CN108824434A - A kind of electric power pylon basis top surface brushes flat method - Google Patents

A kind of electric power pylon basis top surface brushes flat method Download PDF

Info

Publication number
CN108824434A
CN108824434A CN201810553344.3A CN201810553344A CN108824434A CN 108824434 A CN108824434 A CN 108824434A CN 201810553344 A CN201810553344 A CN 201810553344A CN 108824434 A CN108824434 A CN 108824434A
Authority
CN
China
Prior art keywords
electric power
guide rail
top surface
rail
power pylon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810553344.3A
Other languages
Chinese (zh)
Other versions
CN108824434B (en
Inventor
梁广霖
吴俊林
王敬
邓难民
彭旺
董芸菲
马义芳
钟连山
刘国庆
黄健慧
肖璨
张馨云
陈生
周昕
何汉文
邝祥增
谢晓军
陈泽伟
何天云
唐庆旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG YUNFENG POWER INSTALLATION Co.,Ltd.
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
Guangdong Yun Feng Power Ampere Dress Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yun Feng Power Ampere Dress Co Ltd filed Critical Guangdong Yun Feng Power Ampere Dress Co Ltd
Priority to CN201810553344.3A priority Critical patent/CN108824434B/en
Publication of CN108824434A publication Critical patent/CN108824434A/en
Application granted granted Critical
Publication of CN108824434B publication Critical patent/CN108824434B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Foundations (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present invention discloses a kind of electric power pylon basis top surface and brushes flat method, including electric power pylon basis, the top surface on electric power pylon basis is vertical stud, and then the top face on electric power pylon basis builds guide rail again, and all guide rails are mutually arranged in parallel, guide rail is equipped with connector sleeve, the connector sleeve is equipped with set rail set, connection plate, and set rail is put on equipped with sets of holes, connects plate and is equipped with connecting hole, plate is connected by connecting hole and Stud connection, set rail set covers on guide rail;The operating stick that can be moved along the extending direction of guide rail is equipped with above guide rail, operating stick is equipped with across hole, and the height-regulating axis vertical with operating stick is equipped in hole, and the upper end that axis is turned up extends through the upside in hole, and the lower end that axis is turned up, which is equipped with, brushes flat plate.Guide rail is set to pre- inclination angle, operating stick is allowed to move along guide rail, such structure can realize that power transmission tower basis top surface carries out brushing flat for pre- inclination angle well.The present invention is used for the construction of power transmission tower.

Description

A kind of electric power pylon basis top surface brushes flat method
Technical field
The present invention relates to field of electrical equipment, in particular to a kind of electric power pylon basis top surface brushes flat method.
Background technique
In the high-voltage power transmission tower of 110kV or more, it is divided into tangent tower and angle tower.Tangent tower only supports conducting wire, and Angle tower is to stand in corner, to bear biggish lateral force.Angle tower generally wants the opposite direction of guiding line lateral force to incline Tiltedly certain pre- inclination angle, the equalizing contactor pulling force after erection make it keep vertical.So the basic top surface of tangent tower is level Face, and the basic top surface of angle tower will be made into clinoplain, gradient is the pre- inclination rake angle of steel tower.
In the foundation construction of horizontal plane, base surface is carried out with horizontal ruler to grasp gentle detection, qualification rate is relatively higher.But To angle tower, common construction method is to determine the difference in height of basic slope face two sides, is scraped with plate, but basic top surface is vertical has Multiple foundation bolts cannot continuously strike off.Cause basic top surface uneven, flange and basic face bonding are bad, and steel tower is pre- partially Direction and angle inaccuracy, directly affect tower body force request.
Summary of the invention
The technical problem to be solved by the present invention is to:One kind is provided to be able to achieve to electric power pylon basis top surface progress special angle The method brushed flat.
The solution that the present invention solves its technical problem is:
A kind of electric power pylon basis top surface brushes flat method, includes the following steps, namely:
Step a) builds electric power pylon basis, and the stud for having several annulars to lay is found in the top surface on electric power pylon basis, and The concrete of electric power pylon basis top surface is allowed to be in non-condensing state;
Two guide rails are arranged in top face of the step b) on electric power pylon basis, and all guide rails are mutually arranged in parallel, It is set on guide rail there are two connector sleeve, the connection plate that the connector sleeve is equipped with set rail set, connect with the outer wall of set rail set covers rail It puts on and is equipped with sets of holes, connection plate is equipped with connecting hole, and connection plate is connected with connection plate by connecting hole and Stud connection Stud be known as fixed column, set in fixed column there are two fixture nut, the connection plate is sandwiched in described two fixture nuts Between, set rail set covers on guide rail;
Step c) placement operation bar on described two guide rails, the upper and lower surfaces of the operating stick be plane and It is parallel to each other;Horizontal ruler is placed in the upper surface of operating stick to cover by adjusting set rail in stud then according to the data of horizontal ruler On position, to realize the height distance adjusted separately between the angle of guide rail itself and ground, two guide rails, up to by two The angle of the plane and horizontal plane that determine where a guide rail is pre- inclination rake angle;
Step d) operating stick is equipped with across hole, and the height-regulating axis vertical with operating stick is equipped in hole, the upper of axis is turned up End extends through the upside in hole, and the lower end that axis is turned up, which is equipped with, brushes flat plate, brushes flat plate and is mutually perpendicular to axis is turned up, and axis is turned up and is equipped with Two binding nuts, operating stick are located between described two binding nuts, are adjusted binding nut in the position that axis is turned up, are allowed and brush flat The height of plate is in suitable position;
Step e) allows operating stick to move back and forth along the extending direction of operating stick, guide rail, so that ferroelectric tower foundation top surface is mixed Solidifying soil is brushed flat in pre- inclination rake angle.
As a further improvement of the foregoing solution, step c1 is additionally provided between step c) and step d)), described two At least one guide rail is added between guide rail again, so that the guide rail added is located at plane determined by two guide rails in step c) On.
As a further improvement of the foregoing solution, the quantity of several studs is even number.
As a further improvement of the foregoing solution, guide rail is cylindrical.
As a further improvement of the foregoing solution, the jacket wall of set rail set is equipped with threaded hole, and threaded hole, which is equipped with, compresses spiral shell Bolt, the end of hold-down bolt are protruded into sets of holes and are abutted with the outer wall of guide rail, are equipped with adjustment gap between guide rail and set rail set.
The beneficial effects of the invention are as follows:A kind of electric power pylon basis top surface brushes flat method, includes the following steps, namely:Step a) Electric power pylon basis, the vertical stud for there are several annulars to lay in the top surface on electric power pylon basis are built, and makes electric power pylon basic The concrete of top surface is in non-condensing state;Two guide rails are arranged in top face of the step b) on electric power pylon basis, all Guide rail is mutually arranged in parallel, and is set on guide rail there are two connector sleeve, and the connector sleeve is equipped with set rail set, the outer wall with set rail set The connection plate of connection, set rail are put on equipped with sets of holes, are connected plate and are equipped with connecting hole, connection plate passes through connecting hole and stud Connection, the stud for being connected with connection plate are known as fixed column, are set in fixed column there are two fixture nut, the connection plate is pressed from both sides Between described two fixture nuts, set rail set covers on guide rail;Step c) placement operation bar on described two guide rails, it is described The upper and lower surfaces of operating stick are plane and are parallel to each other;Horizontal ruler is placed in the upper surface of operating stick, then basis The data of horizontal ruler cover the position on stud by adjusting set rail, to realize the folder for adjusting separately guide rail itself Yu ground Height distance between angle, two guide rails, until being pre- inclination by the angle of the plane and horizontal plane that are determined where two guide rails Rake angle;Step d) operating stick is equipped with across hole, and the height-regulating axis vertical with operating stick is equipped in hole, the upper end of axis is turned up The upside for extending through hole, the lower end that axis is turned up, which is equipped with, brushes flat plate, brushes flat plate and is mutually perpendicular to axis is turned up, and axis is turned up and is equipped with two A binding nut, operating stick are located between described two binding nuts, are adjusted binding nut in the position that axis is turned up, are allowed and brush flat plate Height be in suitable position;Step e) allows operating stick to move back and forth along the extending direction of operating stick, guide rail, so that ferroelectric tower The concrete of basic top surface is brushed flat in pre- inclination rake angle.Such construction method can ensure that electric power pylon basis top surface can quilt It accurately brushes flat in pre- inclination angle.The present invention is used for the construction of power transmission tower.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described.Obviously, described attached drawing is a part of the embodiments of the present invention, rather than is all implemented Example, those skilled in the art without creative efforts, can also be obtained according to these attached drawings other designs Scheme and attached drawing.
Fig. 1 is the schematic perspective view of the embodiment of the present invention;
Fig. 2 is the schematic perspective view of the set rail set of the embodiment of the present invention.
Specific embodiment
It is carried out below with reference to technical effect of the embodiment and attached drawing to design of the invention, specific structure and generation clear Chu is fully described by, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described embodiment is this hair Bright a part of the embodiment, rather than whole embodiments, based on the embodiment of the present invention, those skilled in the art are not being paid Other embodiments obtained, belong to the scope of protection of the invention under the premise of creative work.In addition, be previously mentioned in text All connection/connection relationships not singly refer to that component directly connects, and referring to can be added deduct according to specific implementation situation by adding Few couple auxiliary, to form more preferably coupling structure.Each technical characteristic in the present invention, in the premise of not conflicting conflict Under can be with combination of interactions.
Referring to Figures 1 and 2, this is the embodiment of the present invention, specifically:
A kind of electric power pylon basis top surface brushes flat method, includes the following steps, namely:
Step a) builds electric power pylon basis, and the stud 1 for having several annulars to lay is found in the top surface on electric power pylon basis, and The concrete of electric power pylon basis top surface is allowed to be in non-condensing state;
Two guide rails 2 are arranged in top face of the step b) on electric power pylon basis, and all guide rails 2 are mutually set in parallel It sets, is set on guide rail 2 there are two connector sleeve 3, the company that the connector sleeve 3 is equipped with set rail set 31, connect with the outer wall of set rail set 31 Connect plate 32, set rail set 31 is equipped with sets of holes, and connection plate 32 is equipped with connecting hole 33, connection plate 32 by connecting hole 33 with Stud 1 connects, and the stud for being connected with connection plate 32 is known as fixed column, and the connection there are two fixture nut 4 is set in fixed column Plate 32 is sandwiched between described two fixture nuts 4, and set rail covers 31 sets on guide rail 2;
Step c) placement operation bar 5 on described two guide rails 2, the upper and lower surfaces of the operating stick 5 are flat It face and is parallel to each other;Horizontal ruler, which is placed, in the upper surface of operating stick 5 passes through adjusting set rail set then according to the data of horizontal ruler 31 position on stud 1, thus realize adjust separately height between the angle of guide rail 2 itself and ground, two guide rails 2 away from From until being pre- inclination rake angle by the angle of the plane and horizontal plane that are determined where two guide rails 2;
Step d) operating stick 5 is equipped with across hole, and the height-regulating axis 6 vertical with operating stick 5 is equipped in hole, and axis 6 is turned up Upper end extend through the upside in hole, the lower end that axis 6 is turned up, which is equipped with, brushes flat plate 7, brush flat plate 7 and axis 6 be turned up and be mutually perpendicular to, height-regulating It is set on axis 6 there are two binding nut 61, operating stick 5 is located between described two binding nuts 61, is adjusted binding nut 61 and is being adjusted The position of high axis 6 allows the height for brushing flat plate 7 to be in suitable position;
Step e) allows operating stick 5 to move back and forth along the extending direction of operating stick 5, guide rail 2, so that ferroelectric tower foundation top surface Concrete is brushed flat in pre- inclination rake angle.Such construction method can ensure that electric power pylon basis top surface can accurately be brushed flat In pre- inclination angle, the error of manual operation generation is avoided, easy to operate, the construction time is short.
Step c1 is additionally provided between step c) and step d)), at least one is added again between described two guide rails 2 leads Rail 2, so that the guide rail 2 added is located in plane determined by two guide rails 2 in step c).Operating stick mistake is avoided in this way Long problem makes operating stick easy to carry.
The quantity of the stud 1 of the present embodiment is even number.
The guide rail 2 of the present embodiment is cylindrical, and such guide rail and slide surface are line face contact, can ensure operating stick well Movement it is smooth.
The jacket wall of the set rail set 31 of the present embodiment is equipped with threaded hole 34, and threaded hole 34 is equipped with hold-down bolt 35, compresses The end of bolt 35 is protruded into sets of holes and is abutted with the outer wall of guide rail 2, is equipped with adjustment gap between guide rail 2 and set rail set 31, in this way It can easily allow guide rail ground in pre- inclination angle, and guide rail can be compressed tightly against in sets of holes by hold-down bolt 35, from And adapt to the demand of various pre- inclination angles.
Better embodiment of the invention is illustrated above, but the present invention is not limited to the embodiment, Those skilled in the art can also make various equivalent modifications or replacement on the premise of without prejudice to spirit of the invention, this Equivalent variation or replacement are all included in the scope defined by the claims of the present application a bit.

Claims (5)

1. a kind of electric power pylon basis top surface brushes flat method, it is characterised in that:It includes the following steps, namely:
Step a) builds electric power pylon basis, the vertical stud (1) for having several annulars to lay in the top surface on electric power pylon basis, and allows The concrete of electric power pylon basis top surface is in non-condensing state;
Two guide rails (2) are arranged in top face of the step b) on electric power pylon basis, and all guide rails (2) are mutually set in parallel It sets, is set on guide rail (2) there are two connector sleeve (3), the connector sleeve (3) is equipped with set rail set (31) and covers the outer of rail set (31) The connection plate (32) of wall connection, set rail set (31) are equipped with sets of holes, and connection plate (32) is equipped with connecting hole (33), and connection is flat Plate (32) is connect by connecting hole (33) with stud (1), and the stud (1) for being connected with connection plate (32) is known as fixed column, fixed It is set on column there are two fixture nut (4), the connection plate (32) is sandwiched between described two fixture nuts (4), covers rail set (31) it covers on guide rail (2);
The upper and lower surfaces of step c) placement operation bar (5) on described two guide rails (2), the operating stick (5) are It plane and is parallel to each other;Horizontal ruler, which is placed, in the upper surface of operating stick (5) passes through adjusting set then according to the data of horizontal ruler Position of the rail set (31) on stud (1), to realize the angle for adjusting separately guide rail (2) itself and ground, two guide rails (2) Between height distance, until being pre- inclination rake angle by the angle of the plane and horizontal plane that are determined where two guide rails (2);
Step d) operating stick (5) is equipped with across hole, is passed through and is equipped with the height-regulating axis (6) vertical with operating stick (5) in hole, and axis is turned up (6) upper end extends through the upside in hole, and the lower end that axis (6) are turned up, which is equipped with, brushes flat plate (7), brushes flat plate (7) and axis (6) phase is turned up It is mutually vertical, it is turned up on axis (6) and sets there are two binding nut (61), operating stick (5) is located between described two binding nuts (61), Binding nut (61) are adjusted in the position that axis (6) are turned up, the height for brushing flat plate (7) is allowed to be in suitable position;
Step e) allows operating stick (5) to move back and forth along the extending direction of operating stick (5), guide rail (2), so that ferroelectric tower foundation top surface Concrete brush flat in pre- inclination rake angle.
2. a kind of electric power pylon basis top surface according to claim 1 brushes flat method, it is characterised in that:In step c) and step It is rapid d) between be additionally provided with step c1), at least one guide rail (2) is added again between described two guide rails (2), so that adds leads Rail (2) is located in plane determined by two guide rails (2) in step c).
3. a kind of electric power pylon basis top surface according to claim 1 brushes flat method, it is characterised in that:Several described spiral shells The quantity of column (1) is even number.
4. a kind of electric power pylon basis top surface according to claim 1 brushes flat method, it is characterised in that:Guide rail (2) is in circle Column.
5. a kind of electric power pylon basis top surface according to claim 4 brushes flat method, it is characterised in that:Cover rail set (31) Jacket wall is equipped with threaded hole (34), and threaded hole (34) is equipped with hold-down bolt (35), and sets of holes are protruded into the end of hold-down bolt (35) The interior outer wall with guide rail (2) abuts, and adjustment gap is equipped between guide rail (2) and set rail set (31).
CN201810553344.3A 2018-05-31 2018-05-31 Method for brushing and leveling top surface of foundation of power transmission tower Active CN108824434B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810553344.3A CN108824434B (en) 2018-05-31 2018-05-31 Method for brushing and leveling top surface of foundation of power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810553344.3A CN108824434B (en) 2018-05-31 2018-05-31 Method for brushing and leveling top surface of foundation of power transmission tower

Publications (2)

Publication Number Publication Date
CN108824434A true CN108824434A (en) 2018-11-16
CN108824434B CN108824434B (en) 2020-08-18

Family

ID=64146708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810553344.3A Active CN108824434B (en) 2018-05-31 2018-05-31 Method for brushing and leveling top surface of foundation of power transmission tower

Country Status (1)

Country Link
CN (1) CN108824434B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3681484A (en) * 1970-08-26 1972-08-01 Eugene T Mckie Method for surfacing poured material
US3960356A (en) * 1974-10-24 1976-06-01 Adams John H Anchor bolt holder
CN101775905A (en) * 2009-12-18 2010-07-14 广东浩和建筑有限公司 Adjustable leveling guide rail and leveling method thereof
CN102094532A (en) * 2010-12-14 2011-06-15 中国建筑一局(集团)有限公司 Measurement control method for building construction horizontal component size
CN103410328A (en) * 2013-08-29 2013-11-27 中天建设集团有限公司天津分公司 Method for constructing large-area concrete surface
CN106120835A (en) * 2016-08-23 2016-11-16 青岛城建集团有限公司 A kind of circular concrete structures toe board panel guide rail and levelling construction thereof
CN106351450A (en) * 2016-11-23 2017-01-25 苏涛 Suspension type pouring-leveling device in building operations and pouring method
CN206279550U (en) * 2016-11-25 2017-06-27 安徽送变电工程公司 A kind of chamfer tool for being applied to project of transmitting and converting electricity basic stand column
CN107476639A (en) * 2017-09-22 2017-12-15 中国南方电网有限责任公司超高压输电公司柳州局 A kind of preparation method of transmission tower main material root long-life anticorrosion structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3681484A (en) * 1970-08-26 1972-08-01 Eugene T Mckie Method for surfacing poured material
US3960356A (en) * 1974-10-24 1976-06-01 Adams John H Anchor bolt holder
CN101775905A (en) * 2009-12-18 2010-07-14 广东浩和建筑有限公司 Adjustable leveling guide rail and leveling method thereof
CN102094532A (en) * 2010-12-14 2011-06-15 中国建筑一局(集团)有限公司 Measurement control method for building construction horizontal component size
CN103410328A (en) * 2013-08-29 2013-11-27 中天建设集团有限公司天津分公司 Method for constructing large-area concrete surface
CN106120835A (en) * 2016-08-23 2016-11-16 青岛城建集团有限公司 A kind of circular concrete structures toe board panel guide rail and levelling construction thereof
CN106351450A (en) * 2016-11-23 2017-01-25 苏涛 Suspension type pouring-leveling device in building operations and pouring method
CN206279550U (en) * 2016-11-25 2017-06-27 安徽送变电工程公司 A kind of chamfer tool for being applied to project of transmitting and converting electricity basic stand column
CN107476639A (en) * 2017-09-22 2017-12-15 中国南方电网有限责任公司超高压输电公司柳州局 A kind of preparation method of transmission tower main material root long-life anticorrosion structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邢俊杰: "探讨高压输电线路基础施工的质量及尺寸控制", 《企 业 技 术 开 发》 *

Also Published As

Publication number Publication date
CN108824434B (en) 2020-08-18

Similar Documents

Publication Publication Date Title
CN108824434A (en) A kind of electric power pylon basis top surface brushes flat method
CN201750018U (en) Spiral electromechanical quick connector
CN201315354Y (en) Grounding wire clamp at gap bridge bus conducting wire end
CN209072024U (en) A kind of power engineering cable anchor ear
CN104007375A (en) Facility for alternating current voltage withstand tests for 200kV and 330kV insulation tools and instruments
CN212926133U (en) Wind tower power transmission electric wire is with supporting equipment that buries line
CN208441483U (en) A kind of electric power pylon basis top surface brushes flat frame building structure
CN204347066U (en) The general switching device of a kind of cable pass plug
CN105261846B (en) A kind of shaft tower grounding-for-lightning device
EP2647312A1 (en) Housing for assembly in a recess of a furniture panel
CN205016693U (en) Pole -tower lightning protection grounding device
CN209487204U (en) A kind of novel fixed cable
CN214176353U (en) Wire arranging device of connector
CN205777822U (en) Portable combined cable quadrant
CN106128664B (en) A kind of mucilage binding device
CN206070477U (en) A kind of solar energy electric boat landing with charging pile
CN210803535U (en) Cable section does not have quick connecting device that hinders
CN213378630U (en) Busbar bending equipment
CN211619645U (en) Secondary cable collecting and accommodating device
CN215981734U (en) Image acquisition device applied to land resource management
CN204012077U (en) Multifunctional power connector
CN218677596U (en) Electric grounding protection device
CN203977960U (en) A kind of assembly type lightning protection electric pole
CN220710565U (en) Battery module pencil division board
CN218214790U (en) Multi-head cable assembly head positioning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201117

Address after: 528200, Foshan City, Guangdong Province Nanhai District, Guicheng street, Hua Hua Dong Road No. 33, Foshan electric power technology industry center 2, 19, 20 layer

Patentee after: GUANGDONG YUNFENG POWER INSTALLATION Co.,Ltd.

Patentee after: FOSHAN POWER SUPPLY BUREAU, GUANGDONG POWER GRID Corp.

Address before: 528200, Foshan City, Guangdong Province Nanhai District, Guicheng street, Hua Hua Dong Road No. 33, Foshan electric power technology industry center 2, 19, 20 layer

Patentee before: GUANGDONG YUNFENG POWER INSTALLATION Co.,Ltd.

TR01 Transfer of patent right