CN105525742B - A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method - Google Patents

A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method Download PDF

Info

Publication number
CN105525742B
CN105525742B CN201511002159.8A CN201511002159A CN105525742B CN 105525742 B CN105525742 B CN 105525742B CN 201511002159 A CN201511002159 A CN 201511002159A CN 105525742 B CN105525742 B CN 105525742B
Authority
CN
China
Prior art keywords
adjusting screw
scaffold
plate
wooden case
platform structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511002159.8A
Other languages
Chinese (zh)
Other versions
CN105525742A (en
Inventor
王涛
厉海龙
齐志广
朱勇军
张文元
李文鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tian Hongyuanfang Architectural Design Co Ltd
Ccdi (beijing) International Architectural Design Consultants Co Ltd
Beijing National Aquatics Center Co Ltd
Harbin Institute of Technology
Original Assignee
Beijing Tian Hongyuanfang Architectural Design Co Ltd
Ccdi (beijing) International Architectural Design Consultants Co Ltd
Beijing National Aquatics Center Co Ltd
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tian Hongyuanfang Architectural Design Co Ltd, Ccdi (beijing) International Architectural Design Consultants Co Ltd, Beijing National Aquatics Center Co Ltd, Harbin Institute of Technology filed Critical Beijing Tian Hongyuanfang Architectural Design Co Ltd
Priority to CN201511002159.8A priority Critical patent/CN105525742B/en
Publication of CN105525742A publication Critical patent/CN105525742A/en
Application granted granted Critical
Publication of CN105525742B publication Critical patent/CN105525742B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong

Abstract

A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method, frame structure includes adjusting screw base, scaffold and top combined connection component from bottom to top, adjusting screw base is located in base plane, including bottom plate and four leading screws for being vertically welded in plate upper surface;The bottom of adjacent four vertical rods of scaffold is set on four leading screws of same adjusting screw base;Top combined connection component is arranged on scaffold top, installation site is corresponding with adjusting screw base, its top support plate is fixedly connected by top connecting bolt with platform structure, and adjacent four vertical rods of scaffold are inserted in four outer tubes of same top combined connection component and prop up limiting plate.The present invention can constitute the supporting frame of large area as needed, there is provided effectively supporting for all kinds of platform structural planes, with unit bearing capacity is adjustable, integral rigidity is controllable, support body height adjustable, efficient and convenient scene dismounting, storage convenient transportation, the low advantage of cost of manufacture.

Description

A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method
Technical field
The present invention relates to field of steel structure, more particularly to one kind is filled for pond body and supports pond body upper brace structure The fast assembling-disassembling frame structure and its construction method in face.
Background technology
At present, in the construction of platform structure support system, common tool formula scaffold coordinates adjustable as supporting frame Base and jacking combination, top set up primary-secondary beam and the plank that tiles formation platform structure face.The supporting frame carrying of such a form Power and stability are uncontrollable, and height and horizontal direction position adjustments low precision, in the case where setting up requirement strictly to support body It can not then be applicable, limit the extensive use of such a support body.
In addition, curling stone and Wheelchair Curling match will be held during Winter Olympic Games in 2022, winter Paralympic Games, in the Water Cube.For Coordinate venue inside winter venue requirement difficult to understand, the Water Cube to be transformed, indoor swimming place and hall are converted into event on ices temporarily Venue.This is accomplished by the place of original conventional venue building ice face and its infrastructure, and event on ices is extensive again after completing Multiple place original appearance.In reconstruction with can not destroy original place during recovering.The operation demand of venue is considered simultaneously, it is desirable to Conversion functionally can be rapidly completed at any time.The conventional scheme that ice face basis is built on original place of venue is a lot, Such as accumulate all kinds of building blocks, set up steel construction or concrete structure framework pop-up warming plate or temperature control plate, or in former base plane On do waterproof and directly pour ice etc..But these methods do not possess versatility and flexibility, or the assembly and disassembly cycle is long, or basis is heavy difficult To deploy large-scale construction equipment operation indoors, or serious is damaged to original place, or basic material can not repeat to install to utilize. A variety of drawbacks are unfavorable for the conversion at any time of place function, do not possess preferable economic benefit, also do not meet the development of environmental protection Theme.
It is therefore desirable to develop a kind of fast assembling-disassembling support body combining form for support platform structural plane, room is adapted it to The energy-efficient scheme of interior interim ice stadium ice face supporting, it is desirable to which it has the characteristics that:1)There are enough bearing capacitys and rigidity, Can be under upper load effect, it is ensured that the stability of support body entirety all directions;2)Installation, dismounting and convenient transportation are flexible, and It is reusable;3)With preferable economy, cost is reasonable.
The content of the invention
The present invention solves the technical problem of a kind of fast assembling-disassembling frame structure supported for platform structure of offer, Solve platform structure lower support structure bearing capacity and stability is uncontrollable, height and horizontal direction position adjustments low precision, It may not apply to set up support body the technical problem in the case of requiring strictly, while may apply to the item that swimming pool reconstructs ice stadium In mesh, the energy-efficient effect of indoor interim ice stadium ice face supporting is realized, it is improved in terms of mechanics, stability and economy Various technical indicators, make it have integral rigidity big, high capacity, live convenient disassembly, storage convenient transportation and be fabricated to This low feature.
In order to solve the above technical problems, the present invention is adopted the following technical scheme that:
A kind of fast assembling-disassembling frame structure supported for platform structure, is supported on the bottom of platform structure, its feature exists In:Include adjusting screw base, scaffold and top combined connection component from bottom to top;
Wherein, the adjusting screw base is located in base plane, including the horizontally disposed square floor of bottommost and hang down Straight four leading screws being welded on square floor upper surface, the rectangular arrangement of four leading screws;
The scaffold is tool type scaffold, including vertical rod and the horizon bar that is connected between vertical rod, and adjacent four are stood The bottom of bar is set on four leading screws of same adjusting screw base;
The top combined connection component is arranged on the top of scaffold, and installation site is corresponding with adjusting screw base, and it is wrapped Top support plate, outer tube, inner sleeve and limiting plate are included, the top support plate is horizontally supported under platform structure, its lower surface On be vertically welded with inside the outer tubes of four rectangular distributions, the outer tube and be fixed with horizontal limiting plate, it is described spacing Inner sleeve is set inside outer tube between plate and top support plate, the top support plate is consolidated by top connecting bolt and platform structure Fixed connection;Four outer tubes of same top combined connection component are inserted on the top of four adjacent vertical rods of the scaffold respectively It is interior and offseted with limiting plate.
It is preferred that, the combining structure that the platform structure is planar spliced to form for the wooden case unit of multiple rectangles, institute Stating wooden case unit includes top panel and lower shoe, and centre is split by floor forms lattice space, is filled with the lattice space Heat-barrier material;Four corners of the wooden case unit are designed with vertical adjusting screw rod, in the corner of four wooden case unit spliceds Provided with wooden case connects bearing;Lower shoe or wooden case unit in the middle of the top support plate and wooden case unit of the top combined connection component Wooden case connects bearing at splice point is fixedly connected.
Wherein, the wooden case unit spliced point includes being located at the splice point in the middle of platform structure, now four wooden case units Spliced using wooden case connects bearing;The wooden case connects bearing includes assembling plate and is vertically welded in assembling plate upper table Four abutment sleeves in face, the adjusting screw rod of adjacent four wooden case units is packed into four abutment sleeves respectively;The regulation spiral shell Bar and abutment sleeve are simultaneously threadedly coupled;The top support plate spiral shell of the assembling plate and the assembling plate and top combined connection component Tether and connect.
In addition, positioned at platform structure periphery stitching portion, now two wooden case units using wooden case connects bearing progress Splicing;The wooden case connects bearing includes assembling plate and is vertically welded in two abutment sleeves of assembling plate upper surface, institute State fixed position of two abutment sleeves on assembling plate and the arrangement of the adjusting screw rod of the two neighboring trees box units in stitching portion Position is corresponding, and two abutment sleeves are horizontal arranged side by side or longitudinally perpendicular arrangement, and two adjusting screw rods pack into two positioning respectively In sleeve;The adjusting screw rod and abutment sleeve are simultaneously threadedly coupled;The assembling plate is combined with the assembling plate with top The top support plate bolt connection of connector.
It is preferred that, the square floor is spliced by square platter, the upper surface vertical welding of each platter There is a leading screw, the position that every group of leading screw applies mechanically correspondence leading screw on a fixed connecting plate, the fixed connecting plate simultaneously is provided with Hole, a hole piece leading screw of correspondence.
It is further preferred that the regulation screw thread of regulation vertical rod height is set with the leading screw, regulation screw thread and leading screw spiral shell Line is connected.
It is preferred that, in the top combined connection component, pad is provided between top connecting bolt and top support plate;To enter one Step is strengthened in the intensity of frame structure, top combined connection component, and ribbed stiffener is connected between top support plate and overcoat pipe outer wall.
Scaffold can be supported more than ground incessantly, can also be located in pond body as filling supporting construction, this It is suitable for reading that Shi Suoshu platform structures are covered in pond body.
In the case of filling supporting construction is used as in above-mentioned pond body, preferably the vertical rod of scaffold periphery is passed through and adjusted Section screw thread shores rod member and pond body sidewall connection reinforcement, and between the vertical rod and vertical rod, between vertical rod and horizon bar or Brace is set up between horizon bar and horizon bar.
Moreover, it relates to a kind of construction party of above-mentioned fast assembling-disassembling frame structure supported for platform structure Method, it is characterised in that comprise the following steps:
Step 1: arrangement adjusting screw base:The arrangement adjusting screw bottom of the vertical rod of correspondence design scaffold Seat, if the square floor of adjusting screw base is spliced by four square platters, fixed connecting plate is enclosed on simultaneously On the leading screw of four bottom adjusting screw bases;
Step 2: setting up scaffold:Correspondence adjusting screw base sets up scaffold, and the bottom of vertical rod is enclosed on into leading screw On;
Step 3: installing top combined connection component:Combined connection component at the top of being installed in the top for the scaffold set up, will Four adjacent vertical rod tops of tool type scaffold are inserted in four outer tubes of top fixedly connected part and and limiting plate respectively Offset;
Step 4: flatness is adjusted:Adjusting screw base is adjusted, includes the height for putting and adjusting screw thread of square floor Regulation, makes vertical rod highly meet the requirements, and can be finely adjusted again using the adjusting screw rod in wooden case corner, while ensureing that top is combined The flatness of connector;
Step 5: carrying out great river spelling group according to above-mentioned erection method, form large area is used for the fast of platform structure support Speed dismounting frame structure, when scaffold is positioned in pond body, peripheral vertical rod shores rod member and pond body side by adjusting screw thread Wall connection reinforcement, so far, the construction of fast assembling-disassembling frame structure are completed.
Compared with prior art, the technical advantages of the present invention are that:
1st, intensity height, stability are good:In terms of loading angle, fast assembling-disassembling frame structure of the present invention is primarily subjected to vertical lotus Carry, while needing in terms of considering the stability under the dynamic loading of top, vertical load, structure construction is respectively to adjust from bottom to top Leading screw base, tool type scaffold, top combined connection component are saved, is combined by Push-fit, unified force structure is formed System;In terms of lateral stability, by installing fixed connecting plate in the middle part of the adjusting screw base of structural system bottom, at top Top combined connection component is installed and carries out overall processing making, it is ensured that the lateral stability of fast-assembling platform structure face frame body;
2nd, combination operation is convenient, flexible:The cell cube of tool type scaffold is subjected to efficient combination, convenient disassembly, material can Turnover is utilized;Globality preferably, effectively plays convenience and the flexibility of tool type scaffold, effectively overcomes tool-type pin hand The problem of frame root stability is poor;
3rd, highly can flexible modulation:Fast assembling-disassembling frame structure can flexibly carry out support body and highly adjust, and can reach platform knot The function that structure horizontal direction is accurately adjusted, overcomes fabrication error, accumulated error and the construction error by a variety of causes is brought;
To sum up, the present invention coordinates adjusting screw base and top combined connection component composition connector with tool type scaffold, Formed an adjustable height, ensure lateral stability, can stress jointly integral structural system, act not only as ground Platform support body, is also used as filling support inside swimming pool, applied widely.
Brief description of the drawings
Fig. 1 is the facade structures schematic diagram of the embodiment 1 of fast assembling-disassembling frame structure of the present invention;
Fig. 2 is the partial enlarged drawing of A in Fig. 1;
Fig. 3 is the structural representation of fixed connecting plate 1.3 of the present invention;
Fig. 4 is structural representation when square floor of the present invention is spliced by 4 platters;
Fig. 5 is the partial enlarged drawing of B in Fig. 1;
Fig. 6 is the annexation schematic diagram of top combined connection component 3 of the present invention and wooden case connects bearing 7;
Fig. 7 is the cross-sectional view of C-C sections in Fig. 6;
Fig. 8 is the structural representation of wooden case unit of the present invention.
Reference:1- adjusting screws base, 1.1- leading screws, 1.2- square floors, 1.3- fixed connecting plates, 2- pin hands Frame, 2.1- vertical rods, 2.2- horizon bars, 2.3- braces, 3- tops combined connection component, 3.1- top support plates, 3.2- outer tubes, 3.3- Inner sleeve, 3.4- limiting plates, 3.5- connecting bolts, 3.6- pads, 3.7- ribbed stiffeners, 4- platform structures, 4.1- top panels, 4.2- Lower shoe, 4.3- floors, 5- base planes, 6- heat-barrier materials, 7- wooden cases connects bearing, 7.1- assembling plates, 7.2- positioning sleeves Cylinder, 8- adjusting screw rods, 9- regulation screw thread, 10- regulation screw threads shore rod member, 11- ponds body sidewall.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
The present invention relates to a kind of fast assembling-disassembling frame structure supported for platform structure, the bottom of platform structure 4 is supported on Portion, it is characterised in that:As shown in figure 1, including adjusting screw base 1, scaffold 2 and top combined connection component 3 from bottom to top;Its In, the adjusting screw base 1 is located in base plane 5, including the horizontally disposed square floor 1.2 of bottommost and vertical welding Four leading screws 1.1 on square floor upper surface, the rectangular arrangement of four leading screws 1.1;The scaffold 2 is tool-type Distinguish scaffold, including vertical rod 2.1 and the horizon bar 2.2 that is connected between vertical rod, such as Fig. 2, the bottom of adjacent four vertical rods 2.1 It is sleeved on four leading screws 1.1 of same adjusting screw base 1;Such as Fig. 5, the top combined connection component 3 is arranged on pin hand The top of frame 2, installation site is corresponding with adjusting screw base 1, and it includes top support plate 3.1, outer tube 3.2, the and of inner sleeve 3.3 Limiting plate 3.4, the top support plate 3.1 is horizontally supported under platform structure 4, and it is in square that four are vertically welded with its lower surface Horizontal limiting plate 3.4, the limiting plate 3.4 and supporting are fixed with inside the outer tube 3.2 of shape distribution, the outer tube 3.2 Inner sleeve 3.3 is set inside outer tube between top plate 3.1, the top support plate 3.1 passes through top connecting bolt 3.5 and platform knot Structure 4 is fixedly connected;Same top combined connection component 3 is inserted on the top of four adjacent vertical rods 2.1 of the scaffold 2 respectively Offset in four outer tubes 3.2 and with limiting plate 3.4.
Such as Fig. 8, the platform structure 4 can be common plane plate body, or the wooden case unit of multiple rectangles is flat The combining structure being spliced to form in face, the wooden case unit includes top panel 4.1 and lower shoe 4.2, and centre is split by floor 4.3 Formed and heat-barrier material 6 is filled with lattice space, the lattice space;Four corners of the wooden case unit are designed with vertical Adjusting screw rod 8, wooden case connects bearing 7 is provided with the corner of four wooden case unit spliceds;The supporting of the top combined connection component 3 Top plate 3.1 is fixedly connected with the wooden case connects bearing 7 at the lower shoe in the middle of wooden case unit or wooden case unit spliced point.Such as Fig. 6 And Fig. 7, the wooden case unit spliced point is including being located at the splice point in the middle of platform structure 4, and now four wooden case units utilize wood Case connects bearing 7 is spliced;The wooden case connects bearing 7 includes assembling plate 7.1 and is vertically welded on assembling plate 7.1 Four abutment sleeves 7.2 on surface, the adjusting screw rod 8 of adjacent four wooden case units is packed into four abutment sleeves 7.2 respectively;Institute State adjusting screw rod 8 and abutment sleeve 7.2 and be threadedly coupled;The assembling plate 7.1 is combined with the assembling plate 7.1 with top The bolt connection of top support plate 3.1 of connector 3.The wooden case unit spliced point also includes the splicing for being located at the periphery of platform structure 4 Place, now two wooden case units are spliced using wooden case connects bearing 7;The wooden case connects bearing 7 includes assembling plate 7.1 With two abutment sleeves 7.2 for being vertically welded in the upper surface of assembling plate 7.1, described two abutment sleeves 7.2 are in assembling plate The arrangement position of the adjusting screw rod 8 of the two neighboring trees box units in fixed position and stitching portion on 7.1 is corresponding, is laterally arranged side by side Or longitudinally perpendicular arrangement, two adjusting screw rods 8 pack into two abutment sleeves 7.2 respectively;The adjusting screw rod 8 and abutment sleeve 7.2 and it is threadedly coupled;The top support plate 3.1 of the assembling plate 7.1 and the assembling plate 7.1 and top combined connection component 3 Bolt connection.
Such as Fig. 3 and Fig. 4, the square floor 1.2 can be a monoblock, can also be as shown in Figure 4 by two or four side The platter of shape is spliced, and the upper surface of each platter is vertically welded with a leading screw 1.1, and one group of leading screw 1.1 covers simultaneously With a fixed connecting plate 1.3, fixed connecting plate 1.3 is rectangular slab, is provided with hole, one in the correspondence position of leading screw 1.1 thereon A hole piece leading screw 1.1 of correspondence, the hole of the fixed connecting plate 1.3 provided with 4 rectangular arrangeds of the present embodiment, correspondence is four small The square floor 1.2 that bottom plate is spliced into.It is preferred that, the regulation screw thread 9 of the regulation height of vertical rod 2.1 is set with the leading screw 1.1, Regulation screw thread 9 is threadedly coupled with the leading screw 1.1 of bottom adjusting screw base.In the top combined connection component 3, top connection spiral shell Pad 3.6 is provided between bolt 3.5 and top support plate 3.1.In top combined connection component 3, outside top support plate 3.1 and outer tube 3.2 Ribbed stiffener 3.7 is connected between wall.
Scaffold 2 can be supported more than ground incessantly, can also be located at such as Fig. 1 in pond body, now platform structure 4 It is covered in pond body suitable for reading, to strengthen intensity, the vertical rod of the periphery of scaffold 2 is shored into rod member 10 and pond body by adjusting screw thread The connection reinforcement of side wall 11;Between the vertical rod 2.1 and vertical rod 2.1, between vertical rod 2.1 and horizon bar 2.2 or horizon bar 2.2 and water Brace 2.3 is also set up between flat bar 2.2.
The invention further relates to a kind of above-mentioned construction method of the fast assembling-disassembling frame structure supported for platform structure, it is special Levy and be, comprise the following steps:
Step 1: arrangement adjusting screw base 1:The arrangement regulation silk of the vertical rod 2.1 of correspondence design scaffold 2 Thick stick base 1, if the square floor 1.2 of adjusting screw base 1 is spliced by four square platters, by fixed connecting plate 1.3 are enclosed on the leading screw 1.1 of four bottom adjusting screw bases simultaneously;
Step 2: setting up scaffold 2:Correspondence adjusting screw base 1 sets up scaffold 2, and the bottom of vertical rod 2.1 is enclosed on On leading screw 1.1;
Step 3: installing top combined connection component 3:Combined connection component at the top of being installed in the top for the scaffold 2 set up 3, four adjacent tops of vertical rod 2.1 of tool type scaffold are inserted in four outer tubes 3.2 of top fixedly connected part respectively And offseted with limiting plate 3.4;
Step 4: flatness is adjusted:Adjust adjusting screw base 1, including screw thread 9 is put and adjusted to square floor 1.2 Height regulation, the height of vertical rod 2.1 is met the requirements, at the same ensure top combined connection component 3 flatness;
Step 5: carrying out great river spelling group according to above-mentioned erection method, form large area is used for the fast of platform structure support Speed dismounting frame structure, when scaffold 2 is positioned in pond body, the vertical rod of perimeter by adjust screw thread shore rod member 10 with Pond body sidewall 11 is to top support, and so far, the construction of fast assembling-disassembling support body framework is completed.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair Equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills Art field, is included within the scope of the present invention.

Claims (8)

1. a kind of fast assembling-disassembling frame structure supported for platform structure, is supported on platform structure(4)Bottom, its feature exists In:Include adjusting screw base from bottom to top(1), scaffold(2)With top combined connection component(3);
Wherein, the adjusting screw base(1)It is located at base plane(5)On, including the horizontally disposed square floor of bottommost (1.2)With four leading screws being vertically welded on square floor upper surface(1.1), four leading screws(1.1)Rectangular arrangement;
The scaffold(2)For tool type scaffold, including vertical rod(2.1)And the horizon bar being connected between vertical rod(2.2), phase Adjacent four vertical rods(2.1)Bottom be set in same adjusting screw base(1)Four leading screws(1.1)On;
The top combined connection component(3)Installed in scaffold(2)Top, installation site and adjusting screw base(1)Correspondence, It includes top support plate(3.1), outer tube(3.2), inner sleeve(3.3)And limiting plate(3.4), the top support plate(3.1)Water It is flat to be supported on platform structure(4)Under, the outer tube of four rectangular distributions is vertically welded with its lower surface(3.2), it is described Outer tube(3.2)Inside is fixed with horizontal limiting plate(3.4), the limiting plate(3.4)With top support plate(3.1)Between it is outer Inside pipe casing sets inner sleeve(3.3), the top support plate(3.1)Pass through top connecting bolt(3.5)With platform structure(4)It is fixed Connection;The scaffold(2)Four adjacent vertical rods(2.1)Top insert same top combined connection component respectively(3)'s Four outer tubes(3.2)Interior and and limiting plate(3.4)Offset;
The leading screw(1.1)On be set with regulation vertical rod(2.1)The regulation screw thread of height(9), the regulation screw thread(9)With leading screw (1.1)Threaded connection;
The scaffold(2)It is located in pond body, the platform structure(4)It is covered in pond body suitable for reading.
2. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 1, it is characterised in that:Institute State platform structure(4)The combining structure being planar spliced to form for the wooden case unit of multiple rectangles, the wooden case unit includes Top panel(4.1)And lower shoe(4.2), centre is by floor(4.3)Segmentation is formed to be filled with lattice space, the lattice space Heat-barrier material(6);Four corners of the wooden case unit are designed with vertical adjusting screw rod(8), in four wooden case unit spliceds Corner be provided with wooden case connects bearing(7);The top combined connection component(3)Top support plate(3.1)In the middle of wooden case unit Lower shoe(4.2)Or the wooden case connects bearing at wooden case unit spliced point(7)It is fixedly connected.
3. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 2, it is characterised in that:Institute Stating wooden case unit spliced point includes being located at platform structure(4)Middle splice point, now four wooden case units utilize wooden case connection Bearing(7)Spliced;The wooden case connects bearing(7)Including assembling plate(7.1)Be vertically welded in assembling plate(7.1) Four abutment sleeves of upper surface(7.2), the adjusting screw rod of adjacent four wooden case units(8)Four abutment sleeves are packed into respectively (7.2)In;The adjusting screw rod(8)With abutment sleeve(7.2)And be threadedly coupled;The assembling plate(7.1)With the assembling Bottom plate(7.1)With top combined connection component(3)Top support plate(3.1)Bolt connection.
4. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 2, it is characterised in that:Institute Stating wooden case unit spliced point includes being located at platform structure(4)Periphery splice point, now two wooden case units using wooden case connection Bearing(7)Spliced;The wooden case connects bearing(7)Including assembling plate(7.1)Be vertically welded in assembling plate(7.1) Two abutment sleeves of upper surface(7.2), described two abutment sleeves(7.2)In assembling plate(7.1)On fixed position with The adjusting screw rod of the two neighboring trees box units in stitching portion(8)Arrangement position it is corresponding, two abutment sleeves(7.2)For transverse direction simultaneously Row or longitudinally perpendicular arrangement, two adjusting screw rods(8)Two abutment sleeves are packed into respectively(7.2)In;The adjusting screw rod(8)With Abutment sleeve(7.2)And be threadedly coupled;The assembling plate(7.1)With the assembling plate(7.1)With top combined connection component (3)Top support plate(3.1)Bolt connection.
5. a kind of fast assembling-disassembling frame structure supported for platform structure according to Claims 1 to 4 any one, its It is characterised by:The square floor(1.2)It is spliced by square platter, the upper surface of each platter is vertically welded with One leading screw(1.1), every group of leading screw(1.1)Apply mechanically a fixed connecting plate simultaneously(1.3), the fixed connecting plate(1.3)On Correspondence leading screw(1.1)Position be provided with hole, a hole piece leading screw of correspondence(1.1).
6. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 5, it is characterised in that:Institute State top combined connection component(3)In, top connecting bolt(3.5)With top support plate(3.1)Between be provided with pad(3.6);Supporting Top plate(3.1)With outer tube(3.2)Ribbed stiffener is connected between outer wall(3.7).
7. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 5, it is characterised in that:Institute State scaffold(2)The vertical rod of perimeter shores rod member by adjusting screw thread(10)With pond body sidewall(11)To top support;It is described Vertical rod(2.1)With vertical rod(2.1)Between, vertical rod(2.1)With horizon bar(2.2)Between or horizon bar(2.2)With horizon bar(2.2) Between also set up brace(2.3).
8. a kind of fast assembling-disassembling frame structure supported for platform structure according to any one of claim 6 or 7 Construction method, it is characterised in that comprise the following steps:
Step 1: arrangement adjusting screw base(1):Correspondence design scaffold(2)Vertical rod(2.1)Arrangement regulation Leading screw base(1)If, adjusting screw base(1)Square floor(1.2)Be spliced by four square platters, then will be solid Determine connecting plate(1.3)The leading screw of four bottom adjusting screw bases is enclosed on simultaneously(1.1)On;
Step 2: setting up scaffold(2):Correspondence adjusting screw base(1)Set up scaffold(2), and by vertical rod(2.1)Bottom It is enclosed on leading screw(1.1)On;
Step 3: installing top combined connection component(3):In the scaffold set up(2)Top install top combined connection component (3), by four adjacent vertical rods of tool type scaffold(2.1)Four outer tubes of top fixedly connected part are inserted on top respectively (3.2)Interior and and limiting plate(3.4)Offset;
Step 4: flatness is adjusted:Adjust adjusting screw base(1), including square floor(1.2)Put and adjust screw thread (9)Height regulation, make vertical rod(2.1)Highly meet the requirements, while ensureing top combined connection component(3)Flatness;
Step 5: carrying out setting up spelling group according to above-mentioned erection method, the quick of platform structure support that be used for for forming large area is torn open Frame structure is filled, works as scaffold(2)When being positioned in pond body, the vertical rod of perimeter shores rod member by adjusting screw thread(10)With Pond body sidewall(11)To top support, so far, the construction of fast assembling-disassembling frame structure is completed.
CN201511002159.8A 2015-12-29 2015-12-29 A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method Active CN105525742B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511002159.8A CN105525742B (en) 2015-12-29 2015-12-29 A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511002159.8A CN105525742B (en) 2015-12-29 2015-12-29 A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method

Publications (2)

Publication Number Publication Date
CN105525742A CN105525742A (en) 2016-04-27
CN105525742B true CN105525742B (en) 2017-09-05

Family

ID=55768237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511002159.8A Active CN105525742B (en) 2015-12-29 2015-12-29 A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method

Country Status (1)

Country Link
CN (1) CN105525742B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107687561A (en) * 2017-09-14 2018-02-13 南京艺成教育科技发展有限公司 A kind of blinds box bracket

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2194949Y (en) * 1994-05-23 1995-04-19 湖南省公路机械工程公司 Insertion built-up scaffold
CN201031497Y (en) * 2007-05-08 2008-03-05 刘大为 Top end regulating mechanism of wrist lock/wheel lock type scaffolding steel tube pole setting
CN201962929U (en) * 2010-12-23 2011-09-07 姜伟壮 Multifunctional demountable scaffold
CN102191851A (en) * 2010-03-18 2011-09-21 王云剑 Novel support system
CN202266002U (en) * 2011-01-20 2012-06-06 开平市优赢金属制品有限公司 Supporting gate type scaffold for buildings
AU2011279563A1 (en) * 2010-07-16 2013-02-07 Marc Keersmaekers Scaffold with scaffolding elements and methods for erection thereof
CN205369868U (en) * 2015-12-29 2016-07-06 北京国家游泳中心有限责任公司 A quick assembly disassembly support body structure for platform structure supports

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2194949Y (en) * 1994-05-23 1995-04-19 湖南省公路机械工程公司 Insertion built-up scaffold
CN201031497Y (en) * 2007-05-08 2008-03-05 刘大为 Top end regulating mechanism of wrist lock/wheel lock type scaffolding steel tube pole setting
CN102191851A (en) * 2010-03-18 2011-09-21 王云剑 Novel support system
AU2011279563A1 (en) * 2010-07-16 2013-02-07 Marc Keersmaekers Scaffold with scaffolding elements and methods for erection thereof
CN201962929U (en) * 2010-12-23 2011-09-07 姜伟壮 Multifunctional demountable scaffold
CN202266002U (en) * 2011-01-20 2012-06-06 开平市优赢金属制品有限公司 Supporting gate type scaffold for buildings
CN205369868U (en) * 2015-12-29 2016-07-06 北京国家游泳中心有限责任公司 A quick assembly disassembly support body structure for platform structure supports

Also Published As

Publication number Publication date
CN105525742A (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN106760529B (en) Roof steel truss sliding assembly construction platform and installation method
CN102251657B (en) Arching formwork erecting method for assembled framework beam plate
TWI689652B (en) Beam-slab structure and construction method
CN110644664A (en) Fabricated building construction method and laminated slab construction supporting system
CN109184030B (en) Assembly type concrete shear wall superposed structure system and installation method
CN105525557B (en) Structural system and its construction method for indoor interim ice stadium ice face supporting conversion
CN102518148A (en) Architecture related to triangular bracing structure of underground open cut station and construction method thereof
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN205369868U (en) A quick assembly disassembly support body structure for platform structure supports
CN210002931U (en) tool type protection system for telescopic adjustment of construction of super high-rise outer frame column
CN109184029B (en) Assembled shear wall superimposed structure system convenient to mount and mounting method
CN105525742B (en) A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method
CN102094524B (en) Construction method of high-altitude large-span beam-slab template steel support system
CN202125061U (en) Scaffold of large-space concrete structure
CN104234445B (en) Reset-security the multiple bay of distortion timber-framed building
CN110565941A (en) PC aluminum formwork system for prefabricated building and construction method thereof
CN109098338A (en) A kind of assembled abnormity structural system of roof and its construction method
CN102312563A (en) Method for connecting external scaffold with wall for large-span and ultra-story-height structures
CN204850469U (en) Commercial mansion system that builds
CN109024685B (en) Large-volume concrete bottom plate steel bar supporting system and construction method thereof
CN207847150U (en) A kind of temporary facility for being used for structural demolition and rebuilding
CN106988520B (en) Construction method and support system for high-rise suspension structure
CN105525556B (en) Wooden case unit is combined into the connector and its joining method of light-duty wooden platform
CN104763054B (en) A kind of assembled integral orthogonal spatial mixed type steel lattice box structure
CN102587404B (en) Construction method for large-sized blast furnace foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant