CN106351450A - Suspension type pouring-leveling device in building operations and pouring method - Google Patents

Suspension type pouring-leveling device in building operations and pouring method Download PDF

Info

Publication number
CN106351450A
CN106351450A CN201611046937.8A CN201611046937A CN106351450A CN 106351450 A CN106351450 A CN 106351450A CN 201611046937 A CN201611046937 A CN 201611046937A CN 106351450 A CN106351450 A CN 106351450A
Authority
CN
China
Prior art keywords
assembly
levelling
connecting rod
leveling unit
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611046937.8A
Other languages
Chinese (zh)
Other versions
CN106351450B (en
Inventor
苏涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Tianli Construction Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611046937.8A priority Critical patent/CN106351450B/en
Publication of CN106351450A publication Critical patent/CN106351450A/en
Application granted granted Critical
Publication of CN106351450B publication Critical patent/CN106351450B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/10Devices for levelling, e.g. templates or boards

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention provides a suspension type pouring-leveling device in building operations and a pouring method, wherein the suspension type pouring-leveling device comprises a suspension assembly and a leveling assembly. The suspension assembly comprises a fixing device and a connecting bar; a first plane is arranged below the leveling assembly which is located below the connecting bar; the upper portion of the connecting bar is connected with the fixing device; the leveling assembly is hanged on a reserved steel bar by the fixing device, wherein the position of the reserved steel bar is higher than the floor elevation. The suspension type pouring-leveling device controls the flatness and thickness of the whole floor through the arrangement of the leveling assembly. The suspension type pouring-leveling device is easy to install, can be quickly removably after the concrete floor is plastified, and used repeatedly.

Description

A kind of construction centre mounted type pours leveling unit and casting method
Technical field
The present embodiments relate to architectural engineering reinforced concrete construction field, hang particularly in a kind of construction Formula pours leveling unit and casting method.
Background technology
In modern economy society, based on steel and concrete structure, the building template of steel and concrete structure mostly is wooden template, group to housing-group Close steel form, bamboo and wood glued mould, all-steel big shuttering etc..Concreting refers to enter concreting by above-mentioned a few class moulds Until plasticizing forms the process of building plate face in the mould that plate surrounds.
In prior art, in casting concrete plate face, in the plate face to be poured of installation form, except the steel of tiling Ledges and exceed floor elevation vertical reinforcing bar (for last layer wall in bar connecting), there is no other objects of reference for really The absolute altitude of plate face surely to be poured, integral slab face thickness is difficult to control to;Meanwhile, when the flatness of plate face being adjusted, integral slab The flatness in face is also difficult to be guaranteed it is difficult to ensure whole plate face in same level.If pacified in plate face to be poured Dress mark post, when mark post is removed, can leave hole in plate face;If marking graticule in template, graticule is easily by concrete mortar Cover and disappear, simultaneously overall plate face when levelling, levelling with thick stick chi be difficult to be operated according to the graticule in template, mainly Operated according further to experience.
Because body of wall root is inadequate with the flatness of the junction of plate face, after installation form, can produce between template and plate face Raw gap, when pouring, can produce spillage phenomenon.On the other hand, the template that body of wall pours, in installation process, can produce dust With saw powder, in the prior art, body of wall root is concordant with plate face, when pouring, rinses body of wall root using water, body of wall root Dust is still difficult to discharge with saw powder, causes young concrete with to plastify concrete binding insecure, and body of wall can exist and splits Seam and slag inclusion.
Content of the invention
The thickness of flatness and overall plate face for solving above-mentioned body of wall root and overall plate face is difficult to control to problem, this A kind of construction centre mounted type of bright offer pours leveling unit, including suspension assembly and levelling assembly, wherein:
Described suspension assembly includes fixing device and connecting rod;
It is provided with the first plane below described levelling assembly;Described levelling assembly is located at the lower section of described connecting rod;
The top of described connecting rod is connected with described fixing device;Described fixing device is by described connecting rod by described levelling group Part hangs to be fixed.
Further, described suspension assembly also includes chuck;Pass through described folder between described connecting rod and described levelling assembly Head connects.
Further, the side of described chuck is provided with bolt, and described bolt is described for being fixed on described levelling assembly On chuck.
Further, it is provided with horizontal cross bar between described connecting rod and described levelling assembly, described levelling assembly is along described water Flat cross bar moves.
Further, described fixing device is locking pliers;Described levelling assembly is hung and is anchored on difference by described locking pliers On the reserved steel bar of specification;
The upper end hinge of described connecting rod is fixed on described locking pliers.
Further, the end of described connecting rod is provided with external screw thread, and described connecting rod is provided with stop nut;
Described locking pliers is provided with fixing nut, and described connecting rod is by described fixing nut and described clipper joint energetically;
Described stop nut is located at the lower section of described fixing nut, and described stop nut limits to described fixing nut Position.
Further, described levelling assembly is right angle section bar;Second plane of described right angle section bar is close to and last layer Body of wall side is toward the plane of body of wall offset inboard distance to a declared goal;3rd plane of described right angle section bar and floor elevation to be poured Concordantly.
The present invention also provides casting method in a kind of construction, pours levelling dress using as above arbitrarily described suspension type Put, specifically comprise the following steps that
Step s110, the reinforcing bar of installation walling post to be poured, the reinforcing bar making walling post to be poured is higher than floor elevation to be poured, shape Become reserved steel bar;
Step s120, the fixing device that suspension type pours leveling unit are fixed on reserved steel bar described in step s110 On;
Step s130, the surrounding along concrete plate surface to be poured install the levelling assembly that suspension type pours leveling unit, look for Flat assembly is fixed on the lower section of at least one fixing device;
Step s140, the selected a certain plane of levelling assembly are horizontal reference point, treat casting concrete plate face and body of wall root Portion poured with levelling.
Further, treat casting concrete plate face in step s140 and body of wall root poured with levelling when, body of wall Root upper surface is higher than floor elevation.
Further, also include:
Step s150, by model sheetinstallat in remove described suspension type pour leveling unit back wall root and plate face infall In the groove being formed, there is between the side of template and body of wall root certain distance, form micro-groove;
Step s160, template bottom outside, filling concrete mortar;
Step s170, the upper surface of flushing body of wall root, make the micro-impurities of the upper surface of body of wall root flow to step In micro-groove described in s170;
Step s180, between template casting concrete, complete pouring of body of wall;
Step s190, form removal.
The suspension type that the present invention provides pours leveling unit and passes through to arrange levelling assembly, controls body of wall root to intersect with plate face The flatness of the flatness at place and whole plate face and thickness.Leveling unit is poured using the suspension type that the present invention provides, levelling dress Put easy for installation, after concrete plate surface plasticizing, leveling unit can quick-detach soon, recycling.
Plate face and body of wall casting method that the present invention provides, are poured by setting suspension type on concrete plate surface to be poured Leveling unit, can conveniently control the thickness of body of wall root, the flatness of overall plate face and overall plate face, simultaneously by levelling group Part, when pouring, makes body of wall root be higher than floor elevation, when pouring last layer body of wall, washes away the upper surface of body of wall root with water, Dust can be made to flow to plate face the new and old coagulation it is ensured that in body of wall with saw powder from the part of the body of wall root higher than floor elevation Soil contact face cleans, and is firmly bonded.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Have technology description in required use accompanying drawing be briefly described it should be apparent that, drawings in the following description are these Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, acceptable Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 pours leveling unit structural representation for the construction centre mounted type that the present invention provides;
Fig. 2 pours leveling unit preferred embodiment schematic diagram for construction centre mounted type;
Fig. 3 pours leveling unit scheme of installation for construction centre mounted type;
Fig. 4 is levelling assembly preferred embodiment cross-sectional view in Fig. 1;
Casting method flow chart in the construction that Fig. 5 provides for the present invention;
Fig. 6 is casting method preferred implementation flow chart in construction;
Fig. 7 is schematic diagram before the casting method construction being provided using the present invention;
Fig. 8 is to pour design sketch before leveling unit is removed using casting method is back suspended;
Fig. 9 is using casting method body of wall root schematic diagram;
Figure 10 is using casting method preferred implementation model sheetinstallat schematic diagram.
Reference:
10 levelling assembly 11 first plane 12 second planes
13 the 3rd plane, 21 fixing device 22 connecting rod
23 chuck, 24 bolt 25 fixing nut
26 stop nut, 30 reserved steel bar 40 horizontal cross bar
50 plate face, 60 body of wall root 70 template
80 mortar 90 micro-impurities
Specific embodiment
Purpose, technical scheme and advantage for making the embodiment of the present invention are clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described it is clear that described embodiment is The a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment being obtained under the premise of not making creative work, broadly falls into the scope of protection of the invention.
Fig. 1 pours leveling unit structural representation for the construction centre mounted type that the present invention provides, as shown in Figure 1: outstanding Hanging pour leveling unit, including suspension assembly and levelling assembly 10, wherein: described suspension assembly includes fixing device 21 and even Bar 22;It is provided with the first plane 11 below described levelling assembly 10;Described levelling assembly 10 is located at the lower section of described connecting rod 22;Described The top of connecting rod 22 is connected with described fixing device 21;Described fixing device 21 passes through described connecting rod 22 by described levelling assembly 10 Hang and fix.
When being embodied as, as shown in FIG. 1 to 3: after installing reinforced frame in the plate face of casting concrete, building is applied The fixing device 21 that work centre mounted type pours leveling unit is fixed on the reserved steel bar 30 exceeding floor elevation part in wall column, According to the thickness of concrete plate surface to be poured, adjust the height of fixing device 21, levelling assembly 10 is connected by connecting rod 22.Levelling First plane 11 of assembly 10 lower section can control the flatness of body of wall root 60 and plate face infall.After plate face pours end, Levelling assembly 10 can be close in the two ends of thick stick chi, thick stick chi is mobile along levelling assembly 10, makes plate face reach preferable flatness.
The construction centre mounted type that the present invention provides is poured leveling unit and is hung on levelling assembly by suspension assembly Exceed on the reserved steel bar of floor elevation in wall column, during casting concrete plate face, the height according to levelling assembly controls whole plate The flatness in face and thickness.Leveling unit is poured using the construction centre mounted type that the present invention provides, leveling unit install and Convenient disassembly is simple and direct, after concrete plate surface plasticizing, leveling unit can quick-detach soon, recycling.
Preferably, described suspension assembly also includes chuck 23;Pass through institute between described connecting rod 22 and described levelling assembly 10 State chuck 23 to connect.
Preferably, the side of described chuck 23 is provided with bolt 24, and described bolt 24 is used for will be fixing for described levelling assembly 10 On described chuck 23.
