CN201315354Y - Grounding wire clamp at gap bridge bus conducting wire end - Google Patents

Grounding wire clamp at gap bridge bus conducting wire end Download PDF

Info

Publication number
CN201315354Y
CN201315354Y CNU2008201497115U CN200820149711U CN201315354Y CN 201315354 Y CN201315354 Y CN 201315354Y CN U2008201497115 U CNU2008201497115 U CN U2008201497115U CN 200820149711 U CN200820149711 U CN 200820149711U CN 201315354 Y CN201315354 Y CN 201315354Y
Authority
CN
China
Prior art keywords
clamp
hook head
base
bridge
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201497115U
Other languages
Chinese (zh)
Inventor
张志宏
李航
白金峰
贾伟
汤乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU XIANGYU SCIENCE AND TECHNOLOGY DEVELOPMENT Co Ltd
Zhengzhou Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
ZHENGZHOU XIANGYU SCIENCE AND TECHNOLOGY DEVELOPMENT Co Ltd
Zhengzhou Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU XIANGYU SCIENCE AND TECHNOLOGY DEVELOPMENT Co Ltd, Zhengzhou Power Supply Co of Henan Electric Power Co filed Critical ZHENGZHOU XIANGYU SCIENCE AND TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CNU2008201497115U priority Critical patent/CN201315354Y/en
Application granted granted Critical
Publication of CN201315354Y publication Critical patent/CN201315354Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型公开一种过桥母线导线端接地线夹,主要由机械上丝螺旋卡头、L型线夹底座、勾头和上顶工具牙构成,机械上丝螺旋卡头由金属棒螺旋穿接在L型线夹底座下方,金属棒的顶端设有上顶工具牙,L型线夹底座上端连接有勾头,上顶工具牙在L型线夹底座与勾头构成的空间内上下移动、缩紧或松开。本实用新型可方便的连接到绝缘棒上,紧固力是通过旋转把手垂直上传的,所需力量较小,上顶工具牙上下可调使得应用范围广;组合式结构,拆装方便且便于携带;不使用任何攀高工具即快速的完成了过桥母线地线的安装工作,缩短了时间,降低了人身伤亡事故,提高了供电可靠性。

Figure 200820149711

The utility model discloses a grounding wire clamp at the wire end of a bridge busbar, which is mainly composed of a mechanical screw-on screw chuck, an L-shaped wire clamp base, a hook head and upper tool teeth, and the mechanical screw-on screw clamp is screwed through by a metal rod. Connected to the bottom of the L-shaped wire clamp base, the top of the metal rod is provided with an upper tool tooth, and the upper end of the L-shaped wire clamp base is connected with a hook head, and the upper top tool tooth moves up and down in the space formed by the L-shaped wire clamp base and the hook head , tighten or loosen. The utility model can be conveniently connected to the insulating rod, the fastening force is uploaded vertically through the rotating handle, and the required force is small, and the upper and lower tool teeth can be adjusted up and down, so that the application range is wide; the combined structure is convenient for disassembly and assembly. Portable; without using any climbing tools, the installation of the bridge bus ground wire is quickly completed, which shortens the time, reduces personal casualties, and improves the reliability of power supply.

Figure 200820149711

Description

过桥母线导线端接地线夹 Grounding clamp for bridge busbar conductor end

技术领域: Technical field:

本实用新型涉及电力系统安全生产装置,特别涉及用于40MVA及以上容量主变压器低压侧(6kV-35kV)过桥母线处安全连接装置。The utility model relates to a safety production device for an electric power system, in particular to a safety connection device for a bridge bus on the low-voltage side (6kV-35kV) of a main transformer with a capacity of 40MVA and above.

背景技术: Background technique:

随着国内经济飞速发展,电力终端用户的负荷激增,输配变电站的单台变压器安装容量大幅提高。以110kV变电站为例,目前我国单台主变容量已由过去的31.5MVA提高到50MVA或60MVA的容量。由于单台主变容量的增加,低压侧过桥母线(6kV、10kV、35kV)均采用了双铜排接线,母线上下铜排厚度达到了35mm。同时,主变低压距基准面高度达到了3500mm。当主变压器检修时,在低压过桥母线处安装地线在装设时,常常需要借助凳子、梯子等攀高工具,攀高往往超过距基准面1.5米,且无处捆绑安全带,直接违反了《国家电网公司电力安全工作规程》第13.6条的规定。在现有导线端接地夹的类型中:1、由于线夹上下张口多在35Vmm-40mm之间,因此不能满足母线排安装厚度的要求;2、线夹安装方式必须登高作业才能完成,增加了安全隐患;3、线夹不能根据母线排的尺寸随意调节,限制了使用范围。With the rapid development of the domestic economy, the load of power end users has increased sharply, and the installed capacity of a single transformer in transmission and distribution substations has increased significantly. Taking 110kV substation as an example, the capacity of a single main transformer in my country has been increased from 31.5MVA in the past to 50MVA or 60MVA. Due to the increase in the capacity of a single main transformer, the bridge busbars (6kV, 10kV, 35kV) on the low-voltage side are all connected with double copper bars, and the thickness of the upper and lower copper bars on the busbars has reached 35mm. At the same time, the height of the reference plane of the main transformer low pressure distance has reached 3500mm. When the main transformer is overhauled, it is often necessary to use stools, ladders and other climbing tools when installing the ground wire at the low-voltage bridge bus. According to Article 13.6 of the Electric Power Safety Work Regulations of Power Grid Corporation. Among the types of grounding clamps at the existing wire ends: 1. Since the upper and lower openings of the clamps are mostly between 35Vmm-40mm, it cannot meet the requirements for the installation thickness of the bus bar; Potential safety hazard; 3. The wire clip cannot be adjusted arbitrarily according to the size of the bus bar, which limits the scope of use.

实用新型内容: Utility model content:

本实用新型所要解决的技术问题就是针对以上不足而提供一种过桥母线导线端接地线夹,该接地线夹夹口根据母线宽度适当调节,施工时毋须登高,组合式结构,安装使用方便,降低了人生伤亡事,提高了电力企业的供电可靠性。The technical problem to be solved by the utility model is to provide a grounding wire clip for the wire end of the bridge busbar in view of the above deficiencies. It reduces casualties and improves the power supply reliability of power companies.

本实用新型所采取的技术方案是:The technical scheme that the utility model takes is:

一种过桥母线导线端接地线夹,主要由机械上丝螺旋卡头、L型线夹底座、勾头和上顶工具牙构成,机械上丝螺旋卡头由金属棒穿接在L型线夹底座下方,金属棒的顶端设有上顶工具牙,L型线夹底座上端连接有勾头,上顶工具牙在L型线夹底座与勾头构成的空间内上下移动、缩紧或松开。A grounding clamp at the conductor end of a bridge busbar, mainly composed of a mechanical threaded screw clamp, an L-shaped clamp base, a hook head and an upper tool tooth, and the mechanical threaded screw clamp is connected to the L-shaped wire by a metal rod Below the clamp base, the top of the metal rod is provided with upper tool teeth, and the upper end of the L-shaped wire clamp base is connected with a hook head, and the upper top tool teeth move up and down, tighten or loosen in the space formed by the L-shaped wire clamp base and the hook head. open.

金属棒螺纹穿接在L型线夹底座上,以利于上顶工具牙上下移动,以缩紧或松开母线排夹。The metal rod is threaded through the base of the L-shaped clamp to facilitate the upper and lower tool teeth to move up and down to tighten or loosen the busbar clamp.

L型线夹底座上端具有螺纹柱,螺纹柱依次穿接勾头、夹块,螺纹柱顶端与夹块紧固螺母旋接,以利于拆装携带。The upper end of the L-shaped wire clamp base has a threaded column, which passes through the hook head and the clamping block in turn, and the top of the threaded column is screwed with the fastening nut of the clamping block, so as to facilitate disassembly and carrying.

勾头上具有调节孔,以调节勾头伸缩长短。There is an adjustment hole on the hook head to adjust the telescopic length of the hook head.

勾头上的头端具有弯折部,以利于卡紧母线排夹。The head end on the hook head has a bent part to facilitate clamping of the bus bar clamp.

L型线夹底座具有固定件,可将地线通过螺母固定在L型线夹底座上。The base of the L-shaped wire clamp has a fixing part, which can fix the ground wire on the base of the L-shaped wire clamp through a nut.

机械上丝螺旋卡头上具有金属销,可实现与绝缘棒的装配和卡紧。There are metal pins on the mechanical threaded screw chuck, which can realize the assembly and clamping with the insulating rod.

机械上丝螺旋卡头、L型线夹底座、勾头、夹块和上顶工具牙均由铝合金材料铸造,表面光滑平整,利于与母线结合稳固,为进一步旋紧上下面创造条件且接地良好。The mechanical wire threading screw chuck, L-shaped clamp base, hook head, clamp block and upper top tool tooth are all casted by aluminum alloy material, with smooth and flat surface, which is conducive to the stable combination with the busbar, creating conditions for further tightening the upper and lower parts and grounding good.

本实用新型能达到的有益效果是:The beneficial effect that the utility model can reach is:

1、本实用新型可方便的连接到绝缘棒上,紧固力是通过旋转把手垂直上传的,所需力量较小;勾头长短可调及上顶工具牙上下可调使得本实用新型可适用于不同厚度和宽度的硬金属过桥母线排。1. The utility model can be easily connected to the insulating rod, and the fastening force is uploaded vertically through the rotating handle, and the required force is small; the length of the hook head can be adjusted and the upper and lower tool teeth can be adjusted up and down, so that the utility model is applicable Hard metal bridge busbars in different thicknesses and widths.

2、本实用新型使用简单,不用使用任何攀高工具即快速的完成了过桥母线地线的安装工作,缩短了时间。2. The utility model is easy to use, and quickly completes the installation of the bridge bus ground wire without using any climbing tools, shortening the time.

3、本实用新型组合式结构,拆装方便且便于携带,制作成本低廉,易于批量生产,应用范围广。3. The utility model has a combined structure, which is convenient to disassemble and carry, has low production cost, is easy to produce in batches, and has a wide range of applications.

附图说明: Description of drawings:

图1为本实用新型结构示意图。Fig. 1 is the structural representation of the utility model.

图2为图1中的勾头的俯视图。Fig. 2 is a top view of the hook in Fig. 1 .

具体实施方式: Detailed ways:

下面结合附图对本实用新型作进一步的描述:Below in conjunction with accompanying drawing, the utility model is further described:

如图1、图2所示,该过桥母线导线端接地线夹,主要由机械上丝螺旋卡头1、L型线夹底座6、勾头10、夹块9和上顶工具牙4构成,机械上丝螺旋卡头1由具有外螺纹的金属棒3螺旋穿接在L型线夹底座6下方,金属棒3的顶端设有上顶工具牙4,L型线夹底座6上端连接有勾头10,上顶工具牙4在L型线夹底座6与勾头10构成的空间内上下移动、缩紧或松开;L型线夹底座6上端具有螺纹柱7,螺纹柱7依次穿接具有调节孔11的勾头10和夹块9,螺纹柱7顶部与夹块紧固螺母8旋接,以利于拆装携带,勾头10上的头端具有弯折部,L型线夹底座6具有固定件5,机械上丝螺旋卡头1上具有金属销2,可实现与绝缘棒的装配和卡紧。As shown in Figure 1 and Figure 2, the grounding clamp at the conductor end of the bridge busbar is mainly composed of a mechanical threaded screw chuck 1, an L-shaped clamp base 6, a hook 10, a clamping block 9 and an upper tool tooth 4 , the mechanical threading screw chuck 1 is threaded and connected under the L-shaped clamp base 6 by a metal rod 3 with external threads, the top of the metal rod 3 is provided with an upper tool tooth 4, and the upper end of the L-shaped clamp base 6 is connected with The hook head 10 and the upper tool tooth 4 move up and down, tighten or loosen in the space formed by the L-shaped wire clamp base 6 and the hook head 10; Connect the hook head 10 with the adjustment hole 11 and the clamp block 9, and the top of the threaded column 7 is screwed with the clamp block fastening nut 8 to facilitate disassembly and carrying. The base 6 has a fixing part 5, and the mechanical wire screw chuck 1 has a metal pin 2, which can realize the assembly and clamping with the insulating rod.

使用时,首先将铜绞线(导线截面不得小于25平方毫米)制成的地线通过双孔线鼻用碟形螺母固定在L型线夹底座6具有固定件5上,旋转机械上丝螺旋卡头1,使夹口渐渐增大到合适的位置,将绝缘棒的卡座套接在机械上丝螺旋卡头1上,并且将机械上丝螺旋卡头1上的金属销2与绝缘棒卡座上的卡位孔对齐,然后通过绝缘棒挑至母线排处,上顶工具牙4与勾头10之间的夹口对准母线排横向咬紧母线排,旋转绝缘棒带动机械上丝螺旋卡头1,通过旋转机械上丝螺旋卡头1使上顶工具牙4与勾头10之间的夹口逐渐缩小,致使整个夹口咬紧母线排,达到远程安装过桥母线排上的地线,最后逆向旋转绝缘棒,使绝缘棒上的卡位孔与机械上丝螺旋卡头1的金属销2分离,至此整个过桥母线排安装地线的过程完成。When in use, first fix the ground wire made of copper stranded wire (the cross section of the wire shall not be less than 25 square millimeters) on the L-shaped clamp base 6 with the fixing part 5 through the double-hole wire lug, and the screw thread on the rotating machine Chuck 1, make the jaw gradually increase to a suitable position, sleeve the holder of the insulating rod on the mechanical threading screw chuck 1, and connect the metal pin 2 on the mechanical threading screw chuck 1 with the insulating rod Align the clamping holes on the card base, and then pick it to the bus bar through the insulating rod. The clamp between the upper tool tooth 4 and the hook head 10 is aligned with the bus bar and clamped to the bus bar horizontally. Rotate the insulating rod to drive the mechanical wire Screw chuck 1, by rotating the screw chuck 1 on the machine, the clamp between the upper tool tooth 4 and the hook head 10 is gradually reduced, so that the entire clamp bites the bus bar, so as to achieve the remote installation on the bridge bus bar For the ground wire, finally rotate the insulating rod in the opposite direction, so that the clamping hole on the insulating rod is separated from the metal pin 2 of the mechanical threading screw chuck 1, and the process of installing the ground wire for the entire bridge busbar is completed.

Claims (8)

1、一种过桥母线导线端接地线夹,主要由机械上丝螺旋卡头、L型线夹底座、勾头和上顶工具牙构成,其特征是:机械上丝螺旋卡头由金属棒穿接在L型线夹底座下方,金属棒的顶端设有上顶工具牙,L型线夹底座上端连接有勾头,上顶工具牙在L型线夹底座与勾头构成的空间内上下移动、缩紧或松开。1. A grounding clamp at the conductor end of a bridge busbar, mainly composed of a mechanical threading screw chuck, an L-shaped clamp base, a hook head and an upper tool tooth, and is characterized in that: the mechanical screwing screw chuck is made of a metal rod Connected under the base of the L-shaped wire clamp, the top of the metal rod is provided with an upper tool tooth, and the upper end of the L-shaped wire clamp base is connected with a hook head, and the upper top tool tooth is up and down in the space formed by the L-shaped wire clamp base and the hook head Move, tighten or loosen. 2、如权利要求1所述的过桥母线导线端接地线夹,其特征是:金属棒螺纹穿接在L型线夹底座上夹。2. The grounding clamp at the conductor end of the bridge bus bar according to claim 1, wherein the metal rod is threaded and connected to the base of the L-shaped clamp. 3、如权利要求1或2所述的过桥母线导线端接地线夹,其特征是:L型线夹底座上端具有螺纹柱,螺纹柱依次穿接勾头、夹块,螺纹柱顶端与夹块紧固螺母旋接。3. The grounding clamp of the conductor end of the bridge busbar as claimed in claim 1 or 2, characterized in that: the upper end of the base of the L-shaped clamp has a threaded post, the threaded post passes through the hook head and the clamping block in turn, and the top of the threaded post is connected to the clip The block fastening nut is screwed on. 4、如权利要求3所述的过桥母线导线端接地线夹,其特征是:勾头上具有调节孔,以调节勾头伸缩长短。4. The grounding clamp of the conductor end of the bridge busbar as claimed in claim 3, wherein the hook head has an adjustment hole to adjust the telescopic length of the hook head. 5、如权利要求3所述的过桥母线导线端接地线夹,其特征是:勾头上的头端具有弯折部,以利于卡紧母线排夹。5. The grounding clamp for the conductor end of the bridge busbar as claimed in claim 3, wherein the head end of the hook head has a bent part to facilitate clamping of the busbar row clamp. 6、如权利要求3所述的过桥母线导线端接地线夹,其特征是:L型线夹底座具有固定件。6. The grounding clamp at the conductor end of the bridge bus bar according to claim 3, wherein the base of the L-shaped clamp has a fixing piece. 7、如权利要求3所述的过桥母线导线端接地线夹,其特征是:机械上丝螺旋卡头上具有金属销。7. The grounding clamp of the conductor end of the bridge busbar as claimed in claim 3, characterized in that: there is a metal pin on the mechanically threaded screw chuck. 8、如权利要求3所述的过桥母线导线端接地线夹,其特征是:机械上丝螺旋卡头、L型线夹底座、勾头、夹块和上顶工具牙均由铝合金材料制作。8. The grounding clamp for the conductor end of the bridge busbar as claimed in claim 3, characterized in that: the mechanical threading screw chuck, the L-shaped clamp base, the hook head, the clamping block and the upper tool tooth are all made of aluminum alloy make.
CNU2008201497115U 2008-10-14 2008-10-14 Grounding wire clamp at gap bridge bus conducting wire end Expired - Fee Related CN201315354Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201497115U CN201315354Y (en) 2008-10-14 2008-10-14 Grounding wire clamp at gap bridge bus conducting wire end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201497115U CN201315354Y (en) 2008-10-14 2008-10-14 Grounding wire clamp at gap bridge bus conducting wire end

Publications (1)

Publication Number Publication Date
CN201315354Y true CN201315354Y (en) 2009-09-23

Family

ID=41127153

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201497115U Expired - Fee Related CN201315354Y (en) 2008-10-14 2008-10-14 Grounding wire clamp at gap bridge bus conducting wire end

Country Status (1)

Country Link
CN (1) CN201315354Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102157804A (en) * 2011-03-23 2011-08-17 江苏省电力公司泰州供电公司 Grounding wire clip
CN102723678A (en) * 2012-05-23 2012-10-10 河南省电力公司信阳供电公司 Connection tool for energized cables
CN104466461A (en) * 2014-11-18 2015-03-25 国网河南省电力公司洛阳供电公司 Ground wire clamp
CN105024186A (en) * 2015-07-15 2015-11-04 国家电网公司 Inverted L-shaped grounding clamp
CN108092011A (en) * 2017-12-12 2018-05-29 无锡优耐特能源科技有限公司 A kind of U-shaped fixing piece for copper bar overlap joint
CN113922306A (en) * 2021-09-02 2022-01-11 山东鲁能光大电力器材有限公司 Adjustable tubular bus flat-end telescopic wire clamp

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102157804A (en) * 2011-03-23 2011-08-17 江苏省电力公司泰州供电公司 Grounding wire clip
CN102723678A (en) * 2012-05-23 2012-10-10 河南省电力公司信阳供电公司 Connection tool for energized cables
CN104466461A (en) * 2014-11-18 2015-03-25 国网河南省电力公司洛阳供电公司 Ground wire clamp
CN105024186A (en) * 2015-07-15 2015-11-04 国家电网公司 Inverted L-shaped grounding clamp
CN108092011A (en) * 2017-12-12 2018-05-29 无锡优耐特能源科技有限公司 A kind of U-shaped fixing piece for copper bar overlap joint
CN108092011B (en) * 2017-12-12 2023-06-09 无锡优耐特能源科技有限公司 U-shaped fixing piece for copper bar lap joint
CN113922306A (en) * 2021-09-02 2022-01-11 山东鲁能光大电力器材有限公司 Adjustable tubular bus flat-end telescopic wire clamp

Similar Documents

Publication Publication Date Title
CN203326127U (en) Spacing-adjustable ground wire clamp
CN201315354Y (en) Grounding wire clamp at gap bridge bus conducting wire end
CN102496789B (en) Angle-adjustable combined ground rod
CN204030029U (en) Transformer grounding protective device
CN101820144B (en) Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire
CN202997080U (en) Plug-in type equipment wire clamp of distribution transformer
CN206758672U (en) One kind ground wire fixture
CN201215833Y (en) Earthing wire clip with adjustable interval
CN206004210U (en) A kind of livewire work construction elastic wire clamp
CN203466513U (en) Device for fixing line of electric transmission and distribution circuit
CN202586173U (en) Quick-connecting tubular cable clamp
CN204577638U (en) A kind of multiple wire holes inflection wire clamp
CN102610937A (en) Adjustable earthing wire clip
CN203251021U (en) Pay-off trolley clamping device
CN103001022B (en) Ground wire clamp
CN205248698U (en) Join in marriage special fast -assembling fastener of net live working
CN204558688U (en) Earthing clamp
CN205985942U (en) Cable ware of flare -outing
CN211089065U (en) High-voltage cross arm
CN202373706U (en) Angle-adjustable combined ground rod
CN205355299U (en) Heterotypic cross -section spring wire of live working construction usefulness presss from both sides
CN205429192U (en) Novel low pressure earth connection device
CN202797549U (en) Detachable wire connecting device
CN204045755U (en) A kind of copper-aluminium transition connector fixed for transformer pile head and aluminum conductor
CN109524809B (en) Quick-connection clamp and insulation clamp for low-voltage live working and operation method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090923

Termination date: 20111014