CN203145475U - Foundation of floor concrete leveling device - Google Patents

Foundation of floor concrete leveling device Download PDF

Info

Publication number
CN203145475U
CN203145475U CN 201320015832 CN201320015832U CN203145475U CN 203145475 U CN203145475 U CN 203145475U CN 201320015832 CN201320015832 CN 201320015832 CN 201320015832 U CN201320015832 U CN 201320015832U CN 203145475 U CN203145475 U CN 203145475U
Authority
CN
China
Prior art keywords
foundation
welded
concrete
leveling device
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320015832
Other languages
Chinese (zh)
Inventor
张文胜
孙志波
王宇
王伟
朱恒杰
郭会合
马全丽
何柳
蔡芳婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin MCC20 Construction Co Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN 201320015832 priority Critical patent/CN203145475U/en
Application granted granted Critical
Publication of CN203145475U publication Critical patent/CN203145475U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a foundation of a floor concrete leveling device. The foundation comprises a base. A steel upright column is welded on the base, a horizontal handle is arranged on the top of the steel upright column, an adjusting hoop is arranged on the steel upright column, a horizontal support plate is welded on the adjusting hoop, a fixing hoop is welded on the surface of the horizontal support plate, and a oblique support is welded between the horizontal support plate and the adjusting hoop. The foundation has the advantages that the foundation is simple in structure and convenient to manufacture, foundations are symmetrically arranged in groups when used, steel pipes are fixed by the aid of fixing hoops and are used as slide rails, and a scraping lever is placed on the slide rails to perform leveling for floor concrete; and the foundation can be used for construction conveniently and quickly, the concrete surface layer construction efficiency can be improved, the concrete surface layer flatness construction quality is enhanced, the height of the foundation can be freely adjusted, the foundation can be transferred and utilized conveniently, and materials are saved.

Description

A kind of flooring concrete leveling device pedestal
Technical field
The utility model relates to a kind of fixed buildings construction and uses servicing unit, specifically, relates to a kind of pedestal for flooring concrete leveling device.
Background technology
Present builing industry high speed development, high-rise, super highrise building gets more and more, and it is particularly outstanding that the control of Surface Quality of Concrete seems in construction thereupon.But general concrete pavement directly adopts dipstick metering to be difficult to guarantee the planeness of concrete pavement in the levelling process.At present the normal mode that adopts be pre-buried angle steel as slideway, be placed on levelling on the slideway with darby, it is comparatively loaded down with trivial details to construct, time-consuming taking a lot of work.
The utility model content
Technical problem of taking a lot of work when being present flooring concrete pavement levelling construction cost to be solved in the utility model provides a kind of flooring concrete leveling device pedestal, can accelerate the speed of application of concrete pavement, strengthens the construction quality of concrete pavement planeness.
In order to solve the problems of the technologies described above, the utility model is achieved by following technical scheme:
A kind of flooring concrete leveling device pedestal, comprise base, be welded with steel post on the described base, described steel post is provided with the adjusting clip, described adjusting clip is welded with horizontal supporting plate, described horizontal supporting plate surface soldered has fixing hoop, is welded with bearing diagonal between described horizontal supporting plate and the described adjusting clip.
Described steel post top is provided with Level handle.
The beneficial effects of the utility model are:
The utility model is simple in structure, and is easy to make, is symmetrical arranged in groups during use, utilize fixing hoop fixedly steel pipe place darby at slideway and carry out levelling as slideway.Utilize the utility model construction convenient, can improve the efficiency of construction of concrete pavement, strengthen the construction quality of concrete pavement planeness, and can the free adjustment height, be convenient to turnover utilization, economical with materials.
Description of drawings
Fig. 1 is the structural representation of leveling unit pedestal provided by the utility model;
Fig. 2 is the use view of leveling unit pedestal provided by the utility model.
Among the figure: 1, base; 2, steel post; 21, Level handle; 3, regulate clip; 4, fixing hoop;
5, horizontal supporting plate; 6, bearing diagonal; 7, darby; 8, wood screw; 9, concrete slab; 10, wooden form.
The specific embodiment
For further understanding content of the present utility model, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
As shown in Figure 1, present embodiment discloses a kind of flooring concrete leveling device pedestal, mainly is made of base 1, steel post 2, adjusting clip 3, fixing hoop 4, horizontal supporting plate 5 and bearing diagonal 6.
Base 1 is made by iron plate, is used for being connected and fixed by the wooden form 10 of wood screw 8 with the bottom, in conjunction with shown in Figure 2.
Be welded with steel pipe on the base 1 as steel post 2, the top of steel post 2 is provided with Level handle 21, in order to have enough to meet the need when utilizing pedestal is extracted and is removed from wooden form 10.
Steel post 1 upper outside socket is provided with regulates clip 3, regulates clip 3 by bolton, unclamps bolt and can change the height and position of adjusting clip 3 on steel post 1.
Regulate on the clip 3 and be welded with horizontal supporting plate 5, be welded with bearing diagonal 6 between horizontal supporting plate 5 and the adjusting clip 3, thereby constitute three corner steadies.Horizontal supporting plate 5 surface soldered have fixing hoop 4, and fixing hoop 4 is used for fixing steel pipe as slideway.
As shown in Figure 2, this pedestal is symmetrical arranged in groups during use, earlier base 1 usefulness wood screw 8 is fixed on the wooden form 10, and wood screw 8 can not be long, pedestal firmly can be got final product.The spacing of two pedestals can be adjusted according to the length of slideway and the area size of concrete slab 9, and the pedestal spacing of large area concrete plate 9 is set to 3m.Note that the base 1 of pedestal can not place under the plate muscle in the time of fixedly.To regulate clip 3 and carry out the adjustment of absolute altitude according to building high unity then; And choose the length of slideway in advance according to concrete slab 9 area sizes, wherein large-area concrete slab 9 can select for use the steel pipe of 6m as slideway.After finishing, adjustment carries out the concrete work of building.To link to each other with the fixing hoop 4 of pedestal as the slideway steel pipe after building, with steel pipe slideway dieback, guarantee that slideway does not produce movement with the screw on the fixing hoop 4.Carry out the levelling construction of concrete surface at last at slideway with darby 7.After levelling work is finished, pedestal is extracted in concrete, water is cleaned out, and prepares to be used for construction next time.
Although by reference to the accompanying drawings preferred embodiment of the present utility model is described above; but the utility model is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; not breaking away under the scope situation that the utility model aim and claim protect, can also make the concrete conversion of a lot of forms, these all belong within the protection domain of the present utility model.

Claims (2)

1. flooring concrete leveling device pedestal, comprise base, it is characterized in that, be welded with steel post on the described base, described steel post is provided with the adjusting clip, described adjusting clip is welded with horizontal supporting plate, and described horizontal supporting plate surface soldered has fixing hoop, is welded with bearing diagonal between described horizontal supporting plate and the described adjusting clip.
2. a kind of flooring concrete leveling device pedestal according to claim 1 is characterized in that described steel post top is provided with Level handle.
CN 201320015832 2013-01-12 2013-01-12 Foundation of floor concrete leveling device Expired - Fee Related CN203145475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320015832 CN203145475U (en) 2013-01-12 2013-01-12 Foundation of floor concrete leveling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320015832 CN203145475U (en) 2013-01-12 2013-01-12 Foundation of floor concrete leveling device

Publications (1)

Publication Number Publication Date
CN203145475U true CN203145475U (en) 2013-08-21

Family

ID=48973014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320015832 Expired - Fee Related CN203145475U (en) 2013-01-12 2013-01-12 Foundation of floor concrete leveling device

Country Status (1)

Country Link
CN (1) CN203145475U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421776A (en) * 2015-11-09 2016-03-23 中冶天工集团有限公司 Device for leveling super-flat floor and method for conducting super-flat floor construction through device
CN106351450A (en) * 2016-11-23 2017-01-25 苏涛 Suspension type pouring-leveling device in building operations and pouring method
CN111691676A (en) * 2020-06-20 2020-09-22 深圳市建工集团股份有限公司 Cast-in-place concrete floor high-precision ground construction method
CN113265912A (en) * 2020-02-14 2021-08-17 广东博智林机器人有限公司 Prefabricated base and track supporting component

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421776A (en) * 2015-11-09 2016-03-23 中冶天工集团有限公司 Device for leveling super-flat floor and method for conducting super-flat floor construction through device
CN106351450A (en) * 2016-11-23 2017-01-25 苏涛 Suspension type pouring-leveling device in building operations and pouring method
CN106351450B (en) * 2016-11-23 2019-06-18 甘肃天力建设工程有限责任公司 A kind of construction centre mounted type pours leveling unit and casting method
CN113265912A (en) * 2020-02-14 2021-08-17 广东博智林机器人有限公司 Prefabricated base and track supporting component
CN111691676A (en) * 2020-06-20 2020-09-22 深圳市建工集团股份有限公司 Cast-in-place concrete floor high-precision ground construction method

Similar Documents

Publication Publication Date Title
CN103615110B (en) Random oblique netted nine-squares beam Hyperbolic Roof construction method
CN203145475U (en) Foundation of floor concrete leveling device
CN103967273B (en) Concrete floor slab placement concrete mould plate supporting device
CN202090605U (en) Tool type floor evenness and floor slab negative reinforcement protecting layer control device
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN204027557U (en) A kind of fixedly levelling pole bearing
CN206606463U (en) A kind of adjustable civil engineering pipe fitting rack of structure
CN203905488U (en) Concrete formwork supporting device for slab pouring
CN204510816U (en) The stair template of adjustable angle
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN201620563U (en) Height adjustable movable floor support
CN202108245U (en) Adjustable double-layer jack
CN204662369U (en) A kind of slope cantilever large form
CN207727978U (en) Girderless floor bolumn cap template reinforcing device
CN206902768U (en) A kind of post-cast strip adjustable supporting
CN202990415U (en) Nuclear power plant four tubular post early detaching supporting device
CN102936868A (en) Precise adjustment auxiliary device for track board of high speed railway and adjusting method thereof
CN210263989U (en) Wall body bearing structure is built in room
CN205116749U (en) A track strutting arrangement that is used for large -span steel construction wholly to slide
CN201933779U (en) Springing formwork system for assembled framed girder
CN208152556U (en) A kind of branch fastener for beam slab early stripping formwork system system
CN105525742B (en) A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method
CN203160707U (en) Adjustable t-shaped controller
CN204960174U (en) A support instrument of oblique roofing roughness of control light grade
CN102887446B (en) The detachable fixed feet structure of a kind of tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20210112