CN110599024A - System and method for implementing supervision and evaluation of 'one picture' of homeland space planning - Google Patents
System and method for implementing supervision and evaluation of 'one picture' of homeland space planning Download PDFInfo
- Publication number
- CN110599024A CN110599024A CN201910838022.8A CN201910838022A CN110599024A CN 110599024 A CN110599024 A CN 110599024A CN 201910838022 A CN201910838022 A CN 201910838022A CN 110599024 A CN110599024 A CN 110599024A
- Authority
- CN
- China
- Prior art keywords
- planning
- evaluation
- module
- unit
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000011156 evaluation Methods 0.000 title claims abstract description 70
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000011161 development Methods 0.000 claims abstract description 26
- 238000012544 monitoring process Methods 0.000 claims abstract description 11
- 238000012545 processing Methods 0.000 claims abstract description 7
- 238000004891 communication Methods 0.000 claims description 6
- 238000010276 construction Methods 0.000 claims description 6
- 239000002689 soil Substances 0.000 claims description 4
- 230000002457 bidirectional effect Effects 0.000 claims description 3
- 239000003990 capacitor Substances 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 6
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Educational Administration (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a 'one-picture' implementation supervision and evaluation system and a method for territorial space planning. The method comprises the steps of collecting basic information, and processing and evaluating the basic information; planning scheme drawing, scheme comparison and result output are carried out according to the evaluation result, and the output result of the planning scheme is approved; and monitoring the evaluation, compilation and approval work, and carrying out early warning prompt according to the monitoring result. By integrating various types of information of natural resources, the intelligent analysis capability of the homeland space planning and development, the driving capability of the management implementation network and the monitoring evaluation accuracy capability are comprehensively improved, the whole processes of space planning and development, approval, implementation, supervision evaluation and early warning are effectively supported, and the space planning and treatment capability and the space treatment system modernization level are comprehensively improved.
Description
Technical Field
The invention relates to the technical field of territorial space planning, in particular to a 'one-picture' implementation supervision and evaluation system and a method for territorial space planning.
Background
The compendium of national informatization development strategy proposes that the modernization is driven by informatization to be a main line, the strong country of a network is constructed as a target, the informatization development capability of the country is strengthened, the informatization application level is improved, the informatization development environment is optimized, and the modernization of the national treatment system and the treatment capability is promoted. Based on the territorial space planning management, the information and intelligent requirements on the territorial space planning management are clarified, the power-assisted planning work is changed to a digital ecological civilization mode, and the service demand support is provided for providing a sensible, learning-capable, good-management and self-adaptive territorial space planning informatization solution. Working at each stage of the territorial space planning management is oriented, an intelligent scene and an application point are provided, and the application direction and the guidance are determined.
The 'one picture' refers to that a nationwide unified territorial space basic information platform is established on the basis of natural resource investigation monitoring data, the nationwide territorial space planning 'one picture' is gradually formed by taking the territorial space basic information platform as a bottom plate and combining various levels of territorial space planning compilation, and data sharing among government departments and information interaction between governments and the society are promoted. However, at present, no complete system exists, and a national territorial space plan 'a map' can be really formed.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a system and a method for implementing supervision and evaluation of national soil space planning, which overcome the defect that no complete system can really form national soil space planning.
The invention realizes the purpose through the following technical scheme:
a system for implementing supervision and evaluation of one map for territorial space planning comprises
The information acquisition module is used for acquiring basic information of population resources, natural resources, resource environment bearing capacity and homeland development suitability;
the input end of the central control module is connected with the output end of the information acquisition module and is used for processing the basic information;
the input end of the information evaluation module is connected with the output end of the central control module and is used for evaluating the basic information;
the input end of the planning compiling module is connected with the output end of the information evaluation module and is used for planning a planning scheme, comparing the scheme and outputting a result according to an evaluation result;
the input end of the planning approval module is connected with the output end of the planning and compiling module and is used for approving the output result of the planning scheme;
the planning supervision module is connected with the information evaluation module, the planning compilation module and the planning approval module in a bidirectional way and is used for supervising the evaluation, compilation and approval work;
and the control end of the early warning module is connected with the planning and monitoring module and is used for carrying out early warning prompt according to a monitoring result.
The further improvement lies in that the information acquisition module comprises a chip CC2530 transceiver unit and an AD unit, the chip CC2530 transceiver unit and the AD unit are integrated in the information acquisition module, and the information acquisition module also comprises an anti-interference circuit formed by a capacitor and an inductor.
The further improvement lies in that the central control module comprises a first microcontroller, a communication unit, a chip CC2530 transceiver unit and a second microcontroller, wherein the first microcontroller is respectively electrically connected with the second microcontroller and the communication unit, and the chip CC2530 transceiver unit is electrically connected with the second microcontroller.
The further improvement lies in that the information evaluation module comprises a population resource evaluation unit, a natural resource evaluation unit, a resource environment bearing capacity evaluation unit and a homeland development suitability evaluation unit.
In a further development, the planning and planning module comprises
The first acquisition unit is used for acquiring the evaluation result of the information evaluation module;
the second acquisition unit is used for acquiring a planning preselection scheme matched with the evaluation result according to the evaluation result acquired by the first acquisition unit;
the comparison unit is used for comparing all planning preselection schemes to obtain a final planning scheme;
and the output unit is used for outputting the final planning scheme.
The further improvement is that the examination and approval content of the planning examination and approval module comprises the territorial development intensity, the urban development boundary control area, the ecological red line control area, the urban and rural construction land, the construction land utilization intensity control, the cultivated land conservation quantity, the basic farmland area and the town development boundary.
A method for performing supervision and evaluation on a 'map' of a territorial space plan comprises the following steps
Collecting basic information of population resources, natural resources, resource environment bearing capacity and homeland development suitability, and processing and evaluating the basic information;
step two, planning a planning scheme, comparing the scheme and outputting results according to the evaluation result, and examining and approving the output results of the planning scheme;
and step three, supervising the evaluation, compilation and approval work, and carrying out early warning prompt according to the supervision result.
The invention has the beneficial effects that: by integrating various types of information of natural resources, the intelligent analysis capability of the homeland space planning and development, the driving capability of the management implementation network and the monitoring evaluation accuracy capability are comprehensively improved, the whole processes of space planning and development, approval, implementation, supervision evaluation and early warning are effectively supported, and the space planning and treatment capability and the space treatment system modernization level are comprehensively improved.
Drawings
FIG. 1 is a schematic diagram of the system of the present invention;
FIG. 2 is a circuit diagram of a transceiver unit of the CC2530 chip;
FIG. 3 is a flow chart of a method of the present invention;
Detailed Description
The present application will now be described in further detail with reference to the drawings, it should be noted that the following detailed description is given for illustrative purposes only and is not to be construed as limiting the scope of the present application, as those skilled in the art will be able to make numerous insubstantial modifications and adaptations to the present application based on the above disclosure.
Referring to fig. 1 and 2, a system for performing supervision and evaluation on a territorial space plan, which is a graph, comprises
The information acquisition module is used for acquiring basic information of population resources, natural resources, resource environment bearing capacity and homeland development suitability; the information acquisition module comprises a CC2530 transceiver unit and an AD unit, the CC2530 transceiver unit and the AD unit of the chip are integrated in the information acquisition module, and the information acquisition module further comprises an anti-interference circuit formed by a capacitor and an inductor.
The input end of the central control module is connected with the output end of the information acquisition module and is used for processing the basic information; the central control module comprises a first microcontroller, a communication unit, a chip CC2530 transceiving unit and a second microcontroller, wherein the first microcontroller is respectively electrically connected with the second microcontroller and the communication unit, and the chip CC2530 transceiving unit is electrically connected with the second microcontroller.
The input end of the information evaluation module is connected with the output end of the central control module and is used for evaluating the basic information; the information evaluation module comprises a population resource evaluation unit, a natural resource evaluation unit, a resource environment bearing capacity evaluation unit and a homeland development suitability evaluation unit.
The input end of the planning compiling module is connected with the output end of the information evaluation module and is used for planning a planning scheme, comparing the scheme and outputting a result according to an evaluation result; the planning compiling module comprises a first obtaining unit used for obtaining the evaluation result of the information evaluation module; the second acquisition unit is used for acquiring a planning preselection scheme matched with the evaluation result according to the evaluation result acquired by the first acquisition unit; the comparison unit is used for comparing all planning preselection schemes to obtain a final planning scheme; and the output unit is used for outputting the final planning scheme.
The input end of the planning approval module is connected with the output end of the planning and compiling module and is used for approving the output result of the planning scheme; the examination and approval contents of the planning examination and approval module comprise national soil development strength, urban development boundary control area, ecological red line control area, urban and rural construction land, construction land utilization strength control, cultivated land conservation quantity, basic farmland area and urban development boundary.
And the planning supervision module is connected with the information evaluation module, the planning compilation module and the planning approval module in a bidirectional way and is used for supervising the evaluation, compilation and approval work.
And the control end of the early warning module is connected with the planning and monitoring module and is used for carrying out early warning prompt according to a monitoring result.
Referring to fig. 3, the invention also provides a method for implementing supervision and evaluation of territorial space planning, which comprises the following steps
Collecting basic information of population resources, natural resources, resource environment bearing capacity and homeland development suitability, and processing and evaluating the basic information;
step two, planning a planning scheme, comparing the scheme and outputting results according to the evaluation result, and examining and approving the output results of the planning scheme;
and step three, supervising the evaluation, compilation and approval work, and carrying out early warning prompt according to the supervision result.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the present invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention.
Claims (7)
1. A territorial space planning 'a picture' implementation supervision and evaluation system is characterized in that: comprises that
The information acquisition module is used for acquiring basic information of population resources, natural resources, resource environment bearing capacity and homeland development suitability;
the input end of the central control module is connected with the output end of the information acquisition module and is used for processing the basic information;
the input end of the information evaluation module is connected with the output end of the central control module and is used for evaluating the basic information;
the input end of the planning compiling module is connected with the output end of the information evaluation module and is used for planning a planning scheme, comparing the scheme and outputting a result according to an evaluation result;
the input end of the planning approval module is connected with the output end of the planning and compiling module and is used for approving the output result of the planning scheme;
the planning supervision module is connected with the information evaluation module, the planning compilation module and the planning approval module in a bidirectional way and is used for supervising the evaluation, compilation and approval work;
and the control end of the early warning module is connected with the planning and monitoring module and is used for carrying out early warning prompt according to a monitoring result.
2. The territorial space planning one-map implementation supervision and evaluation system according to claim 1, characterized in that: the information acquisition module comprises a CC2530 transceiver unit and an AD unit, the CC2530 transceiver unit and the AD unit of the chip are integrated in the information acquisition module, and the information acquisition module further comprises an anti-interference circuit formed by a capacitor and an inductor.
3. The territorial space planning one-map implementation supervision and evaluation system according to claim 1, characterized in that: the central control module comprises a first microcontroller, a communication unit, a chip CC2530 transceiving unit and a second microcontroller, wherein the first microcontroller is respectively electrically connected with the second microcontroller and the communication unit, and the chip CC2530 transceiving unit is electrically connected with the second microcontroller.
4. The territorial space planning one-map implementation supervision and evaluation system according to claim 1, characterized in that: the information evaluation module comprises a population resource evaluation unit, a natural resource evaluation unit, a resource environment bearing capacity evaluation unit and a homeland development suitability evaluation unit.
5. The territorial space planning one-map implementation supervision and evaluation system according to claim 1, characterized in that: the planning and compiling module comprises
The first acquisition unit is used for acquiring the evaluation result of the information evaluation module;
the second acquisition unit is used for acquiring a planning preselection scheme matched with the evaluation result according to the evaluation result acquired by the first acquisition unit;
the comparison unit is used for comparing all planning preselection schemes to obtain a final planning scheme;
and the output unit is used for outputting the final planning scheme.
6. The territorial space planning one-map implementation supervision and evaluation system according to claim 1, characterized in that: the examination and approval contents of the planning examination and approval module comprise national soil development strength, urban development boundary control area, ecological red line control area, urban and rural construction land, construction land utilization strength control, cultivated land conservation quantity, basic farmland area and urban development boundary.
7. A method for implementing supervision and evaluation of a 'map' for territorial space planning is characterized by comprising the following steps: comprises the steps of
Collecting basic information of population resources, natural resources, resource environment bearing capacity and homeland development suitability, and processing and evaluating the basic information;
step two, planning a planning scheme, comparing the scheme and outputting results according to the evaluation result, and examining and approving the output results of the planning scheme;
and step three, supervising the evaluation, compilation and approval work, and carrying out early warning prompt according to the supervision result.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910838022.8A CN110599024A (en) | 2019-09-05 | 2019-09-05 | System and method for implementing supervision and evaluation of 'one picture' of homeland space planning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910838022.8A CN110599024A (en) | 2019-09-05 | 2019-09-05 | System and method for implementing supervision and evaluation of 'one picture' of homeland space planning |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110599024A true CN110599024A (en) | 2019-12-20 |
Family
ID=68857814
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910838022.8A Pending CN110599024A (en) | 2019-09-05 | 2019-09-05 | System and method for implementing supervision and evaluation of 'one picture' of homeland space planning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110599024A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111445358A (en) * | 2020-03-23 | 2020-07-24 | 四川中地云智慧科技有限公司 | Territorial space planning one-picture implementation supervision information system |
CN111539659A (en) * | 2020-07-07 | 2020-08-14 | 航天宏图信息技术股份有限公司 | Territorial space planning system and method and electronic equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105354267A (en) * | 2015-10-23 | 2016-02-24 | 广州绘宇智能勘测科技有限公司 | Method for realizing ''more rules one'' electronic approval of multi-type planning scheme |
CN106933987A (en) * | 2017-02-21 | 2017-07-07 | 广州市城市规划勘测设计研究院 | The dynamic updating method and device of a kind of " rule unification more " " figure " |
CN106971260A (en) * | 2017-03-07 | 2017-07-21 | 广州市城市规划勘测设计研究院 | " many rule unifications " " figure " Planning preparation achievement inspection method and device |
CN107730099A (en) * | 2017-09-30 | 2018-02-23 | 四川师范大学 | A kind of space planning method for establishing model |
-
2019
- 2019-09-05 CN CN201910838022.8A patent/CN110599024A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105354267A (en) * | 2015-10-23 | 2016-02-24 | 广州绘宇智能勘测科技有限公司 | Method for realizing ''more rules one'' electronic approval of multi-type planning scheme |
CN106933987A (en) * | 2017-02-21 | 2017-07-07 | 广州市城市规划勘测设计研究院 | The dynamic updating method and device of a kind of " rule unification more " " figure " |
CN106971260A (en) * | 2017-03-07 | 2017-07-21 | 广州市城市规划勘测设计研究院 | " many rule unifications " " figure " Planning preparation achievement inspection method and device |
CN107730099A (en) * | 2017-09-30 | 2018-02-23 | 四川师范大学 | A kind of space planning method for establishing model |
Non-Patent Citations (1)
Title |
---|
王志坚: "洛阳市国土资源一张图及综合监管系统的设计与研究", 《中国优秀硕士学位论文全文数据库(基础科学辑)》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111445358A (en) * | 2020-03-23 | 2020-07-24 | 四川中地云智慧科技有限公司 | Territorial space planning one-picture implementation supervision information system |
CN111539659A (en) * | 2020-07-07 | 2020-08-14 | 航天宏图信息技术股份有限公司 | Territorial space planning system and method and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sahoo et al. | The dynamic impact of urbanization, structural transformation, and technological innovation on ecological footprint and PM2. 5: evidence from newly industrialized countries | |
Omrany et al. | A bibliometric review of net zero energy building research 1995–2022 | |
Lee et al. | Review on investment direction of green technology R&D in Korea | |
Peñaloza et al. | The influence of system boundaries and baseline in climate impact assessment of forest products | |
CN110599024A (en) | System and method for implementing supervision and evaluation of 'one picture' of homeland space planning | |
Topaloglu et al. | Solid waste collection system selection for smart cities based on a type-2 fuzzy multi-criteria decision technique | |
CN112462603B (en) | Optimal regulation and control method, device, equipment and medium for regional atmosphere heavy pollution emergency | |
CN110648266A (en) | Management system and method for territorial space planning detection evaluation and early warning information | |
Ahakwa | The role of economic production, energy consumption, and trade openness in urbanization-environment nexus: a heterogeneous analysis on developing economies along the Belt and Road route | |
Oyebanji et al. | Green technology, green electricity, and environmental sustainability in Western European countries | |
CN111784084A (en) | Travel generation prediction method, system and device based on gradient lifting decision tree | |
CN105718601A (en) | Business dynamic integration model and application method thereof | |
Lu et al. | The effect of population density on the suitability of biomass energy development | |
Xu et al. | Prediction of Agricultural Water Consumption in 2 Regions of China Based on Fractional‐Order Cumulative Discrete Grey Model | |
Battarra et al. | Indicators and actions for the smart and sustainable city: a study on Italian metropolitan cities | |
Froemelt et al. | Greenhouse gas emissions quantification and reduction efforts in a rural municipality | |
Arfelis et al. | Life cycle assessment on calcium zincate production methods for rechargeable batteries | |
Franko et al. | Large‐scale identification of hot spots for soil carbon demand under climate change and bioenergy production | |
Changjiang | Development efficiency of leisure agriculture based on DEA model in the background of rural revitalization | |
CN115587718A (en) | Urban land planning system based on land configuration model | |
CN101122786A (en) | Wireless multiple parameter on-line environment monitor | |
Antunes et al. | Managing solid waste through discrete location analysis: A case study in central Portugal | |
Yang et al. | Using material flow and stock indicators to evaluate urban allometry: Evidence from the Beijing–Tianjin–Hebei Region | |
CN105373682A (en) | Anime game and virtual simulation product integration system | |
Panek et al. | Participatory GIS for water provision and community planning: Case study Koffiekraal, South Africa |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191220 |