- CN206458083U CN206458083U CN201720147466.3U CN201720147466U CN206458083U CN 206458083 U CN206458083 U CN 206458083U CN 201720147466 U CN201720147466 U CN 201720147466U CN 206458083 U CN206458083 U CN 206458083U
- Authority
- CN
- China
- Prior art keywords
- template
- side template
- templates
- plate
- mounting groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of adjustable building template, including two side templates, two Side Templates and an end template, it is engaged by clamping between end template and two side templates be arrangeding in parallel, two Side Templates are located at the two ends of end template, side template, Side Template and end template three are mutually perpendicular to and surround the cuboid cavity of a upper surface open, connected, fixed between side template and Side Template by connection fastener by the equally distributed leverage of two or more between two side templates.The utility model can be assembled quickly, and adapt to different size of casting beams or plate, improve efficiency of construction.
Description
Technical field
The utility model is related to Architectural Equipment technical field, more specifically, more particularly to a kind of adjustable building template.
Background technology
In construction engineering technical field, it will usually poured using cement was carried out to template.During pouring, lead to
It often can use to pour and use template, for carrying out moulding to cement.Building form is the formwork and branch of concreting shaping
Frame, is a kind of temporary structure, is an important construction tool in fabric structure construction.
Form work engineering is an important step in reinforced concrete work.Because form work engineering expense would generally be accounted for
The 20%-30% of reinforced concrete work expense, the form work engineering amount of labour would generally account for reinforced concrete work work
The 30%-40% of the amount and template duration would generally account for 40% or so of reinforced concrete work duration, therefore, mould plate technique
It is directly connected to construction cost, labour's consumption and project progress;So as to which raising of the mould plate technique to building level has
Very important meaning.
The working template system of Cast-in-situ Concrete Structural Engineering, is mainly made up of template and Screw arbor with nut at both-ends two parts.Mould
Plate is the force bearing plate of direct contact newly-laid concrete, internal model board wall and external mold board wall is constituted by template splicing, so that in inner template
The wall space of wall is formed for concrete perfusion and shaped between wall and external mold board wall;Screw arbor with nut at both-ends is used for internal model board wall
Connected with external mold board wall, so as to keep the spacing of internal model board wall and external mold board wall and bear coagulation earth lateral pressure and load.
Existing template system, by template splicing into internal model board wall and external mold board wall, template generally required by solid
It is scheduled on the support on the outside of template to achieve a fixed connection, causes whole template system not only to need substantial amounts of support is installed and also need to
Removal bracket after the completion of pouring, causes whole man-hour very long, inefficient.Solid steel or mould are used existing template more
Plate, heavier-weight causes in carrying and installation process, and very big work burden is all brought to operator.
In summary, how building template adapts to beam size of casting, and realizes fast transportation and installation, to improving efficiency of construction
There is very big benefit.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of adjustable building template, and the template can quick group
Dress, and different size of casting beams and plate are adapted to, improve efficiency of construction.
In order to solve the above technical problems, technical solution adopted in the utility model is:A kind of adjustable building template, its
It is characterised by:Including two side templates, two Side Templates and an end template, described end template and two sides be arrangeding in parallel
It is engaged by clamping between template, two Side Templates are located at the two ends of end template, and side template, Side Template and end template three are mutually perpendicular to
And the cuboid cavity of a upper surface open is surrounded, connected between two side templates by the equally distributed leverage of two or more
Connect, fixed between side template and Side Template by connection fastener.
Such scheme is further qualified, described side template is the hard aluminium sheet that can be bent, and is set on the surface of plate
There is the square mounting groove that bending shapes, mounting groove is along side template length direction insertion, and mounting groove is more than two and be arranged in parallel,
The through hole for penetrating the leverage is distributed with side template, is provided with what is coordinated with connection fastener in the upper and lower ends of side template
Snap groove.
Such scheme is further qualified, described Side Template is identical with end template width, both of which be by panel and
Cambered plate superposition is welded, and square inserted terminal is additionally provided with the two ends of end template, and inserted terminal coordinates with mounting groove, makes bed die
Plate and side template are connected as one.
Such scheme is further qualified, the main body of described connection fastener is U-shaped folded plate, and U-shaped folded plate is divided into left folding
Section, interlude and right folding section, wherein left folding section coordinate with threaded rod grafting, are provided with threaded rod one end for clamping snap groove
Limited block, the threaded rod other end coordinates with nut thread, in stopper slot of the centre provided with insertion Side Template of right folding section, Side Template
Two ends be provided with the supporting plate that is contacted with side template inner surface.
Such scheme is further qualified, described leverage includes sleeve pipe and double threaded screw, and its middle sleeve is placed in two
Between side template, in double threaded screw threading, and through two side templates, two ends and the fixing nut of double threaded screw coordinate.
It is using the beneficial effect produced by above-mentioned technical proposal:The utility model uses side template, Side Template and bottom
Template constitutes building template, and grafting coordinates wherein between end template and side template, can be needed to adjust according to casting plate thickness
The mounting groove of end template institute grafting, the height for adjusting end template, while Side Template alongst come it is any set its
Position, and being fixed using connection fastener, can so realize that to constitute cuboid cavity to side template, Side Template and end template big
It is small to be adjusted, so as to complete to pour different size beams and plate;Side template, Side Template and end template composition in this use
Easily, it is only necessary to overall assembling can be completed to nut fastening using spanner, the quick assembling of building template is realized, so as to subtract
The built-up time of few execute-in-place work, improves efficiency of construction.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of side template in the utility model;
Fig. 3 is the structural representation of connection fastener in the utility model;
Fig. 4 is the structural representation of end template in the utility model;
In figure:1st, side template, 2, connection fastener, 3, sleeve pipe, 4, Side Template, 5, reinforcing plate, 6, double threaded screw, 7, fixed spiral shell
Mother, 8, end template, 11, snap groove, 12, mounting groove, 13, through hole, 21, U-shaped folded plate, 22, threaded rod, 23, limited block, 24, limit
Position groove, 25, supporting plate, 81, cambered plate, 82, inserted terminal, 83, panel.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
The utility model is specifically related to a kind of adjustable building template, it is possible to achieve the size of building template casting component is adjusted
It is whole, it is adaptable to which that different size building elements pour shaping.
1 understand with reference to the accompanying drawings, concrete structure of the present utility model includes two side templates 1, two Side Templates 4 and a bottom
It is engaged by clamping between template 8, the side template 1 that end template 8 and two be arranged in parallel, two Side Templates 4 are located at the two of end template 8
End, side template 1, Side Template 4 and the three of end template 8 are mutually perpendicular to and surround the cuboid cavity of a upper surface open, two
Connected between individual side template 1 by the equally distributed leverage of two or more, pass through connection fastener 2 between side template 1 and Side Template 4
It is fixed.
Building template, wherein grafting between end template 8 and side template 1 are constituted using side template 1, Side Template 3 and end template 8
Coordinate, can be needed to adjust the position of mounting groove 12 of end template institute grafting according to casting plate thickness, for adjusting end template 8
Highly, while Side Template 4 alongst comes any its position of setting, and fixed, can so realized using connection fastener 2
To side template 1, Side Template 4 and end template 8 cuboid cavity size is constituted to be adjusted, thus complete to different size beams and
Plate is poured.
In addition, the leverage in the utility model includes sleeve pipe 3 and double threaded screw 6, its middle sleeve 3 is placed in two side templates 1
Between, in the threading 3 of double threaded screw 6, and through two side templates 1, two ends and the fixing nut 7 of double threaded screw 6 coordinate.Profit
The structure constituted with leverage, realizes fixation to two side templates 1, the number of leverage, can be according to poured component the need for
To select, while being equipped with reinforcement for casting component.
In fig 2, side template 1 is as main body template, the hard aluminium sheet that use can be bent, and is carried out on hard aluminium sheet
Compacting, the square mounting groove 12 of bending is formed on the surface of plate, and mounting groove 12 is along the length direction insertion of side template 1, mounting groove 12
As the installation site of end template 8, both fixations are realized by way of grafting.Mounting groove 12 is more than two and parallel set
Put, a plurality of mounting groove 12 can be set as needed, and the distance of mounting groove is 30mm or so.Between mounting groove 12, side
The through hole 13 for penetrating the leverage is distributed with template 1, is provided with and coordinates with connection fastener 2 in the upper and lower ends of side template 1
Snap groove 11.The structure of side template 1, determines adjustable extent of the present utility model, and miscellaneous part is matched somebody with somebody with side template 1
Conjunction is used, therefore it is required that with certain rigidity and bearing capacity.
In fig. 3, the main body of connection fastener 2 is U-shaped folded plate 21, and 21 points of U-shaped folded plate is left folding section, interlude and right folding
Section, wherein left folding section coordinate with the grafting of threaded rod 22, and the limited block 23 for clamping snap groove 11 is provided with the one end of threaded rod 22,
The other end of threaded rod 22 coordinates with nut thread, in stopper slot 24 of the centre provided with insertion Side Template 4 of right folding section, Side Template 4
Two ends be provided with the supporting plate 25 that is contacted with the inner surface of side template 1.When in use, the position of Side Template 4 is determined the connection fastener 2
After good, connection fastener is installed, it is necessary first in the insertion Side Template 4 of stopper slot 24, utilize U-shaped folded plate 21 and the button of side template 1
Access slot 11 is fastened, the position of rotary stopper block 23, it is contacted with the inner surface of snap groove 11, nut, which is tightened, to be completed
The fixation of Side Template 4 and side template 1.
In figure 4, Side Template 4 is identical with the width of end template 8, and both of which is to be superimposed welding by panel 83 and cambered plate 81
Form, square inserted terminal 82 is additionally provided with the two ends of end template 8, inserted terminal 82 coordinates with mounting groove 12, makes end template 8 and side
Template 1 is connected as one.Wherein cambered plate 81 is the intensity for reinforced panel 83, it is to avoid too heavy and produce change because pouring component
Shape, influence pours effect.
The utility model according to poured scantling, is assembled, its assembling is suitable to building template when specifically used
Sequence is:The distance of two side templates 1 is determined first, and from suitable Side Template 4 and end template 8, end template 8 is inserted side template
In 1 mounting groove 12, Side Template 4 is placed at two ends, and is fastened using connection fastener 2, you can complete assembling.Side form in this use
Plate, Side Template and end template composition are very convenient, it is only necessary to can complete overall assembling to nut fastening using spanner, realize building
The quick assembling of template, so as to reduce the built-up time of execute-in-place work, improves efficiency of construction.
It is described above, only it is preferred embodiment of the present utility model, any formal limit is not done to the utility model
System, every any simple modification made according to technical spirit of the present utility model to above example, equivalent variations are each fallen within
Within protection domain of the present utility model.
Claims (5)
1. a kind of adjustable building template, it is characterised in that:Including two side templates(1), two Side Templates(4)With a bed die
Plate(8), described end template(8)With two side templates be arrangeding in parallel(1)Between be engaged by clamping, two Side Templates(4)It is located at
End template(8)Two ends, side template(1), Side Template(4)And end template(8)Three is mutually perpendicular to and surrounds a upper surface to open
The cuboid cavity of mouth, in two side templates(1)Between pass through the equally distributed leverage of two or more and connect, side template(1)With
Side Template(4)Between pass through connection fastener(2)It is fixed.
2. a kind of adjustable building template according to claim 1, it is characterised in that:Described side template(1)For can be with
The hard aluminium sheet of bending, in square mounting groove of the surface of plate provided with bending shaping(12), mounting groove(12)Along side template(1)It is long
Spend direction insertion, mounting groove(12)For more than two and it be arranged in parallel, in side template(1)On be distributed with for penetrating the leverage
Through hole(13), in side template(1)Upper and lower ends be provided with and connection fastener(2)The snap groove of cooperation(11).
3. a kind of adjustable building template according to claim 2, it is characterised in that:Described Side Template(4)And bed die
Plate(8)Width is identical, and both of which is by panel(83)And cambered plate(81)Superposition is welded, in end template(8)Two ends also
Provided with square inserted terminal(82), inserted terminal(82)With mounting groove(12)Coordinate, make end template(8)And side template(1)It is connected as
One.
4. a kind of adjustable building template according to claim 3, it is characterised in that:Described connection fastener(2)Master
Body is U-shaped folded plate(21), U-shaped folded plate(21)It is divided into left folding section, interlude and right folding section, wherein left folding section and threaded rod(22)Insert
Cooperation is connect, in threaded rod(22)One end, which is provided with, is used for clamping snap groove(11)Limited block(23), threaded rod(22)The other end with
Nut thread coordinates, in the centre of right folding section provided with insertion Side Template(4)Stopper slot(24), Side Template(4)Two ends be provided with
With side template(1)The supporting plate of inner surface contact(25).
5. a kind of adjustable building template according to any one in claim 1-4, it is characterised in that:Described leverage
Including sleeve pipe(3)And double threaded screw(6), its middle sleeve(3)It is placed in two side templates(1)Between, double threaded screw(6)Threading
(3)In, and pass through two side templates(1), double threaded screw(6)Two ends and fixing nut(7)Coordinate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720147466.3U CN206458083U (en) | 2017-02-19 | 2017-02-19 | A kind of adjustable building template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720147466.3U CN206458083U (en) | 2017-02-19 | 2017-02-19 | A kind of adjustable building template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206458083U true CN206458083U (en) | 2017-09-01 |
Family
ID=59691179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720147466.3U Expired - Fee Related CN206458083U (en) | 2017-02-19 | 2017-02-19 | A kind of adjustable building template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206458083U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107571378A (en) * | 2017-09-28 | 2018-01-12 | 中铁城建集团第三工程有限公司 | Prereinforced U_shaped concrete mould and its application method |
CN111764642A (en) * | 2020-07-13 | 2020-10-13 | 江苏富盈汇林达建筑科技有限公司 | Aluminum alloy template for building |
CN112585328A (en) * | 2018-08-10 | 2021-03-30 | 生态建筑有限公司 | Moulding unit for building a beam by means of a rapid assembly system |
CN114737749A (en) * | 2022-04-24 | 2022-07-12 | 中国十七冶集团有限公司 | Concrete wall body design template |
-
2017
- 2017-02-19 CN CN201720147466.3U patent/CN206458083U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107571378A (en) * | 2017-09-28 | 2018-01-12 | 中铁城建集团第三工程有限公司 | Prereinforced U_shaped concrete mould and its application method |
CN107571378B (en) * | 2017-09-28 | 2020-01-14 | 中铁城建集团第三工程有限公司 | Precast concrete U-shaped groove mold and using method thereof |
CN112585328A (en) * | 2018-08-10 | 2021-03-30 | 生态建筑有限公司 | Moulding unit for building a beam by means of a rapid assembly system |
CN112585328B (en) * | 2018-08-10 | 2023-03-10 | 生态建筑有限公司 | Moulding unit for building beams by means of a rapid assembly system |
CN111764642A (en) * | 2020-07-13 | 2020-10-13 | 江苏富盈汇林达建筑科技有限公司 | Aluminum alloy template for building |
CN114737749A (en) * | 2022-04-24 | 2022-07-12 | 中国十七冶集团有限公司 | Concrete wall body design template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206458083U (en) | A kind of adjustable building template | |
CN107965065B (en) | Buckling support Combined type pre-embedded member construction method | |
CN100447363C (en) | Metal formwork with accessories for moulding concrete | |
CN201666157U (en) | Inverted arch integral type moving die carrier | |
CN208733666U (en) | A kind of fixing bolt preformed hole template tool | |
CN215760447U (en) | Reinforcing structure for anti-ridge template device and anti-ridge template device | |
CN205444456U (en) | Precast concrete lotus root roof beam rebar positioning board | |
CN207812307U (en) | The construction system of Cable stayed Bridge Main Tower and steel anchor beam | |
CN110670873B (en) | Support system of steel formwork of ultrahigh large-section concrete column and construction method | |
CN217999064U (en) | Reinforced structure of brick-concrete structure wall | |
CN218264944U (en) | Arc roof beam construction side form reinforcing apparatus | |
CN214834742U (en) | Anti-bank template structure | |
CN212224611U (en) | Shear force wall pouring template reinforcing apparatus | |
CN104631675B (en) | A kind of two-sided prefabricated superimposed sheet | |
CN209228032U (en) | Regularization formwork inside-corner reinforcing device | |
CN207296115U (en) | A kind of cast-in-situ floor high accuracy positioning control system | |
CN207193782U (en) | A kind of pole type box culvert supporting embedded part of primary concreting Underground Culvert | |
CN112681485B (en) | One-step grooving die for U-shaped groove of slag sluiceway and construction method | |
CN205531285U (en) | Scaffold frame is encorbelmented shaped steel and is reserved bolt hole and establish structure | |
CN215212353U (en) | Anti-bank of tensile formula hangs mould and consolidates anchor clamps | |
CN220377654U (en) | Reinforcing steel bar member for controlling thickness of wall | |
CN217811946U (en) | Device with concrete pouring thickness control and aluminum mould diagonal bracing fixing functions | |
CN210622378U (en) | Stand for steel structure support | |
CN221095854U (en) | One-step formed supporting structure of concrete inverted ridge | |
CN217782584U (en) | Secondary structure reinforcing steel bar reservation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170901 Termination date: 20180219 |
|
CF01 | Termination of patent right due to non-payment of annual fee |