When being embodied as, by arranging chuck 23, the convenient letter of chuck 23 installation and removal in connecting rod 22 and levelling assembly 10 Prompt.When installation whole building construction centre mounted type pours leveling unit, first suspension assembly and connecting rod 22 can be fixed on wall On the reserved steel bar 30 of post, more levelling assembly 10 is installed by chuck 23, being easily controlled levelling assembly 10 makes its 3rd plane 13 Concordant with the floor elevation treating casting concrete.It is provided with bolt 24 in the two sides of chuck 23, fix levelling group by bolt 24 Part 10, installation and removal are convenient, can finely tune the position of levelling assembly 10 in vertical direction simultaneously, make the of levelling assembly 10 Three planes 13 are concordant with the floor elevation treating casting concrete.
Preferably, it is provided with horizontal cross bar 40, described levelling assembly 10 edge between described connecting rod 22 and described levelling assembly 10 Described horizontal cross bar 40 is mobile.
When being embodied as, it is provided with horizontal cross bar 40 between connecting rod 22 and levelling assembly 10, levelling assembly 10 can be along water Flat cross bar 40 is mobile, and is fixed on the optional position of horizontal cross bar 40, can be suitable for the body of wall of different-thickness.The wall column of building Also different, the reserved steel bar 30 in wall column is also different from the distance of surface of wall, thus levelling assembly 10 can be horizontal by level Bar 40 moves along perpendicular to the direction of body of wall, the body of wall of suitable different-thickness.
Preferably, described fixing device 21 is locking pliers;Described levelling assembly 10 is hung and is anchored on not by described locking pliers On the described reserved steel bar 30 of same specification;The upper end hinge of described connecting rod 22 is fixed on described locking pliers.
When being embodied as, using locking pliers as fixing device 21, connecting rod 22 is fixed on the lower section of locking pliers, locking pliers Can clamp on the reserved steel bar 30 being anchored on different size, be suitable for different occasions.
Preferably, the end of described connecting rod 22 is provided with external screw thread, and described connecting rod 22 is provided with stop nut 26;Described energetically Pincers are provided with fixing nut 25, and described connecting rod 22 is by described fixing nut 25 and described clipper joint energetically;Described stop nut 26 lower sections being located at described fixing nut 25, described stop nut 26 carries out spacing to described fixing nut 25.
When being embodied as, external screw thread is set in the end of connecting rod 22, locking pliers is provided with fixing nut 25, is easy to connecting rod 22 with clipper joint energetically;Stop nut 26 is also set up on connecting rod 22, by stop nut 26, fixing nut 25 is limited Position, prevents the position of levelling assembly 10 from changing.
Preferably, described levelling assembly 10 is right angle section bar;Second plane 12 of described right angle section bar is close to and upper one Layer body of wall side is toward the plane of body of wall offset inboard distance to a declared goal;3rd plane 13 of described right angle section bar and plate face to be poured Absolute altitude is concordant.
When being embodied as, using right angle section bar as levelling assembly 10, as shown in Figure 4: right angle section bar wherein Outer surface as the first plane 11 horizontal positioned, for controlling the flatness of body of wall root 60 and plate face infall.Right angle section bar Another side outer surface as the second plane 12, be close to last layer body of wall side toward body of wall offset inboard distance to a declared goal Plane, when pouring whole plate face, the upper surface that can make body of wall root 60 is higher than floor elevation, is pouring the body of wall of last layer When, template 70 is installed on the position and the side of body of wall root 60 between with certain distance, forms micro-groove, washed away with water The upper surface of body of wall root 60, can make micro-impurities such as (dust and saw powder) from the upper table higher than floor elevation body of wall root 60 Surface current it is ensured that the new-old concrete contact surface cleaning of body of wall, is firmly bonded in plate face.3rd plane 13 of right angle section bar with treat The floor elevation pouring is concordant, when pouring, makes plate face concordant with the 3rd plane 13 of right angle section bar.
It is preferred that the second plane 12 of right angle section bar is close to last layer body of wall side toward body of wall offset inboard 5mm's Plane.
It is preferred that the specification of right angle section bar is 50mm*50mm* (1.5mm~2mm).
It is preferred that right angle section bar can adopt steel, aluminium, aluminum alloy materials, zinc alloy material, plastic material or its He makes material.
Preferably, described levelling assembly 10 is hung on by suspension assembly at least one described and exceeds the described pre- of floor elevation Stay on reinforcing bar 30.
When being embodied as, need the surrounding along concrete plate surface to be poured that levelling group that suspension type pours leveling unit is installed Part 10, between floors, just has the reserved steel bar 30 of wall column in spaced positions, can by levelling assembly 10 be fixed on to The lower section of a few suspension assembly.To hang levelling assembly 10 using multiple suspension assemblies, when pouring, the position of levelling assembly 10 Put and floor elevation will not change.
Casting method flow chart in the construction that Fig. 5 provides for the present invention, as shown in Figure 5: the side of pouring in construction Method, pours leveling unit using as above arbitrarily described suspension type, specifically comprises the following steps that
Step s110, the reinforcing bar of installation walling post to be poured, the reinforcing bar making walling post to be poured is higher than floor elevation to be poured, shape Become reserved steel bar;
Step s120, the fixing device that suspension type pours leveling unit are fixed on reserved steel bar described in step s110 On;
Step s130, the surrounding along concrete plate surface to be poured install the levelling assembly that suspension type pours leveling unit, look for Flat assembly is fixed on the lower section of at least one fixing device;
Step s140, the selected a certain plane of levelling assembly are horizontal reference point, treat casting concrete plate face and body of wall root Portion poured with levelling.
Preferably, treat casting concrete plate face in step s140 and body of wall root poured with levelling when, body of wall root Portion's upper surface is higher than floor elevation.
Fig. 6 is casting method preferred implementation flow chart in construction, as shown in Figure 6: the side of pouring in construction Method also includes:
Step s150, by model sheetinstallat in remove described suspension type pour leveling unit back wall root and plate face infall In the groove being formed, there is between the side of template and body of wall root certain distance, form micro-groove;
Step s160, template bottom outside, filling concrete mortar;
Step s170, the upper surface of flushing body of wall root, make the micro-impurities of the upper surface of body of wall root flow to step In micro-groove described in s170;
Step s180, between template casting concrete, complete pouring of body of wall;
Step s190, form removal.
When being embodied as, as shown in Figure 7: in step s110, after the reinforcement installation of plate face reinforcing bar and wall column, each wall Post is provided with the reserved steel bar 30 higher than floor elevation, for being connected with the wall column of last layer building.In step s120, install The suspension type that the present invention provides pours leveling unit, is clamped using fixing device 21 (such as: locking pliers) and is anchored on higher than plate face mark On high reserved steel bar 30.In step s130, the surrounding installation suspension type along concrete plate surface to be poured pours leveling unit Levelling assembly 10, due between floors, there is the reserved steel bar 30 of wall column, levelling assembly 10 can be fixed at least one The lower section of individual suspension assembly, fixing device 21 connects leveling unit by connecting rod 22, is 50mm*50mm* (1.5mm using specification ~2mm) right angle section bar, suspension type pours leveling unit and can pass through locking pliers, and horizontal cross bar 40 and chuck 23 make perpendicular type Material the both direction along the vertical direction and on horizontal plane can carry out the adjustment of position it is ensured that the accuracy of installation site;Wherein, 3rd plane 13 of right angle section bar is concordant with the absolute altitude of plate face, and the second plane 12 of right angle section bar is close to and last layer body of wall side Face is toward the plane of body of wall offset inboard 5mm.In step s140, concreting is carried out to plate face, make plate face and right angle section bar The 3rd plane 13 concordant, the upper surface simultaneously making body of wall root 60 is higher than floor elevation, it is preferred that the upper table of body of wall root 60 Face 10mm high compared with floor elevation.After plate face pours end, the two ends of thick stick chi can be close to the 3rd plane 13 of right angle section bar, thick stick chi Mobile along the 3rd plane 13 of right angle section bar, make plate face reach preferable flatness.After concrete initial set, remove device and hang Formula pours leveling unit.After pouring, plate face 50 and body of wall root 60 are as shown in Figure 8 and Figure 9.
Suspension type is provided to pour leveling unit by installing the present invention, in the infall surrounding peace of body of wall root 60 and plate face Dress 50mm*50mm* (1.5mm~2mm) right angle section bar it is ensured that body of wall root 60 is smooth with the infall of plate face, whole plate face Smooth, the thickness of plate face can be well controlled simultaneously.
Suspension type pours after leveling unit removes, body of wall root 60 and plate face 50 infall can be formed 50mm* (1.5mm~ Groove 2mm).This groove is used for installing the template 70 when last layer building masonry wall pours;In template 70 (thickness is 5mm) peace During dress, make the surface that template 70 and body of wall root 60 exceed floor elevation have certain distance, form (wide * height: 5mm* Micro-groove 12mm), forms the groove of (wide * height: 25mm* (1.5mm~2mm)) in template 70 outside.In order to ensure pouring walling During body, body of wall root 60 not spillage, smear into corner protector with 1:1 mortar 80 in the groove in template 70 outside.In template 70 installation process In, some micro-impurities 90 can be covered in the upper surface of body of wall root 60, such as dust and saw powder, before body of wall is poured, The upper surface of body of wall root 60 must be washed away with water, so that micro-impurities 90 is flowed in micro-groove it is ensured that the new-old concrete of body of wall Contact surface cleans, and is firmly bonded.In the body of wall casting method that the present invention provides, the installation method of template 70 is as shown in Figure 10.
Although more herein employ such as levelling assembly, plane, fixing device, chuck, bolt, reinforcing bar, level Cross bar, the term such as side, but it is not precluded from the probability using other terms.It is used for the purpose of more easily using these terms Describe and explain the essence of the present invention;Being construed as any additional restriction is all to disagree with spirit of the present invention 's.
Finally it is noted that various embodiments above, only in order to technical scheme to be described, is not intended to limit;To the greatest extent Pipe has been described in detail to the present invention with reference to foregoing embodiments, it will be understood by those within the art that: its according to So the technical scheme described in foregoing embodiments can be modified, or wherein some or all of technical characteristic is entered Row equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of construction centre mounted type pour leveling unit it is characterised in that: include suspension assembly and levelling assembly (10), Wherein:
Described suspension assembly includes fixing device (21) and connecting rod (22);
It is provided with the first plane (11) below described levelling assembly (10);Described levelling assembly (10) is located under described connecting rod (22) Side;
The top of described connecting rod (22) is connected with described fixing device (21);Described fixing device (21) passes through described connecting rod (22) Described levelling assembly (10) is hung and fixes.
2. construction centre mounted type according to claim 1 pour leveling unit it is characterised in that: described suspension assembly Also include chuck (23);It is connected by described chuck (23) between described connecting rod (22) and described levelling assembly (10).
3. construction centre mounted type according to claim 2 pour leveling unit it is characterised in that: described chuck (23) Side be provided with bolt (24), described bolt (24) be used for described levelling assembly (10) is fixed on described chuck (23).
4. construction centre mounted type according to claim 1 pour leveling unit it is characterised in that: described connecting rod (22) It is provided with horizontal cross bar (40) and described levelling assembly (10) between, described levelling assembly (10) is moved along described horizontal cross bar (40) Dynamic.
5. construction centre mounted type according to claim 1 pour leveling unit it is characterised in that: described fixing device (21) it is locking pliers;Described levelling assembly (10) is hung and is anchored on the reserved steel bar (30) of different size by described locking pliers;
The upper end hinge of described connecting rod (22) is fixed on described locking pliers.
6. construction centre mounted type according to claim 5 pour leveling unit it is characterised in that: described connecting rod (22) End be provided with external screw thread, described connecting rod (22) is provided with stop nut (26);
Described locking pliers is provided with fixing nut (25), and described connecting rod (22) is by described fixing nut (25) and described locking pliers Connect;
Described stop nut (26) is located at the lower section of described fixing nut (25), and described stop nut (26) is to described fixing nut (25) carry out spacing.
7. construction centre mounted type according to claim 1 pour leveling unit it is characterised in that: described levelling assembly (10) it is right angle section bar;Second plane (12) of described right angle section bar is close to last layer body of wall side toward body of wall offset inboard The plane of distance to a declared goal;3rd plane (13) of described right angle section bar is concordant with floor elevation to be poured.
8. in a kind of construction casting method it is characterised in that: using suspension type as described in any one of claim 1~7 Pour leveling unit, specifically comprise the following steps that
Step s110, the reinforcing bar of installation walling post to be poured, the reinforcing bar making walling post to be poured is higher than floor elevation to be poured, and is formed pre- Stay reinforcing bar;
Step s120, the fixing device that suspension type pours leveling unit are fixed on reserved steel bar described in step s110;
Step s130, the surrounding along concrete plate surface to be poured install the levelling assembly that suspension type pours leveling unit, levelling group Part is fixed on the lower section of at least one fixing device;
Step s140, the selected a certain plane of levelling assembly are horizontal reference point, treat casting concrete plate face and body of wall root enters Row pour with levelling.
9. in construction according to claim 8 casting method it is characterised in that: treat in step s140 and pour coagulation Native plate face and body of wall root poured with levelling when, body of wall root upper surface is higher than floor elevation.
10. in construction according to claim 9 casting method it is characterised in that: also include:
Step s150, model sheetinstallat is poured leveling unit back wall root and plate face infall is formed in removing described suspension type Groove in, there is between the side of template and body of wall root certain distance, form micro-groove;
Step s160, template bottom outside, filling concrete mortar;
Step s170, the upper surface of flushing body of wall root, make the micro-impurities of the upper surface of body of wall root flow to step s170 institute In the micro-groove stated;
Step s180, between template casting concrete, complete pouring of body of wall;
Step s190, form removal.
CN201611046937.8A 2016-11-23 2016-11-23 A kind of construction centre mounted type pours leveling unit and casting method Active CN106351450B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611046937.8A CN106351450B (en) 2016-11-23 2016-11-23 A kind of construction centre mounted type pours leveling unit and casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611046937.8A CN106351450B (en) 2016-11-23 2016-11-23 A kind of construction centre mounted type pours leveling unit and casting method

Publications (2)

Publication Number Publication Date
CN106351450A true CN106351450A (en) 2017-01-25
CN106351450B CN106351450B (en) 2019-06-18

Family

ID=57861799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611046937.8A Active CN106351450B (en) 2016-11-23 2016-11-23 A kind of construction centre mounted type pours leveling unit and casting method

Country Status (1)

Country Link
CN (1) CN106351450B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086174A (en) * 2018-02-14 2018-05-29 北京城建道桥建设集团有限公司 A kind of shape-setting clamp and its method for repairing and mending for concrete guardrail skin patching
CN108590120A (en) * 2018-06-07 2018-09-28 福建省闽南建筑工程有限公司 Mould bases is poured for the modified in the room floor one-pass molding working procedure of underground
CN108824434A (en) * 2018-05-31 2018-11-16 广东运峰电力安装有限公司 A kind of electric power pylon basis top surface brushes flat method
CN109779241A (en) * 2019-03-18 2019-05-21 中建二局第四建筑工程有限公司 Multifunctional wall formwork root positioning system and construction method thereof
CN110307823A (en) * 2019-06-19 2019-10-08 湘潭大学 A kind of suspension type digital levelling instrument and measurement method
CN113133728A (en) * 2021-04-09 2021-07-20 江苏环亚医用科技集团股份有限公司 Maintenance device for movable sliding rail of outer wall
CN114370163A (en) * 2022-01-26 2022-04-19 湖南固工机器人有限公司 Leveling robot and operation method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1025893A (en) * 1996-07-10 1998-01-27 Shigeru Hiramine Measuring bar
JP2005207200A (en) * 2004-01-19 2005-08-04 Yuji Kawamura Assembling function of inner level metal fitting
CN2825832Y (en) * 2005-07-22 2006-10-11 中国第二十冶金建设公司 Surface level control device for concrete casting
CN101492965A (en) * 2008-05-16 2009-07-29 中冶天工上海十三冶建设有限公司 Large area cast-in-situ concrete plate flatness control method
CN203145475U (en) * 2013-01-12 2013-08-21 天津二十冶建设有限公司 Foundation of floor concrete leveling device
CN203905503U (en) * 2014-06-17 2014-10-29 中石化第十建设有限公司 Upper surface leveling device for large-area and large-section steel reinforced concrete pouring construction
CN204826673U (en) * 2015-08-05 2015-12-02 中天建设集团有限公司 Concrete elevation control tool
CN206205455U (en) * 2016-11-23 2017-05-31 苏涛 A kind of construction centre mounted type pours leveling unit

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1025893A (en) * 1996-07-10 1998-01-27 Shigeru Hiramine Measuring bar
JP2005207200A (en) * 2004-01-19 2005-08-04 Yuji Kawamura Assembling function of inner level metal fitting
CN2825832Y (en) * 2005-07-22 2006-10-11 中国第二十冶金建设公司 Surface level control device for concrete casting
CN101492965A (en) * 2008-05-16 2009-07-29 中冶天工上海十三冶建设有限公司 Large area cast-in-situ concrete plate flatness control method
CN203145475U (en) * 2013-01-12 2013-08-21 天津二十冶建设有限公司 Foundation of floor concrete leveling device
CN203905503U (en) * 2014-06-17 2014-10-29 中石化第十建设有限公司 Upper surface leveling device for large-area and large-section steel reinforced concrete pouring construction
CN204826673U (en) * 2015-08-05 2015-12-02 中天建设集团有限公司 Concrete elevation control tool
CN206205455U (en) * 2016-11-23 2017-05-31 苏涛 A kind of construction centre mounted type pours leveling unit

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086174A (en) * 2018-02-14 2018-05-29 北京城建道桥建设集团有限公司 A kind of shape-setting clamp and its method for repairing and mending for concrete guardrail skin patching
CN108086174B (en) * 2018-02-14 2023-05-16 北京城建道桥建设集团有限公司 Repairing method of shaping clamp for repairing surface of concrete guardrail
CN108824434A (en) * 2018-05-31 2018-11-16 广东运峰电力安装有限公司 A kind of electric power pylon basis top surface brushes flat method
CN108824434B (en) * 2018-05-31 2020-08-18 广东运峰电力安装有限公司 Method for brushing and leveling top surface of foundation of power transmission tower
CN108590120A (en) * 2018-06-07 2018-09-28 福建省闽南建筑工程有限公司 Mould bases is poured for the modified in the room floor one-pass molding working procedure of underground
CN109779241A (en) * 2019-03-18 2019-05-21 中建二局第四建筑工程有限公司 Multifunctional wall formwork root positioning system and construction method thereof
CN109779241B (en) * 2019-03-18 2024-04-26 中建二局第四建筑工程有限公司 Multifunctional wall form root positioning system and construction method thereof
CN110307823A (en) * 2019-06-19 2019-10-08 湘潭大学 A kind of suspension type digital levelling instrument and measurement method
CN113133728A (en) * 2021-04-09 2021-07-20 江苏环亚医用科技集团股份有限公司 Maintenance device for movable sliding rail of outer wall
CN114370163A (en) * 2022-01-26 2022-04-19 湖南固工机器人有限公司 Leveling robot and operation method thereof

Also Published As

Publication number Publication date
CN106351450B (en) 2019-06-18

Similar Documents

Publication Publication Date Title
CN106351450B (en) A kind of construction centre mounted type pours leveling unit and casting method
CN103821366B (en) Clear water concrete metope grooved stereo wood pattern decoration construction method
CN104895318A (en) Aluminum alloy template system and construction method of same
CN106150055B (en) The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting
CN102733596A (en) Construction method of fair-faced concrete structure node templates
CN108265885A (en) The construction method of tall and big nonopiate high inclination-angle abnormal shape concrete batter post
CN109024987B (en) Post-pouring construction method for toilet shear wall
CA3068904C (en) Method for producing a ceiling element and ceiling formwork
CN103206088B (en) Parts of shear wall structure wall, slab integral pouring construction method
CN110485713B (en) Roofing cornice and escape canal once only pour template reinforcing apparatus
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
CN206205455U (en) A kind of construction centre mounted type pours leveling unit
CN103628575A (en) Large-altitude-difference variable-section concrete structure construction joint and construction method thereof
CN108755972A (en) Prefabricated component feet and its application method
CN111379412A (en) Kitchen bathroom stagnant water platform aluminium mould construction structures
CN104912231A (en) Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same
CN104878926A (en) Suspended template system construction method and turnover brackets
CN204983661U (en) Light steel is framed greatly, integrative -in -place mould support system is decorated in protection that keeps warm
CN110821174A (en) Die adjusting embedded part and aluminum alloy template diagonal bracing device
CN109457950A (en) Structural wall boundary Template Location fixed structure and casting method
CN109594765A (en) Shear wall formwork system mold method
CN211286666U (en) Die adjusting embedded part and aluminum alloy template diagonal bracing device
CN203879014U (en) Cast-in-situ concrete floor thickness control device
CN106639099A (en) Control method for flatness of surface of formwork bracing system of plant fiber type heat-preservation non-dismantling formwork
CN208534040U (en) A kind of location structure positioned for controlling pre-buried vertical casing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190515

Address after: 733000 Tianjing Jade City Building, Xuanwu Road, Liangzhou District, Wuwei City, Gansu Province

Applicant after: Gansu Tianli Construction Engineering Co., Ltd.

Address before: Room 1406, No. 2, Erli, Xiangwu, Xindian Town, Xiangan District, Xiamen City, Fujian Province

Applicant before: Su Tao

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant