CN105525742B - A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method - Google Patents
A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method Download PDFInfo
- Publication number
- CN105525742B CN105525742B CN201511002159.8A CN201511002159A CN105525742B CN 105525742 B CN105525742 B CN 105525742B CN 201511002159 A CN201511002159 A CN 201511002159A CN 105525742 B CN105525742 B CN 105525742B
- Authority
- CN
- China
- Prior art keywords
- adjusting screw
- scaffold
- plate
- wooden case
- platform structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/18—Scaffolds primarily resting on the ground adjustable in height
- E04G1/20—Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
Abstract
A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method, frame structure includes adjusting screw base, scaffold and top combined connection component from bottom to top, adjusting screw base is located in base plane, including bottom plate and four leading screws for being vertically welded in plate upper surface;The bottom of adjacent four vertical rods of scaffold is set on four leading screws of same adjusting screw base;Top combined connection component is arranged on scaffold top, installation site is corresponding with adjusting screw base, its top support plate is fixedly connected by top connecting bolt with platform structure, and adjacent four vertical rods of scaffold are inserted in four outer tubes of same top combined connection component and prop up limiting plate.The present invention can constitute the supporting frame of large area as needed, there is provided effectively supporting for all kinds of platform structural planes, with unit bearing capacity is adjustable, integral rigidity is controllable, support body height adjustable, efficient and convenient scene dismounting, storage convenient transportation, the low advantage of cost of manufacture.
Description
Technical field
The present invention relates to field of steel structure, more particularly to one kind is filled for pond body and supports pond body upper brace structure
The fast assembling-disassembling frame structure and its construction method in face.
Background technology
At present, in the construction of platform structure support system, common tool formula scaffold coordinates adjustable as supporting frame
Base and jacking combination, top set up primary-secondary beam and the plank that tiles formation platform structure face.The supporting frame carrying of such a form
Power and stability are uncontrollable, and height and horizontal direction position adjustments low precision, in the case where setting up requirement strictly to support body
It can not then be applicable, limit the extensive use of such a support body.
In addition, curling stone and Wheelchair Curling match will be held during Winter Olympic Games in 2022, winter Paralympic Games, in the Water Cube.For
Coordinate venue inside winter venue requirement difficult to understand, the Water Cube to be transformed, indoor swimming place and hall are converted into event on ices temporarily
Venue.This is accomplished by the place of original conventional venue building ice face and its infrastructure, and event on ices is extensive again after completing
Multiple place original appearance.In reconstruction with can not destroy original place during recovering.The operation demand of venue is considered simultaneously, it is desirable to
Conversion functionally can be rapidly completed at any time.The conventional scheme that ice face basis is built on original place of venue is a lot,
Such as accumulate all kinds of building blocks, set up steel construction or concrete structure framework pop-up warming plate or temperature control plate, or in former base plane
On do waterproof and directly pour ice etc..But these methods do not possess versatility and flexibility, or the assembly and disassembly cycle is long, or basis is heavy difficult
To deploy large-scale construction equipment operation indoors, or serious is damaged to original place, or basic material can not repeat to install to utilize.
A variety of drawbacks are unfavorable for the conversion at any time of place function, do not possess preferable economic benefit, also do not meet the development of environmental protection
Theme.
It is therefore desirable to develop a kind of fast assembling-disassembling support body combining form for support platform structural plane, room is adapted it to
The energy-efficient scheme of interior interim ice stadium ice face supporting, it is desirable to which it has the characteristics that:1)There are enough bearing capacitys and rigidity,
Can be under upper load effect, it is ensured that the stability of support body entirety all directions;2)Installation, dismounting and convenient transportation are flexible, and
It is reusable;3)With preferable economy, cost is reasonable.
The content of the invention
The present invention solves the technical problem of a kind of fast assembling-disassembling frame structure supported for platform structure of offer,
Solve platform structure lower support structure bearing capacity and stability is uncontrollable, height and horizontal direction position adjustments low precision,
It may not apply to set up support body the technical problem in the case of requiring strictly, while may apply to the item that swimming pool reconstructs ice stadium
In mesh, the energy-efficient effect of indoor interim ice stadium ice face supporting is realized, it is improved in terms of mechanics, stability and economy
Various technical indicators, make it have integral rigidity big, high capacity, live convenient disassembly, storage convenient transportation and be fabricated to
This low feature.
In order to solve the above technical problems, the present invention is adopted the following technical scheme that:
A kind of fast assembling-disassembling frame structure supported for platform structure, is supported on the bottom of platform structure, its feature exists
In:Include adjusting screw base, scaffold and top combined connection component from bottom to top;
Wherein, the adjusting screw base is located in base plane, including the horizontally disposed square floor of bottommost and hang down
Straight four leading screws being welded on square floor upper surface, the rectangular arrangement of four leading screws;
The scaffold is tool type scaffold, including vertical rod and the horizon bar that is connected between vertical rod, and adjacent four are stood
The bottom of bar is set on four leading screws of same adjusting screw base;
The top combined connection component is arranged on the top of scaffold, and installation site is corresponding with adjusting screw base, and it is wrapped
Top support plate, outer tube, inner sleeve and limiting plate are included, the top support plate is horizontally supported under platform structure, its lower surface
On be vertically welded with inside the outer tubes of four rectangular distributions, the outer tube and be fixed with horizontal limiting plate, it is described spacing
Inner sleeve is set inside outer tube between plate and top support plate, the top support plate is consolidated by top connecting bolt and platform structure
Fixed connection;Four outer tubes of same top combined connection component are inserted on the top of four adjacent vertical rods of the scaffold respectively
It is interior and offseted with limiting plate.
It is preferred that, the combining structure that the platform structure is planar spliced to form for the wooden case unit of multiple rectangles, institute
Stating wooden case unit includes top panel and lower shoe, and centre is split by floor forms lattice space, is filled with the lattice space
Heat-barrier material;Four corners of the wooden case unit are designed with vertical adjusting screw rod, in the corner of four wooden case unit spliceds
Provided with wooden case connects bearing;Lower shoe or wooden case unit in the middle of the top support plate and wooden case unit of the top combined connection component
Wooden case connects bearing at splice point is fixedly connected.
Wherein, the wooden case unit spliced point includes being located at the splice point in the middle of platform structure, now four wooden case units
Spliced using wooden case connects bearing;The wooden case connects bearing includes assembling plate and is vertically welded in assembling plate upper table
Four abutment sleeves in face, the adjusting screw rod of adjacent four wooden case units is packed into four abutment sleeves respectively;The regulation spiral shell
Bar and abutment sleeve are simultaneously threadedly coupled;The top support plate spiral shell of the assembling plate and the assembling plate and top combined connection component
Tether and connect.
In addition, positioned at platform structure periphery stitching portion, now two wooden case units using wooden case connects bearing progress
Splicing;The wooden case connects bearing includes assembling plate and is vertically welded in two abutment sleeves of assembling plate upper surface, institute
State fixed position of two abutment sleeves on assembling plate and the arrangement of the adjusting screw rod of the two neighboring trees box units in stitching portion
Position is corresponding, and two abutment sleeves are horizontal arranged side by side or longitudinally perpendicular arrangement, and two adjusting screw rods pack into two positioning respectively
In sleeve;The adjusting screw rod and abutment sleeve are simultaneously threadedly coupled;The assembling plate is combined with the assembling plate with top
The top support plate bolt connection of connector.
It is preferred that, the square floor is spliced by square platter, the upper surface vertical welding of each platter
There is a leading screw, the position that every group of leading screw applies mechanically correspondence leading screw on a fixed connecting plate, the fixed connecting plate simultaneously is provided with
Hole, a hole piece leading screw of correspondence.
It is further preferred that the regulation screw thread of regulation vertical rod height is set with the leading screw, regulation screw thread and leading screw spiral shell
Line is connected.
It is preferred that, in the top combined connection component, pad is provided between top connecting bolt and top support plate;To enter one
Step is strengthened in the intensity of frame structure, top combined connection component, and ribbed stiffener is connected between top support plate and overcoat pipe outer wall.
Scaffold can be supported more than ground incessantly, can also be located in pond body as filling supporting construction, this
It is suitable for reading that Shi Suoshu platform structures are covered in pond body.
In the case of filling supporting construction is used as in above-mentioned pond body, preferably the vertical rod of scaffold periphery is passed through and adjusted
Section screw thread shores rod member and pond body sidewall connection reinforcement, and between the vertical rod and vertical rod, between vertical rod and horizon bar or
Brace is set up between horizon bar and horizon bar.
Moreover, it relates to a kind of construction party of above-mentioned fast assembling-disassembling frame structure supported for platform structure
Method, it is characterised in that comprise the following steps:
Step 1: arrangement adjusting screw base:The arrangement adjusting screw bottom of the vertical rod of correspondence design scaffold
Seat, if the square floor of adjusting screw base is spliced by four square platters, fixed connecting plate is enclosed on simultaneously
On the leading screw of four bottom adjusting screw bases;
Step 2: setting up scaffold:Correspondence adjusting screw base sets up scaffold, and the bottom of vertical rod is enclosed on into leading screw
On;
Step 3: installing top combined connection component:Combined connection component at the top of being installed in the top for the scaffold set up, will
Four adjacent vertical rod tops of tool type scaffold are inserted in four outer tubes of top fixedly connected part and and limiting plate respectively
Offset;
Step 4: flatness is adjusted:Adjusting screw base is adjusted, includes the height for putting and adjusting screw thread of square floor
Regulation, makes vertical rod highly meet the requirements, and can be finely adjusted again using the adjusting screw rod in wooden case corner, while ensureing that top is combined
The flatness of connector;
Step 5: carrying out great river spelling group according to above-mentioned erection method, form large area is used for the fast of platform structure support
Speed dismounting frame structure, when scaffold is positioned in pond body, peripheral vertical rod shores rod member and pond body side by adjusting screw thread
Wall connection reinforcement, so far, the construction of fast assembling-disassembling frame structure are completed.
Compared with prior art, the technical advantages of the present invention are that:
1st, intensity height, stability are good:In terms of loading angle, fast assembling-disassembling frame structure of the present invention is primarily subjected to vertical lotus
Carry, while needing in terms of considering the stability under the dynamic loading of top, vertical load, structure construction is respectively to adjust from bottom to top
Leading screw base, tool type scaffold, top combined connection component are saved, is combined by Push-fit, unified force structure is formed
System;In terms of lateral stability, by installing fixed connecting plate in the middle part of the adjusting screw base of structural system bottom, at top
Top combined connection component is installed and carries out overall processing making, it is ensured that the lateral stability of fast-assembling platform structure face frame body;
2nd, combination operation is convenient, flexible:The cell cube of tool type scaffold is subjected to efficient combination, convenient disassembly, material can
Turnover is utilized;Globality preferably, effectively plays convenience and the flexibility of tool type scaffold, effectively overcomes tool-type pin hand
The problem of frame root stability is poor;
3rd, highly can flexible modulation:Fast assembling-disassembling frame structure can flexibly carry out support body and highly adjust, and can reach platform knot
The function that structure horizontal direction is accurately adjusted, overcomes fabrication error, accumulated error and the construction error by a variety of causes is brought;
To sum up, the present invention coordinates adjusting screw base and top combined connection component composition connector with tool type scaffold,
Formed an adjustable height, ensure lateral stability, can stress jointly integral structural system, act not only as ground
Platform support body, is also used as filling support inside swimming pool, applied widely.
Brief description of the drawings
Fig. 1 is the facade structures schematic diagram of the embodiment 1 of fast assembling-disassembling frame structure of the present invention;
Fig. 2 is the partial enlarged drawing of A in Fig. 1;
Fig. 3 is the structural representation of fixed connecting plate 1.3 of the present invention;
Fig. 4 is structural representation when square floor of the present invention is spliced by 4 platters;
Fig. 5 is the partial enlarged drawing of B in Fig. 1;
Fig. 6 is the annexation schematic diagram of top combined connection component 3 of the present invention and wooden case connects bearing 7;
Fig. 7 is the cross-sectional view of C-C sections in Fig. 6;
Fig. 8 is the structural representation of wooden case unit of the present invention.
Reference:1- adjusting screws base, 1.1- leading screws, 1.2- square floors, 1.3- fixed connecting plates, 2- pin hands
Frame, 2.1- vertical rods, 2.2- horizon bars, 2.3- braces, 3- tops combined connection component, 3.1- top support plates, 3.2- outer tubes, 3.3-
Inner sleeve, 3.4- limiting plates, 3.5- connecting bolts, 3.6- pads, 3.7- ribbed stiffeners, 4- platform structures, 4.1- top panels, 4.2-
Lower shoe, 4.3- floors, 5- base planes, 6- heat-barrier materials, 7- wooden cases connects bearing, 7.1- assembling plates, 7.2- positioning sleeves
Cylinder, 8- adjusting screw rods, 9- regulation screw thread, 10- regulation screw threads shore rod member, 11- ponds body sidewall.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and
It is non-to be used to limit the scope of the present invention.
The present invention relates to a kind of fast assembling-disassembling frame structure supported for platform structure, the bottom of platform structure 4 is supported on
Portion, it is characterised in that:As shown in figure 1, including adjusting screw base 1, scaffold 2 and top combined connection component 3 from bottom to top;Its
In, the adjusting screw base 1 is located in base plane 5, including the horizontally disposed square floor 1.2 of bottommost and vertical welding
Four leading screws 1.1 on square floor upper surface, the rectangular arrangement of four leading screws 1.1;The scaffold 2 is tool-type
Distinguish scaffold, including vertical rod 2.1 and the horizon bar 2.2 that is connected between vertical rod, such as Fig. 2, the bottom of adjacent four vertical rods 2.1
It is sleeved on four leading screws 1.1 of same adjusting screw base 1;Such as Fig. 5, the top combined connection component 3 is arranged on pin hand
The top of frame 2, installation site is corresponding with adjusting screw base 1, and it includes top support plate 3.1, outer tube 3.2, the and of inner sleeve 3.3
Limiting plate 3.4, the top support plate 3.1 is horizontally supported under platform structure 4, and it is in square that four are vertically welded with its lower surface
Horizontal limiting plate 3.4, the limiting plate 3.4 and supporting are fixed with inside the outer tube 3.2 of shape distribution, the outer tube 3.2
Inner sleeve 3.3 is set inside outer tube between top plate 3.1, the top support plate 3.1 passes through top connecting bolt 3.5 and platform knot
Structure 4 is fixedly connected;Same top combined connection component 3 is inserted on the top of four adjacent vertical rods 2.1 of the scaffold 2 respectively
Offset in four outer tubes 3.2 and with limiting plate 3.4.
Such as Fig. 8, the platform structure 4 can be common plane plate body, or the wooden case unit of multiple rectangles is flat
The combining structure being spliced to form in face, the wooden case unit includes top panel 4.1 and lower shoe 4.2, and centre is split by floor 4.3
Formed and heat-barrier material 6 is filled with lattice space, the lattice space;Four corners of the wooden case unit are designed with vertical
Adjusting screw rod 8, wooden case connects bearing 7 is provided with the corner of four wooden case unit spliceds;The supporting of the top combined connection component 3
Top plate 3.1 is fixedly connected with the wooden case connects bearing 7 at the lower shoe in the middle of wooden case unit or wooden case unit spliced point.Such as Fig. 6
And Fig. 7, the wooden case unit spliced point is including being located at the splice point in the middle of platform structure 4, and now four wooden case units utilize wood
Case connects bearing 7 is spliced;The wooden case connects bearing 7 includes assembling plate 7.1 and is vertically welded on assembling plate 7.1
Four abutment sleeves 7.2 on surface, the adjusting screw rod 8 of adjacent four wooden case units is packed into four abutment sleeves 7.2 respectively;Institute
State adjusting screw rod 8 and abutment sleeve 7.2 and be threadedly coupled;The assembling plate 7.1 is combined with the assembling plate 7.1 with top
The bolt connection of top support plate 3.1 of connector 3.The wooden case unit spliced point also includes the splicing for being located at the periphery of platform structure 4
Place, now two wooden case units are spliced using wooden case connects bearing 7;The wooden case connects bearing 7 includes assembling plate 7.1
With two abutment sleeves 7.2 for being vertically welded in the upper surface of assembling plate 7.1, described two abutment sleeves 7.2 are in assembling plate
The arrangement position of the adjusting screw rod 8 of the two neighboring trees box units in fixed position and stitching portion on 7.1 is corresponding, is laterally arranged side by side
Or longitudinally perpendicular arrangement, two adjusting screw rods 8 pack into two abutment sleeves 7.2 respectively;The adjusting screw rod 8 and abutment sleeve
7.2 and it is threadedly coupled;The top support plate 3.1 of the assembling plate 7.1 and the assembling plate 7.1 and top combined connection component 3
Bolt connection.
Such as Fig. 3 and Fig. 4, the square floor 1.2 can be a monoblock, can also be as shown in Figure 4 by two or four side
The platter of shape is spliced, and the upper surface of each platter is vertically welded with a leading screw 1.1, and one group of leading screw 1.1 covers simultaneously
With a fixed connecting plate 1.3, fixed connecting plate 1.3 is rectangular slab, is provided with hole, one in the correspondence position of leading screw 1.1 thereon
A hole piece leading screw 1.1 of correspondence, the hole of the fixed connecting plate 1.3 provided with 4 rectangular arrangeds of the present embodiment, correspondence is four small
The square floor 1.2 that bottom plate is spliced into.It is preferred that, the regulation screw thread 9 of the regulation height of vertical rod 2.1 is set with the leading screw 1.1,
Regulation screw thread 9 is threadedly coupled with the leading screw 1.1 of bottom adjusting screw base.In the top combined connection component 3, top connection spiral shell
Pad 3.6 is provided between bolt 3.5 and top support plate 3.1.In top combined connection component 3, outside top support plate 3.1 and outer tube 3.2
Ribbed stiffener 3.7 is connected between wall.
Scaffold 2 can be supported more than ground incessantly, can also be located at such as Fig. 1 in pond body, now platform structure 4
It is covered in pond body suitable for reading, to strengthen intensity, the vertical rod of the periphery of scaffold 2 is shored into rod member 10 and pond body by adjusting screw thread
The connection reinforcement of side wall 11;Between the vertical rod 2.1 and vertical rod 2.1, between vertical rod 2.1 and horizon bar 2.2 or horizon bar 2.2 and water
Brace 2.3 is also set up between flat bar 2.2.
The invention further relates to a kind of above-mentioned construction method of the fast assembling-disassembling frame structure supported for platform structure, it is special
Levy and be, comprise the following steps:
Step 1: arrangement adjusting screw base 1:The arrangement regulation silk of the vertical rod 2.1 of correspondence design scaffold 2
Thick stick base 1, if the square floor 1.2 of adjusting screw base 1 is spliced by four square platters, by fixed connecting plate
1.3 are enclosed on the leading screw 1.1 of four bottom adjusting screw bases simultaneously;
Step 2: setting up scaffold 2:Correspondence adjusting screw base 1 sets up scaffold 2, and the bottom of vertical rod 2.1 is enclosed on
On leading screw 1.1;
Step 3: installing top combined connection component 3:Combined connection component at the top of being installed in the top for the scaffold 2 set up
3, four adjacent tops of vertical rod 2.1 of tool type scaffold are inserted in four outer tubes 3.2 of top fixedly connected part respectively
And offseted with limiting plate 3.4;
Step 4: flatness is adjusted:Adjust adjusting screw base 1, including screw thread 9 is put and adjusted to square floor 1.2
Height regulation, the height of vertical rod 2.1 is met the requirements, at the same ensure top combined connection component 3 flatness;
Step 5: carrying out great river spelling group according to above-mentioned erection method, form large area is used for the fast of platform structure support
Speed dismounting frame structure, when scaffold 2 is positioned in pond body, the vertical rod of perimeter by adjust screw thread shore rod member 10 with
Pond body sidewall 11 is to top support, and so far, the construction of fast assembling-disassembling support body framework is completed.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair
Equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills
Art field, is included within the scope of the present invention.
Claims (8)
1. a kind of fast assembling-disassembling frame structure supported for platform structure, is supported on platform structure(4)Bottom, its feature exists
In:Include adjusting screw base from bottom to top(1), scaffold(2)With top combined connection component(3);
Wherein, the adjusting screw base(1)It is located at base plane(5)On, including the horizontally disposed square floor of bottommost
(1.2)With four leading screws being vertically welded on square floor upper surface(1.1), four leading screws(1.1)Rectangular arrangement;
The scaffold(2)For tool type scaffold, including vertical rod(2.1)And the horizon bar being connected between vertical rod(2.2), phase
Adjacent four vertical rods(2.1)Bottom be set in same adjusting screw base(1)Four leading screws(1.1)On;
The top combined connection component(3)Installed in scaffold(2)Top, installation site and adjusting screw base(1)Correspondence,
It includes top support plate(3.1), outer tube(3.2), inner sleeve(3.3)And limiting plate(3.4), the top support plate(3.1)Water
It is flat to be supported on platform structure(4)Under, the outer tube of four rectangular distributions is vertically welded with its lower surface(3.2), it is described
Outer tube(3.2)Inside is fixed with horizontal limiting plate(3.4), the limiting plate(3.4)With top support plate(3.1)Between it is outer
Inside pipe casing sets inner sleeve(3.3), the top support plate(3.1)Pass through top connecting bolt(3.5)With platform structure(4)It is fixed
Connection;The scaffold(2)Four adjacent vertical rods(2.1)Top insert same top combined connection component respectively(3)'s
Four outer tubes(3.2)Interior and and limiting plate(3.4)Offset;
The leading screw(1.1)On be set with regulation vertical rod(2.1)The regulation screw thread of height(9), the regulation screw thread(9)With leading screw
(1.1)Threaded connection;
The scaffold(2)It is located in pond body, the platform structure(4)It is covered in pond body suitable for reading.
2. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 1, it is characterised in that:Institute
State platform structure(4)The combining structure being planar spliced to form for the wooden case unit of multiple rectangles, the wooden case unit includes
Top panel(4.1)And lower shoe(4.2), centre is by floor(4.3)Segmentation is formed to be filled with lattice space, the lattice space
Heat-barrier material(6);Four corners of the wooden case unit are designed with vertical adjusting screw rod(8), in four wooden case unit spliceds
Corner be provided with wooden case connects bearing(7);The top combined connection component(3)Top support plate(3.1)In the middle of wooden case unit
Lower shoe(4.2)Or the wooden case connects bearing at wooden case unit spliced point(7)It is fixedly connected.
3. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 2, it is characterised in that:Institute
Stating wooden case unit spliced point includes being located at platform structure(4)Middle splice point, now four wooden case units utilize wooden case connection
Bearing(7)Spliced;The wooden case connects bearing(7)Including assembling plate(7.1)Be vertically welded in assembling plate(7.1)
Four abutment sleeves of upper surface(7.2), the adjusting screw rod of adjacent four wooden case units(8)Four abutment sleeves are packed into respectively
(7.2)In;The adjusting screw rod(8)With abutment sleeve(7.2)And be threadedly coupled;The assembling plate(7.1)With the assembling
Bottom plate(7.1)With top combined connection component(3)Top support plate(3.1)Bolt connection.
4. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 2, it is characterised in that:Institute
Stating wooden case unit spliced point includes being located at platform structure(4)Periphery splice point, now two wooden case units using wooden case connection
Bearing(7)Spliced;The wooden case connects bearing(7)Including assembling plate(7.1)Be vertically welded in assembling plate(7.1)
Two abutment sleeves of upper surface(7.2), described two abutment sleeves(7.2)In assembling plate(7.1)On fixed position with
The adjusting screw rod of the two neighboring trees box units in stitching portion(8)Arrangement position it is corresponding, two abutment sleeves(7.2)For transverse direction simultaneously
Row or longitudinally perpendicular arrangement, two adjusting screw rods(8)Two abutment sleeves are packed into respectively(7.2)In;The adjusting screw rod(8)With
Abutment sleeve(7.2)And be threadedly coupled;The assembling plate(7.1)With the assembling plate(7.1)With top combined connection component
(3)Top support plate(3.1)Bolt connection.
5. a kind of fast assembling-disassembling frame structure supported for platform structure according to Claims 1 to 4 any one, its
It is characterised by:The square floor(1.2)It is spliced by square platter, the upper surface of each platter is vertically welded with
One leading screw(1.1), every group of leading screw(1.1)Apply mechanically a fixed connecting plate simultaneously(1.3), the fixed connecting plate(1.3)On
Correspondence leading screw(1.1)Position be provided with hole, a hole piece leading screw of correspondence(1.1).
6. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 5, it is characterised in that:Institute
State top combined connection component(3)In, top connecting bolt(3.5)With top support plate(3.1)Between be provided with pad(3.6);Supporting
Top plate(3.1)With outer tube(3.2)Ribbed stiffener is connected between outer wall(3.7).
7. a kind of fast assembling-disassembling frame structure supported for platform structure according to claim 5, it is characterised in that:Institute
State scaffold(2)The vertical rod of perimeter shores rod member by adjusting screw thread(10)With pond body sidewall(11)To top support;It is described
Vertical rod(2.1)With vertical rod(2.1)Between, vertical rod(2.1)With horizon bar(2.2)Between or horizon bar(2.2)With horizon bar(2.2)
Between also set up brace(2.3).
8. a kind of fast assembling-disassembling frame structure supported for platform structure according to any one of claim 6 or 7
Construction method, it is characterised in that comprise the following steps:
Step 1: arrangement adjusting screw base(1):Correspondence design scaffold(2)Vertical rod(2.1)Arrangement regulation
Leading screw base(1)If, adjusting screw base(1)Square floor(1.2)Be spliced by four square platters, then will be solid
Determine connecting plate(1.3)The leading screw of four bottom adjusting screw bases is enclosed on simultaneously(1.1)On;
Step 2: setting up scaffold(2):Correspondence adjusting screw base(1)Set up scaffold(2), and by vertical rod(2.1)Bottom
It is enclosed on leading screw(1.1)On;
Step 3: installing top combined connection component(3):In the scaffold set up(2)Top install top combined connection component
(3), by four adjacent vertical rods of tool type scaffold(2.1)Four outer tubes of top fixedly connected part are inserted on top respectively
(3.2)Interior and and limiting plate(3.4)Offset;
Step 4: flatness is adjusted:Adjust adjusting screw base(1), including square floor(1.2)Put and adjust screw thread
(9)Height regulation, make vertical rod(2.1)Highly meet the requirements, while ensureing top combined connection component(3)Flatness;
Step 5: carrying out setting up spelling group according to above-mentioned erection method, the quick of platform structure support that be used for for forming large area is torn open
Frame structure is filled, works as scaffold(2)When being positioned in pond body, the vertical rod of perimeter shores rod member by adjusting screw thread(10)With
Pond body sidewall(11)To top support, so far, the construction of fast assembling-disassembling frame structure is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511002159.8A CN105525742B (en) | 2015-12-29 | 2015-12-29 | A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511002159.8A CN105525742B (en) | 2015-12-29 | 2015-12-29 | A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105525742A CN105525742A (en) | 2016-04-27 |
CN105525742B true CN105525742B (en) | 2017-09-05 |
Family
ID=55768237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511002159.8A Active CN105525742B (en) | 2015-12-29 | 2015-12-29 | A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105525742B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107687561A (en) * | 2017-09-14 | 2018-02-13 | 南京艺成教育科技发展有限公司 | A kind of blinds box bracket |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2194949Y (en) * | 1994-05-23 | 1995-04-19 | 湖南省公路机械工程公司 | Insertion built-up scaffold |
CN201031497Y (en) * | 2007-05-08 | 2008-03-05 | 刘大为 | Top end regulating mechanism of wrist lock/wheel lock type scaffolding steel tube pole setting |
CN201962929U (en) * | 2010-12-23 | 2011-09-07 | 姜伟壮 | Multifunctional demountable scaffold |
CN102191851A (en) * | 2010-03-18 | 2011-09-21 | 王云剑 | Novel support system |
CN202266002U (en) * | 2011-01-20 | 2012-06-06 | 开平市优赢金属制品有限公司 | Supporting gate type scaffold for buildings |
AU2011279563A1 (en) * | 2010-07-16 | 2013-02-07 | Marc Keersmaekers | Scaffold with scaffolding elements and methods for erection thereof |
CN205369868U (en) * | 2015-12-29 | 2016-07-06 | 北京国家游泳中心有限责任公司 | A quick assembly disassembly support body structure for platform structure supports |
-
2015
- 2015-12-29 CN CN201511002159.8A patent/CN105525742B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2194949Y (en) * | 1994-05-23 | 1995-04-19 | 湖南省公路机械工程公司 | Insertion built-up scaffold |
CN201031497Y (en) * | 2007-05-08 | 2008-03-05 | 刘大为 | Top end regulating mechanism of wrist lock/wheel lock type scaffolding steel tube pole setting |
CN102191851A (en) * | 2010-03-18 | 2011-09-21 | 王云剑 | Novel support system |
AU2011279563A1 (en) * | 2010-07-16 | 2013-02-07 | Marc Keersmaekers | Scaffold with scaffolding elements and methods for erection thereof |
CN201962929U (en) * | 2010-12-23 | 2011-09-07 | 姜伟壮 | Multifunctional demountable scaffold |
CN202266002U (en) * | 2011-01-20 | 2012-06-06 | 开平市优赢金属制品有限公司 | Supporting gate type scaffold for buildings |
CN205369868U (en) * | 2015-12-29 | 2016-07-06 | 北京国家游泳中心有限责任公司 | A quick assembly disassembly support body structure for platform structure supports |
Also Published As
Publication number | Publication date |
---|---|
CN105525742A (en) | 2016-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760529B (en) | Roof steel truss sliding assembly construction platform and installation method | |
CN102251657B (en) | Arching formwork erecting method for assembled framework beam plate | |
TWI689652B (en) | Beam-slab structure and construction method | |
CN110644664A (en) | Fabricated building construction method and laminated slab construction supporting system | |
CN109184030B (en) | Assembly type concrete shear wall superposed structure system and installation method | |
CN105525557B (en) | Structural system and its construction method for indoor interim ice stadium ice face supporting conversion | |
CN102518148A (en) | Architecture related to triangular bracing structure of underground open cut station and construction method thereof | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN205369868U (en) | A quick assembly disassembly support body structure for platform structure supports | |
CN210002931U (en) | tool type protection system for telescopic adjustment of construction of super high-rise outer frame column | |
CN109184029B (en) | Assembled shear wall superimposed structure system convenient to mount and mounting method | |
CN105525742B (en) | A kind of fast assembling-disassembling frame structure supported for platform structure and its construction method | |
CN102094524B (en) | Construction method of high-altitude large-span beam-slab template steel support system | |
CN202125061U (en) | Scaffold of large-space concrete structure | |
CN104234445B (en) | Reset-security the multiple bay of distortion timber-framed building | |
CN110565941A (en) | PC aluminum formwork system for prefabricated building and construction method thereof | |
CN109098338A (en) | A kind of assembled abnormity structural system of roof and its construction method | |
CN102312563A (en) | Method for connecting external scaffold with wall for large-span and ultra-story-height structures | |
CN204850469U (en) | Commercial mansion system that builds | |
CN109024685B (en) | Large-volume concrete bottom plate steel bar supporting system and construction method thereof | |
CN207847150U (en) | A kind of temporary facility for being used for structural demolition and rebuilding | |
CN106988520B (en) | Construction method and support system for high-rise suspension structure | |
CN105525556B (en) | Wooden case unit is combined into the connector and its joining method of light-duty wooden platform | |
CN104763054B (en) | A kind of assembled integral orthogonal spatial mixed type steel lattice box structure | |
CN102587404B (en) | Construction method for large-sized blast furnace foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |