CN109184029B - Assembled shear wall superimposed structure system convenient to mount and mounting method - Google Patents

Assembled shear wall superimposed structure system convenient to mount and mounting method Download PDF

Info

Publication number
CN109184029B
CN109184029B CN201811197266.4A CN201811197266A CN109184029B CN 109184029 B CN109184029 B CN 109184029B CN 201811197266 A CN201811197266 A CN 201811197266A CN 109184029 B CN109184029 B CN 109184029B
Authority
CN
China
Prior art keywords
steel bars
shear wall
hollow prefabricated
concrete shear
prefabricated superposed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811197266.4A
Other languages
Chinese (zh)
Other versions
CN109184029A (en
Inventor
冯大阔
宋闻辉
郜玉芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201811197266.4A priority Critical patent/CN109184029B/en
Publication of CN109184029A publication Critical patent/CN109184029A/en
Application granted granted Critical
Publication of CN109184029B publication Critical patent/CN109184029B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses an assembled shear wall superposed structure system convenient to install and an installation method, and solves the technical problems of complex connection, high construction difficulty, poor integrity and water resistance of structural members of the existing assembled shear wall. The hollow prefabricated composite concrete shear wall comprises two thin shear walls which are symmetrically arranged, and bending anchoring steel bars which are buckled with the hollow prefabricated composite concrete shear wall are arranged on the periphery of the prefabricated floor slab. The invention has simple construction, high construction efficiency and good waterproof performance, and has good popularization and application prospect.

Description

Assembled shear wall superimposed structure system convenient to mount and mounting method
Technical Field
The invention relates to the technical field of assembly type building construction, in particular to an assembly type shear wall superimposed structure system convenient to install and an installation method.
Background
The fabricated shear wall structure is a type of fabricated concrete structure, which is defined as a fabricated concrete structure composed of mainly force-bearing members, shear walls, beams, slab portions, or all of precast concrete members. When the traditional assembled ring rib buckling anchored concrete shear wall structure is used for vertical connection, horizontal steel bars need to be inserted into the upper wall body and the lower wall body after the upper wall body and the lower wall body are in place, the horizontal steel bars can be blocked after penetrating a certain distance, manual adjustment which is time-consuming and labor-consuming is needed by workers, the installation difficulty is very high, and the construction efficiency is low; in addition, when vertical connection and horizontal connection are carried out to traditional assembled structure, the construction joint waterproof performance that wet junction formed is poor, and structural wholeness and structural strength are not high.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides an assembled shear wall superimposed structure system convenient to install and an installation method, and solves the technical problems of complex installation, high construction difficulty, lack of integrity and poor waterproof performance of the existing assembled shear wall.
The technical scheme of the invention is realized as follows: an assembled shear wall superposed structure system convenient to install comprises a vertical component connection and a horizontal component connection, wherein the vertical component connection and the horizontal component connection respectively comprise a hollow prefabricated superposed concrete shear wall and a prefabricated floor slab, the hollow prefabricated superposed concrete shear wall comprises two sheets of thin shear walls which are symmetrically arranged, the two sheets of thin shear walls are connected through truss steel bars, a plurality of shaped anchoring steel bars or a plurality of bent anchoring steel bars are arranged on vertical butt joint surfaces on two sides of the hollow prefabricated superposed concrete shear wall, a plurality of annular anchoring steel bars are arranged on the lower end surface of the hollow prefabricated superposed concrete shear wall in parallel, horizontal steel bars are temporarily fixed in the shaped anchoring steel bars on the lower side of the hollow prefabricated superposed concrete shear wall, a plurality of bent anchoring steel bars are arranged on the upper end surfaces of the two sheets of thin shear wall, and bent hooks of the bent anchoring steel bars face the inner sides of the two sheets of thin shear wall, and bent anchoring steel bars are arranged around the prefabricated floor slab.
The vertical component connection is vertical butt joint of the hollow prefabricated superposed concrete shear wall, and horizontal steel bars are inserted between the annular anchoring steel bars at the lower side of the upper hollow prefabricated superposed concrete shear wall and the bent anchoring steel bars at the upper side of the lower hollow prefabricated superposed concrete shear wall to form framework steel bars of the hidden beam.
The horizontal members are connected with the hollow prefabricated composite concrete shear wall on the same layer, the annular anchoring steel bars or the bent anchoring steel bars on the two sides of the hollow prefabricated composite concrete shear wall on the same layer are buckled with each other and are connected through the vertical steel bars in a reinforcing mode, and the bent anchoring steel bars of the prefabricated floor slabs are buckled with the bent anchoring steel bars of the hollow prefabricated composite concrete shear wall in a crossed mode.
The reinforcing steel bars inside the thin shear wall are through long reinforcing steel bars, and the through long reinforcing steel bars comprise bent anchoring reinforcing steel bars extending out of the top of the hollow prefabricated laminated concrete shear wall and annular anchoring reinforcing steel bars extending out of the bottom of the hollow prefabricated laminated concrete shear wall.
Truss ribs are arranged in the prefabricated floor slab and are equal-height truss ribs or spaced equal-height truss ribs.
The bending angle of the end of the bent anchoring steel bar is 135 degrees.
An installation method of an assembled shear wall superimposed structure system convenient to install comprises a vertical component installation connection and a horizontal component installation connection, wherein the vertical component installation connection comprises the following steps:
the method comprises the following steps: and (3) installing and fixing the lower hollow prefabricated superposed concrete shear wall, and pouring concrete between the two thin shear walls until the concrete is 10-20cm away from the top end of the thin shear wall.
Step two: and (4) vertically hoisting the precast floor slab to enable the bent anchoring steel bars at the upper part of the lower layer of the hollow precast laminated concrete shear wall in the step one and the bent anchoring steel bars at the end part of the precast floor slab to be mutually crossed and buckled.
Step three: the hollow prefabricated composite concrete shear wall on the upper layer is installed, four horizontal steel bars penetrate into annular steel bars on the lower side of the hollow prefabricated composite concrete shear wall on the upper layer before installation, the horizontal steel bars are temporarily fixed, and when the hollow prefabricated composite concrete shear wall on the upper layer is installed, the hollow prefabricated composite concrete shear wall on the lower layer is vertically placed in the first step from top to bottom, so that the horizontal steel bars are guaranteed to smoothly pass through the neutral position in the middle of the bent anchoring steel bars at the top of the thin shear wall on the lower layer.
Step four: and removing the temporary fixation of the horizontal reinforcing steel bars in the third step, and binding the horizontal reinforcing steel bars to the inner four corners of the annular anchoring reinforcing steel bars to finish the installation.
Step five: and pouring concrete into the middle of the hollow prefabricated superposed concrete shear wall on the upper layer in the third step until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The horizontal component installation connection comprises a straight line connection, an L-shaped connection, a T-shaped connection and a cross-shaped connection.
The in-line connection comprises an in-line direct buckling method and an in-line external lapping rib buckling method, and the in-line external lapping rib buckling method comprises the following steps:
step six: and hoisting the two hollow prefabricated superposed concrete shear walls in place, so that the two hollow prefabricated superposed concrete shear walls are opposite left and right and are positioned on a straight line.
Step seven: and step six, annular reinforcing steel bars are placed at the butt joint ends of the two pages of hollow prefabricated laminated concrete shear walls, two ends of each annular reinforcing steel bar are respectively buckled on the annular anchoring reinforcing steel bars at two sides, the annular reinforcing steel bars are buckled with the two annular anchoring reinforcing steel bars to form three reinforcing steel bar rings, the three reinforcing steel bar rings comprise two first reinforcing steel bar rings close to the hollow prefabricated laminated concrete shear wall, and the reinforcing steel bar ring in the middle of the two first reinforcing steel bar rings is a second reinforcing steel bar ring.
Step eight: and in the seventh step, vertical reinforcing steel bars are vertically inserted into the inner four corners of the two first reinforcing steel bar rings.
Step nine: and pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls in the step six until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The straight line type direct buckling method comprises the following steps:
step ten: and hoisting one hollow prefabricated superposed concrete shear wall in place, vertically hoisting the other hollow prefabricated superposed concrete shear wall to a designed elevation, horizontally moving the next hollow prefabricated superposed concrete shear wall to a designed position in a hoisting state, and ensuring that the bent anchoring steel bars or the annular anchoring steel bars at the end parts of the two hollow prefabricated superposed concrete shear walls are mutually buckled.
Step eleven: and (5) penetrating vertical reinforcing steel bars into four corners of the bent anchoring reinforcing steel bars or the annular anchoring reinforcing steel bars which are buckled in the step ten to form the skeleton reinforcing steel bars of the hidden columns.
Step twelve: and casting concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls in the step eleven until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The T-shaped connection comprises a T-shaped external lapping rib buckling method and a T-shaped direct buckling method, and the T-shaped external lapping rib buckling method comprises the following steps:
step thirteen: and hoisting the three-leaf hollow prefabricated superposed concrete shear wall in place to enable the three-leaf hollow prefabricated superposed concrete shear wall to form a T-shaped arrangement.
Fourteen steps: and C, placing two annular reinforcing steel bars at the butt joint end of the three-page hollow prefabricated superposed concrete shear wall in the step thirteen, wherein the two annular reinforcing steel bars form a T-shaped combined rib, and the three ends of the T-shaped combined rib are respectively buckled on the annular anchoring reinforcing steel bars of the three-page hollow prefabricated superposed concrete shear wall.
Step fifteen: and in the fourteenth step, inserting the vertical steel bars into the corners of the T-shaped combined steel bars and the annular anchoring steel bars.
Sixthly, the steps are as follows: and pouring concrete at the butt joint end of the three-page hollow prefabricated superposed concrete shear wall in the step thirteen until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The T-shaped direct buckling method comprises the following steps:
seventeen steps: the first page of hollow prefabricated superposed concrete shear wall is hoisted in place, the second page of hollow prefabricated superposed concrete shear wall is vertically hoisted to a designed elevation, the second page of hollow prefabricated superposed concrete shear wall is horizontally moved to a designed position in a hoisting state, and the buckling anchoring steel bars or annular anchoring steel bars at the end parts of the first page of hollow prefabricated superposed concrete shear wall and the second page of hollow prefabricated superposed concrete shear wall are guaranteed to be buckled with each other.
Eighteen steps: and vertically hoisting the third hollow prefabricated superposed concrete shear wall to a designed elevation, and horizontally hoisting the third hollow prefabricated superposed concrete shear wall to a designed position under the hoisting state to ensure that the third hollow prefabricated superposed concrete shear wall is mutually buckled with the annular anchoring steel bars or the bent anchoring steel bars at the end parts of the two hollow prefabricated superposed concrete shear walls in the seventeenth step.
Nineteen steps: and eighteen, penetrating the vertical steel bars into the corners of the buckled anchoring steel bars or the annular anchoring steel bars to form the skeleton steel bars of the hidden columns.
Twenty steps: and pouring concrete at the butt joint end of the three-leaf hollow prefabricated superposed concrete shear wall in the nineteen steps until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The L-shaped connection comprises an L-shaped direct buckling method and an L-shaped external lapping annular reinforcing steel bar buckling method, and the L-shaped connection method of the annular reinforcing steel bars comprises the following steps:
twenty one: and hoisting the two hollow prefabricated superposed concrete shear walls in place to enable the two hollow prefabricated superposed concrete shear walls to form an L-shaped arrangement.
Step twenty-two: and twenty one, annular reinforcing steel bars are placed at the butt joint ends of the two pages of hollow prefabricated superposed concrete shear walls, the number of the annular reinforcing steel bars is two, the two annular reinforcing steel bars form an L-shaped combined reinforcing steel bar, and two ends of the L-shaped combined reinforcing steel bar are respectively buckled on the annular anchoring reinforcing steel bars of the two pages of hollow prefabricated superposed concrete shear walls.
Twenty-three steps: and in the twenty-two steps, inserting vertical reinforcing steel bars into the corners of the L-shaped combined reinforcing steel bars and the annular anchoring reinforcing steel bars.
Twenty-four steps: and C, pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls in the step thirteen until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The L-shaped direct buckling method comprises the following steps:
twenty-five steps: the first page of hollow prefabricated superposed concrete shear wall is installed in place, the second page of hollow prefabricated superposed concrete shear wall is vertically hoisted to a designed elevation, the second page of hollow prefabricated superposed concrete shear wall is horizontally moved to a designed position in a hoisting state, and the buckling anchoring reinforcing steel bars or annular anchoring reinforcing steel bars at the end parts of the first page of hollow prefabricated superposed concrete shear wall and the second page of hollow prefabricated superposed concrete shear wall are guaranteed to be buckled with each other.
Twenty-six steps: and in the twenty-fifth step, each corner of the buckled anchoring steel bar or the annular anchoring steel bar penetrates into the vertical steel bar to form the skeleton steel bar of the hidden column.
Twenty-seven steps: and pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls in the twenty-sixth step until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The cross-shaped connection comprises a cross-shaped external lapping rib buckling method and a cross-shaped direct buckling method, and the cross-shaped external lapping rib buckling method comprises the following steps:
twenty-eight steps: and hoisting the four hollow prefabricated superposed concrete shear walls in place to form a cross-shaped arrangement.
Twenty-nine steps: in twenty-eighth step, the butt joint ends of the four pages of hollow prefabricated superposed concrete shear walls are provided with four annular reinforcing steel bars, the four annular reinforcing steel bars form a cross-shaped combined bar, and four ends of the cross-shaped combined bar are respectively buckled on the annular anchoring reinforcing steel bars of the four pages of hollow prefabricated superposed concrete shear walls.
Thirty steps are as follows: and in the twenty-nine step, inserting vertical reinforcing steel bars into the corners of the cross-shaped combined reinforcing steel bars and the annular anchoring reinforcing steel bars.
Thirty-one steps: and pouring concrete at the butt joint end of the four-page hollow prefabricated superposed concrete shear wall in the thirty step until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The cross-shaped direct buckling method comprises the following steps:
step thirty-two: the first page of hollow prefabricated superposed concrete shear wall is installed in place, the second page of hollow prefabricated superposed concrete shear wall is vertically hoisted to a designed elevation, the annular anchoring reinforcing steel bars or the bent anchoring reinforcing steel bars at the end part of the second page of hollow prefabricated superposed concrete shear wall are lengthened, the second page of hollow prefabricated superposed concrete shear wall is horizontally moved to a designed position in a hoisting state, and the bent anchoring reinforcing steel bars or the annular anchoring reinforcing steel bars at the end parts of the first page of hollow prefabricated superposed concrete shear wall and the second page of hollow prefabricated superposed concrete shear wall are ensured to be buckled with each other.
Step thirty three: and vertically hoisting the third hollow prefabricated superposed concrete shear wall to a designed elevation, horizontally moving the third hollow prefabricated superposed concrete shear wall to a designed position in a hoisting state, enabling the first hollow prefabricated superposed concrete shear wall, the second hollow prefabricated superposed concrete shear wall and the third hollow prefabricated superposed concrete shear wall to form a T-shaped structure, and freely extending the lengthened annular anchoring steel bars or the bent anchoring steel bars at the end part of the second hollow prefabricated superposed concrete shear wall.
Thirty-four steps: and vertically hoisting the fourth hollow prefabricated laminated concrete shear wall to a designed elevation, and horizontally moving the fourth hollow prefabricated laminated concrete shear wall to a designed position in a hoisting state to ensure that the annular anchoring steel bars or the bent anchoring steel bars at the end part of the fourth hollow prefabricated laminated concrete shear wall are buckled with the lengthened annular anchoring steel bars or the bent anchoring steel bars at the end part of the second hollow prefabricated laminated concrete shear wall in the thirty-three steps.
Step thirty-five: and penetrating vertical reinforcing steel bars into corners of the bent anchoring reinforcing steel bars or the annular anchoring reinforcing steel bars which are buckled with each other in thirty-four steps to form the framework reinforcing steel bars of the hidden columns.
Step thirty-six: and pouring concrete at the butt joint end of the four-page hollow prefabricated superposed concrete shear wall in the thirty-five steps until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
Another cruciform attachment includes the steps of:
step three seventeen: and horizontally hoisting the fourth hollow prefabricated superposed concrete shear wall to the installation position on the basis of the eighteenth step, so that the fourth hollow prefabricated superposed concrete shear wall and other three hollow prefabricated superposed concrete shear walls form a cross-shaped positioning.
Step thirty-eight: annular reinforcing steel bars are additionally arranged between the fourth hollow prefabricated laminated concrete shear wall and the other three hollow prefabricated laminated concrete shear walls, so that the fourth hollow prefabricated laminated concrete shear wall and the other three hollow prefabricated laminated concrete shear walls form cross connection.
Step thirty-nine: and penetrating vertical steel bars into each corner of the connecting end of the four-page hollow prefabricated laminated concrete shear wall in the thirty-eighth step to form a skeleton steel bar of the hidden column.
Step forty: and pouring concrete at the butt joint end of the four pages of hollow prefabricated superposed concrete shear walls in the thirty-nine step until the concrete is 10-20cm away from the top end of the thin shear wall.
The invention can directly pre-arrange horizontal steel bars in the annular anchoring steel bars, thereby avoiding the technical problem that the horizontal steel bars need to be penetrated when the number of the shear walls are connected in the prior art, simplifying the construction process and improving the construction efficiency; the hollow prefabricated superposed concrete shear wall is adopted, so that the hollow prefabricated superposed concrete shear wall is light in hoisting and convenient and fast in splicing and installation, and the prefabrication, splicing and wet operation are carried out simultaneously, so that the integrity and the structural strength are fully guaranteed. In addition, the construction joint is positioned inside the thin shear wall, so that the construction process is simplified, and meanwhile, the waterproof capacity of the structure is effectively improved. The assembled annular rib buckling and overlapping structure fully utilizes the prefabricated wall body as a template, and can form a whole after concrete of the hollow part of the prefabricated wall body on the same floor is poured, so that the integrity and the anti-seismic performance of the structure are effectively improved, and the construction joints among floors are kept at the specified height (10-20 cm away from the top of the prefabricated thin shear wall 1-1), so that the self waterproof performance of the structure can be greatly improved. The invention has simple structure, convenient manufacture, less and simple construction procedures, high construction efficiency and good waterproof performance, and has good popularization and application prospect.
Drawings
FIG. 1 is a schematic structural diagram of a hollow prefabricated composite concrete shear wall;
FIG. 2 is a schematic structural view of a precast floor slab;
FIG. 3 is a schematic view of two structural forms of the truss rib in the precast floor slab;
FIG. 4 is a schematic structural diagram of the lower hollow prefabricated composite concrete shear wall filled with concrete;
FIG. 5 is a schematic structural view of the hollow prefabricated composite concrete shear wall and the prefabricated floor slab in FIG. 4;
FIG. 6 is a schematic structural view of the hollow prefabricated composite concrete shear wall of FIG. 5 spliced with an upper hollow prefabricated composite concrete shear wall;
FIG. 7 is a schematic view of the horizontal rebar of FIG. 6 with the temporary fixation removed and installed in place;
FIG. 8 is a schematic structural view of concrete filled in the upper hollow prefabricated composite concrete shear wall and the prefabricated floor slab in FIG. 7;
FIG. 9 is a schematic view of a straight-line direct snap-fit connection process;
FIG. 10 is a schematic view of a connection process of a straight-line external-lap-ring-rib buckling method;
FIG. 11 is a schematic view showing a T-shaped direct snap-fit connection process;
FIG. 12 is a schematic view showing a T-shaped external-lapping rib-buckling method;
FIG. 13 is a schematic view showing the connection process of the L-shaped direct snap-fit method;
FIG. 14 is a schematic view showing a connection process of an L-shaped external-hook-and-loop-rib fastening method;
FIG. 15 is a schematic view of a cross-shaped direct snap-fit connection process;
FIG. 16 is a schematic view showing a cross-shaped external lapping rib fastening method;
fig. 17 is a schematic view of a connection process by a combined connection method.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without inventive effort based on the embodiments of the present invention, are within the scope of the present invention.
Embodiment 1, an assembled shear wall superimposed structure system convenient to installation, includes vertical component connection and horizontal component connection, as shown in fig. 1 and fig. 2, vertical component and horizontal component all include cavity prefabricated coincide concrete shear wall 1 and prefabricated floor 3, cavity prefabricated coincide concrete shear wall 1 includes two pages of thin shear wall 1-1 that the symmetry set up, connects through truss reinforcing bar 2-3 between two pages of thin shear wall 1-1. As shown in fig. 9, a plurality of shaped anchoring steel bars 2-2 or a plurality of bent anchoring steel bars 2-1 are arranged on the vertical butt joint surfaces on both sides of the hollow precast laminated concrete shear wall 1, and the bending angle of the end parts of the bent anchoring steel bars 2-1 is 135 °.
As shown in fig. 6, a plurality of annular anchoring steel bars 2-2 are arranged in parallel on the lower end surface of the hollow prefabricated composite concrete shear wall 1, and horizontal steel bars 2-4 are temporarily fixed in the annular anchoring steel bars 2-2 at the lower side of the hollow prefabricated composite concrete shear wall 1. As shown in figure 1, the upper end surfaces of the two pages of thin shear walls 1-1 are respectively provided with a plurality of bent anchoring steel bars 2-1, and bent hooks of the bent anchoring steel bars 2-1 face the inner sides of the two pages of thin shear walls 1-1. As shown in fig. 2, the prefabricated floor slab 3 is also provided with bent anchoring steel bars 2-1 at the periphery.
Further, as shown in fig. 1, the annular anchoring steel bars 2-2 and the bent anchoring steel bars 2-1 are through-length steel bars 2 penetrating through the thin shear wall 1-1 or the prefabricated floor slab 3, and the through-length steel bars 2 include the bent anchoring steel bars 2-1 extending out of the top and the annular anchoring steel bars 2-2 extending out of the bottom of the hollow prefabricated laminated concrete shear wall 1, respectively. The through-length steel bar is convenient to produce, and the structural strength can be guaranteed to the maximum extent. Truss ribs are also arranged in the precast floor slab 3, and as shown in fig. 3, the truss ribs are equal-height truss ribs 3-1 or spaced equal-height truss ribs 3-2.
The vertical component connection is vertical butt joint of the hollow prefabricated superposed concrete shear wall 1, and the annular anchoring steel bars 2-2 at the lower side of the upper hollow prefabricated superposed concrete shear wall 1 and the bent anchoring steel bars 2-1 at the upper side of the lower hollow prefabricated superposed concrete shear wall 1 are in reinforcing connection through the horizontal steel bars 2-4.
The horizontal component connection is the connection between the hollow prefabricated composite concrete shear walls 1 on the same layer, the annular anchoring steel bars 2-2 or the bent anchoring steel bars 2-1 on the two sides of the hollow prefabricated composite concrete shear walls 1 on the same layer are buckled with each other and are connected in a reinforcing mode through the vertical steel bars 2-5, and the bent anchoring steel bars 2-1 of the prefabricated floor slab 3 and the bent anchoring steel bars 2-1 of the hollow prefabricated composite concrete shear walls 1 are buckled in a crossed mode.
Embodiment 2, a method for installing an assembled shear wall superimposed structure system convenient for installation, comprising a vertical component installation connection and a horizontal component installation connection, wherein the vertical component installation connection process is as shown in fig. 4 to 8, and comprises the following steps:
the method comprises the following steps: as shown in fig. 4, the hollow prefabricated superposed concrete shear wall 1 at the lower layer is installed and fixed, and concrete is poured between the two thin shear walls 1-1 until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
Step two: and (3) vertically hoisting the precast floor slab 3, so that the bent anchoring steel bars 2-1 at the upper part of the lower layer of the hollow precast laminated concrete shear wall 1 in the step one and the bent anchoring steel bars 2-1 at the end part of the precast floor slab 3 are mutually crossed and buckled, as shown in fig. 5.
Step three: installing the upper hollow prefabricated composite concrete shear wall 1, penetrating four horizontal steel bars 2-4 into annular steel bars 2-2 at the lower side of the upper hollow prefabricated composite concrete shear wall 1 before installation, and temporarily fixing the horizontal steel bars 2-4, as shown in fig. 6. When the hollow prefabricated superposed concrete shear wall 1 on the upper layer is installed, the hollow prefabricated superposed concrete shear wall 1 on the lower layer in the step one is vertically arranged from top to bottom, and the horizontal reinforcing steel bars 2-4 are ensured to smoothly pass through the neutral position in the middle of the bent anchoring reinforcing steel bars 2-1 at the top of the thin shear wall 1-1 on the lower layer.
Step four: and removing the temporary fixation of the horizontal steel bars 2-4 in the step three, and binding the horizontal steel bars 2-4 to the inner four corners of the annular anchoring steel bars 2-1 to finish the installation, as shown in fig. 7.
Step five: as shown in fig. 8, concrete is poured into the middle of the upper hollow prefabricated laminated concrete shear wall 1 in the third step until the distance between the concrete and the top end of the thin shear wall 1-1 is 10-20 cm.
The horizontal component installation connection comprises a straight line connection, an L-shaped connection, a T-shaped connection and a cross-shaped connection.
The in-line connection includes an in-line direct snap-fit method as shown in fig. 9 and an in-line external lap-ring rib snap-fit method as shown in fig. 10, the in-line external lap-ring rib snap-fit method including the steps of:
step six: and hoisting the two hollow prefabricated superposed concrete shear walls 1 in place, so that the two hollow prefabricated superposed concrete shear walls 1 are opposite left and right and are positioned on a straight line.
Step seven: and step six, annular reinforcing steel bars 4 are placed at the butt ends of the two pages of hollow prefabricated laminated concrete shear walls 1, two ends of each annular reinforcing steel bar 4 are respectively buckled on the annular anchoring steel bars 2-2 at two sides, the annular reinforcing steel bars 2-2 are buckled with the two annular anchoring steel bars 2-2 to form three reinforcing steel bar rings, each reinforcing steel bar ring comprises two first reinforcing steel bar rings close to the hollow prefabricated laminated concrete shear wall, and the reinforcing steel bar ring in the middle of the two first reinforcing steel bar rings is a second reinforcing steel bar ring.
Step eight: and in the seventh step, vertical reinforcing steel bars are vertically inserted into the inner four corners of the two first reinforcing steel bar rings.
Step nine: and pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls 1 in the step six until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The straight-line direct buckling method is shown in fig. 9, the upper row in fig. 9 is a schematic process diagram of the connection of the hollow prefabricated laminated concrete shear wall 1 by using the bent anchoring steel bar 2-1, and the lower row is a schematic process diagram of the connection of the hollow prefabricated laminated concrete shear wall 1 by using the annular anchoring steel bar 2-2, and the steps of the method are the same, and the method comprises the following steps:
step ten: and hoisting one hollow prefabricated superposed concrete shear wall 1 in place, vertically hoisting the other hollow prefabricated superposed concrete shear wall 1 to a designed elevation, horizontally moving the next hollow prefabricated superposed concrete shear wall 1 to a designed position in a hoisting state, and ensuring that the bent anchoring steel bars 2-1 or the annular anchoring steel bars 2-2 at the end parts of the two hollow prefabricated superposed concrete shear walls 1 are buckled with each other.
Step eleven: and (4) penetrating four corners of the bent anchoring steel bars 2-1 or the annular anchoring steel bars 2-2 which are buckled with each other in the step ten into vertical steel bars 2-5 to form the skeleton steel bars of the hidden columns.
Step twelve: pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls 1 in the step eleven until the distance between the concrete and the top end of the thin shear wall 1-1 is 10-20 cm.
Embodiment 3, a method for installing an assembled shear wall composite structure system convenient to install, where the T-shaped connection includes a T-shaped external-lap hoop buckling method and a T-shaped direct buckling method, and the T-shaped external-lap hoop buckling method is shown in fig. 12, and includes the following steps:
step thirteen: and hoisting the three-leaf hollow prefabricated superposed concrete shear wall 1 in place to enable the three-leaf hollow prefabricated superposed concrete shear wall 1 to form a T-shaped arrangement.
Fourteen steps: and placing two annular reinforcing steel bars 4 at the butt joint end of the three-page hollow prefabricated superposed concrete shear wall 1 in the step thirteen, wherein the two annular reinforcing steel bars 4 form a T-shaped combined reinforcing steel bar, and the three ends of the T-shaped combined reinforcing steel bar are respectively buckled on the annular anchoring reinforcing steel bars 2-2 of the three-page hollow prefabricated superposed concrete shear wall.
Step fifteen: in the fourteenth step, the T-shaped combined reinforcement and each corner of the annular anchoring reinforcement 2-2 are inserted into the vertical reinforcement 2-5.
Sixthly, the steps are as follows: and pouring concrete at the butt joint end of the three-leaf hollow prefabricated superposed concrete shear wall 1 in the step thirteen until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The T-shaped direct buckling method is shown in fig. 11, a schematic process diagram of the hollow prefabricated composite concrete shear wall 1 connected by using the bent anchoring steel bar 2-1 is shown in the lower row of fig. 11, and a schematic process diagram of the hollow prefabricated composite concrete shear wall 1 connected by using the annular anchoring steel bar 2-2 is shown in the upper row, and the steps of the method are the same, and the method comprises the following steps:
seventeen steps: the first page of hollow prefabricated superposed concrete shear wall 1 is hoisted in place, the second page of hollow prefabricated superposed concrete shear wall 1 is vertically hoisted to a designed elevation, the second page of hollow prefabricated superposed concrete shear wall 1 is horizontally moved to a designed position in a hoisting state, and the buckling anchoring steel bars 2-1 or the annular anchoring steel bars 2-2 at the end parts of the first page of hollow prefabricated superposed concrete shear wall 1 and the second page of hollow prefabricated superposed concrete shear wall 1 are ensured to be buckled with each other.
Eighteen steps: and vertically hoisting the third hollow prefabricated superposed concrete shear wall 1 to a designed elevation, and horizontally hoisting the third hollow prefabricated superposed concrete shear wall 1 to a designed position under the hoisting state to ensure that the third hollow prefabricated superposed concrete shear wall 1 is mutually buckled with the annular anchoring steel bars 2-2 or the bent anchoring steel bars 2-1 at the end parts of the two hollow prefabricated superposed concrete shear walls 1 in the seventeenth step.
Nineteen steps: and eighteen, penetrating the corners of the buckled anchoring steel bars 2-1 or the annular anchoring steel bars 2-2 into vertical steel bars 2-5 to form the skeleton steel bars of the hidden columns.
Twenty steps: and pouring concrete at the butt joint end of the three-leaf hollow prefabricated superposed concrete shear wall 1 in the nineteen steps until the distance between the concrete and the top end of the thin shear wall 1-1 is 10-20 cm.
The other structure mounting method is the same as embodiment 2.
Embodiment 4, a method for installing an assembled shear wall composite structure system convenient to install, where the L-shaped connection includes an L-shaped direct buckling method and an L-shaped external loop bar buckling method, and the L-shaped connection method of the loop bar is shown in fig. 14, and includes the following steps:
twenty one: and hoisting the two hollow prefabricated superposed concrete shear walls 1 in place to enable the two hollow prefabricated superposed concrete shear walls 1 to form an L-shaped arrangement.
Step twenty-two: in the twenty-first step, two annular reinforcing steel bars 4 are arranged at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls 1, the number of the annular reinforcing steel bars 4 is two, the two annular reinforcing steel bars 4 form an L-shaped combined reinforcing steel bar, and two ends of the L-shaped combined reinforcing steel bar are respectively buckled on the annular anchoring reinforcing steel bars 2-2 of the two pages of hollow prefabricated superposed concrete shear walls 1.
Twenty-three steps: in the twenty-two steps, the vertical steel bars 2-5 are inserted into the corners of the L-shaped combined steel bars and the annular anchoring steel bars 2-2.
Twenty-four steps: and pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls 1 in the step thirteen until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The L-shaped direct buckling method is shown in fig. 13, a schematic process diagram of the hollow prefabricated composite concrete shear wall 1 connected by using the bent anchoring steel bar 2-1 is shown in the lower row of fig. 13, and a schematic process diagram of the hollow prefabricated composite concrete shear wall 1 connected by using the annular anchoring steel bar 2-2 is shown in the upper row, and the steps of the method are the same, and the method comprises the following steps:
twenty-five steps: the first page of hollow prefabricated superposed concrete shear wall 1 is installed in place, the second page of hollow prefabricated superposed concrete shear wall 1 is vertically hoisted to a designed elevation, the second page of hollow prefabricated superposed concrete shear wall 1 is horizontally moved to a designed position in a hoisting state, and the buckling anchoring steel bars 2-1 or the annular anchoring steel bars 2-2 at the end parts of the first page of hollow prefabricated superposed concrete shear wall 1 and the second page of hollow prefabricated superposed concrete shear wall 1 are ensured to be buckled with each other.
Twenty-six steps: and in the twenty-fifth step, each corner of the buckled anchoring steel bar 2-1 or the annular anchoring steel bar 2-2 penetrates into the vertical steel bar 2-5 to form a skeleton steel bar of the hidden column.
Twenty-seven steps: and pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls 1 in the twenty-sixth step until the distance between the concrete and the top end of the thin shear wall 1-1 is 10-20 cm.
The other structure mounting method is the same as embodiment 3.
Embodiment 5, a method for installing an assembled shear wall superimposed structure system convenient to install, the cross-shaped connection includes a cross-shaped external lapping rib buckling method and a cross-shaped direct buckling method, the cross-shaped external lapping rib buckling method is shown in fig. 16, and the method includes the following steps:
twenty-eight steps: the four-leaf hollow prefabricated superposed concrete shear wall 1 is hoisted in place, so that the four-leaf hollow prefabricated superposed concrete shear wall 1 forms a cross-shaped arrangement, as shown in the lower drawing of fig. 16.
Twenty-nine steps: in twenty-eighth step, annular reinforcing steel bars 4 are placed at the butt joint ends of the four pages of hollow prefabricated superposed concrete shear walls 1, the number of the annular reinforcing steel bars 4 is four, the four annular reinforcing steel bars 4 form cross-shaped combined reinforcing steel bars, and four ends of the cross-shaped combined reinforcing steel bars are buckled on the annular anchoring reinforcing steel bars 2-2 of the four pages of hollow prefabricated superposed concrete shear walls 1 respectively.
Thirty steps are as follows: in twenty-nine steps the corners of the cruciform combination bars and the annular anchoring bars 2-2 are inserted into the vertical bars 2-5, as shown in the upper drawing of fig. 16.
Thirty-one steps: and pouring concrete at the butt joint end of the four-page hollow prefabricated superposed concrete shear wall 1 in the thirty step until the distance between the concrete and the top end of the thin shear wall is 10-20 cm.
The cross-shaped direct buckling method is shown in fig. 15, a schematic process diagram of connection of the lower two rows of hollow prefabricated laminated concrete shear walls 1 by using the bent anchoring steel bars 2-1 in fig. 15, and a schematic process diagram of connection of the upper two rows of hollow prefabricated laminated concrete shear walls 1 by using the annular anchoring steel bars 2-2 are shown, and the steps of the method are the same, and the method comprises the following steps:
step thirty-two: the method comprises the steps of installing a first page of hollow prefabricated superposed concrete shear wall 1 in place, vertically hoisting a second page of hollow prefabricated superposed concrete shear wall 1 to a designed elevation, lengthening an annular anchoring steel bar 2-2 or a bent anchoring steel bar 2-1 at the end part of the second page of hollow prefabricated superposed concrete shear wall 1, horizontally moving the second page of hollow prefabricated superposed concrete shear wall 1 to a designed position in a hoisting state, and ensuring that the bent anchoring steel bar 2-1 or the annular anchoring steel bar 2-2 at the end part of the first page of hollow prefabricated superposed concrete shear wall 1 and the second page of hollow prefabricated superposed concrete shear wall 1 are buckled with each other.
Step thirty three: and vertically hoisting the third-page hollow prefabricated superposed concrete shear wall 1 to a designed elevation, horizontally moving the third-page hollow prefabricated superposed concrete shear wall 1 to a designed position in a hoisting state, enabling the first-page hollow prefabricated superposed concrete shear wall 1, the second-page hollow prefabricated superposed concrete shear wall and the third-page hollow prefabricated superposed concrete shear wall 1 to form a T-shaped structure, and freely extending the lengthened annular anchoring steel bar 2-2 or the bent anchoring steel bar 2-1 at the end part of the second-page hollow prefabricated superposed concrete shear wall 1.
Thirty-four steps: and vertically hoisting the fourth hollow prefabricated superposed concrete shear wall 1 to a designed elevation, and horizontally moving the fourth hollow prefabricated superposed concrete shear wall 1 to a designed position in a hoisting state to ensure that the annular anchoring steel bar 2-2 or the bent anchoring steel bar 2-1 at the end part of the fourth hollow prefabricated superposed concrete shear wall 1 is buckled with the lengthened annular anchoring steel bar 2-2 or the bent anchoring steel bar 2-1 at the end part of the second hollow prefabricated superposed concrete shear wall 1 in the thirty-three step.
Step thirty-five: and (3) penetrating the corners of the bent anchoring steel bars 2-1 or the annular anchoring steel bars 2-2 which are buckled with each other in thirty-four steps into the vertical steel bars 2-5 to form the skeleton steel bars of the hidden columns.
Step thirty-six: and pouring concrete at the butt joint end of the four-page hollow prefabricated superposed concrete shear wall 1 in the thirty-five steps until the distance between the concrete and the top end of the thin shear wall 1-1 is 10-20 cm.
The other structure mounting method is the same as embodiment 4.
Embodiment 6, a method for installing an assembled shear wall laminated structure system convenient to install, where the cross connection further includes a combined connection method, as shown in fig. 17, a schematic process diagram of connecting an upper two rows of hollow prefabricated laminated concrete shear walls 1 by using bent anchoring steel bars 2-1, and a schematic process diagram of connecting a lower two rows of hollow prefabricated laminated concrete shear walls 1 by using annular anchoring steel bars are shown, where the two steps are the same, and the method includes the following steps:
step three seventeen: and horizontally hoisting the fourth hollow prefabricated superposed concrete shear wall 1 to the installation position on the basis of the eighteenth step, so that the fourth hollow prefabricated superposed concrete shear wall 1 and other three hollow prefabricated superposed concrete shear walls 1 form a cross-shaped positioning.
Step thirty-eight: and additionally arranging annular reinforcing steel bars 4 between the fourth hollow prefabricated superposed concrete shear wall 1 and the other three hollow prefabricated superposed concrete shear walls 1, so that the fourth hollow prefabricated superposed concrete shear wall 1 and the other three hollow prefabricated superposed concrete shear walls 1 form a cross connection.
Step thirty-nine: and (3) penetrating vertical steel bars 2-5 into each corner of the connecting end of the four-page hollow prefabricated superposed concrete shear wall 1 in the thirty-eighth step to form a skeleton steel bar of the hidden column.
Step forty: and pouring concrete at the butt joint end of the four-page hollow prefabricated superposed concrete shear wall 1 in the thirty-nine step until the distance between the concrete and the top end of the thin shear wall 1-1 is 10-20 cm.
The other structure mounting method is the same as embodiment 3.
The invention is not exhaustive and is common general knowledge in the art.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (9)

1. The utility model provides an assembled shear force wall superimposed structure system convenient to installation, includes that vertical component connects and horizontal component connects its characterized in that: the vertical component and the horizontal component both comprise a hollow prefabricated laminated concrete shear wall (1) and a prefabricated floor slab (3), the hollow prefabricated laminated concrete shear wall (1) comprises two sheets of thin shear walls (1-1) which are symmetrically arranged, the two sheets of thin shear walls (1-1) are connected through truss steel bars (2-3), a plurality of annular anchoring steel bars (2-2) or a plurality of bent anchoring steel bars (2-1) are arranged on vertical butt joint faces on two sides of the hollow prefabricated laminated concrete shear wall (1), a plurality of annular anchoring steel bars (2-2) are arranged on the lower end face of the hollow prefabricated laminated concrete shear wall (1) in parallel, horizontal steel bars (2-4) are temporarily fixed in the annular anchoring steel bars (2-2) on the lower side of the hollow prefabricated laminated concrete shear wall (1), and a plurality of bent anchoring steel bars (2) are arranged on the upper end faces of the two sheets of thin shear walls (1-1) 1) Bending hooks of the bending anchoring steel bars (2-1) face the inner sides of the two pages of thin shear walls (1-1), and the bending anchoring steel bars (2-1) are arranged on the periphery of the prefabricated floor slab (3);
the vertical component connection is vertical butt joint of the hollow prefabricated superposed concrete shear wall (1), and horizontal steel bars (2-4) are inserted between annular anchor steel bars (2-2) at the lower side of the upper layer of the hollow prefabricated superposed concrete shear wall (1) and bent anchor steel bars (2-1) at the upper side of the lower layer of the hollow prefabricated superposed concrete shear wall (1) to form framework steel bars of the hidden beam;
the horizontal component connection is the connection between the hollow prefabricated composite concrete shear walls (1) on the same layer, annular anchoring steel bars (2-2) or bent anchoring steel bars (2-1) on two sides of the hollow prefabricated composite concrete shear wall (1) on the same layer are buckled with each other and penetrate through vertical steel bars (2-5) to be connected to form skeleton steel bars of a hidden column, and the bent anchoring steel bars (2-1) of the prefabricated floor slab (3) are buckled with the bent anchoring steel bars (2-1) of the hollow prefabricated composite concrete shear wall (1) in a crossed manner;
the reinforcing steel bars in the thin shear wall (1-1) are through-length reinforcing steel bars (2), and the through-length reinforcing steel bars (2) comprise bent anchoring reinforcing steel bars (2-1) extending out of the top of the hollow prefabricated laminated concrete shear wall (1) and annular anchoring reinforcing steel bars (2-2) extending out of the bottom of the hollow prefabricated laminated concrete shear wall.
2. An assembled shear wall superposition architecture for facilitating installation according to claim 1, wherein: truss ribs are arranged in the precast floor slab (3), and are equal-height truss ribs (3-1) or spaced equal-height truss ribs (3-2).
3. An assembled shear wall superposition architecture for facilitating installation according to claim 1 or 2, wherein: the bending angle of the end part of the bent anchoring steel bar (2-1) is 135 degrees.
4. A method of installing an easily installable, fabricated shear wall cladding structure system according to claim 1, wherein: the method comprises the following steps of installing and connecting a vertical component and a horizontal component, wherein the vertical component comprises the following steps:
the method comprises the following steps: installing and fixing the lower hollow prefabricated superposed concrete shear wall (1), and pouring concrete between the two thin shear walls (1-1) until the concrete is 10-20cm away from the top end of the thin shear wall;
step two: vertically hoisting the precast floor slab (3) to enable the bent anchoring steel bars (2-1) at the upper part of the lower layer of the hollow precast laminated concrete shear wall (1) in the step one and the bent anchoring steel bars (2-1) at the end part of the precast floor slab (3) to be mutually crossed and buckled;
step three: installing an upper-layer hollow prefabricated superposed concrete shear wall (1), penetrating four horizontal steel bars (2-4) into annular anchoring steel bars (2-2) at the lower side of the upper-layer hollow prefabricated superposed concrete shear wall (1) before installation, and temporarily fixing the horizontal steel bars (2-4), wherein when the upper-layer hollow prefabricated superposed concrete shear wall (1) is installed, the upper-layer hollow prefabricated superposed concrete shear wall is vertically arranged towards the lower-layer hollow prefabricated superposed concrete shear wall (1) in the step one from top to bottom, so that the horizontal steel bars (2-4) smoothly pass through a neutral position in the middle of bent anchoring steel bars (2-1) at the top of the lower-layer thin shear wall (1-1);
step four: removing the temporary fixation of the horizontal steel bars (2-4) in the third step, and binding the horizontal steel bars (2-4) to the inner four corners of the annular anchoring steel bars (2-2) to finish the installation;
step five: pouring concrete into the middle of the upper hollow prefabricated laminated concrete shear wall (1) in the third step until the distance between the concrete and the top end of the thin shear wall (1-1) is 10-20 cm;
the horizontal component installation connection comprises a straight line connection, an L-shaped connection, a T-shaped connection and a cross-shaped connection.
5. The method of installing an assembled shear wall composite structure system that facilitates installation according to claim 4, wherein: the in-line connection comprises an in-line direct buckling method and an in-line external lapping rib buckling method, and the in-line external lapping rib buckling method comprises the following steps:
step six: hoisting the two hollow prefabricated superposed concrete shear walls (1) in place to enable the two hollow prefabricated superposed concrete shear walls (1) to be opposite left and right and to be positioned on a straight line;
step seven: placing annular reinforcing steel bars (4) at the butt joint ends of the two pages of hollow prefabricated laminated concrete shear walls (1) in the sixth step, enabling the two ends of the annular reinforcing steel bars (4) to be respectively buckled on the annular anchoring reinforcing steel bars (2-2) at the two sides, buckling the annular reinforcing steel bars (4) and the two annular anchoring reinforcing steel bars (2-2) to form three reinforcing steel bar rings, wherein the three reinforcing steel bar rings comprise two first reinforcing steel bar rings close to the hollow prefabricated laminated concrete shear walls, and the reinforcing steel bar ring in the middle of the two first reinforcing steel bar rings is a second reinforcing steel bar ring;
step eight: vertical steel bars are vertically inserted into the four inner corners of the two first steel bar rings in the step seven;
step nine: pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls (1) in the step six until the distance between the concrete and the top end of the thin shear wall is 10-20 cm;
the straight line type direct buckling method comprises the following steps:
step ten: hoisting one hollow prefabricated superposed concrete shear wall (1) in place, vertically hoisting the other hollow prefabricated superposed concrete shear wall (1) to a designed elevation, horizontally moving the next hollow prefabricated superposed concrete shear wall (1) to a designed position in a hoisting state, and ensuring that bent anchoring steel bars (2-1) or annular anchoring steel bars (2-2) at the end parts of the two hollow prefabricated superposed concrete shear walls (1) are buckled with each other;
step eleven: penetrating vertical reinforcing steel bars (2-5) into four corners of the bent anchoring reinforcing steel bars (2-1) or the annular anchoring reinforcing steel bars (2-2) which are buckled with each other in the step ten to form skeleton reinforcing steel bars of the hidden columns;
step twelve: pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls (1) in the step eleven until the distance between the concrete and the top end of the thin shear wall (1-1) is 10-20 cm.
6. The method of installing an assembled shear wall composite structure system that facilitates installation according to claim 4, wherein: the T-shaped connection comprises a T-shaped external lapping rib buckling method and a T-shaped direct buckling method, and the T-shaped external lapping rib buckling method comprises the following steps:
step thirteen: hoisting the three-leaf hollow prefabricated superposed concrete shear wall (1) in place to enable the three-leaf hollow prefabricated superposed concrete shear wall (1) to form a T-shaped arrangement;
fourteen steps: placing two annular reinforcing steel bars (4) at the butt joint end of the three-page hollow prefabricated superposed concrete shear wall (1) in the step thirteen, wherein the two annular reinforcing steel bars (4) form a T-shaped combined bar, and the three ends of the T-shaped combined bar are respectively buckled on the annular anchoring reinforcing steel bars (2-2) of the three-page hollow prefabricated superposed concrete shear wall;
step fifteen: inserting vertical steel bars (2-5) into corners of the T-shaped combined steel bars and the annular anchoring steel bars (2-2) in the fourteenth step;
sixthly, the steps are as follows: pouring concrete at the butt joint end of the three-leaf hollow prefabricated superposed concrete shear wall (1) in the step thirteen until the distance between the concrete and the top end of the thin shear wall is 10-20 cm;
the T-shaped direct buckling method comprises the following steps:
seventeen steps: hoisting a first page of hollow prefabricated superposed concrete shear wall (1) in place, vertically hoisting a second page of hollow prefabricated superposed concrete shear wall (1) to a design elevation, horizontally moving the second page of hollow prefabricated superposed concrete shear wall (1) to a design position in a hoisting state, and ensuring that bent anchoring steel bars (2-1) or annular anchoring steel bars (2-2) at the end parts of the first page of hollow prefabricated superposed concrete shear wall and the second page of hollow prefabricated superposed concrete shear wall (1) are buckled with each other;
eighteen steps: vertically hoisting the third hollow prefabricated superposed concrete shear wall (1) to a designed elevation, and horizontally hoisting the third hollow prefabricated superposed concrete shear wall (1) to a designed position under the hoisting state to ensure that the third hollow prefabricated superposed concrete shear wall (1) is mutually buckled with the annular anchoring steel bars (2-2) or the bent anchoring steel bars (2-1) at the end parts of the two hollow prefabricated superposed concrete shear walls (1) in the seventeen steps;
nineteen steps: penetrating vertical steel bars (2-5) into corners of the bent anchoring steel bars (2-1) or the annular anchoring steel bars (2-2) which are buckled with each other in the eighteenth step to form skeleton steel bars of the hidden columns;
twenty steps: pouring concrete at the butt joint end of the three-leaf hollow prefabricated superposed concrete shear wall (1) in the nineteen steps until the distance between the concrete and the top end of the thin shear wall (1-1) is 10-20 cm.
7. The method of installing an assembled shear wall composite structure system that facilitates installation according to claim 4, wherein: the L-shaped connection comprises an L-shaped direct buckling method and an L-shaped external lapping annular reinforcing steel bar buckling method, and the L-shaped connection method of the annular reinforcing steel bars comprises the following steps:
twenty one: hoisting the two hollow prefabricated superposed concrete shear walls (1) in place to enable the two hollow prefabricated superposed concrete shear walls (1) to form an L-shaped arrangement;
step twenty-two: placing two annular reinforcing steel bars (4) at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls (1) in the twenty-first step, wherein the two annular reinforcing steel bars (4) form L-shaped combined reinforcing steel bars, and the two ends of the L-shaped combined reinforcing steel bars are respectively buckled on the annular anchoring reinforcing steel bars (2-2) of the two pages of hollow prefabricated superposed concrete shear walls (1);
twenty-three steps: inserting vertical steel bars (2-5) into corners of the L-shaped combined steel bars and the annular anchoring steel bars (2-2) in the twenty-two step;
twenty-four steps: pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls (1) in the step thirteen until the distance between the concrete and the top end of the thin shear wall is 10-20 cm;
the L-shaped direct buckling method comprises the following steps:
twenty-five steps: installing a first page of hollow prefabricated superposed concrete shear wall (1) in place, vertically hoisting a second page of hollow prefabricated superposed concrete shear wall (1) to a designed elevation, horizontally moving the second page of hollow prefabricated superposed concrete shear wall (1) to a designed position in a hoisting state, and ensuring that bent anchoring steel bars (2-1) or annular anchoring steel bars (2-2) at the end parts of the first page of hollow prefabricated superposed concrete shear wall and the second page of hollow prefabricated superposed concrete shear wall (1) are mutually buckled;
twenty-six steps: penetrating vertical reinforcing steel bars (2-5) into corners of the bent anchoring reinforcing steel bars (2-1) or the annular anchoring reinforcing steel bars (2-2) which are buckled with each other in the twenty-five step to form skeleton reinforcing steel bars of the hidden columns;
twenty-seven steps: and pouring concrete at the butt joint end of the two pages of hollow prefabricated superposed concrete shear walls (1) in the twenty-sixth step until the distance between the concrete and the top end of the thin shear wall (1-1) is 10-20 cm.
8. The method of installing an assembled shear wall composite structure system that facilitates installation according to claim 4, wherein: the cross-shaped connection comprises a cross-shaped external lapping rib buckling method and a cross-shaped direct buckling method, and the cross-shaped external lapping rib buckling method comprises the following steps:
twenty-eight steps: hoisting the four-leaf hollow prefabricated superposed concrete shear wall (1) in place to enable the four-leaf hollow prefabricated superposed concrete shear wall (1) to form a cross-shaped arrangement;
twenty-nine steps: annular reinforcing steel bars (4) are placed at the butt joint end of the four-page hollow prefabricated superposed concrete shear wall (1) in the twenty-eighth step, four annular reinforcing steel bars (4) are arranged, the four annular reinforcing steel bars (4) form a cross-shaped combined bar, and four ends of the cross-shaped combined bar are respectively buckled on annular anchoring reinforcing steel bars (2-2) of the four-page hollow prefabricated superposed concrete shear wall (1);
thirty steps are as follows: inserting vertical steel bars (2-5) into corners of the cross-shaped combined steel bars and the annular anchoring steel bars (2-2) in the twenty-nine step;
thirty-one steps: pouring concrete at the butt joint end of the four-page hollow prefabricated superposed concrete shear wall (1) in the thirty step until the distance between the concrete and the top end of the thin shear wall is 10-20 cm;
the cross-shaped direct buckling method comprises the following steps:
step thirty-two: the method comprises the steps that a first page of hollow prefabricated superposed concrete shear wall (1) is installed in place, a second page of hollow prefabricated superposed concrete shear wall (1) is vertically hoisted to a designed elevation, annular anchoring steel bars (2-2) or bent anchoring steel bars (2-1) at the end part of the second page of hollow prefabricated superposed concrete shear wall (1) are lengthened, the second page of hollow prefabricated superposed concrete shear wall (1) is horizontally moved to a designed position in a hoisting state, and the bent anchoring steel bars (2-1) or the annular anchoring steel bars (2-2) at the end parts of the first page of hollow prefabricated superposed concrete shear wall and the second page of hollow prefabricated superposed concrete shear wall (1) are guaranteed to be buckled with each other;
step thirty three: vertically hoisting the third hollow prefabricated superposed concrete shear wall (1) to a designed elevation, horizontally moving the third hollow prefabricated superposed concrete shear wall (1) to a designed position in a hoisting state, enabling the first hollow prefabricated superposed concrete shear wall, the second hollow prefabricated superposed concrete shear wall and the third hollow prefabricated superposed concrete shear wall (1) to form a T-shaped structure, and enabling the lengthened annular anchoring steel bar (2-2) or the bent anchoring steel bar (2-1) at the end part of the second hollow prefabricated superposed concrete shear wall (1) to freely extend out;
thirty-four steps: vertically hoisting the fourth-page hollow prefabricated superposed concrete shear wall (1) to a designed elevation, horizontally moving the fourth-page hollow prefabricated superposed concrete shear wall (1) to a designed position in a hoisting state, and ensuring that the annular anchoring steel bars (2-2) or the bent anchoring steel bars (2-1) at the end part of the fourth-page hollow prefabricated superposed concrete shear wall (1) are buckled with the lengthened annular anchoring steel bars (2-2) or the bent anchoring steel bars (2-1) at the end part of the second-page hollow prefabricated superposed concrete shear wall (1) in the thirty-three steps;
step thirty-five: penetrating vertical reinforcing steel bars (2-5) into corners of the bent anchoring reinforcing steel bars (2-1) or the annular anchoring reinforcing steel bars (2-2) which are buckled with each other in thirty-four steps to form skeleton reinforcing steel bars of the hidden columns;
step thirty-six: and pouring concrete at the butt joint end of the four-page hollow prefabricated superposed concrete shear wall (1) in the thirty-five steps until the distance between the concrete and the top end of the thin shear wall (1-1) is 10-20 cm.
9. The method of installing an assembled shear wall composite structure system that facilitates installation according to claim 6, wherein: the cross-shaped connection comprises a combined connection method, and comprises the following steps:
step three seventeen: horizontally hoisting the fourth hollow prefabricated superposed concrete shear wall (1) to the installation position on the basis of the eighteenth step, so that the fourth hollow prefabricated superposed concrete shear wall (1) and other three hollow prefabricated superposed concrete shear walls (1) form a cross-shaped positioning;
step thirty-eight: annular reinforcing steel bars (4) are additionally arranged between the fourth hollow prefabricated superposed concrete shear wall (1) and the other three hollow prefabricated superposed concrete shear walls (1), so that the fourth hollow prefabricated superposed concrete shear wall (1) and the other three hollow prefabricated superposed concrete shear walls (1) form a cross connection;
step thirty-nine: penetrating vertical steel bars (2-5) into each corner of the connecting end of the four-page hollow prefabricated superposed concrete shear wall (1) in the thirty-eighth step to form a skeleton steel bar of the hidden column; step forty: and pouring concrete at the butt joint end of the four-page hollow prefabricated superposed concrete shear wall (1) in the thirty-nine step until the distance between the concrete and the top end of the thin shear wall (1-1) is 10-20 cm.
CN201811197266.4A 2018-10-15 2018-10-15 Assembled shear wall superimposed structure system convenient to mount and mounting method Active CN109184029B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811197266.4A CN109184029B (en) 2018-10-15 2018-10-15 Assembled shear wall superimposed structure system convenient to mount and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811197266.4A CN109184029B (en) 2018-10-15 2018-10-15 Assembled shear wall superimposed structure system convenient to mount and mounting method

Publications (2)

Publication Number Publication Date
CN109184029A CN109184029A (en) 2019-01-11
CN109184029B true CN109184029B (en) 2020-06-26

Family

ID=64944567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811197266.4A Active CN109184029B (en) 2018-10-15 2018-10-15 Assembled shear wall superimposed structure system convenient to mount and mounting method

Country Status (1)

Country Link
CN (1) CN109184029B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868920B (en) * 2019-02-26 2021-04-02 武汉理工大学 Connection structure of T-shaped superimposed shear wall edge member
CN109868918B (en) * 2019-02-26 2021-04-16 武汉理工大学 Connection structure of L-shaped superimposed shear wall edge member
CN110042953B (en) * 2019-04-11 2024-05-24 北京蝴蝶行实验室家具有限公司 Buckled fireproof partition panel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437458A (en) * 2013-09-06 2013-12-11 南京工业大学 Precast concrete double-board shear wall with internal inclined braces and construction method for same
CN106245817A (en) * 2016-09-20 2016-12-21 中国建筑第七工程局有限公司 A kind of fabricated shear wall vertical connection structure and installation method thereof
CN106759952A (en) * 2017-01-18 2017-05-31 黄坤坤 A kind of assembled ring muscle is fastened and is anchored concrete shear wall structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437458A (en) * 2013-09-06 2013-12-11 南京工业大学 Precast concrete double-board shear wall with internal inclined braces and construction method for same
CN106245817A (en) * 2016-09-20 2016-12-21 中国建筑第七工程局有限公司 A kind of fabricated shear wall vertical connection structure and installation method thereof
CN106759952A (en) * 2017-01-18 2017-05-31 黄坤坤 A kind of assembled ring muscle is fastened and is anchored concrete shear wall structure

Also Published As

Publication number Publication date
CN109184029A (en) 2019-01-11

Similar Documents

Publication Publication Date Title
CN109184030B (en) Assembly type concrete shear wall superposed structure system and installation method
CN109184029B (en) Assembled shear wall superimposed structure system convenient to mount and mounting method
AU2020100658B4 (en) Building module and method for constructing a multistorey building
CN109680797B (en) Ring reinforcement buckling anchoring assembly type shear wall superposed structure system and installation method
CN103243804A (en) Pre-stressed combined frame of thin wall section steels and concrete, and construction method thereof
CN109184028B (en) Assembled shear wall vertical connection structure convenient to construct and installation method
CN103883054B (en) A kind of rope bar girt strip composite floor system and construction method thereof
CN106149868A (en) Prefabricated buildings architectural structure system and assembly method thereof
CN113638491A (en) Assembled beam-column connecting joint and construction method thereof
CN113718753B (en) Anchor underground continuous wall foundation assembled type intermediate wall and construction method
CN109162437B (en) Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof
CN109184033B (en) Assembled shear wall superimposed structure system convenient to construct and installation method
EA036348B1 (en) Arcos system reinforced concrete frame of a multi-storeyed building
CN109208785B (en) Assembled superposed structure system
CN109826232B (en) Construction method of subway station
CN112593632A (en) Fabricated beam-slab structure suitable for large-span high-clearance building and construction method thereof
CN108755938B (en) Steel core area node of assembled concrete frame
EA007023B1 (en) Reinforced concrete frame of multistorey building
CN202202415U (en) Side node of rectangular steel pipe concrete special-shaped column and steel beam framework
CN211286279U (en) Prefabricated section steel concrete column
CN213978605U (en) Assembled pier stud connection structure
CN214035078U (en) Light prefabricated enclosure wall
CN106245752A (en) Prefabricated assembled tube structure public building and its method of construction
RU96589U1 (en) BUILDING FRAME
CN108661237B (en) Prefabricated wallboard suitable for multi-layer assembled building and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant