CN115182603A - Climbing frame system fixed type intelligent concrete curing device and using method thereof - Google Patents
Climbing frame system fixed type intelligent concrete curing device and using method thereof Download PDFInfo
- Publication number
- CN115182603A CN115182603A CN202210797801.XA CN202210797801A CN115182603A CN 115182603 A CN115182603 A CN 115182603A CN 202210797801 A CN202210797801 A CN 202210797801A CN 115182603 A CN115182603 A CN 115182603A
- Authority
- CN
- China
- Prior art keywords
- water pipe
- reinforcement cage
- climbing frame
- steel reinforcement
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/246—Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses a fixed intelligent concrete curing device of a climbing frame system and a using method thereof, belonging to the intelligent technical field of building construction and comprising a device body connected to the water outlet end of a main water pipe, wherein the device body comprises a steel reinforcement cage, a welding unit positioned inside the steel reinforcement cage and extending to the outside of the steel reinforcement cage, and a channel steel arranged on one side of the steel reinforcement cage, the welding unit comprises a water pipe, a buckle welding point connected with the inner side of the steel reinforcement cage, a channel steel welding point connected with the climbing frame of the channel steel, and a four-way connector positioned in the middle position inside the steel reinforcement cage and matched with the water pipe, the water pipe penetrates through the bottom of the steel reinforcement cage, the middle part of the water pipe is provided with an intelligent controller, the tail end of the water pipe is provided with a three-way connector, the left port, the right port and the upper port of the four-way connector are connected with automatic spraying units, and the free end of the channel steel is connected with the climbing frame. The concrete climbing frame is connected with the climbing frame through simple manufacture, and the problem that manual concrete maintenance is inconvenient and untimely is solved greatly.
Description
Technical Field
The invention belongs to the intelligent technical field of house construction, and particularly relates to a fixed intelligent concrete curing device of a climbing frame system and a using method thereof.
Background
Along with the rapid development of building trade, high-rise building quantity constantly increases, and traditional steel pipe scaffold is replaced by inserted lift scaffold gradually, and high-rise building often has the inconvenient, untimely scheduling problem of concrete manual maintenance operation, and the efficiency and the level of maintenance also can not be guaranteed, to high-rise construction more, also have temporary construction water pipe promotion and outer wall maintenance unsafe scheduling problem.
Traditional high-rise concrete maintenance is earlier through inserting water pipe for interim construction from the water source point, arrange the pipeline along with the promotion of floor again, connect in water pipe at last and carry out the maintenance, but traditional construction is established at the balcony position mostly with the water pipe, have the potential safety hazard during the takeover, and this maintenance sprays efficiency lower, can not involve every room, can lead to the maintenance untimely not in place, thereby influence major structure concrete shaping quality, floor and wall body can produce the crack when temperature risees in summer.
Disclosure of Invention
In order to solve the technical problems, the inventor obtains the technical scheme of the invention through practice and summary, and the invention discloses a fixed intelligent concrete curing device of a climbing frame system, which comprises a device body connected to the water outlet end of a main water pipe, wherein the device body comprises a steel reinforcement cage, a welding unit and channel steel, the welding unit is positioned inside the steel reinforcement cage and extends to the outside of the steel reinforcement cage, the channel steel is arranged on one side of the steel reinforcement cage, the welding unit comprises a water pipe, a buckle welding point connected with the inner side of the steel reinforcement cage, a channel steel welding point connected with the climbing frame of the channel steel, and a four-way interface, the four-way interface is positioned in the middle of the inside of the steel reinforcement cage and matched with the water pipe, the water pipe penetrates through the bottom of the steel reinforcement cage, the intelligent controller is arranged in the middle of the water pipe, the tail end of the water pipe is provided with a three-way interface, the left and right ports and upper ports of the four-way interface are connected with automatic spraying units, and the free ends of the channel steel are connected with the climbing frame.
Further preferably, the steel reinforcement cage is cup type structure, and it is including many twisted steel that constitute the support, the iron sheet of parcel externally to and set up respectively on the steel reinforcement cage and with water pipe matched with three preformed hole and a lower preformed hole.
Further preferably, the automatic spraying unit comprises three climbing frame spray heads with the same structure, and the climbing frame spray heads are installed at the free ends of the water pipes extending out of the tops of the reinforcement cages.
Further preferably, the intelligent controller is internally provided with a line control valve and is provided with a timing switch.
Further preferably, the side interface end of the three-way interface is the starting point of the device body and is connected with the main water pipe to introduce water into the device body.
Further preferably, a spray controller is arranged on the main water pipe, and the operation of the main water pipe is controlled through the spray controller.
The invention also discloses a use method of the fixed intelligent concrete curing device of the climbing frame system, which comprises the following steps:
welding a plurality of threaded steel bars into a cup-shaped steel bar cage, and connecting the cup-shaped steel bar cage with a climbing frame through channel steel to form a fixed platform;
connecting a PVC water pipe from a construction water pipe to the interior of the reinforcement cage, and forming three climbing frame spray heads with different angles by using a four-way joint as a conversion interface to extend out a water pipe spray joint, wherein the extension angles of two sides extend out in a cup shape, and the middle of the water pipe spray joint naturally goes out to form outer wall full-coverage spraying;
thirdly, a main water pipe is connected to the side interface end of the three-way interface, water is led into the water pipe, and a switch gear is controlled by a spraying controller;
and step four, when the climbing frame is lifted, the intelligent controller is closed, and the intelligent controller is opened after the climbing frame is lifted.
Compared with the prior art, the invention can obtain the following technical effects:
according to the fixed intelligent concrete curing device with the climbing frame system, the concrete is simply manufactured and connected with the climbing frame, the problem that manual concrete curing is inconvenient and untimely is greatly solved, the device body is sprayed by the inner wall and the outer wall in a full-covering mode, the concrete curing level and efficiency are greatly improved, the solid structure concrete forming quality is further improved, a good foundation is laid for main structure acceptance and next-stage construction, and the device has good use and popularization values.
The parts of the device not involved are the same as or can be implemented using prior art.
Drawings
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a welding unit according to the present invention;
FIG. 3 is a schematic view of the reinforcement cage of the present invention;
fig. 4 is a schematic view of the structure of the spray controller of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The application of the principles of the present invention will be further described with reference to the accompanying drawings and specific embodiments.
Examples
As shown in fig. 1-4, a fixed intelligent concrete curing device of a climbing frame system is connected to the water outlet end of a main water pipe and comprises a device body consisting of a reinforcement cage 1, a welding unit 2 and channel steel 5.
The welding unit 2 is positioned inside the reinforcement cage 1 and extends to the outside of the reinforcement cage 1, the channel steel 5 is arranged on one side of the reinforcement cage 1, and a climbing frame is connected to the free end of the channel steel 5; welding unit 2 is by the water pipe, with 1 inboard buckle welding point 21 of being connected of steel reinforcement cage, climbs the channel-section steel welding point 22 of being connected with the channel-section steel to and be located 2 inside intermediate positions of steel reinforcement cage and constitute with water pipe matched with cross connection port 23, wherein, the water pipe runs through 1 bottom of steel reinforcement cage, and the water pipe middle part is equipped with intelligent control ware 3, and tee bend port 4 is installed to the water pipe end. Meanwhile, the reinforcement cage 1 is of a cup-shaped structure and consists of a plurality of threaded reinforcements 11, an iron sheet 12, a lower preformed hole 13 and three upper preformed holes 14, wherein the threaded reinforcements 11 are mainly used for forming a support of the reinforcement cage 1, the iron sheet 12 is wrapped outside the threaded reinforcements 11 and plays a certain role in protecting the body of the device, so that external pollution and damage are avoided, and the three upper preformed holes 14 and the lower preformed hole 13 are respectively arranged at the top and the bottom of the reinforcement cage 1 and correspondingly matched with a water pipe of the welding unit 2; the intelligent controller 3 is internally provided with a circuit control valve, is provided with a timing switch and greenhouse induction, has three operating spaces in total, and can adjust to the highest gear to accelerate the spraying speed and pressure when the air temperature rises or the relative humidity becomes lower (less than 80%), and adjust to the lowest gear to reduce the spraying speed and pressure when the air temperature falls or the relative humidity becomes higher (more than 80%), and normally operates at the middle gear, and the timing switch sets two time periods of morning and afternoon for timed maintenance; the side interface end of the three-way interface 4 is the starting point of the device body and is connected with the main water pipe to introduce water into the device body; the cross connection port 23 is connected with automatic spraying units at the left and right sides and the upper end port, the automatic spraying units are composed of three climbing frame nozzles 6 with the same structure, and the climbing frame nozzles 6 are fixedly installed at the free ends of the water pipes extending out of the top of the steel reinforcement cage 1.
Meanwhile, a spraying controller is arranged on the main water pipe, and the operation of the main water pipe is controlled through the spraying controller.
A use method of a fixed intelligent concrete curing device of a climbing frame system comprises the following specific steps:
firstly, welding a plurality of threaded steel bars into a cup-shaped steel bar cage, and connecting the cup-shaped steel bar cage with a climbing frame through channel steel to form a fixed platform;
connecting a PVC water pipe from a construction water pipe to the interior of the reinforcement cage, and forming three climbing frame spray heads with different angles by using a four-way joint as a conversion interface to extend out a water pipe spray joint, wherein the extension angles of two sides extend out in a cup shape, and the middle of the water pipe spray joint naturally goes out to form outer wall full-coverage spraying;
thirdly, a main water pipe is connected to the side interface end of the three-way interface, water is led into the water pipe, and a switch gear is controlled through a spraying controller;
and step four, when the climbing frame is lifted, the intelligent controller is closed, and the intelligent controller is opened after the climbing frame is lifted.
And a set of fixed intelligent concrete curing device is arranged outside each room, and is lifted along with the climbing frame and recycled.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (7)
1. The utility model provides a climb fixed intelligent concrete curing means of frame system, is including connecting the device body at main water pipe outlet end, its characterized in that: the device body includes steel reinforcement cage (1), is located inside and extends to the outside welding unit (2) of steel reinforcement cage (1) to and set up in channel-section steel (5) of steel reinforcement cage (1) one side, welding unit (2) include the water pipe, buckle welding point (21) of being connected with steel reinforcement cage (1) inboard, climb channel-section steel welding point (22) of being connected with frame (5) with the channel-section steel to and be located inside intermediate position of steel reinforcement cage (1) and with water pipe matched with cross connection (23), the water pipe runs through steel reinforcement cage (1) bottom, and is equipped with intelligent control ware (3) in the middle part of the water pipe, and its end installs tee bend interface (4), cross connection (23) are controlled and the port is connected with the automatic spray unit, be connected with on the free end of channel-section steel (5) and climb the frame.
2. The fixed intelligent concrete curing means of frame system climbs of claim 1, characterized in that: reinforcement cage (1) is cup type structure, and it is including many twisted steel (11) that constitute the support, wraps up iron sheet (12) outside to and set up respectively on reinforcement cage (1) and with water pipe matched with three preformed hole (14) and one lower preformed hole (13).
3. The stationary intelligent concrete curing device of a climbing frame system according to claim 2, characterized in that: the automatic spraying unit comprises three climbing frame nozzles (6) with the same structure, and the climbing frame nozzles (6) are installed at the free ends of the water pipes extending out of the tops of the steel reinforcement cages (1).
4. The fixed intelligent concrete curing means of frame system climbs of claim 3, characterized in that: and a line control valve is arranged in the intelligent controller (3), and a timing switch is arranged.
5. The fixed intelligent concrete curing means of frame system climbs of claim 1, characterized in that: the side interface end of the three-way interface (4) is the starting point of the device body and is connected with the main water pipe to introduce water into the device body.
6. The fixed intelligent concrete curing means of frame system climbs of claim 5, characterized in that: and a spraying controller is arranged on the main water pipe, and the operation of the main water pipe is controlled by the spraying controller.
7. A method of using the creeper system fixed intelligent concrete curing apparatus according to any one of claims 1 to 6, comprising the steps of:
firstly, welding a plurality of twisted steel bars (11) into a cup-shaped steel reinforcement cage (1), and connecting the cup-shaped steel reinforcement cage with a climbing frame through channel steel (5) to form a fixed platform; connecting a PVC water pipe from a construction water pipe to the interior of the reinforcement cage (1), and forming three climbing frame spray heads (6) extending out of the water pipe spray joint into three different angles by using a four-way joint (23) as a conversion interface, wherein the extending angles of two sides extend out along a cup shape, and the middle of the water pipe naturally extends out to form outer wall full-coverage spraying; thirdly, a main water pipe is connected to the side interface end of the three-way interface (4), water is introduced into the water pipe, and a switch gear is controlled by a spraying controller; and step four, when the climbing frame is lifted, the intelligent controller (3) is closed, and the intelligent controller is opened after the climbing frame is lifted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210797801.XA CN115182603A (en) | 2022-07-06 | 2022-07-06 | Climbing frame system fixed type intelligent concrete curing device and using method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210797801.XA CN115182603A (en) | 2022-07-06 | 2022-07-06 | Climbing frame system fixed type intelligent concrete curing device and using method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115182603A true CN115182603A (en) | 2022-10-14 |
Family
ID=83516614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210797801.XA Pending CN115182603A (en) | 2022-07-06 | 2022-07-06 | Climbing frame system fixed type intelligent concrete curing device and using method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115182603A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009101569A (en) * | 2007-10-23 | 2009-05-14 | Oriental Shiraishi Corp | Curing device and curing method of mass concrete |
CN202969940U (en) * | 2012-10-31 | 2013-06-05 | 中建三局第二建设工程有限责任公司 | Automatic concrete spraying and curing device capable of being lifted with outside climbing rack |
CN108798046A (en) * | 2017-05-04 | 2018-11-13 | 中建城市建设发展有限公司 | A kind of high-level structure storage concrete curing system and its construction method |
CN110107103A (en) * | 2019-05-16 | 2019-08-09 | 中国十七冶集团有限公司 | The automatic maintenance device of cast-in-place concrete shear wall |
CN211114913U (en) * | 2019-10-22 | 2020-07-28 | 中建二局第一建筑工程有限公司 | Automatic spraying maintenance system for high-rise building |
CN215168249U (en) * | 2021-02-09 | 2021-12-14 | 中铁建工集团有限公司 | Outer wall automatic spray maintenance system |
-
2022
- 2022-07-06 CN CN202210797801.XA patent/CN115182603A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009101569A (en) * | 2007-10-23 | 2009-05-14 | Oriental Shiraishi Corp | Curing device and curing method of mass concrete |
CN202969940U (en) * | 2012-10-31 | 2013-06-05 | 中建三局第二建设工程有限责任公司 | Automatic concrete spraying and curing device capable of being lifted with outside climbing rack |
CN108798046A (en) * | 2017-05-04 | 2018-11-13 | 中建城市建设发展有限公司 | A kind of high-level structure storage concrete curing system and its construction method |
CN110107103A (en) * | 2019-05-16 | 2019-08-09 | 中国十七冶集团有限公司 | The automatic maintenance device of cast-in-place concrete shear wall |
CN211114913U (en) * | 2019-10-22 | 2020-07-28 | 中建二局第一建筑工程有限公司 | Automatic spraying maintenance system for high-rise building |
CN215168249U (en) * | 2021-02-09 | 2021-12-14 | 中铁建工集团有限公司 | Outer wall automatic spray maintenance system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106499182B (en) | High-rise building integrated construction robot | |
CN104179144B (en) | A kind of tower crane spray equipment with automatic control function | |
CN216517007U (en) | High-rise building outer wall concrete construction maintenance and spray dust fall system | |
CN206554461U (en) | A kind of socket joint bayonet type exhaust duct | |
CN115182603A (en) | Climbing frame system fixed type intelligent concrete curing device and using method thereof | |
CN110886473A (en) | Automatic chimney paint spraying machine device and construction method | |
CN109518900B (en) | Bare top decoration structure of steel structure building and elastic coating construction method | |
CN106930571A (en) | A kind of assembled stereoscopic structure plant and its construction method | |
CN206600028U (en) | A kind of assembled stereoscopic structure plant | |
CN207379672U (en) | A kind of window for building rain-proof sprays detection machine | |
CN104328898A (en) | Rendering maintenance device for building external wall | |
CN208220028U (en) | A kind of assembled decorative concrete cornice component | |
CN204282845U (en) | Buildings in cold roof insulating structure | |
CN205296213U (en) | Utility tunnel lining cutting platform truck | |
CN112033606A (en) | Gable wall water spraying test device and operation method thereof | |
CN201643975U (en) | Spraying device of circulating slurry for desulfurizing flue gas | |
CN204212380U (en) | A kind of external wall whitewashes curing means | |
CN203989639U (en) | Super High continuous relay formula construction fire-fighting system | |
CN211362795U (en) | Box girder automatic spray equipment | |
CN204212443U (en) | A kind of external wall stop water | |
CN203569890U (en) | Energy-saving watering maintenance device for concrete pouring | |
CN206373004U (en) | Spray molding production line | |
CN210563347U (en) | Template supporting structure without window under outer eaves overhanging plate | |
CN219483057U (en) | Main structure concrete member comprehensive maintenance system | |
CN205925405U (en) | Efficiency of desulfurization of wet desulfurization tower is improved device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |