CN203905488U - Concrete form support device for floor slab pouring - Google Patents

Concrete form support device for floor slab pouring Download PDF

Info

Publication number
CN203905488U
CN203905488U CN201420184236.0U CN201420184236U CN203905488U CN 203905488 U CN203905488 U CN 203905488U CN 201420184236 U CN201420184236 U CN 201420184236U CN 203905488 U CN203905488 U CN 203905488U
Authority
CN
China
Prior art keywords
pouring
floor
screw rod
steel
floor slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420184236.0U
Other languages
Chinese (zh)
Inventor
李坤富
成耀华
李灿琼
仝冰冰
敖荣祥
毕永昆
马辉
胡盺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Original Assignee
YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN KUNGANG STEEL STRUCTURE CO Ltd filed Critical YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Priority to CN201420184236.0U priority Critical patent/CN203905488U/en
Application granted granted Critical
Publication of CN203905488U publication Critical patent/CN203905488U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a floor is pour and is used concrete form strutting arrangement, construct the roof beam including main part steel, the template, its characterized in that interval sets up height-adjustable's main joist between two relative main part steel constructs the roof beam, and the interval sets up the false keel on the main joist, and the template is arranged in on the false keel. The nuts are rotated to enable the vertical screws to move upwards or downwards, so that the horizontal beams are lifted or lowered, and finally, the whole main keel is stably fixed between the two steel beams by replacing the upper cushion blocks and/or the lower cushion blocks with different heights or thicknesses, the pouring requirement of a floor slab or a floor clapboard is met, and embedded parts such as a line pipe box and the like are conveniently embedded in the pouring process. Can carry out the cross construction, construct such as wall body masonry, when guaranteeing construction quality, effectively improve work efficiency for the construction progress, form removal, frame unloading are very convenient, swift, have that the construction is convenient, cross construction safe and reliable, the time limit for a project is short, easy dismounting, repeatedly usable, advantage such as with low costs.

Description

Floor is built and is used concrete mould plate supporting device
Technical field
The utility model relates to a kind of bracing or strutting arrangement, and particularly a kind of floor is built and used concrete mould plate supporting device, belongs to construction formwork bracing or strutting arrangement design and manufacturing technology field.
Background technology
When building the building of frame construction, need concreting floor.Prior art is when concreting floor, or use full hall scaffold, or carrys out support shuttering with profiled sheet.While supporting with full hall scaffold, not only there is complicated construction technique, inefficiency, labour intensity is large, time-consuming taking a lot of work, and after need waiting for concrete setting after building, maintain, frame is unloaded in ability form removal, so just crossed construction be cannot carry out, Construction Schedule and time limit had a strong impact on.While using profiled sheet to support, there will be again floor pouring out-of-flatness, cannot pre-embedded pipe, line box, and high cost shortcoming.Therefore be necessary prior art to be improved.
Summary of the invention
For solving existing concreting floor, adopt full hall scaffold or profiled sheet as braced structures, the complex process of bringing, maintenance striking time length, base plate water out-of-flatness, are difficult to the problems such as pre-embedded pipe, line box, and the utility model provides a kind of floor to build and uses concrete mould plate supporting device.
The utility model completes by following technical proposal: a kind of floor is built and used concrete mould plate supporting device, comprise main body steel constructed beam, template, it is characterized in that interval arranges adjustable for height main joist between two relative main body steel constructed beams, on main joist, interval arranges rider keel, and template is placed on rider keel, with by the Height Adjustment of main joist, meet the requirement of building of floor or floor dividing plate, facilitate the built-in fitting such as built-in line pipeline box in casting process simultaneously.
Described adjustable for height main joist comprises horizontal beam, be separately positioned on the support member of below, horizontal beam two ends, support member below is connected with on it vertical screw rod with nut, vertically screw rod lower end is placed in hollow pillar stand, hollow pillar stand lower end is fixed on pedestal, so that rotating nut makes on screw rod or lower movement, thereby realizes rising or the decline of support member and horizontal beam, finally make whole main joist be stably fixed between two steel constructed beams, meet the requirement of building of floor or floor dividing plate.
Described horizontal beam is square beam, and the support member of below, square beam two ends is uncovered cell body upward, so that square beam snaps in the groove of cell body.
Described hollow pillar stand is cylinder, the pedestal of its lower end is uncovered cell body down, so that vertically insert in cylinder screw rod lower end, and the nut on vertical screw rod is placed on cylinder, to facilitate, support fixing vertical screw rod on cylinder, facilitate nut rotation and lifting water flat-topped ridge simultaneously.
Described main body steel constructed beam is H shaped steel.
Between top, described horizontal beam two ends and H shaped steel, be respectively equipped with cushion block, on this, cushion block is wooden unit, to change as required the upper cushion block of differing heights or thickness, adjusts the distance between horizontal beam and H shaped steel top, meets the requirement of building of floor or floor dividing plate.
Between described pedestal below and H shaped steel, be provided with lower cushion block, this lower cushion block is wooden unit, to change as required the lower cushion block of differing heights or thickness, adjusts the distance between horizontal beam and H shaped steel bottom, meets the requirement of building of floor or floor dividing plate.
Described rider keel is the lumps of wood, and template is wooden form, and lumps of wood interval is placed on main joist, and wooden form is laid on the lumps of wood, and by steel nail fixedly wooden form on the lumps of wood.
The utlity model has following advantages and effect: adopt such scheme, can be easily rotation by adjusting nut drive horizontal beam to move up or down, and on using, lower cushion block is by the vertical screw rod at horizontal beam and two ends thereof, undersetting is separately fixed between the bottom flange and top flange of two relative main body steel constructed beams, and then realize the rider keel on horizontal beam, the Height Adjustment of template, meet the requirement of building of floor or floor dividing plate, and build at floor, solidify, in maintenance processes, also can carry out crossed construction, as constructions such as building walls, when guaranteeing construction quality, effectively increase work efficiency, accelerating construction progress, form removal, unload frame very convenient, fast, can not only improve floor and build planeness, also facilitate the built-in fitting such as built-in line pipeline box in casting process, there is construction convenient, crossed construction is safe and reliable, duration is short, easy accessibility, reusable, low cost and other advantages.Be in fact that a desirable floor is built and used mould plate supporting device.
Accompanying drawing explanation
Fig. 1 is the utility model top view;
Fig. 2 is the horizontal cross-section structure of Fig. 1.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further.
The floor that the utility model provides is built and is used concrete mould plate supporting device, comprise main body steel constructed beam 1, template 4, this main body steel constructed beam 1 is H shaped steel, template 4 is conventional wooden form, between two relative main body steel constructed beams 1, interval arranges adjustable for height main joist, and on main joist, interval arranges rider keel 3, and template 4 is placed on rider keel 3; Described adjustable for height main joist comprises horizontal beam 2, be separately positioned on the support member 6 of horizontal beam 2 belows, two ends, support member 6 belows are connected with on it vertical screw rod 7 with nut 8, and vertically screw rod 7 lower ends are placed in hollow pillar stand 9, and hollow pillar stand 9 lower ends are fixed on pedestal 10; Described horizontal beam 2 is square beam, and this square beam is steel square tube, and the support member 6 of below, square beam two ends is uncovered cell body upward, and cell body is channel-section steel, so that square beam snaps in the groove of cell body; Described hollow pillar stand 9 is cylinder, this cylinder is round steel pipe, the pedestal 10 of its lower end is uncovered cell body down, this cell body is channel-section steel, so that vertically insert in cylinder screw rod 7 lower ends, and the nut 8 on vertical screw rod 7 is placed on cylinder, and to facilitate, support fixing vertical screw rod 7 on cylinder, facilitate nut 8 to rotate and lifting water flat-topped ridge 2 simultaneously; Between described horizontal beam 2 tops, two ends and H shaped steel, be respectively equipped with cushion block 12, on this, cushion block 12 is wooden unit, to change as required the upper cushion block 12 of differing heights or thickness, adjust the distance between horizontal beam 2 and H shaped steel top, meet the requirement of building of floor or floor dividing plate; Between described pedestal 10 belows and H shaped steel, be provided with lower cushion block 11, this lower cushion block 11 is wooden unit, to change as required the lower cushion block 11 of differing heights or thickness, adjusts the distance between horizontal beam 2 and H shaped steel bottom, meets the requirement of building of floor or floor dividing plate; Described rider keel 3 is the lumps of wood, and lumps of wood interval is placed on main joist, and wooden form is laid on the lumps of wood, and by steel nail 5 fixedly wooden form on the lumps of wood.
During work: rotating nut 8 moves up or down vertical screw rod 7, thereby realize rising or the decline of support member 6 and horizontal beam 2, simultaneously by changing upper cushion block 12 and/or the lower cushion block 11 of differing heights or thickness, finally make whole main joist be stably fixed between two steel constructed beams 1, meet the requirement of building of floor or floor dividing plate, and convenient in casting process the built-in fitting such as built-in line pipeline box.

Claims (8)

1.一种楼板浇筑用混凝土模板支撑装置,包括主体钢构梁,模板,其特征在于在相对的两主体钢构梁之间间隔设置高度可调的主龙骨,主龙骨上间隔设置副龙骨,模板置于副龙骨上。 1. A concrete formwork support device for floor slab pouring, comprising a main body steel beam, a formwork, is characterized in that a height-adjustable main keel is set at intervals between two relative main body steel beams, and an auxiliary keel is set at intervals on the main keel, The formwork is placed on the auxiliary keel. 2.根据权利要求1所述的楼板浇筑用混凝土模板支撑装置,其特征在于所述高度可调的主龙骨包括水平梁,分别设置在水平梁两端下方的支撑件,支撑件下方连接有其上带螺母的竖直螺杆,竖直螺杆下端置于中空立柱内,中空立柱下端固定在基座上。 2. The concrete formwork supporting device for pouring floor slab according to claim 1, characterized in that the height-adjustable main keel comprises a horizontal beam, and supports are respectively arranged below the two ends of the horizontal beam, and the support is connected below the support. A vertical screw rod with a nut is provided, the lower end of the vertical screw rod is placed in the hollow column, and the lower end of the hollow column is fixed on the base. 3.根据权利要求2所述的楼板浇筑用混凝土模板支撑装置,其特征在于所述水平梁为方梁,方梁两端下方的支撑件为敞口朝上的槽体。 3. The concrete formwork supporting device for pouring floor slabs according to claim 2, characterized in that the horizontal beam is a square beam, and the supports below the two ends of the square beam are grooves that are open upward. 4.根据权利要求2所述的楼板浇筑用混凝土模板支撑装置,其特征在于所述中空立柱为圆柱,其下端的基座为敞口朝下的槽体,以便竖直螺杆下端插入圆柱中,并使竖直螺杆上的螺母置于圆柱上,以方便支撑固定竖直螺杆于圆柱上,同时方便螺母转动而升降水平梁。 4. The concrete formwork supporting device for floor slab pouring according to claim 2, characterized in that the hollow column is a cylinder, and the base at its lower end is a groove body with an open mouth facing downward, so that the lower end of the vertical screw rod is inserted into the cylinder, And make the nut on the vertical screw rod be placed on the cylinder, support and fix the vertical screw rod on the cylinder conveniently, make things convenient for the nut to rotate simultaneously and lift the horizontal beam. 5.根据权利要求1所述的楼板浇筑用混凝土模板支撑装置,其特征在于所述主体钢构梁为H型钢。 5. The concrete formwork supporting device for pouring floor slab according to claim 1, characterized in that the main steel beam is H-shaped steel. 6.根据权利要求2所述的楼板浇筑用混凝土模板支撑装置,其特征在于所述水平梁两端上方与H型钢之间分别设有上垫块,该上垫块为木块。 6. The concrete formwork supporting device for pouring floor slabs according to claim 2, characterized in that upper pads are respectively provided between the two ends of the horizontal beam and the H-shaped steel, and the upper pads are wooden blocks. 7.根据权利要求2所述的楼板浇筑用混凝土模板支撑装置,其特征在于所述基座下方与H型钢之间设有下垫块,该下垫块为木块。 7. The concrete formwork support device for pouring floor slabs according to claim 2, characterized in that a lower pad is provided between the bottom of the base and the H-shaped steel, and the lower pad is a wooden block. 8.根据权利要求1所述的楼板浇筑用混凝土模板支撑装置,其特征在于所述副龙骨为方木,模板为木模板,方木间隔置于主龙骨上,木模板平铺在方木上,并通过钢钉固定木模板于方木上。 8. The concrete formwork supporting device for floor slab pouring according to claim 1, characterized in that the auxiliary keel is square wood, the template is a wooden formwork, the square wood is placed on the main joist at intervals, and the wooden formwork is tiled on the square wood , and fix the wooden formwork on the square wood with steel nails.
CN201420184236.0U 2014-04-16 2014-04-16 Concrete form support device for floor slab pouring Expired - Lifetime CN203905488U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420184236.0U CN203905488U (en) 2014-04-16 2014-04-16 Concrete form support device for floor slab pouring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420184236.0U CN203905488U (en) 2014-04-16 2014-04-16 Concrete form support device for floor slab pouring

Publications (1)

Publication Number Publication Date
CN203905488U true CN203905488U (en) 2014-10-29

Family

ID=51779776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420184236.0U Expired - Lifetime CN203905488U (en) 2014-04-16 2014-04-16 Concrete form support device for floor slab pouring

Country Status (1)

Country Link
CN (1) CN203905488U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967273A (en) * 2014-04-16 2014-08-06 云南昆钢钢结构有限公司 Concrete formwork supporting device for floor slab pouring
CN108343265A (en) * 2018-02-09 2018-07-31 陈云燕 It is a kind of can automatic lifting material construction Machines supporting rack
CN108343264A (en) * 2018-02-09 2018-07-31 陈云燕 A kind of construction Machines supporting rack based on material lifting technology
CN111042521A (en) * 2019-12-11 2020-04-21 华北水利水电大学 Building templates link for civil engineering

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967273A (en) * 2014-04-16 2014-08-06 云南昆钢钢结构有限公司 Concrete formwork supporting device for floor slab pouring
CN103967273B (en) * 2014-04-16 2016-06-29 云南昆钢钢结构有限公司 Concrete form support device for floor slab pouring
CN108343265A (en) * 2018-02-09 2018-07-31 陈云燕 It is a kind of can automatic lifting material construction Machines supporting rack
CN108343264A (en) * 2018-02-09 2018-07-31 陈云燕 A kind of construction Machines supporting rack based on material lifting technology
CN111042521A (en) * 2019-12-11 2020-04-21 华北水利水电大学 Building templates link for civil engineering

Similar Documents

Publication Publication Date Title
CN103967273B (en) Concrete form support device for floor slab pouring
CN203905488U (en) Concrete form support device for floor slab pouring
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN104831756B (en) A kind of construction method utilizing template jacking instrument to carry out Bars In Poured Concrete Slab post-cast strip formwork
CN204326548U (en) A kind of building floor leveling unit
CN204530742U (en) A kind of adjustable suspension column
CN104912320A (en) Synchronous construction method of shear walls on the two sides of settlement joint
CN204357117U (en) A kind of after-pouring band beam-slab template and lattice column thereof
CN202627493U (en) Combined template for constructing elevator shaft
CN201202272Y (en) Rapid replacement formwork for tall building construction
CN202644976U (en) Slope roof double-side formwork support structure
CN201367729Y (en) Multi-functional early-dismantled top support for slab formworks
CN110158949A (en) Early-dismantling system for support and matched aluminum mold and construction method thereof
CN203547137U (en) Adjustable support tray of rear supporting bottom die
CN203145475U (en) Foundation of floor concrete leveling device
CN205713078U (en) A kind of outer wall of basement vertical post-cast strip side mold device
CN205088951U (en) Many function combination jackscrew
CN204510814U (en) Beam for building jacking
CN202990415U (en) Nuclear power plant four tubular post early detaching supporting device
CN218668695U (en) A wooden formwork early demolition independent support reinforcement system
CN206736956U (en) A kind of subway station standard paragraphs movable formwork device
CN205804949U (en) A kind of sealing reversed beam model sheetinstallat fixing device
CN215907403U (en) Fine adjustment tool for supporting large steel formwork
CN203879014U (en) Cast-in-situ concrete floor thickness control device
CN204804320U (en) Moving as a whole formula template is assembled in advance to building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141029

Effective date of abandoning: 20160629

AV01 Patent right actively abandoned

Granted publication date: 20141029

Effective date of abandoning: 20160629

C25 Abandonment of patent right or utility model to avoid double patenting