CN105354267B - The method for realizing polymorphic type programme " more rule unifications " Electronic approval - Google Patents

The method for realizing polymorphic type programme " more rule unifications " Electronic approval Download PDF

Info

Publication number
CN105354267B
CN105354267B CN201510703352.8A CN201510703352A CN105354267B CN 105354267 B CN105354267 B CN 105354267B CN 201510703352 A CN201510703352 A CN 201510703352A CN 105354267 B CN105354267 B CN 105354267B
Authority
CN
China
Prior art keywords
space planning
space
planning scheme
control line
electronic approval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510703352.8A
Other languages
Chinese (zh)
Other versions
CN105354267A (en
Inventor
范海林
谭军辉
王大成
李姗迟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Eyu Intelligent Survey Technology Co Ltd
Original Assignee
Guangdong Eyu Intelligent Survey Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Eyu Intelligent Survey Technology Co Ltd filed Critical Guangdong Eyu Intelligent Survey Technology Co Ltd
Priority to CN201510703352.8A priority Critical patent/CN105354267B/en
Publication of CN105354267A publication Critical patent/CN105354267A/en
Application granted granted Critical
Publication of CN105354267B publication Critical patent/CN105354267B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Databases & Information Systems (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Remote Sensing (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The present invention relates to a kind of methods for realizing polymorphic type programme " more rule unifications " Electronic approval, specifically include that default gis database (Geographic Information System, GIS);Extract from the library GIS/read reference data;For Electronic approval system creation or typing space planning scheme;The space planning scheme is compared with the reference data, coordinates plot;To coordinate/the processed space planning scheme stores into the library GIS.The present invention can solve the contradiction between each department's space planning, promote the efficiency of administrative examination and approval, and realize the economic value of construction land to the maximum extent.

Description

The method for realizing polymorphic type programme " more rule unifications " Electronic approval
Technical field
The present invention relates to space plannings to adjust field, and in particular to a kind of realization polymorphic type programme, " more rule are closed The method of one " Electronic approval.
Background technique
The spatial planning system in each city of current National, for example, urban and rural planning, overall plan for land use, environmental protection planning, Forestry planning etc., there is contradiction and conflicts between " more rule ", cause Space resources distribution efficiency lower.Main problem has: (1) The data class of plan for land is various, data source is extensive, and each department, unit are in statistical method, data mode and way to manage On have differences, wherein each department includes that planning construction department, land departments, environmental protection administration, the forest department etc. in place have The department of quorum space planning management permission, the difference of statistical method are mainly reflected in the difference of Land resources classification, for example, Overall plan for land use is concerned with construction land, and urban and rural planning is concerned with urban land, in addition, advising for environmental protection It draws, forestry planning, also has respective statistical requirements for water conservation district, nature reserve area, forest resourceies etc.;(2) land used is advised The data semantic drawn is different, this is also mainly reflected in the difference of Land resources classification, for example, the execution standard of urban and rural planning is " Standard for classification of urban land and for planning of constructional land " (GB50137-2011) and " Village Planning land use class guide " (is built Village [2014] 98), and the execution standard of overall plan for land use is overall plan for land use establishment regulation (TD/ T1023-2010, TD/T1024-2010, TD/T1025-2010) in reallocation of land purpose classification, the two it is specific division and Meaning is different, for another example, the forest land concrete meaning in forest land and forestry planning in overall plan for land use also difference; (3) data mode, format of plan for land are many and diverse, and general plan for land includes drawing data, CAD data and GIS data etc.; (4) each department, the spatial frame of reference of unit are different.
In urban construction design field, research staff is dedicated to utilizing geographic information system technology (Geographic Information System, GIS) Computer Aided Design.Chinese patent CN102592008A discloses a kind of city based on GIS technology The modules such as city waste pipe-network design system, including pipe network Element Drawing, wastewater quantity prediction, water pipeline optimization.The invention also mentions For a kind of operation method of Design of Urban Drainage Pipe Network system based on GIS technology, in the system for making full use of GIS-Geographic Information System On the basis of scheming the functions such as editor, data management, storage, the layout for carrying out pipeline is drawn and adjustment, to the pipeline in design scheme Corresponding water force and diameter optimal are carried out, convenient for scientific and reasonable design drainage pipeline networks programme.
However, each department, unit formulate space planning scheme when, in addition to design and produce corresponding programme with Outside, it is also necessary to which, in view of whether the space planning scheme of each department can violate the regulation of other departments, this is in space planning scheme Declaration during be the key element that must be taken into consideration.That is, only having in terms of declaration space planning scheme The GIS technology application method of design function is inadequate.
Summary of the invention
To solve above-mentioned problem of the prior art, the object of the present invention is to provide a kind of realization polymorphic type programmes The method of " more rule unifications " Electronic approval, to solve contradiction of each department in terms of space planning;Another object of the present invention It is, the above method is provided, so that the standardization and standardization of the space planning achievement of each department is achieved;Of the invention Another object also resides in, and maximally utilises idle land resource, and adjusts unreasonable Land arrangement.
To achieve the above object, realize that Electronic approval " advises more and unify " to polymorphic type programme the present invention provides a kind of Method, function rely primarily on Electronic approval system to realize, and successively including at least following steps:
Step 1: default gis database (Geographic Information System, GIS), it is described It is stored with geographic information data in GIS database, coordinates the legal sky of resulting control line system and each department through each department Between layout data;
Step 2: extracting/read the geographic information data, control line system and space from the GIS database and advise Draw data;
Step 3: appointing with reference to the geographic information data, control line system and space planning data, and according to design The requirement of business book, makes initial quorum space programme;
Step 4: the space planning scheme being compared with the control line system, to differentiate the space planning It whether there is between scheme and the control line system and conflict, if it is decided that result is that "Yes" has conflict, then executes plot association It debugs, the coordinator includes modification space attribute, and/or merges plot, and/or split plot, so that the space Programme meets the requirement of the design specifications and the regulation of the control line system;
Step 5: will coordinate/the processed space planning scheme stores into the GIS database.
In one embodiment, the step 3 further comprises Computer Aided Design module, and the Computer Aided Design module is for providing Threadiness design element relevant to the planning of the quorum space of corresponding department and planar design element.
The present invention also provides another method for realizing polymorphic type programme " more rule unifications " Electronic approval, functions Electronic approval system is relied primarily on to realize, and successively including at least following steps:
Step 1: default gis database (Geographic Information System, GIS), it is described It is stored with geographic information data in GIS database, coordinates the legal sky of resulting control line system and each department through each department Between layout data;
Step 2: extracting/read the geographic information data, control line system and space planning number from the library GIS According to;
Step 3: by general reading device, by existing quorum space programme typing to the Electronic approval system In system;
Step 4: the space planning scheme being compared with the control line system, to differentiate the space planning It whether there is between scheme and the control line system and conflict, if it is decided that result is that "Yes" has conflict, then executes plot association It debugs, the coordinator includes modification space attribute, and/or merges plot, and/or split plot, so that the space Programme meets the requirement of the design specifications and the regulation of the control line system;
Step 5: will coordinate/the processed space planning scheme stores into the library GIS.
In one embodiment, the step 4 further includes steps of
Step 4.1: the conflict rule between control line system and the space planning described in pre-programmed;
Step 4.2: differentiating the space planning scheme using the conflict rule of sequencing, thereby determine that institute Stating, which whether there is between space planning scheme and the control line system, conflicts;
Step 4.3: if the result of the differentiation is that "Yes" has conflict, executing the plot coordinator;
Step 4.4: statistics coordinated/the processed space planning scheme in various plot quantity;
Step 4.5: will coordinate/the processed space planning scheme and the design specifications compare, adjustment ground The range of block, until the space planning scheme meets the requirement of the design specifications;
After completing the step 4.5, the Electronic approval system at least executes institute to the space planning scheme again Step 4.2 is stated, until the result of the differentiation is "No".
In another embodiment, the step 5 further comprises gridding module, for advising the space when storing The scheme of drawing is divided into several grids with specific dimensions.
In a specific embodiment, it is fixed to the control line system in the step 1 to further include steps of Phase is updated maintenance, and when updating the control line system, and the Electronic approval system is successively executed except described automatically Method flow other than step 1, step 3.
In a specific embodiment, it further includes steps of when there are another space planning scheme, wherein institute Another space planning scheme is stated compared with initial/existing quorum space programme of the step 3, more meets design objective The requirement of book and/or the control line system, the Electronic approval system execute the method stream of the step 2-5 again automatically Journey.
In a specific embodiment, when executing the step 5, former space planning scheme and new is correspondingly compared one by one Each grid of space planning scheme, for the grid that two editions schemes have differences, storage mode is to be covered with new grid Old grid is covered, and defines the version of the new grid simultaneously.
In another embodiment, when the space planning scheme needs to be converted into the Electronic approval system from other forms When readable form, coordinate conversion, and/or format conversion, and/or the regular program of attribute are executed to the space planning scheme.
In another embodiment, the library GIS is attached with sharing application module, for extracting from the GIS database Data, the data for inquire, count, the spatial information of space planning scheme described in overlay analysis.
Compared with prior art, present invention has the advantage that
(1) present invention can solve the contradiction between each department's space planning from data source, utilize this method establishment Space planning scheme is in terms of data format, data structure, statistical indicator, space layout, it will with existing control line system It is consistent, the final lifecycle management for realizing more rule unification work;
(2) present invention is advantageously implemented the standardization of each department's quorum space program results and standardization, improves Planning preparation Science and normalization, reduce space planning scheme examination & approval cost, and solve drawn due to each department's space planning contradiction The conflict when planning risen executes, promotes the efficiency of administrative examination and approval, is conducive to implementing for people's livelihood project, promotes social development;From For legal perspective, it can push and implement more rule unification achievements;
(3) present invention maximally utilises idle land resource, adjustment does not conform to by analysis difference, coordination plot Construction land layout and the basic farmland of reason are laid out, and realize that land used for urban and rural construction projects scale is planned as a whole, and ensure that urban development construction needs, The economic value of construction land is realized in intensive utilization soil to the maximum extent.
Detailed description of the invention
Fig. 1 shows Electronic approval method flow diagram of the invention, involved in programme be newly-built space Programme;And
Fig. 2 shows the Electronic approval method flow diagram of another embodiment of the present invention, involved in programme be Existing space planning scheme.
Hereinafter, it will by way of example, and the embodiment of the present invention is described in detail referring to appended attached drawing.
Specific embodiment
Fig. 1 shows Electronic approval method flow diagram of the invention, involved in programme be newly-built space Programme.
GIS database: normally, in order to store the geography information of specific region, user can build in public server Vertical database --- gis database (Geographic Information System, GIS), the GIS database It is inside stored with general geographic information data, coordinates resulting control line system and each department through each department to quorum space Layout data, wherein control line system is that can be considered the achievements of more rule unifications, these control lines may include Ecological Control Line, Urban Scale control line, basic farmland control line, industry block control line, Forestry Ecological red line, water conservation district control Line, city blue line, history culture control line, has ready conditions and builds area etc. at infrastructure control line, and the control line system Maintenance can be periodically updated by related software, in addition, each department can also similarly periodically to the layout data of quorum space It is updated maintenance.It is to be noted, however, that obtaining a unified control wire body although mutually coordinated by each department System, but this part of control line system only includes the part that each department has reached common understanding, and fail the part reached common understanding then It is still embodied in the independent control line system of each department.
Reference data: when user, which needs to submit newly-built scheme, carries out declaration, it is necessary first to from GIS database Extraction/reading reference data, that is, have stored in the control line system in GIS database, and the quorum space of each department plans number Accordingly and this creates the Universal Geographical information data within the scope of plot involved in space planning scheme.
Computer Aided Design: user refers to the geographic information data, control line system and space planning data, such as Relevant linear design element such as highway layout information, planar design element such as plot design information is provided, and according to design The requirement of charter, the drawing of rendering space programme, the space planning scheme include such as road, soil, functional areas, The drawing of space planning scheme is generally made into the readable dwg format text of Auto CAD, gis format text or other are suitable The text of format.
Reference format is converted: if the drawing of space planning scheme is dwg format text or other suitable format text Form, preferably can be regular by format conversion and attribute by the drawing of these space planning schemes, is converted into the gis format of standard Text, i.e., it is " GIS achievement " shown in FIG. 1.
Data management: the space planning scheme for having made the gis format finished is compared with the reference data, Specifically, user can be by the preparatory sequencing of conflict rule of the control line system of each department, followed by rushing for sequencing Prominent rule carrys out discriminant space programme, this discriminating program can be executed for example by the specific processor of Electronic approval system, Thereby determining that, which whether there is between the space planning scheme and the control line system, conflicts, if it is decided that result is "Yes" presence Conflict, then need to coordinate plot.By taking overall plan for land use as an example, if planned land use itself is not belonging to farming land, and it is somebody's turn to do Plot is at least partially disposed in the range of basic farmland control line, then probably needs the range in revised planning plot, in order to avoid The plot for being endowed specific planning/attribute has been occupied in planning plot, and on the other hand, the range in planning plot adjusted is still Need to meet the total amount requirement in design specifications about planning plot.Normally, this coordinator cannot be disposably complete At actually coordinator repeatedly carries out and coordinator can all be counted to GIS database every time, until space is advised It draws no longer to exist between scheme and the control line system and conflict.
Storage tool: the space planning scheme by " data management " processing is then stored again GIS database It is interior.In the present embodiment, related programme is newly-built space planning scheme, therefore the space planning scheme is deposited for the first time It stores up in GIS database, and preferably, gridding processing is executed to the space planning scheme while storage.Also, such as Upper described, control line system and each department can periodically be updated maintenance to the layout data of quorum space, when the control When wire body system processed and layout data change, it may be only that the planning/attribute in part of plot changes, or The coverage area of control line system is varied, Electronic approval system can automatic identification be covered with the grid of update area, and from The dynamic above-mentioned process executed in addition to " Computer Aided Design " program carries out dynamic update to the grid that these include update area, Coordinate plot again, hereafter the grid being updated is stitched together again with the grid not being updated, constitutes new Space planning scheme and again storage arrive GIS database, and update each time, Electronic approval system all can be automatically to by more The version for the grid newly crossed makes special definition/label, the storage mode of this particularly suitable changed meshing The total amount of data for updating need to store every time can be reduced, storage time is effectively shortened and reduces data redundancy.
Sharing application: the space planning scheme in GIS database can be called, for inquiring, counting, overlay analysis The spatial information of the program.
Fig. 2 shows the Electronic approval method flow diagram of another embodiment of the present invention, involved in programme be Existing space planning scheme.
The library-GIS: similarly, in order to store the geography information of specific region, user can establish number in public server According to library --- gis database (Geographic Information System, GIS), the GIS database memory General geographic information data, the coordinated resulting control line system of each department and each department are contained to the rule of quorum space Draw data, wherein control line system is that can be considered the achievement of more rule unifications, these control lines include such as Ecological Control line, city Town scale domination line, basic farmland control line, industry block control line, Forestry Ecological red line, water conservation district control line, basis Facility control line, history culture control line, has ready conditions and builds area etc. at city blue line, and the control line system can pass through Related software is periodically updated maintenance, in addition, each department similarly can also periodically carry out more the layout data of quorum space New maintenance.
Reference data: when user, which needs to submit existing scheme, carries out declaration, it is necessary first to be mentioned from GIS database Reference data is taken/read, that is, has stored in the control line system in GIS database, the quorum space layout data of each department And the Universal Geographical information data within the scope of plot involved in the existing space planning scheme.
Existing scheme: each department, unit usually have respective spatial planning system, and by these space plannings System is fabricated to existing space planning scheme, these existing space planning scheme drawings are generally Freehandhand-drawing drawing, dwg format Text, gis format text or other suitable format texts, preferably can be by the space planning scheme drawing of non-gis format therein It is regular by format conversion and attribute, be converted into the gis format text of standard, i.e., it is " GIS achievement " shown in Fig. 2.
Data management: the space planning scheme of gis format is compared with the reference data, specifically, user The preparatory sequencing of conflict rule of the control line system of each department can be differentiated sky followed by the conflict rule of sequencing Between programme, this discriminating program can be executed for example by the specific processor of Electronic approval system, thereby determine that the space It whether there is between programme and the control line system and conflict, if it is decided that result is that "Yes" has conflict, then needs to assist Plot is adjusted, coordination mode is identical as the coordination mode of previous embodiment, and details are not described herein.Normally, this coordinator is not It can disposably complete, actually coordinator repeatedly carries out and coordinator can all be counted to GIS database every time It is interior, conflict until no longer existing between space planning scheme and the control line system.
Storage tool: the space planning scheme by " data management " processing is then stored again GIS database It is interior.In the present embodiment, related programme is to be logged for the first time to Electronic approval system/GIS database both to have time Between programme, it is preferable that storage while to the space planning scheme execute gridding processing.Also, as described above, control Wire body system and each department processed can periodically be updated maintenance to the layout data of quorum space, when the control line system with And layout data is when changing, and may be only that the planning/attribute in part of plot changes or control line system Coverage area be varied, Electronic approval system can automatic identification be covered with the grid of update area, and executed automatically except " auxiliary Help design " above-mentioned process other than program, dynamic update is carried out to the grid that these include update area, i.e., again in phase Hereafter the grid being updated is stitched together again with the grid not being updated, constitutes new space planning side by block The library GIS is arrived in case and again storage, and is updated each time, the version that Electronic approval system all can automatically to the grid being updated Special definition/label is made,
The storage mode of this particularly suitable changed meshing can reduce the number for updating need to store every time According to total amount, effectively shortens storage time and reduce data redundancy.
Sharing application: the space planning scheme in GIS database can be called, for inquiring, counting, overlay analysis The spatial information of the program.
It should be appreciated that the above embodiment of the present invention is used for the purpose of clearly demonstrating embodiments of the present invention and work Principle, rather than a limitation of the embodiments of the present invention.For the those of ordinary skill in the field, stated upper It can also be made other variations or changes in different ways on the basis of bright.Here all embodiments can not be given thoroughly It lifts.It is all to belong to the obvious variation or change still in protection model of the invention that technical solution of the present invention is amplified out Within enclosing.

Claims (15)

1. a kind of method for realizing polymorphic type programme " more rule unifications " Electronic approval, comes real by Electronic approval system It is existing, and successively including at least following steps:
Step 1: default gis database (Geographic Information System, GIS), the GIS Databases contain geographic information data, coordinate the quorum space of resulting control line system and each department through each department Layout data;
Step 2: extracting/read the geographic information data, control line system and space planning number from the GIS database According to;
Step 3: with reference to the geographic information data, control line system and space planning data, and according to design specifications Requirement, make initial quorum space programme;
Step 4: the space planning scheme being compared with the control line system, to differentiate the space planning scheme It whether there is between the control line system and conflict, if it is decided that result is that "Yes" has conflict, then executes plot and coordinate journey Sequence, the coordinator includes modification space attribute, and/or merges plot, and/or split plot, so that the space planning Scheme meets the requirement of the design specifications and the regulation of the control line system;
Step 4.1: the conflict rule between control line system and the space planning described in pre-programmed;
Step 4.2: differentiating the space planning scheme using the conflict rule of sequencing, thereby determine that the sky Between between programme and the control line system with the presence or absence of conflicting;
Step 4.3: if the result of the differentiation is that "Yes" has conflict, executing the plot coordinator;
Step 4.4: statistics coordinated/the processed space planning scheme in various plot quantity;
Step 4.5: will coordinate/the processed space planning scheme and the design specifications compare, adjust plot Range, until the space planning scheme meets the requirement of the design specifications;
After completing the step 4.5, the Electronic approval system at least executes the step to the space planning scheme again Rapid 4.2, until the result of the differentiation is "No";
Step 5: will coordinate/the processed space planning scheme stores into the GIS database.
2. Electronic approval method according to claim 1, which is characterized in that the step 3 further comprises Computer Aided Design Module, the Computer Aided Design module is for providing linear design element relevant to the planning of the quorum space of corresponding department and face Shape design element.
3. Electronic approval method according to claim 1, which is characterized in that the step 5 further comprises gridding mould Block, for the space planning scheme to be divided into several grids with specific dimensions when storing.
4. Electronic approval method according to claim 3 is further included steps of to the institute in the step 1 It states control line system and is periodically updated maintenance, and when updating the control line system, the Electronic approval system is automatic Successively execute the method flow in addition to the step 1, step 3.
5. Electronic approval method according to claim 4 is further included steps of when there are another space plannings When scheme, wherein another space planning scheme is compared with initial/existing quorum space programme of the step 3, More meet the requirement of design specifications and/or the control line system, the Electronic approval system executes the step again automatically The method flow of rapid 2-5.
6. Electronic approval method according to claim 4 or 5, which is characterized in that when executing the step 5, correspondingly The each grid for comparing former space planning scheme and new space planning scheme one by one, for the former space planning scheme and institute The grid that new space planning scheme has differences is stated, storage mode is old grid to be covered with new grid, and define simultaneously The version of the new grid.
7. Electronic approval method according to claim 1, which is characterized in that when the space planning scheme is needed from other When form is converted into the Electronic approval system readable form, coordinate conversion, and/or lattice are executed to the space planning scheme Formula conversion, and/or the regular program of attribute.
8. Electronic approval method according to claim 1, which is characterized in that the GIS database is attached with sharing application Module, for extracting data from the GIS database, the data for inquiring, counting, space planning described in overlay analysis The spatial information of scheme.
9. a kind of method for realizing polymorphic type programme " more rule unifications " Electronic approval, comes real by Electronic approval system It is existing, and successively including at least following steps:
Step 1: default gis database (Geographic Information System, GIS), the GIS Databases contain geographic information data, coordinate the quorum space of resulting control line system and each department through each department Layout data;
Step 2: extracting/read the geographic information data, control line system and space planning number from the GIS database According to;
Step 3: through general reading device, by existing quorum space programme typing into the Electronic approval system;
Step 4: the space planning scheme being compared with the control line system, to differentiate the space planning scheme It whether there is between the control line system and conflict, if it is decided that result is that "Yes" has conflict, then executes plot and coordinate journey Sequence, the coordinator includes modification space attribute, and/or merges plot, and/or split plot, so that the space planning Scheme meets the requirement of design specifications and the regulation of the control line system;
Step 4.1: the conflict rule between control line system and the space planning described in pre-programmed;
Step 4.2: differentiating the space planning scheme using the conflict rule of sequencing, thereby determine that the sky Between between programme and the control line system with the presence or absence of conflicting;
Step 4.3: if the result of the differentiation is that "Yes" has conflict, executing the plot coordinator;
Step 4.4: statistics coordinated/the processed space planning scheme in various plot quantity;
Step 4.5: will coordinate/the processed space planning scheme and the design specifications compare, adjust plot Range, until the space planning scheme meets the requirement of the design specifications;
After completing the step 4.5, the Electronic approval system at least executes the step to the space planning scheme again Rapid 4.2, until the result of the differentiation is "No";
Step 5: will coordinate/the processed space planning scheme stores into the GIS database.
10. Electronic approval method according to claim 9, which is characterized in that the step 5 further comprises gridding mould Block, for the space planning scheme to be divided into several grids with specific dimensions when storing.
11. Electronic approval method according to claim 10, further includes steps of in the step 1 The control line system is periodically updated maintenance, and when updating the control line system, and the Electronic approval system is certainly The dynamic method flow successively executed in addition to the step 1, step 3.
12. Electronic approval method according to claim 11 is further included steps of when there are another space rule When the scheme of drawing, wherein initial/existing quorum space programme phase of another space planning scheme and the step 3 Than more meeting the requirement of design specifications and/or the control line system, described in the Electronic approval system executes again automatically The method flow of step 2-5.
13. Electronic approval method according to claim 11 or 12, which is characterized in that when executing the step 5, accordingly Ground compares each grid of former space planning scheme and new space planning scheme one by one, for the former space planning scheme with The grid that the new space planning scheme has differences, storage mode are old grid to be covered with new grid, and determine simultaneously The version of the justice new grid.
14. Electronic approval method according to claim 9, which is characterized in that when the space planning scheme is needed from it When his form is converted into the Electronic approval system readable form, to the space planning scheme execute coordinate conversion, and/or Format conversion, and/or the regular program of attribute.
15. Electronic approval method according to claim 9, which is characterized in that the GIS database is attached with sharing application Module, for extracting data from the GIS database, the data for inquiring, counting, space planning described in overlay analysis The spatial information of scheme.
CN201510703352.8A 2015-10-23 2015-10-23 The method for realizing polymorphic type programme " more rule unifications " Electronic approval Active CN105354267B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510703352.8A CN105354267B (en) 2015-10-23 2015-10-23 The method for realizing polymorphic type programme " more rule unifications " Electronic approval

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510703352.8A CN105354267B (en) 2015-10-23 2015-10-23 The method for realizing polymorphic type programme " more rule unifications " Electronic approval

Publications (2)

Publication Number Publication Date
CN105354267A CN105354267A (en) 2016-02-24
CN105354267B true CN105354267B (en) 2019-04-12

Family

ID=55330240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510703352.8A Active CN105354267B (en) 2015-10-23 2015-10-23 The method for realizing polymorphic type programme " more rule unifications " Electronic approval

Country Status (1)

Country Link
CN (1) CN105354267B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3113755A1 (en) * 2020-08-27 2022-03-04 Southeast University System and method for identifying and addressing major conflicts in land parcel planning conditions for transfer

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106157216A (en) * 2016-06-29 2016-11-23 贵州北斗空间信息技术有限公司 A kind of spatial information data management method and system
CN106933987B (en) * 2017-02-21 2019-10-15 广州市城市规划勘测设计研究院 A kind of dynamic updating method and device of " more rule unifications " " figure "
CN106971260A (en) * 2017-03-07 2017-07-21 广州市城市规划勘测设计研究院 " many rule unifications " " figure " Planning preparation achievement inspection method and device
CN107146026B (en) * 2017-05-09 2020-05-19 南京市城市规划编制研究中心 Space planning land difference automatic coordination method
CN107516191B (en) * 2017-08-10 2020-09-04 广州市城市规划勘测设计研究院 Multi-rule-in-one and one-graph project collaborative approval system, method and tool
CN109829024A (en) * 2019-01-21 2019-05-31 辽宁省国土资源调查规划局 A kind of space planning conflict diagnostic method and system
CN110599024A (en) * 2019-09-05 2019-12-20 广州图测智能科技有限公司 System and method for implementing supervision and evaluation of 'one picture' of homeland space planning
CN112529387A (en) * 2020-12-04 2021-03-19 国网天津市电力公司建设分公司 Multi-rule-in-one-based power grid early-stage technology aided decision research method
CN112988788B (en) * 2021-05-20 2021-07-27 四川省林业和草原调查规划院 Method for checking mutation of spatial data in territorial space planning, application system and cloud platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006053179A (en) * 2004-08-09 2006-02-23 Hitachi Ltd Device and method for processing geographic information
CN102043809A (en) * 2009-10-23 2011-05-04 镇江雅迅软件有限责任公司 Spatial database engine system
CN103150614A (en) * 2013-03-26 2013-06-12 武汉大学 Automatic configuration method for land utilization space
CN103150613A (en) * 2013-03-26 2013-06-12 武汉大学 Intelligent optimization method for land utilization layout

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006053179A (en) * 2004-08-09 2006-02-23 Hitachi Ltd Device and method for processing geographic information
CN102043809A (en) * 2009-10-23 2011-05-04 镇江雅迅软件有限责任公司 Spatial database engine system
CN103150614A (en) * 2013-03-26 2013-06-12 武汉大学 Automatic configuration method for land utilization space
CN103150613A (en) * 2013-03-26 2013-06-12 武汉大学 Intelligent optimization method for land utilization layout

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
""三规合一"基础地理信息平台研究与实践—以云浮市"三规合一"地理信息平台建设为例";王俊,何正国;《新技术应用》;20111231;摘要,第2-5节

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3113755A1 (en) * 2020-08-27 2022-03-04 Southeast University System and method for identifying and addressing major conflicts in land parcel planning conditions for transfer

Also Published As

Publication number Publication date
CN105354267A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105354267B (en) The method for realizing polymorphic type programme " more rule unifications " Electronic approval
CN111222661B (en) Urban planning implementation effect analysis and evaluation method
CN108681798B (en) GIS-based regional agriculture planning auxiliary decision system and planning method
CN105022769B (en) A kind of City Underground Pipeline interactive system and its method
CN103336894B (en) A kind of city plot ratio automatic Mesh Partition Method
CN102842072A (en) Town cadastre management method and system
CN110134752A (en) Three-dimensional large scene modeling data processing method and processing device
CN105574675B (en) Method and system for planning and supervising construction engineering based on calculation rule base
CN104036020A (en) MapX-based GIS bus information visualization method
CN110309952A (en) A kind of urban employment spatial configuration optimal auxiliary system based on commuting model
CN101419623A (en) Geographical simulation optimizing system
CN108170855A (en) A kind of CityGML and IFC data unified query and data pick-up method
CN109598056A (en) Measurement Method, system and the storage medium of town site form compactness
Di Giuda et al. BIM and Post-occupancy evaluations for building management system: Weaknesses and opportunities
CN106202762B (en) A kind of user's water data based on ArcGIS tool are automatically imported modeling software method
Zhao et al. Neighborhood micro-renewal: a perspective of gene in China
CN109002520A (en) A kind of intelligent analysis method of Regional agriculture planning industrial selection
Koc et al. Approaches to automated land subdivision using binary search algorithm in zoning applications
CN104598614A (en) Data multi-scale modal diffusing update method based on geographic semantics
CN116842092A (en) Method and system for database construction and collection management
CN102289750A (en) Assistant decision-making system applied to extreme flood risk management
CN103824158B (en) A kind of villages and small towns space planning network system of flow guiding
Gordienko et al. Geoinformation project as complex object forecasting and decision making tool in intelligent information and management systems
CN107169590B (en) Urban morphological analysis and control method based on three elements of plane pattern and fractal calculation
CN114862276B (en) Method and system for collaborative analysis and application of large data of producing city

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 510000 R&D Building, 1/F 102, Oubit Science Park, No. 1 Baisha Road, Tangjiawan Town, Haizhu District, Zhuhai City, Guangdong Province

Applicant after: Guangdong Eyu intelligent Survey Technology Co., Ltd.

Address before: 510665 Room 501, 69 Second Society Yongbian Road, Tangxia, Tianhe District, Guangzhou City, Guangdong Province

Applicant before: GUANGZHOU HUIYU INTELLIGENT SURVEY TECHNOLOGY CO., LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CI03 Correction of invention patent

Correction item: Applicant|Address

Correct: Guangdong Eyu intelligent Survey Technology Co., Ltd.|510000 R&D Building, 1/F 102, Obit Science Park, No. 1 Baisha Road, Tangjiawan Town, Zhuhai High-tech Zone, Guangdong Province

False: Guangdong Eyu intelligent Survey Technology Co., Ltd.|510000 R&D Building, 1/F 102, Obit Science Park, No. 1 Baisha Road, Tangjiawan Town, Haizhu District, Guangdong Province

Number: 13-01

Volume: 35

CI03 Correction of invention patent