had to the client explicitly called for for those, can coding rule be provided, as the diurnal on days, fixing input, serial number, and select the decimal system and hexadecimal coded system, system can print the bar code of various form flexibly and easily according to demand;
(3) material association:
With reference to figure 3, complete sequence number registration and the printing of bar-code label, just can formation sequence number in systems in which, if veneer or yoke plate sequentially, automatic distribution can be clicked, disposable complete or batch operation; For multi-joint plate, single dual platen or comprise the plank scrapped, just needed by barcode scanner manual assignment, in this system, just had work order and complete sequence number, next step is exactly Tracing Material, and it specifically comprises the steps:
Step 1, what material was followed the trail of contains much information, and content is complicated, needs multidisciplinary concurrent maintenance, program provides multiple solutions control of authority platform and mail reminder and combines, and guarantees complete as information such as date of manufacture, production batch, manufacturer and manufacture item numbers of the main information of Tracing Material; In addition at machine properties interface, need definition material association type, by work order, by sequence number, for short run multi items, all smaller batch of material quantity is a lot, just uses by sequence number material loading, thus controls to reload frequently the inaccuracy caused;
Step 2,3, material information and corresponding erect-position information is contain in the programming file of SMT high speed machine and general machine, program is by regular expression and key word processing mode, the information obtaining needing is as sequence number, erect-position information, stock shelf information and item number, table of comparisons when these information scan as material loading, reaches the effect of error proofing; The product of SMT, hand weld and these three processing procedures of wave-soldering can relate to material loading operation, the material table that research and development can be uploaded according to SMT in the test manufacture stage is classified to material, the material table that will confirm according to research and development during volume production is produced, and substantially increases the efficiency of material loading and inspection material;
Step 4, 5, get the raw materials ready according to material loading table, before use, the scanning of material major key and stock shelf bar code scan is carried out by the PDA of Motorola 9090, use C# based on the exploitation of mobile device, based on the program of WinMobile5.0, major function is DataBase combining, WebService uses and inputs information comparison and database write, algorithm upgrades according to the lower rank material of concrete time point during material loading to sequence number, if sequence number S1 is before missing the stop, material M1 completes material loading, all S1 have brought M1 automatically, if M1 is finished, use M2 as replacement, then the material of S1 just becomes M2, and sequence number S2 completes and misses the stop after M1 material loading, the end even if M2 reloads, the material of S2 remains M1, this way is compared by comparing merely of turnaround on airport with other programs, save the time of inquiry of missing the stop, improve the accuracy of information acquisition of missing the stop,
(4) test and time management and control test automatically:
With reference to figure 4, material loading normally occurs in the processing procedure before the operations such as inspection and test, and the plank completing material loading just can enter into the next stop; Have passed through material loading and put slow-witted management and control, substantially the situation of wrong material and dislocation can be stopped, but the unpredictable situation in welding process and the problem of design also can cause plank bad, and ensuing test is exactly the key of quality management and control, and its content measurement of different products is also not quite similar;
TPOK extracts identical or close content measurement (as ICT, AOI), test result is thrown into test file server, multiple threads is carried out by the powerful processing power of server, and for miscellaneous FCT test, just need custom program to obtain its test result, its step is as follows:
Step 1, test file type also can be safeguarded as the attribute of machine in advance, have more than 1,000 kinds of test procedures at present, formula results acquisition is divided three classes: the machine automatically, focus on and time controling, if the machine is automatic, can to be shaken hands by text and the DLL (dynamic link library) of database access calls authentication sequence number and to miss the stop state, and by test result write into Databasce; The method of time controling is mainly that those times are longer, and the program that cannot obtain test result provides a kind of means of forcing to test, and prevents test leakage, but test result needs manual input; The third focuses on is main discussion;
Step 2, in sequence number scanning porch, adds arbitration functions, inside different window applications and DLL, realizes arbitration functions by WebService and class, prevent the formula method of machine improper use, cause test file to resolve;
Step 3, for not needing the test class uploading test file, the state directly judging plank to be measured is called by DLL, having does not have bad, and exception of whether missing the stop, if plank is normal, and it is not certain in changing testing station when setting out in advance to make arrangements, then open test procedure to test, after test terminates, test result of automatically dishing out and flame (plank position, part address and bad phenomenon) are also synchronized to database;
Step 4, if need to upload, test file is carried out synchronously with shared according to predefined client file path, after test file generates from production line test board, program intercepts its state, attempt the read-write power obtaining file, then be synchronized on test file server, carry out unifying filing according to classification, server program is the adaptive document processor of a multithreading, include file quantitative analysis function, thread manager, thread process mechanism and end thread cleaning function, mainly according to the machine attribute of sequence number, find corresponding test file form, carry out file layout analysis, then test result is uploaded, for the sequence number that success is tested, file can be moved to the filing of specific file, for abnormality processing, system again can process within a period of time, or this is abnormal to pass through mail reminder keeper,
(5) bad process and maintenance:
Occur when now bad, pre-define the upper limit of bad number of times according to Production Engineer and Test Engineer, decision is the number of times of erroneous judgement, effectively reduces False Rate, provides the efficiency of production;
Predefined bad code such as short circuit, path, rosin joint etc. will be automatically selected, and the part position of PCBA board also can be read out by test file, if ultimate sequence number is bad, will enter maintenance station etc. to be repaired, the plank do not keeped in repair cannot station later;
After maintenance personal's maintenance, plank can select any one the history testing station in processing procedure, retests, and tests and just can be missed the stop by rear;
(6) packaging warehouse-in:
With reference to figure 5, after all Integration Assembly And Checkout processing procedures all complete, the last leg is packed exactly, and in order to prevent the hidden danger of existence in processing, also set up a Quality Detection station, station before encapsulation, its step is as follows:
Step 1, check all missing the stop and test result, occur to prevent test leakage and leaking station, packaging is set to total inspection, checks whether the station of all settings does not miss the stop all according to the processing procedure of SN, whether all tests are all passed through, so package station is last outpost of the tax office in TPOK sequence number flow process, if do not miss the stop or do not keep in repair, plank cannot be packaged, packaging personnel need plank to return to produce line related process, can repack after completing corresponding processing procedure;
Step 2, the quantity of every case sets in finished product item number, when scanning first sequence number, item number information can be brought out automatically, the sequence number of following scanning all must be consistent with first sequence number machine, and quantity then constantly adds up, after quantity reaches the quantity of every case maintenance, chest will be preserved automatically, and print outer container label; Quality department can inspect by random samples according to outer container label, prevents the finished product shipment without outer container label, thus avoids the situation of leaking station and test leakage in system.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of above-described embodiment, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (4)

1. the Row control in industrial production line and a manufacturing execution system, is characterized in that, comprising:
One central server, it comprises based on the TPOK central database server of SQLServer and the master application server based on .NetframkWork, wherein said TPOK central database server is for storing the related data information coming from each operation, and described master application server is then for controlling the production run of each operation;
One client service platform, described client service platform is connected to described master application server; It is connected with acquisition workstation, service workstations, packing work station and crosses station equipment, for information acquisition, maintenance of equipment, the missing the stop of the packing of product and product; Described acquisition workstation and packing work station are connected with bar code printer, and for automatic printing number label, rewinding label, shipping labels, and label related by online complement material;
One basic data and report query platform, described basic data and report query platform are connected to described master application server; It is connected with supvr's panel board workstation, for report query; It is connected with system maintenance person works station, safeguards for Back ground Informations such as work order, item number, sequence number, processing procedures;
One test file server, it is arranged on central office and is connected to described master application server, process for throwing to various workstation the test procedure come, it is connected with multiple testing workstation, and each described testing workstation is all connected with corresponding testing apparatus;
One ERP central database server, described ERP central database is connected to described TPOK central database server; Described TPOK central database server is uploaded to again after being wherein uploaded to described ERP central database based on the field data of scheduling information that work order, item number are synchronous; Wherein, described TPOK central database server is uploaded to again after the material major key for starting material tracking produced during rewinding is uploaded to described ERP central database;
One information acquisition terminal, described information acquisition terminal is connected to described master application server, and it is for the scanning material major key when material loading, and online complement material major key label;
Information and the described TPOK central database server of described master application server and test file server pass mutually.
2. the Row control in industrial production line according to claim 1 and manufacturing execution system, is characterized in that, described information acquisition terminal adopts wireless collection functional module, and it is that barcode scanner fixed by one/two-dimensional bar code rifle, WinMobilePDA or streamline.
3. the Row control in industrial production line according to claim 1 and manufacturing execution system, it is characterized in that, described acquisition workstation, service workstations, packing work station and testing workstation include computer or terminal, and described terminal is fixed terminal or hand-held mobile terminal.
4. the Row control in industrial production line according to claim 3 and manufacturing execution system, it is characterized in that, also comprise requestor, described requestor is arranged in every platform computer of each workstation, described computer and workstation can pass through the data needed for Web page inquiry of enterprises, as sequence number current location, bad detail, material association situation etc.
CN201410431237.5A 2014-08-28 2014-08-28 Flow control and manufacturing execution system in industrial production line Active CN105404243B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410431237.5A CN105404243B (en) 2014-08-28 2014-08-28 Flow control and manufacturing execution system in industrial production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410431237.5A CN105404243B (en) 2014-08-28 2014-08-28 Flow control and manufacturing execution system in industrial production line

Publications (2)

Publication Number Publication Date
CN105404243A true CN105404243A (en) 2016-03-16
CN105404243B CN105404243B (en) 2020-03-17

Family

ID=55469787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410431237.5A Active CN105404243B (en) 2014-08-28 2014-08-28 Flow control and manufacturing execution system in industrial production line

Country Status (1)

Country Link
CN (1) CN105404243B (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105631615A (en) * 2016-03-28 2016-06-01 京东方(河北)移动显示技术有限公司 Detection system and detection method
CN105929800A (en) * 2016-04-25 2016-09-07 温冬梅 Medical laboratory automation flow line with mobile management system
CN106325241A (en) * 2016-08-12 2017-01-11 苏州博众精工科技有限公司 Material using process managing and controlling method
CN106408227A (en) * 2016-08-03 2017-02-15 重庆盟讯电子科技有限公司 SMT chip mounting intelligent management system and method
CN107068232A (en) * 2017-06-12 2017-08-18 中广核达胜加速器技术有限公司 A kind of irradiation processing device for strip-shaped product
CN107133725A (en) * 2017-04-19 2017-09-05 广东智科电子股份有限公司 A kind of automated production management system of circuit board
CN107516137A (en) * 2017-08-28 2017-12-26 灏翰创科有限公司 Intelligent electric meter manufaturing data acquisition system
CN107942978A (en) * 2017-11-22 2018-04-20 华为机器有限公司 A kind of Intelligent closed-loop system
CN108240838A (en) * 2017-11-10 2018-07-03 精华电子(苏州)有限公司 A kind of on-line detecting system and method
CN108345276A (en) * 2017-12-26 2018-07-31 湖北世纪联合创新科技有限公司 A kind of production process of liquid crystal displays execution system
CN108415886A (en) * 2018-03-07 2018-08-17 清华大学 A kind of data label error correction method and device based on production process
CN108985962A (en) * 2018-07-17 2018-12-11 惠科股份有限公司 Base plate processing method
CN108984760A (en) * 2018-07-19 2018-12-11 耐世特汽车系统(苏州)有限公司 It is a kind of to realize outer package label centralized management and the application system that automatic printing and manufacturing parameter detect automatically on demand
CN109636253A (en) * 2019-01-22 2019-04-16 四川长虹电器股份有限公司 A kind of system and method to miss the stop on production line without tag electronics element batch barcode scanning
CN111125166A (en) * 2018-10-31 2020-05-08 长鑫存储技术有限公司 Online product information acquisition method and device
CN111461602A (en) * 2020-03-31 2020-07-28 济南永信新材料科技有限公司 Barcode generation system and method of spunlace nonwoven product based on cloud server
CN112093345A (en) * 2020-08-05 2020-12-18 首钢京唐钢铁联合有限责任公司 Control system and control method for distribution, offline and warehousing of hot-rolled steel coils
CN112286972A (en) * 2020-11-06 2021-01-29 精华电子(苏州)有限公司 AOI tracing system
CN113035337A (en) * 2019-12-24 2021-06-25 易布鲁有限公司 Method and device for generating bar code for drug administration
CN113071225A (en) * 2021-03-23 2021-07-06 日本电产(韶关)有限公司 Method and device for generating serial number
CN113238532A (en) * 2021-05-08 2021-08-10 万安裕维电子有限公司 Control system and control method for manufacturing process of PCB
CN113305527A (en) * 2021-05-20 2021-08-27 山东英信计算机技术有限公司 Detection method for server production screw lock with missing lock
CN113869837A (en) * 2021-12-01 2021-12-31 常州欣盛半导体技术股份有限公司 Automatic processing method of COF production information
CN114253566A (en) * 2022-01-11 2022-03-29 长沙格力暖通制冷设备有限公司 Chip burning control system, control method and chip burning device
US11797557B2 (en) 2020-12-03 2023-10-24 Boe Technology Group Co., Ltd. Data management platform, intelligent defect analysis system, intelligent defect analysis method, computer-program product, and method for defect analysis

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060020425A1 (en) * 2004-07-20 2006-01-26 Eric Chang Monitor production status query system
CN1746909A (en) * 2004-09-11 2006-03-15 鸿富锦精密工业(深圳)有限公司 Produce line operation managing and control system and method
CN101719243A (en) * 2009-12-29 2010-06-02 金蝶软件(中国)有限公司 Method for processing production order, application server and group enterprise network system
CN102487376A (en) * 2010-12-01 2012-06-06 金蝶软件(中国)有限公司 Enterprise resource planning system login method, device and system
CN103065211A (en) * 2011-11-09 2013-04-24 微软公司 Techniques to provide enterprise resource planning functions from an e-mail client application
CN204116915U (en) * 2014-08-28 2015-01-21 梯梯电子集成制造服务(苏州)有限公司 Row control in industrial production line and manufacturing execution system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060020425A1 (en) * 2004-07-20 2006-01-26 Eric Chang Monitor production status query system
CN1746909A (en) * 2004-09-11 2006-03-15 鸿富锦精密工业(深圳)有限公司 Produce line operation managing and control system and method
CN101719243A (en) * 2009-12-29 2010-06-02 金蝶软件(中国)有限公司 Method for processing production order, application server and group enterprise network system
CN102487376A (en) * 2010-12-01 2012-06-06 金蝶软件(中国)有限公司 Enterprise resource planning system login method, device and system
CN103065211A (en) * 2011-11-09 2013-04-24 微软公司 Techniques to provide enterprise resource planning functions from an e-mail client application
CN204116915U (en) * 2014-08-28 2015-01-21 梯梯电子集成制造服务(苏州)有限公司 Row control in industrial production line and manufacturing execution system

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105631615B (en) * 2016-03-28 2020-01-07 京东方(河北)移动显示技术有限公司 Detection system and detection method
CN105631615A (en) * 2016-03-28 2016-06-01 京东方(河北)移动显示技术有限公司 Detection system and detection method
CN105929800A (en) * 2016-04-25 2016-09-07 温冬梅 Medical laboratory automation flow line with mobile management system
CN105929800B (en) * 2016-04-25 2018-07-03 温冬梅 A kind of Health Service Laboratory automatic assembly line with mobile management system
CN106408227A (en) * 2016-08-03 2017-02-15 重庆盟讯电子科技有限公司 SMT chip mounting intelligent management system and method
CN106325241A (en) * 2016-08-12 2017-01-11 苏州博众精工科技有限公司 Material using process managing and controlling method
CN107133725A (en) * 2017-04-19 2017-09-05 广东智科电子股份有限公司 A kind of automated production management system of circuit board
CN107068232A (en) * 2017-06-12 2017-08-18 中广核达胜加速器技术有限公司 A kind of irradiation processing device for strip-shaped product
CN107068232B (en) * 2017-06-12 2024-01-30 中广核达胜加速器技术有限公司 Irradiation processing device for strip-shaped products
CN107516137A (en) * 2017-08-28 2017-12-26 灏翰创科有限公司 Intelligent electric meter manufaturing data acquisition system
CN108240838A (en) * 2017-11-10 2018-07-03 精华电子(苏州)有限公司 A kind of on-line detecting system and method
CN107942978A (en) * 2017-11-22 2018-04-20 华为机器有限公司 A kind of Intelligent closed-loop system
CN108345276A (en) * 2017-12-26 2018-07-31 湖北世纪联合创新科技有限公司 A kind of production process of liquid crystal displays execution system
CN108345276B (en) * 2017-12-26 2019-02-26 湖北世纪联合创新科技有限公司 A kind of production process of liquid crystal displays execution system
CN108415886A (en) * 2018-03-07 2018-08-17 清华大学 A kind of data label error correction method and device based on production process
WO2020015093A1 (en) * 2018-07-17 2020-01-23 惠科股份有限公司 Substrate processing method
CN108985962A (en) * 2018-07-17 2018-12-11 惠科股份有限公司 Base plate processing method
CN108984760B (en) * 2018-07-19 2020-11-06 耐世特汽车系统(苏州)有限公司 Application system for realizing centralized management and control of outer packaging labels, automatic printing as required and automatic detection of production parameters
CN108984760A (en) * 2018-07-19 2018-12-11 耐世特汽车系统(苏州)有限公司 It is a kind of to realize outer package label centralized management and the application system that automatic printing and manufacturing parameter detect automatically on demand
CN111125166A (en) * 2018-10-31 2020-05-08 长鑫存储技术有限公司 Online product information acquisition method and device
CN109636253A (en) * 2019-01-22 2019-04-16 四川长虹电器股份有限公司 A kind of system and method to miss the stop on production line without tag electronics element batch barcode scanning
CN109636253B (en) * 2019-01-22 2022-05-03 四川长虹电器股份有限公司 System and method for batch code scanning and station passing of label-free electronic components on production line
CN113035337A (en) * 2019-12-24 2021-06-25 易布鲁有限公司 Method and device for generating bar code for drug administration
CN111461602A (en) * 2020-03-31 2020-07-28 济南永信新材料科技有限公司 Barcode generation system and method of spunlace nonwoven product based on cloud server
CN112093345A (en) * 2020-08-05 2020-12-18 首钢京唐钢铁联合有限责任公司 Control system and control method for distribution, offline and warehousing of hot-rolled steel coils
CN112286972A (en) * 2020-11-06 2021-01-29 精华电子(苏州)有限公司 AOI tracing system
CN112286972B (en) * 2020-11-06 2024-02-20 精华电子(苏州)有限公司 AOI tracing system
US11797557B2 (en) 2020-12-03 2023-10-24 Boe Technology Group Co., Ltd. Data management platform, intelligent defect analysis system, intelligent defect analysis method, computer-program product, and method for defect analysis
CN113071225A (en) * 2021-03-23 2021-07-06 日本电产(韶关)有限公司 Method and device for generating serial number
CN113238532A (en) * 2021-05-08 2021-08-10 万安裕维电子有限公司 Control system and control method for manufacturing process of PCB
CN113305527A (en) * 2021-05-20 2021-08-27 山东英信计算机技术有限公司 Detection method for server production screw lock with missing lock
CN113869837A (en) * 2021-12-01 2021-12-31 常州欣盛半导体技术股份有限公司 Automatic processing method of COF production information
CN113869837B (en) * 2021-12-01 2022-04-08 常州欣盛半导体技术股份有限公司 Automatic processing method of COF production information
CN114253566A (en) * 2022-01-11 2022-03-29 长沙格力暖通制冷设备有限公司 Chip burning control system, control method and chip burning device

Also Published As

Publication number Publication date
CN105404243B (en) 2020-03-17

Similar Documents

Publication Publication Date Title
CN105404243A (en) Process control and manufacturing execution system in industrial production line
CN204116915U (en) Row control in industrial production line and manufacturing execution system
Atieh et al. Performance improvement of inventory management system processes by an automated warehouse management system
Qu et al. A case of implementing RFID-based real-time shop-floor material management for household electrical appliance manufacturers
CN110580572B (en) Product life-span traceability system
JP2006341937A (en) Decentralized traceability control system
CN101464969A (en) Longitudinal integration system and method for quality management
Ping Yi et al. Reducing electronic component losses in lean electronics assembly with Six Sigma approach
JP4160917B2 (en) Processing management system and process management system
US20190196442A1 (en) Production management system and production management method
JP2019117627A (en) Production management system and production management method
CN112348530A (en) Automatic server production inspection and repair method
Savsar Simulation analysis of a pull-push system for an electronic assembly line
JP2006285364A (en) Processing management system, and computer-readable recording medium
MICHAEL et al. Optimization of Inbound Logistics by Implementing E-Kanban System in an Automobile Accessories Manufacturing Unit-A Case Study.
CN115271579A (en) Method and system for integrating warehouse logistics system and production execution system
JP4710568B2 (en) Information processing device
Telles et al. Drum-Buffer-Rope in an engineering-to-order productive system: a case study in a Brazilian aerospace company
Peter et al. Lean manufacturing practices: Issues created when two companies are integrated and quality management standards are imposed
JPWO2006106729A1 (en) Processing management system
Satoglu et al. Value of rfid enhanced maintenance in aerospace industry
CN114118925B (en) Defective product material management control system and method
Divakaran et al. Review of Kanban planning and execution in the context of Lean manufacturing
Obermaier et al. Cost efficient mass customisation with a web-based manufacturing execution system
Kern et al. Concept for selecting and integrating traceability systems in the continuous improvement process of SMEs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant