CN108798046A - A kind of high-level structure storage concrete curing system and its construction method - Google Patents

A kind of high-level structure storage concrete curing system and its construction method Download PDF

Info

Publication number
CN108798046A
CN108798046A CN201710307813.9A CN201710307813A CN108798046A CN 108798046 A CN108798046 A CN 108798046A CN 201710307813 A CN201710307813 A CN 201710307813A CN 108798046 A CN108798046 A CN 108798046A
Authority
CN
China
Prior art keywords
level structure
pipeline
curing system
structure storage
concrete curing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710307813.9A
Other languages
Chinese (zh)
Inventor
郝建敏
李宁
孙宇
王宁
崔加文
杨辰亮
左微成
范月林
张喆
陈俍甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Sixth Engineering Division Co Ltd
CSCEC City Construction Development Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Sixth Engineering Division Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201710307813.9A priority Critical patent/CN108798046A/en
Publication of CN108798046A publication Critical patent/CN108798046A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets

Abstract

A kind of high-level structure storage concrete curing system and its construction method, wherein high-level structure storage concrete curing system, the hydraulic climbing scaffold of curing concrete surrounding is waited for including being located at structure, spray pipeline is removably connected with by connection component on the inside of the upper end of the hydraulic climbing scaffold, the spray pipeline is horizontally disposed, in closed ring, the spray pipeline waits for that circumferentially uniform intervals are connected with rotatable atomizer by the first three-way connection for curing concrete side in direction, inlet pipeline is connected to by the second three-way connection silk in succession on the spray pipeline, the inlet pipeline is switched equipped with mechanical timer.The present invention solves the problems, such as that high-level structure concrete curing inconvenience, water resource waste, being dismounted for multiple times process are complicated.

Description

A kind of high-level structure storage concrete curing system and its construction method
Technical field
The present invention relates to the realm of building construction, especially a kind of high-level structure storage concrete curing system and its construction method.
Background technology
With being getting faster for building construction technology development, skyscraper is more and more, but vertical outside high-level structure concrete Face maintenance is a great problem during high-building construction always, existing to carry out watering maintenance generally by artificial but high Layer building artificial watering is inconvenient, and there are certain danger, while artificial watering maintenance often occurs conserving feelings not in place Condition influences construction quality, and is directly conserved by water pipe bath, causes the serious waste of water resource, also has and pass through water spray What pipeline was conserved, but water pipe is connected on scaffold, with the rising of construction height, needs repeated disassembled and assembled, process numerous It is multiple.
Invention content
The object of the present invention is to provide a kind of high-level structure storage concrete curing system and its construction methods, to solve high-rise knot The complicated problem of structure concrete curing inconvenience, water resource waste, being dismounted for multiple times process.
To achieve the above object, the present invention adopts the following technical scheme that:A kind of high-level structure storage concrete curing system, including It is located at the hydraulic climbing scaffold that structure waits for curing concrete surrounding, is detachably connected by connection component on the inside of the upper end of the hydraulic climbing scaffold It is connected to spray pipeline, the spray pipeline is horizontally disposed, is in closed ring, and the spray pipeline waits for curing concrete one in direction By the first three-way connection, circumferentially uniform intervals are connected with rotatable atomizer for side, pass through the two or three on the spray pipeline It connects captacula and is connected to inlet pipeline in succession, the inlet pipeline is switched equipped with mechanical timer.
Preferably, the connection component includes the outer connector being fastened and connected on the column of climbing frame and is connected to outer connection Interconnecting piece on the inside of part.
Preferably, the outer connector be in Contraband shape, back be spaced apart there are two connecting hole, both ends respectively welding there are one Buckle;The buckle is horizontally disposed, by two semi-circular part make-ups in a ring, a connecting pin of two semi-circular parts hingedly connects It connects, another connecting pin is connect in succession by screw rod silk.
Preferably, the interconnecting piece takes the shape of the letter U, and intermediate arc sections are fastened on the outer wall of spray pipeline, both ends are distinguished Connecting hole on outer connector is simultaneously fastened by nut.
Preferably, the radian of the outer wall of the radian and spray pipeline of the arc sections of the interconnecting piece mutually agrees with.
Preferably, the first gasket is lined between the arc sections of the interconnecting piece and the outer wall of spray pipeline.
Preferably, the water inlet of the inlet pipeline is connected to tap water water source, and upper edge water inlet direction has been sequentially communicated Filter and force (forcing) pump, the force (forcing) pump are powered by distribution box.
Preferably, the force (forcing) pump is connected to by pipe collar with water inlet pipe, and second is equipped between the pipe collar and water inlet pipe Gasket.
Preferably, the inlet pipeline is switched equipped with mechanical timer.
Preferably, the spray pipeline is coating steel pipe or PP-R pipes.
A kind of construction method of high-level structure storage concrete curing system described in application, step are:
Step 1:Construction hydraulic climbing scaffold.
Step 2:Connection component is connected on hydraulic climbing scaffold.
Step 3:Spray pipeline is passed through into connection component and is fastened.
Step 4:Rotatable atomizer is connected on spray pipeline.
Step 5:Inlet pipeline is connected on spray pipeline.
Step 6:Filter is connected on inlet pipeline.
Step 7:Force (forcing) pump is connected on inlet pipeline.
Step 8:Inlet pipeline is connected to tap water water source.
Step 9:Tap water water source progress structural concrete is opened to conserve to partly maintenance completion in position to be conserved.
Step 10:Close tap water water source.
Step 11:Remove force (forcing) pump.
Step 12:Hydraulic climbing scaffold climbs upwards.
Step 13:It is promoted and reconnects force (forcing) pump.
Step 14:Step 9 is repeated to step 13, until all position maintenance to be conserved is completed.
Compared with prior art the invention has the characteristics that and advantageous effect:Pipeline is connected directly between in present system On climbing frame, and rise with climbing frame, realizes that the once mounting of pipeline repeatedly utilizes, reduce working procedure, accelerate maintenance speed; It is conserved by rotatable atomizer, prevents curing water from flowing down along maintenance facade, save water resource;Rotatable atomizer Can full angle, it is multi-faceted conserved, no maintenance quadrangle further increases maintenance effect;Instead of original nourishment, avoid There is security risk in nourishment;By mechanical timer switch time switch curing system, automatically to concrete into Row, which is repeated as many times, to be conserved, and maintenance effect is improved;Package unit is flexible and convenient, and is not take up space.
It the composite can be widely applied in storage concrete curing system.
Description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the dimensional structure diagram of the present invention.
Fig. 2 is the planar structure schematic diagram of the present invention.
Fig. 3 is the structural schematic diagram that water pipe is connected to by connection component on climbing frame column.
Fig. 4 is the structural schematic diagram of fastener.
Reference numeral:1- hydraulic climbing scaffolds, 2- spray pipelines, the rotatable atomizers of 3-, 4- inlet pipelines, outside 5- Connector, 6- interconnecting pieces, 7- filters, 8- force (forcing) pumps, 9- distribution boxs, 10- mechanical timers switch.
Specific implementation mode
Embodiment is shown referring to Fig. 1 and Fig. 2, and a kind of high-level structure storage concrete curing system is mainly used for high-rise facade knot The maintenance of structure concrete, including it is located at the hydraulic climbing scaffold 1 that structure waits for curing concrete surrounding, on the inside of the upper end of the hydraulic climbing scaffold It is removably connected with spray pipeline 2 by connection component, the spray pipeline is horizontally disposed, is in closed ring, the spray tube Road 2 waits for that circumferentially uniform intervals are connected with rotatable atomizer 3 by the first three-way connection for curing concrete side in direction, Inlet pipeline 4 is connected to by the second three-way connection silk in succession on the spray pipeline 2, the inlet pipeline is equipped with mechanical timer Switch 10 ensures coagulation according to the interval switch time that the maintenance situation setting mechanical timer of concrete in Specific construction switchs Multiple effective maintenance of soil;The water inlet of the inlet pipeline 4 is connected to tap water water source, and upper edge water inlet direction connects successively It is connected with filter 7 and force (forcing) pump 8, the force (forcing) pump 8 is powered by distribution box 9;The force (forcing) pump is connected by pipe collar and water inlet pipe It is logical, and the second gasket is equipped between the pipe collar and water inlet pipe;The spray pipeline 2 is coating steel pipe or PP-R pipes;Spray tube Road length determines that force (forcing) pump size is selected according to rotatable atomizer quantity according to live balcony perimeter.
Shown in Fig. 3 and Fig. 4, the connection component includes 5 He of outer connector being fastened and connected on the column of climbing frame The interconnecting piece 6 being connected on the inside of outer connector;The outer connector is in Contraband shape, and back is spaced apart, and there are two connecting hole, two Respectively there are one buckles for welding for end;The buckle is horizontally disposed, by two semi-circular part make-ups in a ring, two semi-circular parts The articulated connection of one connecting pin, another connecting pin are connect in succession by screw rod silk;The interconnecting piece takes the shape of the letter U, intermediate arc sections engaging On the outer wall of spray pipeline, both ends are each passed through the connecting hole on outer connector and are fastened by nut;The interior connection The radian of the arc sections of part and the radian of the outer wall of spray pipeline mutually agree with;The arc sections of the interconnecting piece and spray pipeline The first gasket is lined between outer wall.
The construction method of the present invention:
Step 1:Construction hydraulic climbing scaffold 1.
Step 2:Connection component is connected on hydraulic climbing scaffold 1.
Step 3:Spray pipeline 2 is passed through into connection component and is fastened.
Step 4:Rotatable atomizer 3 is connected on spray pipeline.
Step 5:Inlet pipeline 4 is connected on spray pipeline.
Step 6:Filter 7 is connected on inlet pipeline.
Step 7:Force (forcing) pump 8 is connected on inlet pipeline.
Step 8:Inlet pipeline is connected to tap water water source.
Step 9:Tap water water source progress structural concrete is opened to conserve to partly maintenance completion in position to be conserved.
Step 10:Close tap water water source.
Step 11:Remove force (forcing) pump.
Step 12:Hydraulic climbing scaffold climbs upwards.
Step 13:It is promoted and reconnects force (forcing) pump.
Step 14:Step 9 is repeated to step 13, until all position maintenance to be conserved is completed.

Claims (10)

1. a kind of high-level structure storage concrete curing system, including it is located at the hydraulic climbing scaffold that structure waits for curing concrete surrounding(1), It is characterized in that:The hydraulic climbing scaffold(1)Upper end on the inside of spray pipeline is removably connected with by connection component(2), the spray Shower pipe road(2)It is horizontally disposed with, is in closed ring, the spray pipeline(2)Wait for curing concrete side by the one or three in direction Circumferentially uniform intervals are connected with rotatable atomizer to pass joint(3), the spray pipeline(2)It is upper to pass through the second three-way connection Silk is connected to inlet pipeline in succession(4);The inlet pipeline is switched equipped with mechanical timer(10).
2. high-level structure storage concrete curing system according to claim 1, it is characterised in that:The connection component includes button Close the outer connector being connected on the column of climbing frame(5)With the interconnecting piece being connected on the inside of outer connector(6).
3. high-level structure storage concrete curing system according to claim 2, it is characterised in that:The outer connector(5)It is in Contraband shape, back is spaced apart there are two connecting hole, there are one buckles for each welding in both ends;
The buckle is horizontally disposed, by two semi-circular part make-ups in a ring, the connecting pin articulated connection of two semi-circular parts, Another connecting pin is connect in succession by screw rod silk.
4. high-level structure storage concrete curing system according to claim 3, it is characterised in that:The interconnecting piece(6)In U Shape, intermediate arc sections are fastened on the outer wall of spray pipeline, both ends are each passed through the connecting hole on outer connector and pass through spiral shell Mother's fastening.
5. high-level structure storage concrete curing system according to claim 4, it is characterised in that:The interconnecting piece(6)'s The radian of arc sections and the radian of the outer wall of spray pipeline mutually agree with.
6. high-level structure storage concrete curing system according to claim 5, it is characterised in that:The interconnecting piece(6)'s The first gasket is lined between arc sections and the outer wall of spray pipeline.
7. high-level structure storage concrete curing system according to claim 1, it is characterised in that:The inlet pipeline(4)'s Water inlet is connected to tap water water source, and upper edge water inlet direction has been sequentially communicated filter and force (forcing) pump, and the force (forcing) pump passes through Distribution box(9)Power supply.
8. high-level structure storage concrete curing system according to claim 7, it is characterised in that:The force (forcing) pump(8)Pass through Pipe collar is connected to water inlet pipe, and the second gasket is equipped between the pipe collar and water inlet pipe.
9. high-level structure storage concrete curing system according to claim 1, it is characterised in that:The spray pipeline(2)It is Coating steel pipe or PP-R pipes.
10. a kind of application is according to claim --- the construction method of-high-level structure storage concrete curing system, feature It is, step is:
Step 1:Construction hydraulic climbing scaffold(1);
Step 2:Connection component is connected to hydraulic climbing scaffold(1)On;
Step 3:By spray pipeline(2)Across connection component and fasten;
Step 4:By rotatable atomizer(3)It is connected on spray pipeline;
Step 5:By inlet pipeline(4)It is connected on spray pipeline;
Step 6:Filter(7)It is connected on inlet pipeline;
Step 7:By force (forcing) pump(8)It is connected on inlet pipeline;
Step 8:Inlet pipeline is connected to tap water water source;
Step 9:Tap water water source progress structural concrete is opened to conserve to partly maintenance completion in position to be conserved;
Step 10:Close tap water water source;
Step 11:Remove force (forcing) pump;
Step 12:Hydraulic climbing scaffold climbs upwards;
Step 13:It is promoted and reconnects force (forcing) pump;
Step 14:Step 9 is repeated to step 13, until all position maintenance to be conserved is completed.
CN201710307813.9A 2017-05-04 2017-05-04 A kind of high-level structure storage concrete curing system and its construction method Pending CN108798046A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710307813.9A CN108798046A (en) 2017-05-04 2017-05-04 A kind of high-level structure storage concrete curing system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710307813.9A CN108798046A (en) 2017-05-04 2017-05-04 A kind of high-level structure storage concrete curing system and its construction method

Publications (1)

Publication Number Publication Date
CN108798046A true CN108798046A (en) 2018-11-13

Family

ID=64054505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710307813.9A Pending CN108798046A (en) 2017-05-04 2017-05-04 A kind of high-level structure storage concrete curing system and its construction method

Country Status (1)

Country Link
CN (1) CN108798046A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869002A (en) * 2019-04-15 2019-06-11 中建城市建设发展有限公司 A kind of concrete curing device
CN110480817A (en) * 2019-08-28 2019-11-22 中国二十冶集团有限公司 Vertical concrete component sprinkling curing system and method
CN115182603A (en) * 2022-07-06 2022-10-14 中国十七冶集团有限公司 Climbing frame system fixed type intelligent concrete curing device and using method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202610720U (en) * 2012-06-04 2012-12-19 杜鹏 Automatic lifting device for construction maintenance of bridge pier
CN202969940U (en) * 2012-10-31 2013-06-05 中建三局第二建设工程有限责任公司 Automatic concrete spraying and curing device capable of being lifted with outside climbing rack
CN204081508U (en) * 2014-07-15 2015-01-07 中建四局第六建筑工程有限公司 A kind of automatic climbing formula concrete water curing system for highrise building
CN104324471A (en) * 2014-11-18 2015-02-04 广西建工集团联合建设有限公司 Multifunctional spraying system of building outer frame and mounting method of multifunctional spraying system
CN105269668A (en) * 2014-07-29 2016-01-27 中建四局第六建筑工程有限公司 Wind power generation and intelligent fog curing device for attached scaffold and construction method of wind power generation and intelligent fog curing device
CN105839985A (en) * 2016-03-18 2016-08-10 中国水利水电第十工程局有限公司 Hydropower station rectangular high tower hydraulic climb slip form system and construction method
CN105926382A (en) * 2016-04-20 2016-09-07 中铁上海工程局集团华海工程有限公司 Metro depot common monolithic track bed reserved groove rail construction method
CN205822414U (en) * 2016-07-11 2016-12-21 重庆大学 A kind of scalable fixes the device of L-type drain pipe
CN206707311U (en) * 2017-05-04 2017-12-05 中建城市建设发展有限公司 A kind of high-level structure storage concrete curing system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202610720U (en) * 2012-06-04 2012-12-19 杜鹏 Automatic lifting device for construction maintenance of bridge pier
CN202969940U (en) * 2012-10-31 2013-06-05 中建三局第二建设工程有限责任公司 Automatic concrete spraying and curing device capable of being lifted with outside climbing rack
CN204081508U (en) * 2014-07-15 2015-01-07 中建四局第六建筑工程有限公司 A kind of automatic climbing formula concrete water curing system for highrise building
CN105269668A (en) * 2014-07-29 2016-01-27 中建四局第六建筑工程有限公司 Wind power generation and intelligent fog curing device for attached scaffold and construction method of wind power generation and intelligent fog curing device
CN104324471A (en) * 2014-11-18 2015-02-04 广西建工集团联合建设有限公司 Multifunctional spraying system of building outer frame and mounting method of multifunctional spraying system
CN105839985A (en) * 2016-03-18 2016-08-10 中国水利水电第十工程局有限公司 Hydropower station rectangular high tower hydraulic climb slip form system and construction method
CN105926382A (en) * 2016-04-20 2016-09-07 中铁上海工程局集团华海工程有限公司 Metro depot common monolithic track bed reserved groove rail construction method
CN205822414U (en) * 2016-07-11 2016-12-21 重庆大学 A kind of scalable fixes the device of L-type drain pipe
CN206707311U (en) * 2017-05-04 2017-12-05 中建城市建设发展有限公司 A kind of high-level structure storage concrete curing system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869002A (en) * 2019-04-15 2019-06-11 中建城市建设发展有限公司 A kind of concrete curing device
CN110480817A (en) * 2019-08-28 2019-11-22 中国二十冶集团有限公司 Vertical concrete component sprinkling curing system and method
CN115182603A (en) * 2022-07-06 2022-10-14 中国十七冶集团有限公司 Climbing frame system fixed type intelligent concrete curing device and using method thereof

Similar Documents

Publication Publication Date Title
CN108798046A (en) A kind of high-level structure storage concrete curing system and its construction method
CN202029230U (en) In-box automatic cycle spray device of a large scale box girder
CN206690295U (en) A kind of precasting yard automatic spray health recirculated water utilizes construction system
CN206279651U (en) Assembled cast-in-place concrete external heat insulating wall steel skeleton template system and connector
CN203087132U (en) Gardening spraying watering shower nozzle
CN216517007U (en) High-rise building outer wall concrete construction maintenance and spray dust fall system
CN206707311U (en) A kind of high-level structure storage concrete curing system
CN207042752U (en) A kind of engineering steel pipe painting device
CN104389429A (en) Intelligent garden type concrete spray maintenance device and concrete maintenance method thereof
CN202248804U (en) Maintaining jet head for troweled wall body
CN208949667U (en) A kind of L-type steel bolt connection node prefabricated panel assembly road surface
CN104328898A (en) Rendering maintenance device for building external wall
CN207554073U (en) The light-duty convenient self-propelled two in tunnel serves as a contrast health rack
CN206220549U (en) A kind of spray equipment for shear wall maintenance
CN206205424U (en) A kind of civil engineering means for fastening scaffolding
CN208052230U (en) A kind of Intelligent fixed time movable type beam field curing means
CN204212380U (en) A kind of external wall whitewashes curing means
CN204001762U (en) A kind of portable concrete feeder for building
CN210013495U (en) Automatic maintenance device of cast-in-place concrete shear wall
CN206174637U (en) Dustproof fender that encloses of spraying type angularly adjustable for construction
CN203905441U (en) Wall attaching tying part for scaffold
CN206229759U (en) A kind of mixer pressure spray cleaning systems
CN203854094U (en) Beam plate maintenance spraying system
CN212800185U (en) Automatic spraying device for building concrete maintenance
CN220828064U (en) Concrete outer wall maintenance spraying system suitable for climbing frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination