CN102120338A - Time control water saving and maintaining device for high-strength concrete on outer wall of core tube structure - Google Patents

Time control water saving and maintaining device for high-strength concrete on outer wall of core tube structure Download PDF

Info

Publication number
CN102120338A
CN102120338A CN2010105909563A CN201010590956A CN102120338A CN 102120338 A CN102120338 A CN 102120338A CN 2010105909563 A CN2010105909563 A CN 2010105909563A CN 201010590956 A CN201010590956 A CN 201010590956A CN 102120338 A CN102120338 A CN 102120338A
Authority
CN
China
Prior art keywords
strength concrete
time control
exterior wall
water saving
control water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105909563A
Other languages
Chinese (zh)
Inventor
张小华
张琨
周三明
姜志浩
周杰刚
肖华
姜学胜
詹巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN2010105909563A priority Critical patent/CN102120338A/en
Publication of CN102120338A publication Critical patent/CN102120338A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a time control water saving and maintaining device for high-strength concrete on an outer wall of a core tube structure. The time control water saving and maintaining device is characterized by comprising a horizontal water jet pipe (2) and a vertical main pipe (5) that are communicated through a movable joint (4), a pipe body of the horizontal water jet pipe (2) is provided with a group of fine holes on one side facing the wall body; and water is pumped regularly through a pressurizing pump (6) under the control of a time controller(8) and enters the vertical main pipe (5). The vertical main pipe (5) increases by layers with the upward construction of floors, and the horizontal water jet pipe (2) is dismantled after the lower layer concrete is maintained, and then installed on the upper layer. The high-strength concrete on the outer wall of the core tube structure of a high-rise building is continuously sprayed and maintained according to a preset time without polluting the downside of a construction layer, thus maintaining quality is improved, assembly and disassembly construction costs are low, the horizontal water jet pipe (2) and the vertical main pipe (5) can be circularly used, water and labor are saved, worker intensity is reduced, and risk of manual operation is avoided.

Description

Core barrel structure exterior wall high-strength concrete time control water saving curing means
Technical field
The invention belongs to the high-strength concrete curing means, relate to a kind of core barrel structure exterior wall high-strength concrete time control water saving curing means.
Background technology
Continuous appearance along with skyscraper, the utilization of building structure core tube high-strength concrete more and more widely, but the construction quality of high-strength concrete is wayward, for avoiding high-strength concrete to reach because internal-external temperature difference causes surface crack because of early stage dehydration reduces intensity, the high-strength concrete maintenance is very important.Because the skyscraper modeling requirement, core barrel structure outer contour is irregular, and requires maintenance not to be interrupted, and the maintenance of core tube exterior wall high-strength concrete is extremely difficult.The method that the most employing of core tube exterior wall high-strength concrete moisture-keeping maintaining is at present manually watered, artificial water seasoning is intermittent water seasoning, the continuation management difficulty of water seasoning is big, can't effectively guarantee the maintenance quality of high-strength concrete, curing water very easily pollutes below construction layer simultaneously, on-the-spot civilized construction can not get guaranteeing, and water resource is caused waste.The artificial water seasoning of exterior wall high-strength concrete, the workman needs to do in the outrigger drilling, and field conduct is extremely inconvenient, has certain risk.
Summary of the invention
The objective of the invention is provides a kind of core barrel structure exterior wall high-strength concrete time control water saving curing means at the problems referred to above, effectively improve the maintenance promptness of core tube of high-rise building structure outer high-strength concrete, greatly promote high-rise, super-high building structure construction quality.
Technical scheme of the present invention is:
A kind of core barrel structure exterior wall high-strength concrete time control water saving curing means, comprise cistern and force (forcing) pump, it is characterized in that: described time control water saving curing means comprises horizontal sparge pipe and vertical person in charge, horizontal sparge pipe and vertical person in charge are connected by articulation, and level water spray pipe shaft offers one group of pore over against body of wall one side; Described force (forcing) pump is controlled it by time controller and is regularly drawn water and enter the vertical person in charge.
Described vertical person in charge bottom is connected with the force (forcing) pump delivery port at the place, ground.
Described force (forcing) pump water inlet is connected with cistern.
Described horizontal sparge pipe and the vertical junction of being responsible for are provided with a water valve.
The described vertical person in charge along with floor upwards construction successively connect height, the lower-layer concrete maintenance horizontal sparge pipe that finishes is removed and is installed to the upper strata.
Described horizontal sparge pipe and core tube exterior wall external scaffolding are fixed.
Described horizontal sparge pipe is arranged on the core tube high-strength concrete outer wall body outside.
Described horizontal sparge pipe is for comprising straight length and quarter bend pipeline section, and each section is connected by articulation each other.
The described vertical person in charge is a multistage, and each section is connected by articulation each other.
Beneficial effect of the present invention:
Core tube exterior wall concrete timing controlled water saving curing means proposed by the invention, can carry out continuous fog curing to core tube of high-rise building structure outer high-strength concrete according to the predefined time, water spray is vaporific, no open fire current, can below construction layer, not pollute, not only can effectively improve core tube of high-rise building structure outer high-strength concrete maintenance quality, and peace is torn open at the bottom of the construction cost, can have enough to meet the need use, the water saving saving of labor, reduce labor strength, avoid manually-operated security risk.
Description of drawings
The plane schematic top plan view of Fig. 1 apparatus of the present invention.
Fig. 2 is an A-A cross-sectional schematic among Fig. 1.
As shown in the figure: 1, concrete exterior wall 2, horizontal sparge pipe 3, external scaffolding 4, articulation 5, vertically be responsible for 6, force (forcing) pump 7, cistern 8, time controller 9, water valve
The specific embodiment
Shown in Fig. 1-2, a kind of core barrel structure exterior wall high-strength concrete time control water saving curing means, comprise cistern 7 and force (forcing) pump 6, it is characterized in that: described time control water saving curing means comprises the horizontal sparge pipe 2 and the vertical person in charge 5, horizontal sparge pipe 2 and vertically be responsible for 5 and be connected by articulation 4, level water spray pipe shaft 2 offers one group of pore over against body of wall one side; It regularly draws water and enters the vertical person in charge 5 described force (forcing) pump 6 by time controller 8 control.
The described vertical person in charge 5 bottoms are connected with force (forcing) pump 6 delivery ports at the place, ground.
Described force (forcing) pump 6 water inlets are connected with cistern 7.
Described horizontal sparge pipe 2 and vertical 5 junctions of being responsible for are provided with a water valve 9.
The described vertical person in charge 5 along with floor upwards construction successively connect height, the lower-layer concrete maintenance horizontal sparge pipe 2 that finishes is removed and is installed to the upper strata.
Described horizontal sparge pipe 2 is fixing with core tube exterior wall external scaffolding 3.
Described horizontal sparge pipe 2 is arranged on core tube high-strength concrete exterior wall 1 wall outer side.
Described horizontal sparge pipe is for comprising straight length and quarter bend pipeline section, and each section is connected by articulation each other.
The described vertical person in charge is a multistage, and each section is connected by articulation each other.
Time controller 8 links to each other with force (forcing) pump 6 switches; After tank holds full water, regulate the time of pumping and the non-time of pumping of time controller; Time of pumping arrives, and force (forcing) pump 6 automatic opening timing are drawn water, and time of pumping finishes, and force (forcing) pump 6 is closed automatically and stopped pumping.Build when last layer core tube concrete exterior wall and to finish when needing maintenance, will vertically be responsible for 5 connect high to this layer top, and after this layer level water spray arm is installed, the maintenance of beginning automatic water jetting; After the lower-layer concrete maintenance finishes, remove the horizontal sparge pipe 2 of this layer and be installed on the concrete exterior wall that newly build on the upper strata needs maintenance.Along with the upwards construction of core tube high-strength concrete exterior wall, this time control curing means upwards connects height thereupon, treat that construction to top maintenance finishes after, remove this device parts, transfer to next core tube exterior wall high-strength concrete engineering turnover use.

Claims (9)

1. core barrel structure exterior wall high-strength concrete time control water saving curing means, comprise cistern (7) and force (forcing) pump (6), it is characterized in that: described time control water saving curing means comprises horizontal sparge pipe (2) and vertical be responsible for (5), horizontal sparge pipe (2) and vertical be responsible for (5) are connected by articulation (4), and level water spray pipe shaft (2) offers one group of pore over against body of wall one side; Described force (forcing) pump (6) is controlled it by time controller (8) and is regularly drawn water and enter the vertical person in charge (5).
2. core barrel structure exterior wall high-strength concrete time control water saving curing means as claimed in claim 1, it is characterized in that: the described vertical person in charge (5) bottom is connected with force (forcing) pump (6) delivery port at the place, ground.
3. core barrel structure exterior wall high-strength concrete time control water saving curing means as claimed in claim 1, it is characterized in that: described force (forcing) pump (6) water inlet is connected with cistern (7).
4. core barrel structure exterior wall high-strength concrete time control water saving curing means as claimed in claim 1 is characterized in that: described horizontal sparge pipe (2) and vertical (5) junction of being responsible for are provided with a water valve (9).
5. core barrel structure exterior wall high-strength concrete time control water saving curing means as claimed in claim 1, it is characterized in that: the described vertical person in charge (5) along with floor upwards construction successively connect height, the lower-layer concrete maintenance horizontal sparge pipe (2) that finishes is removed and is installed to the upper strata.
6. core barrel structure exterior wall high-strength concrete time control water saving curing means as claimed in claim 1, it is characterized in that: described horizontal sparge pipe (2) is fixing with core tube exterior wall external scaffolding (3).
7. core barrel structure exterior wall high-strength concrete time control water saving curing means as claimed in claim 1, it is characterized in that: described horizontal sparge pipe (2) is arranged on core tube high-strength concrete exterior wall (1) wall outer side.
8. core barrel structure exterior wall high-strength concrete time control water saving curing means as claimed in claim 1, it is characterized in that: described horizontal sparge pipe (2) is for comprising straight length and quarter bend pipeline section, and each section is connected by articulation (4) each other.
9. core barrel structure exterior wall high-strength concrete time control water saving curing means as claimed in claim 1, it is characterized in that: the described vertical person in charge (5) is multistage, and each section is connected by articulation (4) each other.
CN2010105909563A 2010-12-16 2010-12-16 Time control water saving and maintaining device for high-strength concrete on outer wall of core tube structure Pending CN102120338A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105909563A CN102120338A (en) 2010-12-16 2010-12-16 Time control water saving and maintaining device for high-strength concrete on outer wall of core tube structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105909563A CN102120338A (en) 2010-12-16 2010-12-16 Time control water saving and maintaining device for high-strength concrete on outer wall of core tube structure

Publications (1)

Publication Number Publication Date
CN102120338A true CN102120338A (en) 2011-07-13

Family

ID=44249052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105909563A Pending CN102120338A (en) 2010-12-16 2010-12-16 Time control water saving and maintaining device for high-strength concrete on outer wall of core tube structure

Country Status (1)

Country Link
CN (1) CN102120338A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264995A (en) * 2014-10-20 2015-01-07 青岛一建集团有限公司 Automatic spraying conservation system for high-rise building shear wall structure
CN104985681A (en) * 2015-07-22 2015-10-21 中铁隧道集团四处有限公司 Automatic concrete curing device
CN105269668A (en) * 2014-07-29 2016-01-27 中建四局第六建筑工程有限公司 Wind power generation and intelligent fog curing device for attached scaffold and construction method of wind power generation and intelligent fog curing device
CN112521181A (en) * 2020-11-13 2021-03-19 四川船重生态建设有限公司 Member for rapid environment-friendly construction of high-rise building and environment-friendly construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201221056Y (en) * 2008-07-02 2009-04-15 中铁四局集团第五工程有限公司 Concrete bridge pier spray curing means
CN201245815Y (en) * 2008-08-26 2009-05-27 中铁十二局集团第四工程有限公司 Sprayer for dripping water-curing concrete of bridge high pier
CN101716797A (en) * 2009-12-14 2010-06-02 中铁十八局集团有限公司 Spraying health promotion system of precast beam slab
CN201635177U (en) * 2010-02-22 2010-11-17 攀钢集团冶金工程技术有限公司 Concrete curing device for slip form construction of high building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201221056Y (en) * 2008-07-02 2009-04-15 中铁四局集团第五工程有限公司 Concrete bridge pier spray curing means
CN201245815Y (en) * 2008-08-26 2009-05-27 中铁十二局集团第四工程有限公司 Sprayer for dripping water-curing concrete of bridge high pier
CN101716797A (en) * 2009-12-14 2010-06-02 中铁十八局集团有限公司 Spraying health promotion system of precast beam slab
CN201635177U (en) * 2010-02-22 2010-11-17 攀钢集团冶金工程技术有限公司 Concrete curing device for slip form construction of high building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105269668A (en) * 2014-07-29 2016-01-27 中建四局第六建筑工程有限公司 Wind power generation and intelligent fog curing device for attached scaffold and construction method of wind power generation and intelligent fog curing device
CN105269668B (en) * 2014-07-29 2017-10-13 中建四局第六建筑工程有限公司 A kind of attached climbing frame wind-power electricity generation smart spraying curing means and its construction method
CN104264995A (en) * 2014-10-20 2015-01-07 青岛一建集团有限公司 Automatic spraying conservation system for high-rise building shear wall structure
CN104985681A (en) * 2015-07-22 2015-10-21 中铁隧道集团四处有限公司 Automatic concrete curing device
CN112521181A (en) * 2020-11-13 2021-03-19 四川船重生态建设有限公司 Member for rapid environment-friendly construction of high-rise building and environment-friendly construction method

Similar Documents

Publication Publication Date Title
CN206941416U (en) A kind of road and bridge high pier automatic concrete spraying curing system
CN103510702B (en) Steel core concrete column pin type concrete pouring construction method
CN202053362U (en) Automatic spraying system for maintaining T-shaped beam
CN106836002A (en) A kind of sprinkling equipment with high ferro bridge pier automatic maintenance function
CN206801065U (en) A kind of side wall concrete automatic maintenance device
CN106346601B (en) Concrete vertical member automatic spray curing system
CN106351130A (en) Hanging basket cantilever casting box girder segment concrete curing system and hanging basket cantilever casting box girder segment concrete curing method
CN102120338A (en) Time control water saving and maintaining device for high-strength concrete on outer wall of core tube structure
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN104563503A (en) Cast-in-place reinforced concrete high-altitude automatic building method of high-rise and ultra high-rise residential buildings
CN204278202U (en) A kind of movable prefabricated beam automatic spray curing means
CN204163000U (en) The automatic pier stud of SECO or king-post sprinkling curing system
CN109958290A (en) A kind of full-automatic autotrophy protecting system of building green
CN108505446A (en) Bridge pier, continuous beam spray maintenance device
CN206800199U (en) A kind of sprinkling equipment with high ferro bridge pier automatic maintenance function
CN108952191A (en) A kind of vertical apparatus for concrete member curing device and maintenance process
CN204471571U (en) A kind of Precast T-Beam spray maintenance device
CN101694128B (en) Silo concrete self-control maintenance device
CN207077600U (en) Preform production and maintenance canopy
CN113152265B (en) Automatic spraying maintenance device and maintenance method for high pier of bridge
CN211114913U (en) Automatic spraying maintenance system for high-rise building
CN107344388A (en) A kind of concrete prefabricated beam particular time curing means
CN204278203U (en) A kind of automatic spray concrete curing system
CN208309395U (en) A kind of climbing formwork for construction pier stud concrete automatic maintenance device
CN208615028U (en) A kind of water-saving automatic maintenance device of precast beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110713