CN203939040U - A kind of tower foundation for wind-power electricity generation precast concrete pylon - Google Patents

A kind of tower foundation for wind-power electricity generation precast concrete pylon Download PDF

Info

Publication number
CN203939040U
CN203939040U CN201420185675.3U CN201420185675U CN203939040U CN 203939040 U CN203939040 U CN 203939040U CN 201420185675 U CN201420185675 U CN 201420185675U CN 203939040 U CN203939040 U CN 203939040U
Authority
CN
China
Prior art keywords
tower foundation
steel frame
supporting steel
connecting elements
annular connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420185675.3U
Other languages
Chinese (zh)
Inventor
杨静安
申宽育
罗林
胡永柱
杨鑫平
李振作
张鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Northwest Engineering Corp Ltd
Original Assignee
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Northwest Engineering Corp Ltd filed Critical PowerChina Northwest Engineering Corp Ltd
Priority to CN201420185675.3U priority Critical patent/CN203939040U/en
Application granted granted Critical
Publication of CN203939040U publication Critical patent/CN203939040U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model belongs to wind turbine tower field, a kind of tower foundation for wind-power electricity generation precast concrete pylon is provided, supporting steel frame has been built in tower foundation bottom, annular connecting elements has been built at top, and radiai adjustment jack and vertical adjustment jack are installed between supporting steel frame and annular connecting elements.The utility model has improved splicing prefabricated components precision, accelerates the assembled progress of prefabricated units, saves time, and construction method is simple, convenient, has ensured that prestressing with bond rope anchor head is well connected with basis with external prestressing tendon anchor head simultaneously.

Description

A kind of tower foundation for wind-power electricity generation precast concrete pylon
Technical field
The utility model belongs to wind turbine tower field, is specifically related to a kind of tower foundation for wind-power electricity generation precast concrete pylon.
Background technology
The sternness of global energy anxiety and amblent air temperature problem, impels the development and utilization of various countries' pay attention to day by day to regenerative resources such as wind energies.The wind speed of hinterland is conventionally much lower than coastal area, for the wind energy turbine set in low wind speed area in giving provides more generated energy, there are two kinds of main selections in blower fan supplier: they both can select to install the blower fan with larger wind wheel, also can be not having transformed unit to be arranged on higher wind tower.The selection of high tower only need increase appropriate investment, just can significantly improve power stage.Because limitation and the cost of steel tower material behavior have determined the inevitable of high concrete pylon, the cast-in-situ concrete pylon construction period is longer, is difficult to meet wind field rapid construction requirement, and precast concrete pylon arises at the historic moment.
Concrete blower fan pylon comprises whole concrete pylon and steel+concrete mixing pylon, and whole concrete pylon structure has that size is large and weight is large, transports and lift long in time limit, cost is large, and rigidity is large, and power performance is good, the features such as anti-fatigue performance is good, the low and good endurance of maintenance cost; Steel+concrete mixing pylon has, and size is less, weight is less, convenient transportation, the feature such as hoisting cost is low, and the duration is short.Precast concrete pylon is connected with tower foundation, because tower foundation adopts cast-in-place concrete structure mostly, be subject to the impact of wind field mal-condition, cannot ensure the planeness of basic end face, therefore, adopt the form that transition member is set, by adjusting the planeness of transition member, dock with the concrete pylon on top, to ensure the required precision of pylon and base water plane.Visible, transition member is the key that ensures pylon and basic good contact, adopts this kind of precast concrete transition member, has balance adjustment convenient, fast, and the advantages such as precision height.
Utility model content
The purpose of this utility model is to provide a kind of tower foundation coordinating with concrete pylon, improves splicing prefabricated components precision, accelerates the assembled progress of prefabricated units, saves time, and construction method is simple, a kind of pylon of easy construction and basic type of attachment.
The purpose of this utility model is achieved in that a kind of tower foundation for wind-power electricity generation precast concrete pylon, tower foundation lower interior is built the supporting steel frame flushing with tower foundation soffit, tower foundation upper interior build with tower foundation upper surface flush and with the annular connecting elements of pylon soffit adaptation, lateral adjustments jack and vertical adjustment jack are installed between described supporting steel frame and annular connecting elements.
Described supporting steel frame is made up of supporting steel frame one and supporting steel frame two; Described lateral adjustments jack is fixed on the side of annular connecting elements and is supported on supporting steel frame one, and vertical adjustment jack is fixed on the bottom of annular connecting elements and is supported on supporting steel frame two.
Described supporting steel frame has three groups at least, and is uniformly distributed around the center of circle of annular connecting elements below.
On described annular connecting elements, be evenly equipped with prestress hole.
technique effect of the present utility model and advantage:
The utility model ensures that by annular syndeton is set pylon and basis are connected into entirety, then ensure that by grouting form member forms entirety.Arrange connecting elements can ensure pylon with basis good connection, accelerate component assembly progress, improve merging precision, construction method is simple, convenient, save the time, ensured that prestressing with bond rope anchor head is well connected with basis with external prestressing tendon anchor head, has stronger actual application value simultaneously.
Brief description of the drawings
Below in conjunction with embodiment accompanying drawing, the utility model is described further:
Fig. 1 is connecting elements generalized section of the present utility model;
Fig. 2 is connecting elements floor map of the present utility model;
In figure: 1. annular connecting elements; 2. pylon; 3. supporting steel frame; 4. lateral adjustments jack; 5. vertical adjustment jack; 6. tower foundation; 7. prestressing with bond hole; 8, supporting steel frame one; 9, supporting steel frame two.
Detailed description of the invention
embodiment 1,1,2 describes by reference to the accompanying drawings.
A kind of tower foundation for wind-power electricity generation precast concrete pylon, comprise tower foundation 6, tower foundation 6 lower interior are built the supporting steel frame 3 flushing with tower foundation 6 soffits, the annular connecting elements 1 with pylon soffit adaptation is built at tower foundation 6 tops, and radiai adjustment jack 4 and vertical adjustment jack 5 are installed between described supporting steel frame 3 and annular connecting elements 1.
Described supporting steel frame 3 is made up of supporting steel frame 1 and supporting steel frame 29; Described lateral adjustments jack 4 is fixed on the side of annular connecting elements 1 and is supported on supporting steel frame 1, and vertical adjustment jack 5 is fixed on the bottom of annular connecting elements 1 and is supported on supporting steel frame 29.
Described supporting steel frame 3 has three groups at least, and is uniformly distributed around the center of circle of annular connecting elements below.
In described annular connecting elements 1 body, be provided with prestress hole 7, diameter is 5cm~20cm, and length is 0.5m~3.0m.
Described jack 4,5 adopts RC308 models, can pushing tow tonnage 30t, and stroke is 210mm, the scope regulating in the utility model is less, is several millimeters conventionally.
Below in conjunction with accompanying drawing 1,2 and embodiment 1, installation process of the present utility model is described.
Before tower foundation concreting, annular connecting elements 1 is arranged on supporting steel frame 3, annular connecting elements 1 bottom is provided with vertical leveling jack 5, and annular connecting elements 1 side arranges side leveling jack 4; After 1 leveling of annular connecting elements completes, be fixedly connected with supporting steel frame 3, weld other supporting facility simultaneously and ensure the stable of annular connecting elements 1; Carry out building of base concrete, intensity reaches lifting, the installation of carrying out precast concrete pylon after standard again.
Described annular connecting elements 1, also can be divided into some parts.
This tower foundation for wind-power electricity generation precast concrete pylon, comprises following installation steps:
(1) before tower foundation 6 concretings, supporting steel frame 3 is installed;
(2) lift annular connecting elements 1 and be placed on supporting steel frame 1 and supporting steel frame two 9.
(3) utilize horizontal jack 4 and vertical jack 5 to adjust annular connecting elements 1 position, ensure that annular connecting elements 1 end face is horizontal plane, and ensure annular connecting elements 1 axis for vertically to.
(4) build base concrete;
(5) grouting treatment is carried out in the gap between annular connecting elements 1 and tower foundation 6 concrete.
The utility model ensures that by annular connecting elements 1 is set pylon and tower foundation 6 are connected into entirety, then ensures that by grouting form they form entirety.Annular connecting elements 1 is set and can ensures that pylon is connected with the good of tower foundation 6, accelerated component assembly progress and merging precision, construction method is simple, convenient, has saved the time.Ensured that prestressing with bond rope anchor head is well connected with basis with external prestressing tendon anchor head simultaneously.

Claims (4)

1. the tower foundation for wind-power electricity generation precast concrete pylon, comprise tower foundation (6), it is characterized in that: tower foundation (6) lower interior is built the supporting steel frame (3) flushing with tower foundation (6) soffit, tower foundation (6) upper interior build with tower foundation (6) upper surface flush and with the annular connecting elements (1) of pylon soffit adaptation, lateral adjustments jack (4) and vertical adjustment jack (5) are installed between described supporting steel frame (3) and annular connecting elements (1).
2. a kind of tower foundation for wind-power electricity generation precast concrete pylon as claimed in claim 1, is characterized in that: described supporting steel frame (3) is made up of supporting steel frame one (8) and supporting steel frame two (9); Described lateral adjustments jack (4) is fixed on the side of annular connecting elements (1) and is supported in supporting steel frame one (8) upper, and described vertical adjustment jack (5) is fixed on the bottom of annular connecting elements (1) and is supported on supporting steel frame two (9).
3. a kind of tower foundation for wind-power electricity generation precast concrete pylon as claimed in claim 1, is characterized in that: described supporting steel frame (3) has three groups at least, and is uniformly distributed around the center of circle of annular connecting elements (1) below.
4. a kind of tower foundation for wind-power electricity generation precast concrete pylon as claimed in claim 1, is characterized in that: on described annular connecting elements (1), be evenly equipped with prestress hole (7).
CN201420185675.3U 2014-04-17 2014-04-17 A kind of tower foundation for wind-power electricity generation precast concrete pylon Expired - Lifetime CN203939040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420185675.3U CN203939040U (en) 2014-04-17 2014-04-17 A kind of tower foundation for wind-power electricity generation precast concrete pylon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420185675.3U CN203939040U (en) 2014-04-17 2014-04-17 A kind of tower foundation for wind-power electricity generation precast concrete pylon

Publications (1)

Publication Number Publication Date
CN203939040U true CN203939040U (en) 2014-11-12

Family

ID=51858367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420185675.3U Expired - Lifetime CN203939040U (en) 2014-04-17 2014-04-17 A kind of tower foundation for wind-power electricity generation precast concrete pylon

Country Status (1)

Country Link
CN (1) CN203939040U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005401A (en) * 2019-12-12 2020-04-14 贵州建工集团第一建筑工程有限责任公司 Prefabricated concrete component assembling tower footing foundation
CN113356261A (en) * 2021-07-05 2021-09-07 中国电建集团贵州电力设计研究院有限公司 Mounting method for auxiliary machine of non-sizing block type boiler

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005401A (en) * 2019-12-12 2020-04-14 贵州建工集团第一建筑工程有限责任公司 Prefabricated concrete component assembling tower footing foundation
CN113356261A (en) * 2021-07-05 2021-09-07 中国电建集团贵州电力设计研究院有限公司 Mounting method for auxiliary machine of non-sizing block type boiler

Similar Documents

Publication Publication Date Title
CN204024928U (en) One can assemble self-erecting type wind power generating set prestressed concrete steel combination pylon
CN102758445B (en) Foundation forming method for wind driven generator tower
CN103912007B (en) The installation method of the precast concrete cushion cap of reserved basic annular distance and stake nest annular distance and the many pile foundations of assembled based on this cushion cap
CN206917805U (en) The antifatigue combination steel construction wind tower of omnidirectional's prestressing force
EP2735674A1 (en) Slipformed concrete tower
CN203755778U (en) Assembly external pre-stress reactive powder concrete wind power tower
CN103114604B (en) Prestressed concrete tubular type wind generating set foundation
CN103867019A (en) Assembly type external prestressing active powder concrete wind power tower
CN105179183A (en) Prestressed concrete wind power tower system and construction method thereof
CN102797643B (en) A kind of wind power generation tower device
CN103938645B (en) The precast concrete cushion cap in reserved basic annular distance and stake nest hole and many pile foundations of the assembled installation method based on this cushion cap
CN203939040U (en) A kind of tower foundation for wind-power electricity generation precast concrete pylon
CN204024929U (en) A kind of steel concrete combination pylon prestressed concrete steel transformation segment
CN214272172U (en) Wind power plant fan tower foundation repairing and reinforcing structure
CN203782733U (en) Precast concrete bearing platform with reserved foundation ring hole and pile socket holes
CN204024188U (en) A kind of concrete pylon external prestressing anchor Shu Pingheng screw stretching anchor device
CN211777820U (en) Steel pipe concrete tower
CN203359725U (en) Adjustable elevator buffer pier
CN206707932U (en) The antifatigue combining structure wind tower of prestressing force
CN202247939U (en) Sizing block-free equipment installation mechanism
CN205036512U (en) Prestressed concrete wind -powered electricity generation pylon system
CN204984738U (en) Wind turbine generator system pylon foundation ring when slope level up device
CN204163937U (en) A kind of wind power generating set concrete pylon prestressing with bond Shu Zhangla bindiny mechanism
CN102168492B (en) Deformation control cantilever mounting method for large-diameter upright annular structure
CN106438216A (en) Pre-stressed concrete fan tower provided with segmented straight tower cylinder and installation method of pre-stressed concrete fan tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141112