A kind of attached climbing frame wind-power electricity generation smart spraying curing means and its construction method
Technical field
A kind of attached climbing frame wind-power electricity generation smart spraying curing means and its construction method of the present invention, belongs to Building technology neck
Domain.
Background technology
At present, after concrete works is the important component of architectural engineering, casting and compacting of concrete, why can gradually condense
Hardening, is primarily due to the result of cement aquation, and hydration then needs appropriate temperature and humidity condition, therefore is
Ensure that concrete has suitable curing condition, its intensity is constantly increased, it is necessary to be conserved to concrete.Concrete works
The quality of quality and the maintenance of concrete are closely related, conserve bad to be Concrete intensity insufficient or produce the quality such as crack
Problem, and traditional concrete curing method not only waste water resource and human resources and management difficulty is big, thus it is existing also
It is not perfect enough.
The content of the invention
The present invention goal of the invention be:There is provided a kind of simple in construction, cost is low, strong applicability, big for Super High wind speed
The characteristics of, using wind-power electricity generation as supply of electric power, effectively utilize wind energy, environmental protection is not influenceed, coagulation by municipal power supply
After the completion of soil is poured, spray amount and spray time are adjusted by smart spraying device, one kind of the effect of curing concrete is reached
Attached climbing frame wind-power electricity generation smart spraying curing means and its construction method, to overcome the deficiencies in the prior art.
What the present invention was realized in:A kind of attached climbing frame wind-power electricity generation smart spraying curing means, including elevating scaffold,
Smart spraying device and wind power generation plant are provided with elevating scaffold, smart spraying device includes hydrotreater, high pressure
Atomizer and atomizer, hydrotreater and high-pressure atomizer are fixed on elevating scaffold, atomizer and high-pressure atomizer
It is connected after connection by steel wire rope with elevating scaffold, steel wire rope spends blue bolt to be buckled in perpendicular dragon with spending blue bolt to be connected
On bone, wind power generation plant is made up of wind-driven generator, battery, controller, inverter and pylon, and wind-driven generator passes through tower
Frame is connected with centre keel.
Described smart spraying device includes humidity sensor and humidity controller, and humidity sensor connects with humidity controller
Connect and be connected, humidity controller connection is connected with high-pressure atomizer.
Wind-driven generator is connected with controller, and controller is connected with battery and inverter respectively, inverter and intelligence
High-pressure atomizer in energy sprayer unit device is connected.
A kind of construction method of attached climbing frame wind-power electricity generation smart spraying curing means, the construction method is entered according to the following steps
OK,
1)Elevating scaffold is installed:Required according to project progress, the intelligent attachment type raise scaffold of full protection is installed, installed
After the completion of debugged, it is ensured that normal the using of full protection intelligence attachment type raise scaffold;
2)Wind power generation plant is installed:According to need for electricity, wind-driven generator is installed, wind-driven generator connects with controller
Connect, pylon is fixed firmly with centre keel by bolt, after wind power generation plant installation, is debugged, detected, it is ensured that
Can normally it use, battery 11, controller 12, inverter 13 are all positioned on keel plate 18 and take corresponding safety measure;
3)Smart spraying device is installed:First the high pressure resistant pipeline 17 of atomizer 6 and anti-corrosion is connected, then by steel wire rope 7 with
Spend blue bolt 8 to connect, spend blue bolt 8 to be buckled on the hole of centre keel 9 and tense, it is with band that atomizer 6 and anti-corrosion is high pressure resistant
The colligation of pipeline 17 is placed on keel plate 18 and taken in steel wire rope 7, hydrotreater 4, high-pressure atomizer 5, humidity controller 16
Corresponding safety measure;
4)Equipment debugging:A kind of attached climbing frame wind-power electricity generation smart spraying curing means connection is completed, and debugged, it is ensured that energy
Normal operation;
5)Pour agent structure concrete:After the completion of receipts to be tested, agent structure concrete is poured.
6)After concrete casting complete, humidity sensor is arranged in concrete curing region, and sets humidity model
Enclose, open whole system, fog curing is carried out to concrete.
By adopting the above-described technical solution, by adopting the above-described technical solution, for Super High wind speed it is big the characteristics of,
Using wind-power electricity generation as supply of electric power, wind energy is effectively utilized, environmental protection is not influenceed by municipal power supply;Smart spraying is filled
Put and depend on the intelligent attachment type raise scaffold Synchronous lifting of full protection with wind power generation plant;High-pressure atomizer can adjust spraying
Time, spray amount etc.;Humidity controller can control open and close of spraying according to air humidity, can need humid control
In the range of, while reducing the waste of water resource;Spraying is uniform, and maintenance effect is good, will not produce the quality such as peeling to concrete
Problem;The present invention can also be effectively reduced dust, and summer can be carried out the cooling of operation side using the present invention, workman is existed
Construction operation under one comfortable environment.
Floor map of the Fig. 1 for the present invention in floor;
Fig. 2 is Fig. 1 A-A profiles;
Fig. 3 is Fig. 1 B-B profiles;
Fig. 4 is schematic structural view of the invention;
Fig. 5 is that centre keel is connected drawing with wind-driven generator;
Description of reference numerals:1- elevating scaffolds, 2- smart spraying devices, 3- wind power generation plants, 4- hydrotreaters, 5-
High-pressure atomizer, 6- atomizers, 7- steel wire ropes, 8- spends blue bolt, 9- centre keels, 10- wind-driven generators, 11- batteries,
12- controllers, 13- inverters, 14- pylons, 15- humidity sensors, 16- humidity controllers, the high pressure resistant pipeline of 17- anti-corrosions, 18-
Keel plate.
Embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples, but not as the limit to the present invention
System.
Embodiments of the invention:A kind of attached climbing frame wind-power electricity generation smart spraying curing means, including elevating scaffold 1,
Smart spraying device 2 and wind power generation plant 3 are provided with elevating scaffold 1, smart spraying device 2 includes hydrotreater 4, height
Atomizer 5 and atomizer 6 are pressed, hydrotreater 4 and high-pressure atomizer 5 are fixed on elevating scaffold 1, atomizer 6 and height
Pressure atomizer 5 is connected after connecting by steel wire rope 7 with elevating scaffold 1, and steel wire rope 7 spends blue spiral shell with spending blue bolt 8 to be connected
Bolt 8 is buckled on centre keel 9, and wind power generation plant 3 is by wind-driven generator 10, battery 11, controller 12, inverter 13 and tower
Frame 14 is constituted, and wind-driven generator 10 is connected by pylon 14 with centre keel 9.
Described smart spraying device 2 includes humidity sensor 15 and humidity controller 16, humidity sensor 15 and humidity
Controller connection 16 is connected, and humidity controller connection 16 is connected with high-pressure atomizer 5.
Wind-driven generator 10 is connected with controller 12, and controller 12 is connected with battery 11 and inverter 13 respectively,
Inverter 13 is connected with the high-pressure atomizer 5 in the device of smart spraying device 2.
Hydrotreater 4 and high-pressure atomizer 5 in smart spraying device 2 of the present invention are all existing device, high-pressure atomization
Device 5 by microcomputer control system, pressure regulating system, high-pressure pump carry out Electromechanical Design form, can regulate and control spray amount,
Spray time, can be with functions such as time opening, closings.
The total memory capacity of battery 11 of the present invention should be greater than the gross generation of wind-driven generator 10.
The application inverter 13 is existing device, and the voltage of battery 11 can be transformed into smart spraying by inverter 13
The operating voltage of device 2.
Smart spraying device 2 provides electric energy by wind power generation plant 3, and the total rated power of wind power generation plant 3 is sprayed with intelligence
The general power of mist device 2 matches, and the total rated power of wind power generation plant 3 should be able to meet the electric power needs of smart spraying device 2.
The present invention is constructed by following step:
The 1st, elevating scaffold 1 is installed
Required according to project progress, the intelligent attachment type raise scaffold 1 of full protection be installed, debugged after installation,
Ensure normal the using of the intelligent attachment type raise scaffold 1 of full protection.
The 2nd, wind power generation plant 3 is installed
According to need for electricity, wind-driven generator 10 is installed, wind-driven generator 10 is connected with controller 12, pylon 14 and perpendicular dragon
Bone 9 is fixed firmly by bolt, after the installation of wind power generation plant 3, is debugged, detected, it is ensured that can normally made
With battery 11, controller 12, inverter 13 are all positioned on keel plate 18 and take corresponding safety measure.
The 3rd, smart spraying device 2 is installed
First the high pressure resistant pipeline 17 of atomizer 6 and anti-corrosion is connected, then steel wire rope 7 is spent into blue spiral shell with spending blue bolt 8 to be connected
Bolt 8 is buckled on the hole of centre keel 9 and tensed, with band by atomizer 6 and the high pressure resistant colligation of pipeline 17 of anti-corrosion in steel wire rope 7,
Hydrotreater 4, high-pressure atomizer 5, humidity controller 16 are placed on keel plate 18 and take corresponding safety measure.
4th, equipment debugging
A kind of attached climbing frame wind-power electricity generation smart spraying curing means connection is completed, and debugged, it is ensured that can normally be run.
5th, agent structure concrete is poured
After the completion of receipts to be tested, agent structure concrete is poured.
Attached climbing frame wind-power electricity generation smart spraying curing system is opened, after the completion of concreting, humidity sensor 15 is pacified
The region conserved in needs is put, attached climbing frame wind power generation plant 3 is opened, according to the actual requirements, is set by high-pressure atomizer 5
Put spray amount, spray time;Required maintenance humidity scope is set by humidity controller 16.
6th, climbing frame climbs
After young concrete reaches requirement, climbing frame is climbed, and spraying is stopped during climbing.
7th, spray procedure is opened
After the completion of climbing, the concrete floor conserved in needs is opened at respective storey by high-pressure atomizer 5
Spray procedure.Construction layer can reduce temperature and dust by the system, be that workman creates a comfortable working environment.
The attached climbing frame wind-power electricity generation smart spraying curing system of the present invention, typically covers 4 to 5 Rotating fields, if a certain layer is poured
After the completion of note, climbing frame the superiors fog curing equipment is opened, is climbed after climbing frame after one layer, this layer is set using next layer of spraying of climbing frame
Standby maintenance, by that analogy.