CN106150055B - The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting - Google Patents
The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting Download PDFInfo
- Publication number
- CN106150055B CN106150055B CN201610708483.XA CN201610708483A CN106150055B CN 106150055 B CN106150055 B CN 106150055B CN 201610708483 A CN201610708483 A CN 201610708483A CN 106150055 B CN106150055 B CN 106150055B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- hanger bolt
- bracket
- built
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 238000009434 installation Methods 0.000 title claims description 18
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 62
- 239000010959 steel Substances 0.000 claims abstract description 62
- 230000001105 regulatory effect Effects 0.000 claims abstract description 14
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 10
- 238000005266 casting Methods 0.000 claims abstract description 7
- 238000005553 drilling Methods 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 2
- 238000003466 welding Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 6
- 238000006073 displacement reaction Methods 0.000 abstract description 4
- 238000004513 sizing Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/36—Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
Abstract
The present invention relates to architectural furniture technical fields, more particularly to a kind of flat hanging installment work rack of concrete embedded part essence, including bracket, locking regulating part, lateral steel pipe, longitudinal steel pipe, hanger bolt, the both ends of the transverse direction steel pipe are separately fixed on the bracket, the upper and lower ends of the hanger bolt are respectively provided with screw thread, the longitudinal direction steel pipe is connect by the locking regulating part with the hanger bolt, and the longitudinal direction steel tube lapping is on the top of the lateral steel pipe.The invention has the following advantages that 1, protect positive built-in fitting absolute altitude error within 1mm, flatness zero deflection;2, it ensure that built-in fitting in the construction process, not because concrete casting, template or reinforcing bar vibration are subjected to displacement;3, the sizing hard frame of steel is firm, indeformable, can set up precision instrument.
Description
Technical field
The present invention relates to architectural furniture technical field more particularly to a kind of flat hanging erectors of concrete embedded part essence
Make the installation method of rack and built-in fitting.
Background technique
Currently, traditional form of construction work not can guarantee the flatness of built-in fitting in concreting built-in fitting, constructing
In the process, usually cause built-in fitting error larger, Wu Fahou since the vibration of concrete casting, template or reinforcing bar is subjected to displacement
Continuous installation.
Summary of the invention
It is an object of the invention to overcome the shortcomings of above-mentioned technology, and provide a kind of flat hanging installation of concrete embedded part essence
Working gantry protects positive built-in fitting absolute altitude error within 1mm, flatness zero deflection.
The present invention to achieve the above object, using following technical scheme:
A kind of flat hanging installment work rack of concrete embedded part essence, it is characterised in that: including bracket, locking regulating part,
The both ends of lateral steel pipe, longitudinal steel pipe, hanger bolt, the transverse direction steel pipe are separately fixed on the bracket, the hanging spiral shell
The upper and lower ends of bolt are respectively provided with screw thread, and the longitudinal direction steel pipe is connect by the locking regulating part with the hanger bolt, institute
Longitudinal steel tube lapping is stated on the top of the lateral steel pipe.
Preferably, the locking regulating part is made of top nut and lower nut, and upper and lower nut clamps longitudinal steel pipe, hanging
The upper end of bolt is connect with the upper and lower nut thread respectively.
Preferably, the bracket is equipped with the wooden scaffold board.
A kind of installation method of built-in fitting, it is characterised in that: the following steps are included:
Step 1: steel plate cutting is processed, steel plate is processed into required specification shape;
Step 2: drilling, processes circular hole on the steel plate;
Step 3: welding dowel, welds dowel in the bottom of the steel plate;
Step 4: welded nut, in the position welded nut of the circular hole;
Step 5: fixed hanger bolt, the nut thread in the lower end and step 4 of bolt is fixed;
Step 6: setting up bracket, bracket is ridden upon to the two sides of walling body to be poured;
Step 7: steel plate handling is in place, steel plate handling is to be installed in the top of bracket etc.;
Step 8: installation upper lateral, vertical steel pipe, by horizontal, vertical penstock installation on bracket;
Step 9: locking hanger bolt, the top of hanger bolt is mounted on longitudinal lever by locking regulating part;
Step 10: control absolute altitude, fine tuning hanger bolt transfers steel plate to designed elevation;
Step 11: casting concrete;
Step 12: embedded part absolute altitude is calibrated before initial set again;
Step 13: conserving to demoulding.
Preferably, further include the steps that setting up interim reinforcing bar shoulder pole before step 7.
Preferably, further include the steps that removing interim reinforcing bar shoulder pole before step 10.
Preferably, in the step 2, the quantity of circular hole is four, and the circle center line connecting of four circular holes is square, rectangular
Central point is located at the center of steel plate.
The beneficial effects of the present invention are: compared with the existing technology, the present invention is suitable for having built-in fitting embedding precision high
It is required that concrete wall upper rail pipeline installation construction.It has the advantage that 1, protect positive built-in fitting absolute altitude error within 1mm, it is smooth
Spend zero deflection;2, it ensure that built-in fitting in the construction process, not because concrete casting, template or reinforcing bar vibration are subjected to displacement;3,
The hard frame of steel of being formed is firm, indeformable, can set up precision instrument.
Detailed description of the invention
Fig. 1 is the structural schematic diagram in the present invention;
Fig. 2 is partial enlarged view in the present invention.
Specific embodiment
With reference to the accompanying drawing and the preferred embodiment specific embodiment that the present invention will be described in detail.As depicted in figs. 1 and 2,
A kind of flat hanging installment work rack of concrete embedded part essence, including bracket 1, locking regulating part, lateral steel pipe 3, longitudinal steel pipe
4, the both ends of hanger bolt 5, the transverse direction steel pipe are separately fixed on the bracket, the upper and lower ends difference of the hanger bolt
With screw thread, the longitudinal direction steel pipe is connect by the locking regulating part with the hanger bolt, and the longitudinal direction steel tube lapping exists
The top of the transverse direction steel pipe.
In the present invention, the locking regulating part is made of top nut 6 and lower nut 7, and upper and lower nut clamps longitudinal steel
Pipe, the upper end of hanger bolt is connect with the upper and lower nut thread respectively.
For the ease of worker operation, the bracket is equipped with the wooden scaffold board 8.
The present invention also provides a kind of installation methods of built-in fitting, comprising the following steps: Step 1: 9 blanking of steel plate is processed,
Steel plate is processed into required specification shape;Step 2: drilling, processes circular hole 10 on the steel plate;Step 3: weld anchor
Muscle 11 welds dowel in the bottom of the steel plate;Step 4: welded nut 12, in the position welded nut of the circular hole;Step
Five, fixed hanger bolt, the nut thread in the lower end and step 4 of bolt is fixed;Step 6: setting up bracket, bracket is taken
It is located at the two sides of walling body to be poured;Step 7: steel plate handling is in place, steel plate handling is to be installed in the top of bracket etc.;Step
Eight, upper lateral, vertical steel pipe are installed, by horizontal, vertical penstock installation on bracket;Step 9: locking hanger bolt, by hanger bolt
Top is mounted on longitudinal lever by locking regulating part;Step 10: control absolute altitude, fine tuning hanger bolt decentralization steel plate to design
Absolute altitude;Step 11: casting concrete 13;Step 12: embedded part absolute altitude is calibrated before initial set again;Step 13: maintenance is to tearing open
Mould.
Further include the steps that setting up interim reinforcing bar shoulder pole before step 7.It further include removing temporary steel before step 10
The step of muscle shoulder pole.A preliminary support first can be carried out to steel plate by setting reinforcing bar shoulder pole, when horizontal, vertical steel pipe has been set up
Cheng Houzai is removed.
In order to make steel plate keep balancing, in the step 2, the quantity of circular hole is four, and the center of circle of four circular holes connects
Line is square, and rectangular central point is located at the center of steel plate.By adjust four hanger bolts can levelness to steel plate into
Row is adjusted.
The concrete wall upper rail pipeline installation construction that the present invention is suitable for having built-in fitting embedding precision high requirement.With with
Lower advantage: 1, positive built-in fitting absolute altitude error is protected within 1mm, flatness zero deflection;2, it ensure that built-in fitting in the construction process,
Not because concrete casting, template or reinforcing bar vibration are subjected to displacement;3, the sizing hard frame of steel is firm, indeformable, can set up precision instrument.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (7)
1. a kind of flat hanging installment work rack of concrete embedded part essence, it is characterised in that: including bracket, locking regulating part, cross
To steel pipe, longitudinal steel pipe, hanger bolt, the both ends of the transverse direction steel pipe are separately fixed on the bracket, the hanger bolt
Upper and lower ends be respectively provided with screw thread, the longitudinal direction steel pipe is connect by the locking regulating part with the hanger bolt, described
Longitudinal steel tube lapping is on the top of the lateral steel pipe.
2. the flat hanging installment work rack of concrete embedded part essence according to claim 1, it is characterised in that: the locking
Regulating part is made of top nut and lower nut, and upper and lower nut clamps longitudinal steel pipe, the upper end of hanger bolt respectively with it is described it is upper,
Lower nut is threadedly coupled.
3. the flat hanging installment work rack of concrete embedded part essence according to claim 1, it is characterised in that: the bracket
It is equipped with the wooden scaffold board.
4. a kind of installation method of built-in fitting, it is characterised in that: the following steps are included: Step 1: steel plate cutting is processed, by steel plate
It is processed into required specification shape;
Step 2: drilling, processes circular hole on the steel plate;
Step 3: welding dowel, welds dowel in the bottom of the steel plate;
Step 4: welded nut, in the position welded nut of the circular hole;
Step 5: fixed hanger bolt, the nut thread in the lower end and step 4 of bolt is fixed;
Step 6: setting up bracket, bracket is ridden upon to the two sides of walling body to be poured;
Step 7: steel plate handling is in place, steel plate handling is to be installed in the top of bracket etc.;
Step 8: installation upper lateral, vertical steel pipe, by horizontal, vertical penstock installation on bracket;
Step 9: locking hanger bolt, the top of hanger bolt is mounted on longitudinal lever by locking regulating part;
Step 10: control absolute altitude, fine tuning hanger bolt transfers steel plate to designed elevation;
Step 11: casting concrete;
Step 12: embedded part absolute altitude is calibrated before initial set again;
Step 13: conserving to demoulding.
5. the installation method of built-in fitting according to claim 4, it is characterised in that: further include setting up to face before step 7
When reinforcing bar shoulder pole the step of.
6. the installation method of built-in fitting according to claim 5, it is characterised in that: further include removing to face before step 10
When reinforcing bar shoulder pole the step of.
7. the installation method of built-in fitting according to claim 4, it is characterised in that: in the step 2, the quantity of circular hole
It is four, the circle center line connecting of four circular holes is square, and rectangular central point is located at the center of steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610708483.XA CN106150055B (en) | 2016-08-23 | 2016-08-23 | The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610708483.XA CN106150055B (en) | 2016-08-23 | 2016-08-23 | The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106150055A CN106150055A (en) | 2016-11-23 |
CN106150055B true CN106150055B (en) | 2019-02-05 |
Family
ID=57342478
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610708483.XA Active CN106150055B (en) | 2016-08-23 | 2016-08-23 | The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106150055B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107059913A (en) * | 2017-05-22 | 2017-08-18 | 中国五冶集团有限公司 | A kind of reactor built-in fitting supporting construction and method for embedding |
CN108035440A (en) * | 2017-10-27 | 2018-05-15 | 西安建筑科技大学 | A kind of assembled Self-resetting Column Joint with Wedge device |
CN109914820A (en) * | 2019-03-25 | 2019-06-21 | 中国核工业华兴建设有限公司 | Portable high-accuracy absolute altitude installation of embedded parts tool |
CN110206166B (en) * | 2019-06-06 | 2020-09-29 | 广东建星建造集团有限公司 | Section steel column base and installation and construction method thereof |
WO2021103895A1 (en) * | 2019-11-29 | 2021-06-03 | 中建三局第二建设工程有限责任公司 | Pre-embedded assembly type expansion joint ultra-long installation suspension leveling positioning system and construction method |
CN111218991A (en) * | 2020-01-19 | 2020-06-02 | 中国化学工程第十一建设有限公司 | Installation method of large embedded part |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09268659A (en) * | 1996-04-02 | 1997-10-14 | Hitachi Metals Ltd | Fixing structure of anchor bolt |
JP3752310B2 (en) * | 1996-05-20 | 2006-03-08 | 住友林業株式会社 | Anchor bolt positioning tool and method |
CN202031179U (en) * | 2011-04-20 | 2011-11-09 | 中国十七冶集团有限公司 | Centre line aligning and elevation adjusting device of basic embedded bolts |
CN202611261U (en) * | 2012-04-17 | 2012-12-19 | 中国建筑第五工程局有限公司 | Preset embedded bolt support of concrete foundation |
CN204252284U (en) * | 2014-11-21 | 2015-04-08 | 中冶天工集团有限公司 | Built-in fitting bracing means |
CN205976407U (en) * | 2016-08-23 | 2017-02-22 | 天津二建建筑工程有限公司 | Smart flat installation work rack of hanging of concrete built -in fitting |
-
2016
- 2016-08-23 CN CN201610708483.XA patent/CN106150055B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106150055A (en) | 2016-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106150055B (en) | The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting | |
CN106320715B (en) | A kind of construction method of installation of the I-shaped inclined-plane built-in fitting of large size | |
CN109208790B (en) | Single-side formwork erecting construction method for arc shear wall | |
CN107386455B (en) | Shock insulation support and installation and construction method thereof | |
CN206971769U (en) | A kind of rubber support installation positioning special purpose device | |
CN104481167A (en) | High-formwork construction method for miscellaneous fill ground | |
CN106351450A (en) | Suspension type pouring-leveling device in building operations and pouring method | |
CN204626966U (en) | A kind of deformation joint formwork erection device | |
CN204875558U (en) | Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting | |
CN206071044U (en) | A kind of constructional column plate device | |
CN106760014A (en) | A kind of board-like adjustable damper embedded part of full assembled and installation method | |
JP6529009B2 (en) | Construction method of foundation for building | |
CN107859058A (en) | A kind of cast-in-place concrete retaining wall anti-incline anti-floating large steel moulding plate device and installation method | |
CN201901941U (en) | Building system combining precast concrete member and cast-in-place concrete template | |
CN104831832A (en) | Assembly type shearing wall structure and mounting method thereof | |
CN205976407U (en) | Smart flat installation work rack of hanging of concrete built -in fitting | |
CN205188812U (en) | Rail guard template | |
CN207685855U (en) | A kind of anti-anti-floating large steel moulding plate device that inclines of cast-in-place concrete retaining wall | |
CN116623939A (en) | Tool type suspension steel template construction method | |
CN206539026U (en) | A kind of one side formwork formwork system | |
CN206205455U (en) | A kind of construction centre mounted type pours leveling unit | |
CN206189607U (en) | Rag bolt location structure | |
CN205654082U (en) | Half tunnel formwork | |
CN205242684U (en) | Wall body erection joint spare | |
CN104481163B (en) | A kind of L beam construction equipment for building structure reinforcing and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |