Outer shear wall construction reinforcing bar posting and localization method thereof
Technical field
The invention belongs to construction engineering technical field, be specifically related to a kind of outer shear wall construction reinforcing bar posting and localization method thereof.
Background technology
In the installation process of precast shear wall, because lower-layer concrete is in casting process, shear force wall reinforcing steel bar is not positioned, therefore, before installation precast shear wall, also need to reposition and adjust reinforcing bar, adjustment process is complicated, and difficulty is large, once off-position of steel reinforcing bar is larger, also must cut off reinforcing bar, again bar planting, larger to structure influence.Not only the location adjustment of reinforcing bar affects Construction Schedule, and especially to the larger hidden danger of structural safety.
Summary of the invention
Technical problem to be solved by this invention is: solve above-mentioned prior art Problems existing, and a kind of outer shear wall construction reinforcing bar posting and localization method thereof are provided, accurate positioning is reliable, simple and fast, reduces the precast shear wall set-up time, to shear wall structure without harm, and it is easy to make, with low cost, shear force wall reinforcing steel bar positioning precision is high, and construction quality is good.
The technical solution used in the present invention is:
Reinforcing bar posting use in a kind of outer shear wall construction, and upper and lower surface adopts steel plate, and the both sides of upper and lower surface steel plate adopt reinforced bar support connection, and corner angle steel reinforced, upper and lower surface steel plate has and wears muscle hole, below steel plate two ends be fixedly connected with chucking lug.
In technique scheme, the muscle hole of wearing that described upper and lower surface steel plate has is multiple, and its position distribution is corresponding with shear force wall reinforcing steel bar position distribution, and the diameter wearing muscle hole is a bit larger tham the diameter of shear force wall reinforcing steel bar.
In technique scheme, on described upper and lower surface steel plate, interval has the large scale square opening alleviating posting deadweight and concreting.
In technique scheme, described chucking lug and floor slab bottoms template are connected and fixed.
In technique scheme, described upper and lower surface steel plate adopts the steel plate of 10mm thickness, and described chucking lug adopts the steel plate of 3mm thickness.
In technique scheme, described upper and lower surface steel plate adopts dismountable expansion steel plate.
A kind of localization method of outer shear wall construction reinforcing bar posting: comprising:
1) reinforcing bar posting is made: upper and lower surface adopts steel plate, the both sides reinforced bar support of upper and lower surface steel plate is welded and fixed, upper and lower surface steel plate has and wears muscle hole, it is multiple for wearing muscle hole, its position distribution is corresponding with shear force wall reinforcing steel bar position distribution, the diameter wearing muscle hole is a bit larger tham shear force wall reinforcing steel bar diameter, below steel plate two ends be welded with chucking lug; Spaced apart large scale square opening on upper and lower surface steel plate;
2) measurement and positioning in the floor slab bottoms template of upper strata, determines reinforcing bar posting installation site;
3) that lower floor's shear force wall reinforcing steel bar is passed reinforcing bar posting upper and lower surface steel plate wears muscle hole, and the chucking lug of reinforcing bar posting and upper strata floor slab bottoms template is connected and fixed;
4) down concreting in story shear wall form, comprises downward concreting in the large scale square opening of reinforcing bar posting;
5) concrete curing, shear force wall reinforcing steel bar is located;
6) pull down the chucking lug of reinforcing bar posting from upper strata floor slab bottoms template, then pull down reinforcing bar posting, reuse.
Advantageous effect:
Outer shear wall construction reinforcing bar posting simple structure of the present invention, make easily, with low cost, can be mass-produced use.Whole reinforcing bar posting structure adopts frame form, conveniently carry out processing and concrete construction, the muscle hole of wearing of location is arranged on upper and lower surface steel plate, conveniently make, expand steel plate detachable to adapt to the different prefabricated units of rebar spacing, upper and lower two-layered steel plates is set and the square opening that interval has corresponding size can alleviate deadweight, and is concreting reserved location.Reinforcing bar accurate positioning of the present invention is reliable, to shear force wall reinforcing steel bar Positioning Precision Control within 3mm, can ensure that the quality that sleeve is in the milk, and then ensure that construction quality.The present invention can reduce the set-up time of precast shear wall, improve efficiency of construction, and to shear wall structure without harm, is worth promoting use.
Accompanying drawing explanation
Fig. 1 is structural front view of the present invention;
Fig. 2 is structure left view of the present invention;
Fig. 3 is structure top view of the present invention.
Reference numeral:
Steel plate above 1-, 2-angle steel, 3-reinforcing bar, 4-chucking lug, steel plate below 5-, 6-wears muscle hole, 7-square opening.
Detailed description of the invention
See Fig. 1 ~ Fig. 3, outer shear wall construction reinforcing bar posting of the present invention, upper and lower surface adopts steel plate, the both sides of upper and lower surface steel plate adopt reinforced bar support to connect, corner angle steel reinforced, upper and lower surface steel plate has and wears muscle hole, below steel plate two ends be fixedly connected with chucking lug.This frame structure form, is not only conducive to improving structural strength, and conveniently carries out processing and concrete construction.
The muscle hole of wearing that above-mentioned upper and lower surface steel plate has is multiple, and its position distribution is corresponding with shear force wall reinforcing steel bar position distribution, and the diameter wearing muscle hole is a bit larger tham the diameter of shear force wall reinforcing steel bar.Locating hole is arranged on steel plate, conveniently makes.
On above-mentioned upper and lower surface steel plate, interval has the large scale square opening alleviating posting deadweight and concreting.Steel plate is opened this large scale square opening and has greatly been saved steel board, alleviates weight, and is conducive to concrete construction from top to bottom.
Above-mentioned chucking lug and floor slab bottoms template are connected and fixed.The location that location otic placode is conducive to posting of the present invention is fixed, and prevents skew and loosens.
Above-mentioned upper and lower surface steel plate adopts the steel plate of 10mm thickness, and described chucking lug adopts the steel plate of 3mm thickness.
Above-mentioned upper and lower surface steel plate adopts dismountable expansion steel plate.Expand steel plate detachable to adapt to the different prefabricated units of spacing, widen range of application.
A kind of localization method of outer shear wall construction reinforcing bar posting: comprising:
1) reinforcing bar posting is made: upper and lower surface adopts steel plate, the both sides reinforced bar support of upper and lower surface steel plate is welded and fixed, upper and lower surface steel plate has and wears muscle hole, it is multiple for wearing muscle hole, its position distribution is corresponding with shear force wall reinforcing steel bar position distribution, the diameter wearing muscle hole is a bit larger tham shear force wall reinforcing steel bar diameter, below steel plate two ends be welded with chucking lug; Spaced apart large scale square opening on upper and lower surface steel plate;
2) measurement and positioning in the floor slab bottoms template of upper strata, determines reinforcing bar posting installation site;
3) that lower floor's shear force wall reinforcing steel bar is passed reinforcing bar posting upper and lower surface steel plate wears muscle hole, and the chucking lug of reinforcing bar posting and upper strata floor slab bottoms template is connected and fixed;
4) down concreting in story shear wall form, comprises downward concreting in the large scale square opening of reinforcing bar posting;
5) concrete curing, shear force wall reinforcing steel bar is located;
6) pull down the chucking lug of reinforcing bar posting from upper strata floor slab bottoms template, then pull down reinforcing bar posting, reuse.