CN201458093U - 焦炉专用上砖集装箱 - Google Patents

焦炉专用上砖集装箱 Download PDF

Info

Publication number
CN201458093U
CN201458093U CN2009200152992U CN200920015299U CN201458093U CN 201458093 U CN201458093 U CN 201458093U CN 2009200152992 U CN2009200152992 U CN 2009200152992U CN 200920015299 U CN200920015299 U CN 200920015299U CN 201458093 U CN201458093 U CN 201458093U
Authority
CN
China
Prior art keywords
side plate
brick
side plates
bottom tray
freight container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200152992U
Other languages
English (en)
Inventor
吴志敏
李文谦
田华中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INDUSTRIAL FURNACE CONSTRUCTION INSTALLATION ENGINEERING COMPANY MCC NORTHEAST CONSTRUCTION Co Ltd
Original Assignee
INDUSTRIAL FURNACE CONSTRUCTION INSTALLATION ENGINEERING COMPANY MCC NORTHEAST CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INDUSTRIAL FURNACE CONSTRUCTION INSTALLATION ENGINEERING COMPANY MCC NORTHEAST CONSTRUCTION Co Ltd filed Critical INDUSTRIAL FURNACE CONSTRUCTION INSTALLATION ENGINEERING COMPANY MCC NORTHEAST CONSTRUCTION Co Ltd
Priority to CN2009200152992U priority Critical patent/CN201458093U/zh
Application granted granted Critical
Publication of CN201458093U publication Critical patent/CN201458093U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型涉及一种焦炉专用上砖集装箱,包括底托盘、两个侧板A和两个侧板B,底托盘位于集装箱底端,侧板A和侧板B分别与底托盘垂直连接固定,侧板A和侧板B相互垂直连接在一起。该装置结构简单,使用方便,极大的提高了搬运砖块的效率,降低了操作人员的劳动强度。

Description

焦炉专用上砖集装箱
技术领域
本实用新型涉及一种集装箱,特别是涉及一种焦炉专用上砖集装箱。
背景技术
在焦炉砌筑施工过程中,根据焦炉结构的特点,需要倒运不同型号的耐火砖,由于焦炉各部位砌筑用的耐火砖砖号多,倒运次数频繁,炉上砌筑的砖量、砖号、砖质量要求很高,上砖就成为焦炉砌筑的重要环节。传统的上砖方式就是由厂家出厂砖包直接用汽车运输到现场拆包,将砖摆放到手推车上,利用搭设好的龙门架运至砌筑部位上的平台,采用人工搬运的方式分发到炉上各砌筑组。这种方式在使用时相对复杂,人工倒运次数多,上砖速度慢,对已完砌体反复踩踏,砖的破损率高,尤其在计划取砖时,经常有弄混乱的时候,造成施工难度大,效率低,增加了劳动强度和施工成本。
发明内容
本实用新型克服了现有技术中的不足,提供了一种结构简单、使用方便的焦炉专用上砖集装箱。
为了解决上述问题,本实用新型采用以下技术方案:
焦炉专用上砖集装箱,包括底托盘、两个侧板A和两个侧板B,底托盘位于集装箱底端,侧板A和侧板B分别与底托盘垂直连接固定,侧板A和侧板B相互垂直连接在一起。
所述的底托盘的两侧设有挂钩。
与现有技术相比,本实用新型的有益效果是:
1、本实用新型避免了传统倒运耐火砖过程中需要搭设龙门架等不必要环节,在砖库与焦炉距离较远时,用叉车、大棚内的吊车进行装卸,减少人工倒运的次数,降低砖的破损率,提高了上砖速度,从而提高了工作效率。
2、采用配好砖号的集装箱,能够准确地将耐火砖分配到炉上有效部位,方便了施工人员操作,减少了施工人员搬运砖的距离,降低了劳动强度,加大了安全系数。
附图说明
图1为集装箱的底托盘结构示意图;
图2为图1右视图;
图3为集装箱的侧板A结构示意图;
图4为集装箱的侧板B结构示意图。
具体实施方式
焦炉专用上砖集装箱,包括底托盘、两个侧板A和两个侧板B,底托盘位于集装箱底端,侧板A和侧板B分别与底托盘垂直连接固定,侧板A和侧板B相互垂直连接在一起。
底托盘的结构如图1、图2所示,底托盘的框架1由角钢焊接而成,框架1外侧固定有钢管制成的钢套3,底托盘的两侧固定安装有4个挂钩2,挂钩2采用圆钢制成.
侧板A的结构如图3所示,侧板A的框架A4采用钢管焊接而成,框架A4内侧固定有钢板7,框架A4底侧固定有圆钢A6,框架A4侧面固定有弯管5。
侧板B的结构如图4所示,侧板B的框架B8由钢管焊接而成,框架B8内侧固定有钢板7,框架B8底侧固定有圆钢B10,框架B8侧面固定有钢管制成的钢筒9。
使用本实用新型时,将侧板A底端的圆钢A6和侧板B底端的圆钢B10分别插入底托盘上的钢套3内,侧板A上的弯管5插入侧板B上的钢筒9内,从而拼装成具有一定容积的箱体。侧板起固定保护砖的作用,底托盘底面可与叉车共同作用完成地面运输,利用钢丝绳将底托盘上的挂钩2与吊车相连,即可完成炉上垂直和水平的运输。

Claims (2)

1.焦炉专用上砖集装箱,其特征在于,包括底托盘、两个侧板A和两个侧板B,底托盘位于集装箱底端,侧板A和侧板B分别与底托盘垂直连接固定,侧板A和侧板B相互垂直连接在一起。
2.根据权利要求1所述的焦炉专用上砖集装箱,其特征在于,所述的底托盘的两侧设有挂钩。
CN2009200152992U 2009-07-16 2009-07-16 焦炉专用上砖集装箱 Expired - Fee Related CN201458093U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200152992U CN201458093U (zh) 2009-07-16 2009-07-16 焦炉专用上砖集装箱

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200152992U CN201458093U (zh) 2009-07-16 2009-07-16 焦炉专用上砖集装箱

Publications (1)

Publication Number Publication Date
CN201458093U true CN201458093U (zh) 2010-05-12

Family

ID=42385446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200152992U Expired - Fee Related CN201458093U (zh) 2009-07-16 2009-07-16 焦炉专用上砖集装箱

Country Status (1)

Country Link
CN (1) CN201458093U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913526A (zh) * 2010-09-02 2010-12-15 赵勇军 砖用集装箱吊桥
CN102020197A (zh) * 2010-12-23 2011-04-20 中国一冶集团有限公司 垂直运输吊架
CN102795423A (zh) * 2012-08-28 2012-11-28 淮南联合大学 运输砖及砌块的集装箱

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913526A (zh) * 2010-09-02 2010-12-15 赵勇军 砖用集装箱吊桥
CN101913526B (zh) * 2010-09-02 2012-05-23 赵勇军 砖用集装箱吊桥
CN102020197A (zh) * 2010-12-23 2011-04-20 中国一冶集团有限公司 垂直运输吊架
CN102795423A (zh) * 2012-08-28 2012-11-28 淮南联合大学 运输砖及砌块的集装箱

Similar Documents

Publication Publication Date Title
CN202483163U (zh) 大直径筒仓扣件式钢管环形悬挑桁架平台
CN209815081U (zh) 一种空心砖运输装置
CN201458093U (zh) 焦炉专用上砖集装箱
CN204979713U (zh) 一种预制楼板双层存放架
CN203877109U (zh) 建筑预制叠合式楼板的吊运存放架
CN102071812B (zh) 垂直运输建筑材料的方法
CN204626998U (zh) 一种附着升降脚手架用卸料台
CN201770406U (zh) 一种简易起吊固定装置
CN204237853U (zh) 镁合金长大型材时效炉料架
CN105387722A (zh) 一种双膛石灰窑窑膛内耐火材料垂直运输方法
CN201914835U (zh) 垂直运输吊架
CN201942116U (zh) 预制混凝土板运输用固定支撑装置
CN101898622B (zh) 纵舱壁分段总组施工用胎架工装构件
CN205045702U (zh) 带翻转功能的大口径混凝土管材吊具
CN208948679U (zh) 装配式吊架
CN203392111U (zh) 预制混凝土墙板运输装置
CN209760046U (zh) 运输支架以及运输设备
CN201458547U (zh) 焦炉砌筑用分节拼装大棚吊车梁
CN201648437U (zh) 转炉修炉组合装置
CN202465035U (zh) 砖吊运装置
CN218617715U (zh) 一种吊车叉车两用砖垛转运防护筒
CN205036086U (zh) 一种用于浇筑混凝土的料斗
CN212403153U (zh) 一种用于高空吊装物品的承载装置
CN203682998U (zh) 一种用于搬运加气混凝土砌块的手动叉车
CN202754684U (zh) 一种预制混凝土墙板的翻转装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20150716

EXPY Termination of patent right or utility model