CN105386766B - The reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation - Google Patents

The reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation Download PDF

Info

Publication number
CN105386766B
CN105386766B CN201511025411.7A CN201511025411A CN105386766B CN 105386766 B CN105386766 B CN 105386766B CN 201511025411 A CN201511025411 A CN 201511025411A CN 105386766 B CN105386766 B CN 105386766B
Authority
CN
China
Prior art keywords
top plate
disk top
upper disk
reinforcement
stope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511025411.7A
Other languages
Chinese (zh)
Other versions
CN105386766A (en
Inventor
李俊平
刘非
朱斌
杨宏波
王双彦
王昌龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Songxian Qian River Mining Co Ltd
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201511025411.7A priority Critical patent/CN105386766B/en
Publication of CN105386766A publication Critical patent/CN105386766A/en
Application granted granted Critical
Publication of CN105386766B publication Critical patent/CN105386766B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The reinforcement presplitting method for protecting support for the extremely broken upper disk top plate that the present invention exploits for shallow hole shrinkage method, it is an object of the invention to provide a kind of maintaining method of the extremely broken upper disk top plate of steeply inclined thin arteries and veins to middle thickness orebody shrinkage mining, spaced loading presplit blasting is not coupled or does not couple by multiple fan-shaped deep holes of upper disk ore-rock interface, it is to avoid mining process borehole blasting vibrations further damage upper disk top plate;Do not coupled by deep hole or do not couple the upper disk roof rock beyond the reinforcing bar reinforcement presplit blasting face that explosive cartridge is bundled in spaced loading, and by the anchor pole in shallow hole shrinkage method mining process, the stope reinforcing bar that progressively the upper disk top plate of exposure and the sector of indwelling are distributed in bar net combined supporting body supporting mining process, collectively form the support protection network of disk top plate, so as to avoid disk top plate from collapsing and increase the rate of dilution, also stope is avoided to be scrapped because collapsing upper disk top plate, the present invention is presplit blasting, deep hole does not couple or not coupled the integrated innovation of spaced loading and anchor pole bar net supporting.

Description

The reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation
Technical field
The invention belongs to mining technique field, the presplitting for being related to the extremely broken upper disk top plate of shallow hole shrinkage method exploitation is quick-fried Broken shock-dampening method, is directed to the advanced reinforcement method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation, especially relates to And a kind of reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation.
Background technology
When the upper disk top plate of exploitation extremely broken steeply inclined thin arteries and veins to middle thickness orebody, often occur top plate and collapse and cause poor Rate increased dramatically, and even results in stope and scraps.
The content of the invention
In order to overcome the shortcoming of above-mentioned prior art, it is an object of the invention to provide a kind of pole of shallow hole shrinkage method exploitation The reinforcement presplitting method for protecting support of its broken upper disk top plate, it is possible to decrease the rate of dilution, it is to avoid stope is scrapped because of upper disk roof caving, Ensure safety, the economic exploitation.
To achieve these goals, the technical solution adopted by the present invention is:
The reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation, it is characterised in that upper When the presplit blasting of disk ore-rock interface deep hole 4 further damages upper disk top plate so as to avoid mining process borehole blasting from shaking, with bundle Tie up adhesive tape 11 reinforcing bar 7 that explosive cartridge 10 is bundled in slightly larger than the length of deep hole 4 is implemented into deep hole and do not couple or do not couple spaced loading Reinforcing bar 7 is retained in deep hole 4 after presplit blasting, presplit blasting, forms the advance support of the fan-shaped distribution of disk top plate on stope 9 Body.
When shrinkage mining undercuts and falls ore deposit rock drilling every time, total length across strike is moved towards in row's mounting bar net 6 and anchor in stope 9 The progressively upper disk top plate (namely top plate beyond presplit blasting face) of exposure and the indwelling of stope 9 in the combined supporting mining process of bar 5 Fan-shaped distribution reinforcing bar 7, so as to be retained in the reinforcing bar 7 in deep hole 4 when bar net 6 and the combined supporting body of anchor pole 5 are with presplit blasting Form the common carrying prop of disk top plate on stope 9, it is ensured that extremely disk top plate is falling ore deposit and ore drawing process on broken stope 9 In not inbreak, so as to avoid disk top plate on stope 9 from collapsing and increase the rate of dilution, also avoid stope 9 from being reported because collapsing upper disk top plate It is useless.
Depending on the fan-shaped arrangement number of presplitting deep hole 4 is according to roof stability and Pre-splitting Blasting Effect, general top plate is more broken When the number of fan-shaped deep hole 4 arranged is more, total dose for not coupling in single deep hole 4 or not coupling spaced loading is fewer so that On the premise of Pre-splitting Blasting Effect is ensured, so that the reinforcing bar 7 of indwelling in more broken top plate is more intensive.
1 number for entering the fan-shaped deep hole 4 that drilling chamber 3 is constructed through connecting taxiway 2 of being gone up a hill from every is generally 15~27. Along the array pitch of the supporting of top plate incline direction bar net 6 according to depending on the specific steadiness of top plate, general array pitch is 1.5~ 3.0m.The spacing of the supporting of anchor pole 5 is according to depending on the specific steadiness of top plate, and general spacing is 1.0~2.0m.Bar net 6 one As with 2Round bar spacing 110mm, and with discarded steel bar end or the 800~1000mm spot welding of handle iron interval Into its length typically grows 2~3m depending on the convenience of transport.Reinforcing bar (7) specification is
Compared with prior art, the beneficial effects of the invention are as follows:
1) the large area presplit blasting of deep hole 4, separates the disk top plate on stope 9 of the concussion of blasting in shrinkage method mining process and encloses Propagation in rock, this technique yet there are no use in mining process.
2) slightly larger than not coupling of being made of reinforcing bar 7 primacord 8, the explosive 10 that bundle of the depth of the deep hole 4 or not coupling by length Close spaced loading structure to be one by one fitted into deep hole 4, after great Qu elementary errors presplit blastings, indwelling reinforcing bar 7 is as beyond presplit blasting face Upper disk roof rock reinforcement prop.
3) anchor pole 5 of immediate support, the combined supporting body of bar net 6 and presplit blasting during undercuting, falling ore deposit rock drilling every time The reinforcing bar 7 of middle indwelling collectively forms the support protection network of disk top plate on stope 9.
Brief description of the drawings
Fig. 1 is principle schematic diagram of the present invention.
Embodiment
Describe embodiments of the present invention in detail with reference to the accompanying drawings and examples.
As shown in figure 1, extremely being broken the invention provides what a kind of steeply inclined thin arteries and veins to middle thickness orebody shallow hole shrinkage method was exploited The reinforcement presplitting method for protecting support of broken upper disk top plate.Do not coupled by the deep hole 4 of multiple fan-shaped arrangements at upper disk ore-rock interface Or spaced loading presplit blasting is not coupled, further explosion of the cut-off mining process borehole blasting vibrations to disk top plate on stope 9 is shaken Dynamic damage, and do not couple by deep hole or do not couple bundled in spaced loading the reinforcement presplit blasting face of reinforcing bar 7 of explosive cartridge 10 with Outer upper disk roof rock, and combine shallow hole shrinkage method mining process in anchor pole 5, the combined supporting body of bar net 6 progressively adopt by supporting The reinforcing bar 7 of indwelling in the upper disk top plates of the exposure of field 9 and presplit blasting, the reinforcing bar 7 of anchor pole 5, the combined supporting body of bar net 6 and indwelling is total to With the support protection network for constituting disk top plate on stope 9, so as to avoid disk top plate on stope 9 from collapsing and increase the rate of dilution, also avoid Stope 9 is scrapped because collapsing upper disk top plate.
The specific steps of the present invention include:
Go up a hill or way shaft 1 the vertical ore body in middle part on stope 9 disk level tunnel connecting taxiway 2.When connecting taxiway 2 is arrived Up to after ore-rock line of demarcation, connecting taxiway 2 is expanded into drilling chamber 3.Dig fan-shaped along ore-rock interface by Fig. 1 in drilling chamber 3 Deep hole 4.The depth capacity of deep hole 4 is up to 35m.
After the whole rock drilling of fan-shaped deep hole 4 are finished, the primacord 8 that is bundled on reinforcing bar 7 of the length slightly larger than the depth of deep hole 4, Explosive cartridge 10 is made in explosive 9, and cooperation does not couple or do not couple spaced loading structure to be fitted into deep hole 4 one by one, general sector deep hole When depth is more than 20~25m, it is made simultaneously of binding 2 explosive cartridges 10 of binding of adhesive tape 11 on reinforcing bar 7 and does not couple continuous charging Structure;General sector deep hole depth is in 10~15m to 20~25m, and 1 explosive cartridge 10 of binding, which is made, on reinforcing bar 7 does not couple Continuous charging structure;Within 10~15m of aperture, 1 explosive cartridge 10 of binding, which is made, on reinforcing bar 7 does not couple spaced loading structure; 3~5m of aperture bundlees explosive cartridge 10 typically not on reinforcing bar 7.
Before shallow hole shrinkage method exploitation undercuts, first go up a hill or the horizontally disposed drilling chamber 3 in middle part of way shaft 1 in edge The fan-shaped presplit blasting of deep hole 4 of upper disk ore-rock interface, so as to avoid mining process borehole blasting vibrations from further damaging upper disk top plate.
During presplit blasting powder charge, using great Qu short-delay blastings, the ore-rock of disk is demarcated on the disposable whole stope 9 of presplit blasting Face.
After the completion of presplit blasting, start stope 9 and undercut, fall ore deposit, and the timely anchor pole during undercuting every time, falling ore deposit rock drilling 5th, the combined supporting stope 9 of bar net 6 progressively exposure upper disk roof rock and presplit blasting in indwelling reinforcing bar 7, anchor pole 5, bar net 6 Combined supporting body and the reinforcing bar of indwelling 7 collectively form the support protection network of disk top plate on stope 9.
Reinforcing bar 7 is retained in each fan-shaped deep hole 4 after presplit blasting, formed presplit blasting face beyond upper disk top plate namely adopt The advance support body of the fan-shaped distribution of the upper disk top plate of ore deposit 9.When shrinkage mining undercuts and falls ore deposit rock drilling every time, in time along stope The top plate that total length progressively exposes in disk on row's mounting bar net 6 and the combined supporting stope 9 of anchor pole 5 is moved towards, so that bar net 6 and anchor pole 5 The reinforcing bar 7 being retained in when combined supporting body is with presplit blasting in each fan-shaped deep hole 4 is collectively forming the carrying branch of disk top plate on stope 9 Watch box, it is ensured that the upper disk top plate not inbreak during ore deposit and ore drawing is fallen for the extremely broken stope 9 not destroyed by concussion of blasting.

Claims (8)

1. the reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation, it is characterised in that in upper disk When (4) presplit blasting of ore-rock interface deep hole further damages upper disk top plate so as to avoid mining process borehole blasting from shaking, with bundle Tie up adhesive tape (11) reinforcing bar (7) that explosive cartridge (10) is bundled in slightly larger than deep hole (4) length is implemented into deep hole and do not couple or do not couple Reinforcing bar (7) is retained in deep hole (4) after spaced loading presplit blasting, presplit blasting, forms the sector point of disk top plate on stope (9) The advance support body of cloth.
2. the reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation according to claim 1, Characterized in that, when shrinkage mining undercuts and falls ore deposit rock drilling every time, total length across strike is moved towards in row's mounting bar net in stope (9) (6) the upper disk top plate of stope (9) progressively exposure, i.e. top beyond presplit blasting face and in anchor pole (5) combined supporting mining process Plate, and the fan-shaped distribution of indwelling reinforcing bar (7), stayed when the combined supporting body that bar net (6) and anchor pole (5) are formed is with presplit blasting Put the common carrying prop of disk top plate on reinforcing bar (7) the formation stope (9) in deep hole (4), it is ensured that the stope extremely crushed (9) disk top plate not inbreak during ore deposit and ore drawing is fallen on, so that avoid disk top plate on stope (9) from collapsing and increase the rate of dilution, Also stope (9) is avoided to be scrapped because collapsing upper disk top plate.
3. the reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation according to claim 2, Characterized in that, being 1.5~3.0m along the array pitch of top plate incline direction bar net (6) supporting.
4. the reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation according to claim 2, Characterized in that, the spacing of anchor pole (5) supporting is 1.0~2.0m.
5. the reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation according to claim 2, Characterized in that, bar net (6) is with 2Round bar spacing 110mm, and between discarded steel bar end or handle iron Formed every 800~1000mm spot welding, its length is 2~3m.
6. the reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation according to claim 1, Characterized in that, depending on fan-shaped presplitting deep hole (4) arrangement number is according to roof stability and Pre-splitting Blasting Effect, top plate is more broken When fan-shaped deep hole (4) number for arranging is more, total dose for not coupling in single deep hole (4) or not coupling spaced loading is fewer, It is more intensive so as to the reinforcing bar (7) of indwelling in more broken top plate so as on the premise of Pre-splitting Blasting Effect is ensured.
7. the reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation according to claim 1, Characterized in that, the number of (1) through connecting taxiway (2) into the fan-shaped deep hole (4) of drilling chamber (3) construction of being gone up a hill from every is 15 ~27.
8. the reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation according to claim 1, Characterized in that, reinforcing bar (7) specification is
CN201511025411.7A 2015-12-31 2015-12-31 The reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation Active CN105386766B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511025411.7A CN105386766B (en) 2015-12-31 2015-12-31 The reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511025411.7A CN105386766B (en) 2015-12-31 2015-12-31 The reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation

Publications (2)

Publication Number Publication Date
CN105386766A CN105386766A (en) 2016-03-09
CN105386766B true CN105386766B (en) 2017-09-05

Family

ID=55419464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511025411.7A Active CN105386766B (en) 2015-12-31 2015-12-31 The reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation

Country Status (1)

Country Link
CN (1) CN105386766B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109630119A (en) * 2018-11-16 2019-04-16 西北矿冶研究院 Anti-collapse supporting method for ultra-broken thin ore shallow hole shrinkage stope
CN110173247A (en) * 2019-05-19 2019-08-27 中铁十九局集团矿业投资有限公司 A kind of Roof Control fracturing process of soft broken top plate ore body back production
CN110905509B (en) * 2019-11-07 2021-07-23 河南金源黄金矿业有限责任公司 Deep hole shrinkage mining method for thin-vein type steeply inclined ore body
CN112502705A (en) * 2020-11-10 2021-03-16 西北矿冶研究院 Anti-collapse supporting method for ultra-broken thin ore shallow hole shrinkage stope
CN112780277B (en) * 2020-12-30 2023-01-24 六盘水师范学院 Coal seam floor fault water damage reinforcement prevention and control method
CN114856563B (en) * 2022-06-02 2023-04-07 紫金矿业集团股份有限公司 Dead-weight ore-falling mining method for deep-hole pre-cracked ore in downward stage of broken ore rock

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1661422A1 (en) * 1989-07-05 1991-07-07 В.Л.Дюков и А.П.Волков Method for working inclined ore obstructions
RU2234673C1 (en) * 2003-03-17 2004-08-20 Институт горного дела Дальневосточного отделения РАН Method of explosion of ascending wells
CN103089267A (en) * 2013-01-22 2013-05-08 鞍钢集团矿业公司 Thin-ore-body shallow hole shrinkage method without sill pillar

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1661422A1 (en) * 1989-07-05 1991-07-07 В.Л.Дюков и А.П.Волков Method for working inclined ore obstructions
RU2234673C1 (en) * 2003-03-17 2004-08-20 Институт горного дела Дальневосточного отделения РАН Method of explosion of ascending wells
CN103089267A (en) * 2013-01-22 2013-05-08 鞍钢集团矿业公司 Thin-ore-body shallow hole shrinkage method without sill pillar

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
复杂金矿床控制爆破技术探讨;胡伟平等;《黄金》;19951031;第16卷(第10期);第13-16页 *
联合支护法在灵山金矿27#脉开采中的应用;周玉斌等;《矿业工程》;20031231;第1卷(第1期);第21,22,31页 *

Also Published As

Publication number Publication date
CN105386766A (en) 2016-03-09

Similar Documents

Publication Publication Date Title
CN105386766B (en) The reinforcement presplitting method for protecting support of the extremely broken upper disk top plate of shallow hole shrinkage method exploitation
CN110952982B (en) Medium-length hole presplitting blasting mining method for steeply inclined thin-vein to extremely thin-vein ore body
CN108225137A (en) Rock roadway in coal mine tunnels cumulative smooth Hydraulic Blasting structure and method
CN103344154A (en) Carbonaceous schist tunnel blasting method and construction method
CN108007285A (en) A kind of stone head deep hole sublevel is segmented efficient Cut Blasting method
CN103790588A (en) Self-slippage mining method of gentle dip ore body
CN110331978A (en) A kind of environment reconstruction segmentation medium-length hole afterwards filling mining method
CN107503751A (en) A kind of strip pit ore drawing chute and strip pit recovery method
CN104265297A (en) Mining method for multilayer fragile gently-inclined extra-narrow ore vein
CN106121652A (en) Closed pit open-pit mine ore recovery method
CN108489348A (en) A kind of deep hole and the knockdown hard rock air bench blasting method of short-bore
CN106150505B (en) Efficient fine blasting method for ultrathin ore body
CN112880501B (en) Flight-limited hole drilling and blasting method for controlling tunnel blasting flyrock
CN108361032A (en) It is horizontal to tilting route slotting formula mining codes of the very thin arteries and veins to thin lode body
CN102269544A (en) One-end-closed cumulative blasting slotted pipe device
CN103292648A (en) Blasting cartridge type directional blasting process for chimneys of brick-concrete structures
CN209857781U (en) Mine blasting big gun hole structure
CN107687339A (en) A kind of efficient mining methods of Media thick and rake ore body
CN104790950B (en) Optimized mining middle-deep blasthole millisecond blasting slot cutting method
CN115950321A (en) Blasting method for reducing support damage of pipe shed, explosive loading device and explosive cartridge structure
CN104879128A (en) Steep-dip ultra-thick coalbed mining technique based on top-coal advancing pre-detonation weakening
CN206522138U (en) The steel for shot structure of small section tunnel Cut Blasting
CN105300204B (en) A kind of beded rock mass bench blasting hole-by-hole initiation method
CN219197326U (en) Rock mass suspended ceiling medium-length hole bottom pulling structure
CN103175450B (en) Deep hole blasting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180315

Address after: 471400 Xidian village, old county town, Songxian, Luoyang, Henan

Patentee after: Songxian Qian River Mining Co., Ltd.

Address before: 710055 Shaanxi province Xi'an Yanta Road No. 13

Patentee before: Xi'an Architectural Sci & Tech. Univ.