CN105387722A - 一种双膛石灰窑窑膛内耐火材料垂直运输方法 - Google Patents
一种双膛石灰窑窑膛内耐火材料垂直运输方法 Download PDFInfo
- Publication number
- CN105387722A CN105387722A CN201510800320.XA CN201510800320A CN105387722A CN 105387722 A CN105387722 A CN 105387722A CN 201510800320 A CN201510800320 A CN 201510800320A CN 105387722 A CN105387722 A CN 105387722A
- Authority
- CN
- China
- Prior art keywords
- kiln
- material loading
- refractory material
- hanging basket
- feeding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D1/00—Casings; Linings; Walls; Roofs
- F27D1/16—Making or repairing linings increasing the durability of linings or breaking away linings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
本发明公开了一种双膛石灰窑窑膛内耐火材料垂直运输方法,包括以下步骤:根据现场情况,在窑底混凝土平台一侧地面上安装物料提升机,耐火材料由地面垂直提升至混凝土平台上;出料托盘上搭设脚手架及施工工作面,预留垂直的上料通道,上料通道靠近出料托盘的检修门位置,且避开窑膛中心线及牛腿线架位置;在窑膛内顶部喷枪盒上安装挂有上料吊筐的起重装置,所述上料吊筐位于预留的上料通道正上方,上料时,下放上料吊筐,经上料通道降落至窑底出料托盘上,人工将混凝土平台上的耐火材料经检修门装入上料吊筐中,提升上料吊筐至施工工作面。本发明解决了进料困难的问题,节约了人力,安全系数高。
Description
技术领域
本发明涉及一种物料运输方法,更具体的说,是涉及一种双膛石灰窑窑膛内耐火材料垂直运输方法。
背景技术
双膛石灰窑两窑膛因为其结构空间狭小,内部砌筑需要搭脚手架及跳板,导致窑膛内垂直运输耐材困难,传统方法为在窑壳的上分段上开孔进料,造成开孔区域耐材砌筑和焊接质量较难控制,上料过程中上下运砖人员交叉作业,存在较大的安全隐患。
发明内容
本发明的目的是为了克服现有技术中的不足,提供一种双膛石灰窑窑膛内耐火材料垂直运输方法,本方法采用人工加机械相结合的方式,解决了进料困难的问题,节约了人力,安全系数高。
本发明的目的是通过以下技术方案实现的。
本发明的双膛石灰窑窑膛内耐火材料垂直运输方法,包括以下步骤:
(1)根据现场场地情况,在窑底混凝土平台一侧地面上设置安装物料提升机,耐火材料由地面垂直提升至窑底混凝土平台上。
(2)在窑膛内,出料托盘上搭设脚手架及施工工作面,预留垂直的上料通道,所述上料通道靠近出料托盘的检修门位置,且避开窑膛中心线及牛腿线架位置。
(3)在窑膛内顶部喷枪盒上安装挂有上料吊筐的起重装置,所述上料吊筐位于预留的上料通道正上方,上料时,下放上料吊筐,经上料通道降落至窑底出料托盘上,人工将混凝土平台上的耐火材料经检修门装入上料吊筐中,提升上料吊筐至施工工作面即可。
所述上料吊筐由钢材焊接构成。
所述起重装置由卷扬机或电葫芦构成。
与现有技术相比,本发明的技术方案所带来的有益效果是:
(1)本发明在窑底混凝土平台一侧设置安装物料提升机,耐火材料由地面垂直提升至窑底混凝土平台上,操作方便,节约人力;
(2)本发明中,在出料托盘上部搭设脚手架及施工工作面,预留竖直的上料通道,在上料通道的正上方安装有挂上料吊篮的起重装置,上料时,下放上料吊筐,经上料通道降落至窑底出料托盘上,人工将混凝土平台上的耐火材料经检修门装入上料吊筐中,提升上料吊筐至施工工作面即可,避免了对窑壳开孔及后续焊接造成的二次质量问题,解决了进料困难的问题,安全系数高;
附图说明
图1是本发明的结构示意图。
附图标记:1物料提升机2混凝土平台3出料托盘4脚手架
5施工工作面6上料通道7喷枪盒8起重装置9上料吊筐10检修门
具体实施方式
下面结合附图对本发明作进一步的描述。
如图1所示,本发明的双膛石灰窑窑膛内耐火材料垂直运输方法,包括以下步骤:
首先,根据现场场地情况,在窑底混凝土平台2一侧地面上设置安装物料提升机1,叉车配合人工将耐火材料由地面垂直提升至窑底混凝土平台2上,等待下一步运至窑膛内。
然后,在窑膛内,出料托盘3上搭设脚手架4及施工工作面5,预留垂直的上料通道6,所述上料通道6靠近出料托盘3的检修门10位置,且避开窑膛中心线及牛腿线架位置,上料通道6区域可用钢管作加固处理。施工工作面5可选用木跳板。
最后,在窑膛内顶部的喷枪盒7上安装挂有上料吊筐9的起重装置8,所述起重装置可选用卷扬机或电葫芦等,所述上料吊筐9可在现场焊接钢材制成,所述上料吊筐9位于预留的上料通道6正上方,上料时,下放上料吊筐9,经上料通道6降落至窑底钢结构的出料托盘3上,人工将混凝土平台2上的耐火材料经检修门10装入上料吊筐9中,提升上料吊筐9至施工工作面5即可。
Claims (3)
1.一种双膛石灰窑窑膛内耐火材料垂直运输方法,其特征在于,包括以下步骤:
(1)根据现场场地情况,在窑底混凝土平台一侧地面上设置安装物料提升机,耐火材料由地面垂直提升至窑底混凝土平台上。
(2)在窑膛内,出料托盘上搭设脚手架及施工工作面,预留垂直的上料通道,所述上料通道靠近出料托盘的检修门位置,且避开窑膛中心线及牛腿线架位置。
(3)在窑膛内顶部喷枪盒上安装挂有上料吊筐的起重装置,所述上料吊筐位于预留的上料通道正上方,上料时,下放上料吊筐,经上料通道降落至窑底出料托盘上,人工将混凝土平台上的耐火材料经检修门装入上料吊筐中,提升上料吊筐至施工工作面即可。
2.根据权利要求1所述的双膛石灰窑窑膛内耐火材料垂直运输方法,其特征在于,所述上料吊筐由钢材焊接构成。
3.根据权利要求1所述的双膛石灰窑窑膛内耐火材料垂直运输方法,其特征在于,所述起重装置由卷扬机或电葫芦构成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510800320.XA CN105387722A (zh) | 2015-11-19 | 2015-11-19 | 一种双膛石灰窑窑膛内耐火材料垂直运输方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510800320.XA CN105387722A (zh) | 2015-11-19 | 2015-11-19 | 一种双膛石灰窑窑膛内耐火材料垂直运输方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105387722A true CN105387722A (zh) | 2016-03-09 |
Family
ID=55420287
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510800320.XA Pending CN105387722A (zh) | 2015-11-19 | 2015-11-19 | 一种双膛石灰窑窑膛内耐火材料垂直运输方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105387722A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106193775A (zh) * | 2016-08-27 | 2016-12-07 | 中国二十二冶集团有限公司 | 烟囱筒身施工外部上料方法 |
CN106395671A (zh) * | 2016-09-30 | 2017-02-15 | 中冶天工集团天津有限公司 | 利用窑上垂直运输设备进行耐材垂直运输的方法 |
CN107755971A (zh) * | 2016-08-18 | 2018-03-06 | 上海宝冶建设工业炉工程技术有限公司 | 双膛石灰窑非标出灰系统制作方法 |
CN113152868A (zh) * | 2021-05-10 | 2021-07-23 | 攀钢集团工程技术有限公司 | 大断面变径型矿仓支模架的施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS52127409A (en) * | 1976-04-20 | 1977-10-26 | Kurosaki Refractories Co | Vertical spraying device |
JPS6112813A (ja) * | 1984-06-28 | 1986-01-21 | Kawatetsu Tekko Kogyo Kk | ブロック状耐火材の炉体内垂直搬送装置 |
CN101109573A (zh) * | 2007-07-20 | 2008-01-23 | 中冶京唐建设有限公司 | 热风炉炉壳不开口施工内衬的工艺 |
CN102690662A (zh) * | 2011-03-23 | 2012-09-26 | 五冶集团上海有限公司 | 一种干熄炉砌筑耐火材料上料运输方法 |
CN104355077A (zh) * | 2014-10-14 | 2015-02-18 | 中国十七冶集团有限公司 | 一种焦炉耐材的运输装置及运输方法 |
CN104973810A (zh) * | 2015-06-24 | 2015-10-14 | 天津二十冶建设有限公司 | 一种双膛石灰窑窑膛砌筑测量定位方法 |
-
2015
- 2015-11-19 CN CN201510800320.XA patent/CN105387722A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS52127409A (en) * | 1976-04-20 | 1977-10-26 | Kurosaki Refractories Co | Vertical spraying device |
JPS6112813A (ja) * | 1984-06-28 | 1986-01-21 | Kawatetsu Tekko Kogyo Kk | ブロック状耐火材の炉体内垂直搬送装置 |
CN101109573A (zh) * | 2007-07-20 | 2008-01-23 | 中冶京唐建设有限公司 | 热风炉炉壳不开口施工内衬的工艺 |
CN102690662A (zh) * | 2011-03-23 | 2012-09-26 | 五冶集团上海有限公司 | 一种干熄炉砌筑耐火材料上料运输方法 |
CN104355077A (zh) * | 2014-10-14 | 2015-02-18 | 中国十七冶集团有限公司 | 一种焦炉耐材的运输装置及运输方法 |
CN104973810A (zh) * | 2015-06-24 | 2015-10-14 | 天津二十冶建设有限公司 | 一种双膛石灰窑窑膛砌筑测量定位方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107755971A (zh) * | 2016-08-18 | 2018-03-06 | 上海宝冶建设工业炉工程技术有限公司 | 双膛石灰窑非标出灰系统制作方法 |
CN107755971B (zh) * | 2016-08-18 | 2019-11-26 | 上海宝冶建设工业炉工程技术有限公司 | 双膛石灰窑非标出灰系统制作方法 |
CN106193775A (zh) * | 2016-08-27 | 2016-12-07 | 中国二十二冶集团有限公司 | 烟囱筒身施工外部上料方法 |
CN106395671A (zh) * | 2016-09-30 | 2017-02-15 | 中冶天工集团天津有限公司 | 利用窑上垂直运输设备进行耐材垂直运输的方法 |
CN106395671B (zh) * | 2016-09-30 | 2018-08-24 | 中冶天工集团天津有限公司 | 利用窑上垂直运输设备进行耐材垂直运输的方法 |
CN113152868A (zh) * | 2021-05-10 | 2021-07-23 | 攀钢集团工程技术有限公司 | 大断面变径型矿仓支模架的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105387722A (zh) | 一种双膛石灰窑窑膛内耐火材料垂直运输方法 | |
CN204782005U (zh) | 墙板现场转运安装小车 | |
CN105177202B (zh) | 一种炼铁高炉大修方法 | |
CN203878965U (zh) | 一种电梯井施工所用的装置 | |
CN107304631A (zh) | 一种超高层建筑大面积单元体幕墙块的安装方法及系统 | |
CN107795122A (zh) | 混凝土筒身施工装置及施工方法 | |
CN105752826A (zh) | 移动式吊装平台及其施工方法 | |
CN203359745U (zh) | 一种热风炉炉内耐材垂直运输装置 | |
CN104016260A (zh) | 小格漏斗滑移安装方法及滑移安装机构 | |
CN204626998U (zh) | 一种附着升降脚手架用卸料台 | |
CN203765779U (zh) | 预制钢筋混凝土板翻转机 | |
CN104120701A (zh) | 一种垂直升船机重大件吊装的施工方法及装置 | |
CN102399925A (zh) | 更换高炉冷却壁的方法 | |
US2933918A (en) | Method of lining furnaces | |
CN205472479U (zh) | 用于墙板的辅助转运装置 | |
CN201458093U (zh) | 焦炉专用上砖集装箱 | |
CN205688820U (zh) | 一种超高层建筑大面积单元体幕墙块的安装系统 | |
CN104328920B (zh) | 建筑材料输送方法 | |
CN108033415A (zh) | 一种烧结配料仓的安装方法 | |
CN203905436U (zh) | 钢烟囱环形安装平台 | |
CN209760046U (zh) | 运输支架以及运输设备 | |
CN203924652U (zh) | 一种预制楼梯间周边剪力墙的施工平台 | |
CN106285000A (zh) | 整拼模板转运装置及其转运方法 | |
CN104355077A (zh) | 一种焦炉耐材的运输装置及运输方法 | |
CN104495598B (zh) | 一种吊运砖笼 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160309 |