CN204920990U - Two lining rebar positioning fixture in tunnel - Google Patents

Two lining rebar positioning fixture in tunnel Download PDF

Info

Publication number
CN204920990U
CN204920990U CN201520670593.2U CN201520670593U CN204920990U CN 204920990 U CN204920990 U CN 204920990U CN 201520670593 U CN201520670593 U CN 201520670593U CN 204920990 U CN204920990 U CN 204920990U
Authority
CN
China
Prior art keywords
connecting rod
lining
tunnel
groove
array pitch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520670593.2U
Other languages
Chinese (zh)
Inventor
姚亮
蔡晓明
曹松俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN201520670593.2U priority Critical patent/CN204920990U/en
Application granted granted Critical
Publication of CN204920990U publication Critical patent/CN204920990U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a two lining rebar positioning fixture in tunnel relates to tunnel construction apparatus technical field, including two locating plates and a plurality of connecting rod, the locating plate symmetry sets up at the connecting rod both ends, and locating plate outside equipartition is equipped with the draw -in groove, just adjacent draw -in groove interval is consistent with the preformed reinforcement bar interval, connecting rod length and preformed reinforcement bar array pitch phase -match. Utilize the locating plate to fix a position the reinforcing bar card in equidistant draw -in groove, the reuse connecting rod requires to fix two locating plates according to the array pitch of reinforcing bar, control two lining preformed reinforcement bar's longitudinal separation and array pitch well after, can carry out the pouring of concrete and be under construction, treat the concrete setting after, the nut that loosens the connecting rod both ends can be lifted the locating plate off, but reuse still. The utility model has the advantages of simple structure, convenient operation, low cost, solved the control problem of pre -buried two lining bar spacings in the tunnel and array pitch, also improved the accuracy nature of two lining embedded bar positions in the tunnel simultaneously, made work efficiency improvement by a wide margin.

Description

A kind of tunnel double-lining steel bar positioning fixture
Technical field
The utility model relates to constructing tunnel apparatus technical field, particularly relates to a kind of tunnel double-lining steel bar positioning fixture.
Background technology
Tunnel double-lining is a ring important in supporting and protecting system of tunnel, particularly execute the pre-buried two lined steel muscle of man-hour requirement at weak surrounding rock location inverted arch, steel concrete two serves as a contrast as last safety curtain, both can carry the stress load of surrouding rock deformation together with preliminary bracing, construction safety and operation security can have been ensured as one last barrier again.But be often designed to steel concrete in the construction of weak surrounding rock location steel tunnel double-lining, traditional embedded bar construction does not control rebar spacing and array pitch by rebar clips, cause rebar spacing and array pitch after concreting uneven, after finally causing two lining concrete constructions, reinforcing steel bar bear is uneven, and two lining structure surfaces occur that crack affects structure stress in various degree.The colligation of this manual operation reinforcing bar is installed random strong, the longitudinal pitch of two lined steel muscle and the interlamellar spacing of double steel bar are difficult to keep consistency and accuracy, can cause that construction quality is undesirable, long construction period, costly, the problems such as intractability is large of doing over again.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of structure tunnel double-lining steel bar positioning fixture simple, easy to operate, with low cost, can ensure tunnel double-lining reinforcing bar positioning precision and increase work efficiency.
For solving the problems of the technologies described above, technical solution adopted in the utility model is:
A kind of tunnel double-lining steel bar positioning fixture, comprise two location-plates and some connecting rods, described location-plate is symmetricly set on connecting rod two ends, draw-in groove is laid with and adjacent card separation is consistent with reserved steel bar spacing outside described location-plate, adjacent card separation can carry out processing adjustment according to the reserved steel bar spacing difference of layout design, and length of connecting rod and reserved steel bar array pitch match.
Preferably, described connecting rod two ends are provided with screw thread, and described connecting rod two ends are fixed on location-plate by nut, are adjusted the array pitch of reserved steel bar by location-plate in the permanent position at connecting rod two ends.
Preferably, described location-plate is angle steel, and described two angle steel are opposing is arranged on connecting rod two ends, and described draw-in groove is located at outside angle steel horizontal plane, and described connecting rod is fixed on angle steel vertical plane.
Preferably, described interlinking lever end and angle steel vertical plane are fixed with two nuts and two nuts are separately positioned on angle steel vertical plane both sides respectively.
The beneficial effect adopting technique scheme to produce is: utilize location-plate to be stuck in equally spaced draw-in groove by reinforcing bar and position, require two location-plates to be fixed according to the array pitch of reinforcing bar with connecting rod again, control well after the longitudinal pitch of two lining reserved steel bars and array pitch, concrete casting and constructing can be carried out, after concrete setting, location-plate can unload by the nut unclamping connecting rod two ends, can also reuse.The utility model has structure advantage simple, easy to operate, with low cost, and make and simply can reuse, change tradition pre-buried two lining construction spacing and array pitch uneven, the variety of problems of generation is arbitrarily set, through practical proof, the utility model has thoroughly solved the control problem of the pre-buried two lining rebar spacings in tunnel and array pitch, also improve the accuracy of tunnel double-lining embedded bar position simultaneously, decrease because reinforcing bar arbitrarily arranges the post-processed expense caused, save extra cost, and work efficiency is significantly improved.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the left view of Fig. 1;
In figure: 1-location-plate, 2-connecting rod, 3-draw-in groove, 4-nut, plane on 11-angle steel, 12-angle steel vertical plane.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
A kind of tunnel double-lining steel bar positioning fixture as shown in Figure 1, 2, comprise two location-plates 1 and some connecting rods 2, described location-plate 1 is symmetricly set on connecting rod 2 two ends, draw-in groove 3 is laid with and adjacent draw-in groove 3 spacing is consistent with reserved steel bar spacing outside described location-plate 1, adjacent draw-in groove 3 spacing can process adjustment voluntarily according to the rebar spacing Different field of layout design, connecting rod 2 length and reserved steel bar array pitch match, and draw-in groove 3 and connecting rod 2 quantity are determined according to actual needs.
Conveniently adjust the array pitch of two row's reserved steel bars, process screw thread at connecting rod 2 two ends, described connecting rod two ends are fixed on location-plate 1 by nut 4.The position at connecting rod 2 two ends of location-plate 1 can be adjusted according to Design Requirement Drawing, thus the array pitch of adjustment reinforcing bar.
Conveniently buy and make material, make and simply can reuse, described location-plate 1 can select angle steel, and be arranged on connecting rod 2 two ends by opposing for two angle steel, described draw-in groove 3 is arranged on outside angle steel horizontal plane 11, and described connecting rod 2 is fixed on angle steel vertical plane 12.Utilize and process that the steel plate of U-type groove is uniform to be welded on outside angle steel horizontal plane 11 as draw-in groove 3; Also directly draw-in groove 3 can be provided as at angle steel horizontal plane 11 outer ledge fluting; Or adopt the reinforcing bar leftover bits and pieces of site construction to be welded on angle steel horizontal plane 11 outer ledge and form draw-in groove 3, segment reinforcing bar is received the lateral surface of angle steel horizontal plane 11 according to the rebar spacing horizontal welding of reserved steel bar size and drawing requirement.Angle steel length can be determined according to every plate inverted arch length.
Described connecting rod 2 end and angle steel vertical plane 12 fix with two nuts 4 respectively and two nuts 4 are separately positioned on angle steel vertical plane 12 both sides, and such connecting rod 2 is fixing more firm with angle steel, avoids angle steel on connecting rod from inward at both ends generation translation.
Concrete use procedure is as follows: reinforcing bar is stuck in equally spaced draw-in groove 3 and positions by the location-plate 1 utilizing angle steel to make, relend and help connecting rod 2 to require two angle steel nuts 4 to be fixed according to the array pitch of reinforcing bar, make two lining rebar spacings, array pitch one-time positioning, there will not be deviation, thus ensure the reinforcement construction quality of two linings; Control well after the longitudinal pitch of two lining reserved steel bars and array pitch, can carry out concrete casting and constructing, after concrete setting, angle steel can unload by the nut 4 unclamping connecting rod two ends, and the angle steel unloaded down and connecting rod 2 can also reuse.Relative to the method for other traditional positioning bars, precision is high, and efficiency is high, one-shot forming.
In sum, it is simple that the utility model has structure, easy to operate, advantage with low cost, and make and simply can reuse, change tradition pre-buried two lining construction spacing and array pitch uneven, the variety of problems of generation is arbitrarily set, through practical proof, the utility model has thoroughly solved the control problem of the pre-buried two lining rebar spacings in tunnel and array pitch, also improve the accuracy of tunnel double-lining embedded bar position simultaneously, decrease because reinforcing bar arbitrarily arranges the post-processed expense caused, save extra cost, and work efficiency is significantly improved.The utility model is suitable for the location of reinforcing bar in all tunnel double-lining reinforced concrete constructions.

Claims (4)

1. a tunnel double-lining steel bar positioning fixture, it is characterized in that: comprise two location-plates (1) and some connecting rods (2), described location-plate (1) is symmetricly set on connecting rod (2) two ends, described location-plate (1) outside is laid with draw-in groove (3) and adjacent draw-in groove (3) spacing is consistent with reserved steel bar spacing, and described connecting rod (2) length and reserved steel bar array pitch match.
2. tunnel double-lining steel bar positioning fixture as claimed in claim 1, is characterized in that: described connecting rod (2) two ends are provided with screw thread, and described connecting rod two ends are fixed on location-plate (1) by nut (4).
3. tunnel double-lining steel bar positioning fixture as claimed in claim 2, it is characterized in that: described location-plate (1) is angle steel, described two angle steel are opposing is arranged on connecting rod (2) two ends, described draw-in groove (3) is located at angle steel horizontal plane (11) outside, and described connecting rod (2) is fixed on angle steel vertical plane (12).
4. tunnel double-lining steel bar positioning fixture as claimed in claim 3, is characterized in that: described connecting rod (2) end and angle steel vertical plane (12) use two nuts (4) fixing respectively and two nuts (4) are separately positioned on angle steel vertical plane (12) both sides.
CN201520670593.2U 2015-09-01 2015-09-01 Two lining rebar positioning fixture in tunnel Expired - Fee Related CN204920990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520670593.2U CN204920990U (en) 2015-09-01 2015-09-01 Two lining rebar positioning fixture in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520670593.2U CN204920990U (en) 2015-09-01 2015-09-01 Two lining rebar positioning fixture in tunnel

Publications (1)

Publication Number Publication Date
CN204920990U true CN204920990U (en) 2015-12-30

Family

ID=54970127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520670593.2U Expired - Fee Related CN204920990U (en) 2015-09-01 2015-09-01 Two lining rebar positioning fixture in tunnel

Country Status (1)

Country Link
CN (1) CN204920990U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105736016A (en) * 2016-04-27 2016-07-06 中铁四局集团第一工程有限公司 Tunnel secondary lining steel bar framework construction equipment and application thereof
CN107299836A (en) * 2017-08-14 2017-10-27 中铁上海工程局集团有限公司 A kind of short abutment wall of constructing tunnel inverted arch sews up a batch rebar fixing device
CN107387127A (en) * 2017-09-13 2017-11-24 中交公局桥隧工程有限公司 A kind of tunnel inverted arch reserves ring muscle positioning fixture and application method
CN107905457A (en) * 2017-09-29 2018-04-13 苏州市相城区建设工程质量监督站 A kind of adjustable for height high strength cast iron stent
CN107956485A (en) * 2017-11-24 2018-04-24 中铁十局集团第四工程有限公司 A kind of Tunnel Second Lining reinforcing bar binds positioner
CN108533286A (en) * 2018-04-09 2018-09-14 中铁四局集团有限公司 Positioning fixture for quickly disassembling and assembling reserved steel bars of tunnel short side wall lining
CN108561160A (en) * 2018-05-24 2018-09-21 中铁十局集团第工程有限公司 Two lined steel muscle bracing means of ledge method large cross-section tunnel and reinforcement means
CN111112924A (en) * 2020-02-18 2020-05-08 中交路桥建设有限公司 Shear force nail fixed-position welding mould

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105736016A (en) * 2016-04-27 2016-07-06 中铁四局集团第一工程有限公司 Tunnel secondary lining steel bar framework construction equipment and application thereof
CN105736016B (en) * 2016-04-27 2018-01-19 中铁四局集团第一工程有限公司 Tunnel double-lining framework of steel reinforcement construction equipment and its application
CN107299836A (en) * 2017-08-14 2017-10-27 中铁上海工程局集团有限公司 A kind of short abutment wall of constructing tunnel inverted arch sews up a batch rebar fixing device
CN107387127A (en) * 2017-09-13 2017-11-24 中交公局桥隧工程有限公司 A kind of tunnel inverted arch reserves ring muscle positioning fixture and application method
CN107905457A (en) * 2017-09-29 2018-04-13 苏州市相城区建设工程质量监督站 A kind of adjustable for height high strength cast iron stent
CN107956485A (en) * 2017-11-24 2018-04-24 中铁十局集团第四工程有限公司 A kind of Tunnel Second Lining reinforcing bar binds positioner
CN107956485B (en) * 2017-11-24 2024-04-09 中铁十一局集团第四工程有限公司 Tunnel secondary lining reinforcing steel bar binding and positioning device
CN108533286A (en) * 2018-04-09 2018-09-14 中铁四局集团有限公司 Positioning fixture for quickly disassembling and assembling reserved steel bars of tunnel short side wall lining
CN108561160A (en) * 2018-05-24 2018-09-21 中铁十局集团第工程有限公司 Two lined steel muscle bracing means of ledge method large cross-section tunnel and reinforcement means
CN111112924A (en) * 2020-02-18 2020-05-08 中交路桥建设有限公司 Shear force nail fixed-position welding mould

Similar Documents

Publication Publication Date Title
CN204920990U (en) Two lining rebar positioning fixture in tunnel
CN105888108B (en) Built-in positioning prefabricated component reinforced concrete shear wall and construction method
CN103669655B (en) Deformation joint both walls body concrete pouring construction process
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN103321421B (en) The one-time formed construction method of a kind of concrete water pool wall
CN204826619U (en) Mould is hung to superimposed sheet instrument formula
CN205875473U (en) Built -in location prefab reinforced concrete shear wall
CN204435638U (en) A kind of hollow laminated floor slab
CN103195102A (en) Post-cast strip form support structure and method for underground waterproof shear walls
CN104175398A (en) Manufacturing mould and method of reinforcement cage of precast box beam
CN103194982B (en) Construction method for short cantilever support at bridge side span cast-in-situ segment
CN206458083U (en) A kind of adjustable building template
CN204001746U (en) A kind of wall, column template supporting adn fixing device
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN204112712U (en) A kind of side root haunch cast-in-place wall model sheetinstallat device
CN203129604U (en) Structure for controlling thickness of reinforced concrete floor slab
CN106368234A (en) Novel cup foundation box-shaped steel column installation constructing technology
CN110670873A (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN104746521B (en) The application of oversized cross-section slope cushion layer constructing structure
CN206495329U (en) Adjustable high-precision foundation bolt reinforcing mold and reinforcing system
CN202577382U (en) Reinforcing structure of bus supporting pier in electrolytic plant
CN202509530U (en) Post-cast strip water stopping steel plate combined structure of foundation bottom plate
CN108019038A (en) It is a kind of while mould fixing device and while touch fixed construction method
CN103921347A (en) Thrusting type fixing and mounting formwork for prefabricated T-beam ribbed plate rebars and prestressed pipes
CN210140841U (en) Shallow bearing platform template structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20210901