CN105375432A - 一种隧道建设用高压电缆敷设支架 - Google Patents
一种隧道建设用高压电缆敷设支架 Download PDFInfo
- Publication number
- CN105375432A CN105375432A CN201510850287.1A CN201510850287A CN105375432A CN 105375432 A CN105375432 A CN 105375432A CN 201510850287 A CN201510850287 A CN 201510850287A CN 105375432 A CN105375432 A CN 105375432A
- Authority
- CN
- China
- Prior art keywords
- cable
- high voltage
- tunnel construction
- voltage cable
- cable laying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 125000006850 spacer group Chemical group 0.000 claims description 21
- 238000004804 winding Methods 0.000 claims description 5
- 230000002787 reinforcement Effects 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 abstract description 10
- 239000010959 steel Substances 0.000 abstract description 10
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000005286 illumination Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000010606 normalization Methods 0.000 description 1
- 230000003169 placental effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/30—Installations of cables or lines on walls, floors or ceilings
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/08—Installations of electric cables or lines in or on the ground or water in tunnels
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/02—Suspension devices for tubes or the like, e.g. for ventilating ducts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
- Electric Cable Installation (AREA)
Abstract
<b>本发明公开了一种隧道建设用高压电缆敷设支架,它包括两根水平设置的支撑钢筋,两根支撑钢筋之间连接有等边角钢;等边角钢的一边与两根支撑钢筋的端部固定连接,等边角钢的一边上通过螺栓连接有电缆挂钩。</b><b>本发明通过设置两根支撑钢筋来连接和固定等边角钢,再通过等边角钢来连接电缆挂钩,通过电缆挂钩来敷设高压电缆;还在电缆挂钩底部设置了加强筋,提高了电缆挂钩的结构强度,便于敷设重量较大的高压电缆,提高高压电缆敷设的稳定性。本发明不仅能够提高电缆的平顺度和使用安全性,方便使用,还具有结构简单、施工成本低、电能损耗小、结构强度高和电缆敷设稳定性好的优点。</b>
Description
技术领域
本发明涉及一种隧道建设用高压电缆敷设支架。
背景技术
在工程施工中,照明和动力都需要用电;但因场地和环境限制,野外普遍采用的高架裸线高压线无法使用,不得不采用带绝缘层的高压电缆输电,因此电缆敷设是必不可少的一个环节;尤其是在隧道建设等地下工程中,施工周期长,照明和动力需求程度大且用电量大;为了隧道建设的正常施工,必须要进行电缆敷。但是,在现有的隧道建设施工的电缆敷设中,施工用电存在一定的临时性,且施工地点经常变动,导致高压电缆敷设的规范性不理想、乱拉乱扯严重、电缆弯转杂乱且平顺度较差,甚至还存在高压电缆直接搭在钢筋头上和电缆缠绕等现象,存在严重的安全隐患。同时,由于电缆平顺度较差和缠绕的问题,还会导致使用的电缆长度增加,施工成本高,电缆上的电能损耗较大。因此,现有的隧道建设用高压电缆敷设中存在着电缆平顺度较差、电缆使用的安全性不理想、施工成本高和电缆上电能损耗较大的问题。
发明内容
本发明的目的在于,提供一种隧道建设用高压电缆敷设支架。本发明不仅能够提高电缆的平顺度和使用安全性,还具有施工成本低和电能损耗小的优点。
本发明的技术方案:一种隧道建设用高压电缆敷设支架,包括两根水平设置的支撑钢筋,两根支撑钢筋之间连接有等边角钢;等边角钢的一边与两根支撑钢筋的端部固定连接,等边角钢的一边上通过螺栓连接有电缆挂钩。
前述的一种隧道建设用高压电缆敷设支架中,所述电缆挂钩的底部设置有加强筋。
前述的一种隧道建设用高压电缆敷设支架中,所述电缆挂钩的半径为25mm~35mm。
前述的一种隧道建设用高压电缆敷设支架中,所述电缆挂钩位于两根支撑钢筋之间。
前述的一种隧道建设用高压电缆敷设支架中,所述支撑钢筋的悬空长度等于或小于等边角钢的长度。
与现有技术相比,本发明提供了一种隧道建设用高压电缆敷设支架,通过设置两根支撑钢筋来连接和固定等边角钢,再通过等边角钢来连接电缆挂钩,通过电缆挂钩来敷设高压电缆,不仅结构简单,而且还能避免电缆缠绕的现象,提高电缆使用的安全性,还能够在一定程度上缩短电缆的使用长度,降低施工成本和电能损耗;使用时将两根支撑钢筋水平地插入岩壁中,即可支撑和找平的作用,使用方便;同时,电缆挂钩还能起到绝缘的作用,提高了电缆使用的安全性。此外,本发明还在电缆挂钩底部设置了加强筋,能够提高电缆挂钩的结构强度,便于敷设重量较大的高压电缆,提高高压电缆敷设的稳定性;电缆挂钩的半径为25mm~35mm,不仅能够方便高压电缆在电缆挂钩上的敷设,还能对电缆进行限位,防止电缆在使用时意外脱落,进一步提高了安全性;支撑钢筋的悬空长度L等于或小于等边角钢的长度D,能够加强支撑钢筋的承重能力,进一步提高结构强度。因此,本发明不仅能够提高电缆的平顺度和使用安全性,方便使用,还具有结构简单、施工成本低、电能损耗小、结构强度高和电缆敷设稳定性好的优点。
附图说明
图1是本发明的结构示意图;
图2是本发明使用时的结构示意图。
附图中的标记为:1-支撑钢筋,2-等边角钢,3-螺栓,4-电缆挂钩,5-加强筋,6-岩壁。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明,但并不作为对本发明限制的依据。
实施例。一种隧道建设用高压电缆敷设支架,构成如图1、2所示,包括两根水平设置的支撑钢筋1,两根支撑钢筋1之间连接有等边角钢2;等边角钢2的一边与两根支撑钢筋1的端部固定连接,等边角钢2的一边上通过螺栓3连接有电缆挂钩4。
所述电缆挂钩4的底部设置有加强筋5,所述电缆挂钩4的半径为25mm~35mm,所述电缆挂钩4位于两根支撑钢筋3之间,所述支撑钢筋1的悬空长度等于或小于等边角钢2的长度。
使用时,将等边角钢2的一边与两根支撑钢筋1焊接连接,再通过螺栓3将电缆挂钩4安装在等边角钢2的另一边上;然后将两根支撑钢筋1水平地插入隧道的岩壁6内,最后将高压电缆敷设在电缆挂钩4上即可完成隧道建设用高压电缆的敷设,结构简单且使用方便。
Claims (5)
1.一种隧道建设用高压电缆敷设支架,其特征在于:包括两根水平设置的支撑钢筋(1),两根支撑钢筋(1)之间连接有等边角钢(2);等边角钢(2)的一边与两根支撑钢筋(1)的端部固定连接,等边角钢(2)的一边上通过螺栓(3)连接有电缆挂钩(4)。
2.根据权利要求1所述的一种隧道建设用高压电缆敷设支架,其特征在于:所述电缆挂钩(4)的底部设置有加强筋(5)。
3.根据权利要求1所述的一种隧道建设用高压电缆敷设支架,其特征在于:所述电缆挂钩(4)的半径为25mm~35mm。
4.根据权利要求1所述的一种隧道建设用中低压电缆敷设支架,其特征在于:所述电缆挂钩(4)位于两根支撑钢筋(3)之间。
5.根据权利要求1、2、3或4所述的一种隧道建设用中低压电缆敷设支架,其特征在于:所述支撑钢筋(1)的悬空长度等于或小于等边角钢(2)的长度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510850287.1A CN105375432B (zh) | 2015-11-30 | 2015-11-30 | 一种隧道建设用高压电缆敷设支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510850287.1A CN105375432B (zh) | 2015-11-30 | 2015-11-30 | 一种隧道建设用高压电缆敷设支架 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105375432A true CN105375432A (zh) | 2016-03-02 |
CN105375432B CN105375432B (zh) | 2019-08-06 |
Family
ID=55377350
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510850287.1A Active CN105375432B (zh) | 2015-11-30 | 2015-11-30 | 一种隧道建设用高压电缆敷设支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105375432B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106025957A (zh) * | 2016-06-30 | 2016-10-12 | 国网山东省电力公司济南市历城区供电公司 | 电缆支撑装置 |
CN107706855A (zh) * | 2017-10-27 | 2018-02-16 | 江苏华鹏电缆股份有限公司 | 一种分支电缆吊头挂钩结构 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB128116A (en) * | 1918-11-11 | 1919-06-19 | Siemens Brothers & Co Ltd | Improvements in or relating to Means for Supporting Electric Cables and for like purposes. |
US20070205335A1 (en) * | 2006-03-03 | 2007-09-06 | Waxman Consumer Products Group Inc. | Pipe hanger with integral cable tie channel |
CN201462198U (zh) * | 2009-07-07 | 2010-05-12 | 山西华龙塑料有限公司 | 锁合式电缆挂钩 |
JP2010281369A (ja) * | 2009-06-03 | 2010-12-16 | Mirai Ind Co Ltd | 配線・配管材支持具 |
CN201973364U (zh) * | 2011-04-02 | 2011-09-14 | 袁华平 | 矿用多功能敷线装置 |
US20120074268A1 (en) * | 2010-09-23 | 2012-03-29 | Mcmath Justin C | Multi-purpose cable support having bendable stem |
CN203240109U (zh) * | 2013-03-07 | 2013-10-16 | 长沙长缆电工金具有限公司 | 组合式电缆挂架 |
WO2014012137A1 (en) * | 2012-07-17 | 2014-01-23 | Koina Paul | A support hook, and a support management system using same |
CN203707688U (zh) * | 2014-02-24 | 2014-07-09 | 中建安装工程有限公司 | 一种用于自锁型铠装铝合金电缆安装的支架 |
CN205160015U (zh) * | 2015-11-30 | 2016-04-13 | 国家电网公司 | 隧道建设用高压电缆敷设支架 |
-
2015
- 2015-11-30 CN CN201510850287.1A patent/CN105375432B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB128116A (en) * | 1918-11-11 | 1919-06-19 | Siemens Brothers & Co Ltd | Improvements in or relating to Means for Supporting Electric Cables and for like purposes. |
US20070205335A1 (en) * | 2006-03-03 | 2007-09-06 | Waxman Consumer Products Group Inc. | Pipe hanger with integral cable tie channel |
JP2010281369A (ja) * | 2009-06-03 | 2010-12-16 | Mirai Ind Co Ltd | 配線・配管材支持具 |
CN201462198U (zh) * | 2009-07-07 | 2010-05-12 | 山西华龙塑料有限公司 | 锁合式电缆挂钩 |
US20120074268A1 (en) * | 2010-09-23 | 2012-03-29 | Mcmath Justin C | Multi-purpose cable support having bendable stem |
CN201973364U (zh) * | 2011-04-02 | 2011-09-14 | 袁华平 | 矿用多功能敷线装置 |
WO2014012137A1 (en) * | 2012-07-17 | 2014-01-23 | Koina Paul | A support hook, and a support management system using same |
CN203240109U (zh) * | 2013-03-07 | 2013-10-16 | 长沙长缆电工金具有限公司 | 组合式电缆挂架 |
CN203707688U (zh) * | 2014-02-24 | 2014-07-09 | 中建安装工程有限公司 | 一种用于自锁型铠装铝合金电缆安装的支架 |
CN205160015U (zh) * | 2015-11-30 | 2016-04-13 | 国家电网公司 | 隧道建设用高压电缆敷设支架 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106025957A (zh) * | 2016-06-30 | 2016-10-12 | 国网山东省电力公司济南市历城区供电公司 | 电缆支撑装置 |
CN107706855A (zh) * | 2017-10-27 | 2018-02-16 | 江苏华鹏电缆股份有限公司 | 一种分支电缆吊头挂钩结构 |
Also Published As
Publication number | Publication date |
---|---|
CN105375432B (zh) | 2019-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103357785B (zh) | 一种拉线制作器 | |
CN201944421U (zh) | 电缆绝缘支架 | |
CN202206066U (zh) | 电力带电跨越架 | |
CN105375432A (zh) | 一种隧道建设用高压电缆敷设支架 | |
CN205160015U (zh) | 隧道建设用高压电缆敷设支架 | |
CN103779809B (zh) | 带电调整双分裂子导线间距作业方法 | |
CN102966257B (zh) | 一种750kV复合材料横担 | |
CN205104847U (zh) | 隧道建设用中低压电缆敷设支架 | |
CN203406579U (zh) | 一种铝合金芯铝型线导线内衬管大钢锚型耐张线夹 | |
CN206575086U (zh) | 绝缘紧线器拉板装置 | |
CN206076869U (zh) | 一种新型螺钉式高分子材料预埋电缆支架 | |
CN103457216A (zh) | 一种铝合金芯铝型线导线内衬管大钢锚型耐张线夹 | |
CN203574304U (zh) | 铁路用电紧线系统 | |
CN203774694U (zh) | 一种高压电缆敷设系统 | |
CN203398712U (zh) | 一种铝合金芯铝绞线大钢锚型耐张线夹 | |
CN206506249U (zh) | 室外轨道移动起重设备电源线紧线装置 | |
CN106115504A (zh) | 一种吊具 | |
CN203567573U (zh) | 铁路用电紧线轮组 | |
CN202925981U (zh) | 一种750kV复合材料横担 | |
CN202401814U (zh) | 一种转角塔 | |
CN105305323A (zh) | 一种隧道建设用中低压电缆敷设支架 | |
CN204571445U (zh) | 一种高压输电线路钢管塔终端 | |
CN203722143U (zh) | 新型机械化敷设大截面电力电缆系统 | |
CN204441721U (zh) | 一种gil结构 | |
CN203386908U (zh) | 一种接续管 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |