CN201245815Y - Sprayer for dripping water-curing concrete of bridge high pier - Google Patents

Sprayer for dripping water-curing concrete of bridge high pier Download PDF

Info

Publication number
CN201245815Y
CN201245815Y CNU2008200300701U CN200820030070U CN201245815Y CN 201245815 Y CN201245815 Y CN 201245815Y CN U2008200300701 U CNU2008200300701 U CN U2008200300701U CN 200820030070 U CN200820030070 U CN 200820030070U CN 201245815 Y CN201245815 Y CN 201245815Y
Authority
CN
China
Prior art keywords
water
pipeline
concrete
pier
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200300701U
Other languages
Chinese (zh)
Inventor
曾英军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CNU2008200300701U priority Critical patent/CN201245815Y/en
Application granted granted Critical
Publication of CN201245815Y publication Critical patent/CN201245815Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a water spray device for dripping and maintaining concrete on a high pier. The water spray device for dripping and maintaining the concrete on the high pier comprises a water source and a water pump, and is characterized in that the input end of the water pump is connected to the water source through a pipeline, and the output end thereof is connected to a main water pipeline through a pipeline; a branch pipeline is connected to the main water pipeline in parallel, the other end thereof is connected with a valve; the other end of the valve is connected with a water spray pipeline; water spray holes are formed on the wall of the water spray pipeline; and the water spray pipeline is mounted at the top end of the high pier. The utility model has the advantages of simpleness, convenient operation, saved time and labor, low cost and good maintenance effect; a plurality of piers can be maintained within 24 hours continuously; and the maintenance requirements of the prior durable concrete can be fully satisfied. By adopting the utility model, after the piers are dropped and maintained, the surface of each pier body is free from crack; the strength yield of the concrete reaches 100 percent; and the maintenance efficiency is improved by above 3 times. The utility model can be widely applied to the maintaining construction of the high piers on highways and railways.

Description

The drip water injector of curing concrete of Bridge High-pier
Technical field
The utility model relates to the concrete health in complex-terrain place, is specifically related to the drip water injector of curing concrete of Bridge High-pier.
Background technology
The maintenance of concrete construction is very crucial, especially the concrete maintenance of mountain area thin-walled hollow pier, the bad concrete surface cracking that causes of concrete curing, late strength of concrete can not meet design requirement etc., all bring a lot of unnecessary troubles to the quality of structure own and the examination of handing over, may cause this concrete work to be scrapped when serious.As general concrete health is to adopt covering earlier or the watering of parcel back to keep concrete surface moistening, the pier stud maintenance not high as basis, cushion cap, pier shaft, and railway or highway bridge with a varied topography, steep area, high slope, mountain need be crossed over river valley, zanjon, bridge pier is often up to tens meters even rice up to a hundred, and adopt erection without scaffolding more, just can't carry out health with conventional method.If concrete surface adopts conventional method parcel nonwoven or plastic foil, it is very difficult to operate, even after wrapping up well, wind one blows, very easily damages, and does not reach the parcel maintenance effect; Large tracts of land health water promotes problem, especially summer temp height besides, and water evaporates is fast, and each bridge pier all need be joined special messenger's maintenance, exist time-consuming, and the unconspicuous problem of maintenance effect.Unit in charge of construction is perplexed in the health of high pier stud always, and there is the referential defective of no mature technique in this area aspect the health of high pier stud.
Summary of the invention
The purpose of this utility model provides a kind of simple in structure, easy to use, time saving and energy saving, the maintenances simultaneously of many bridge piers, and its maintenance effect can guarantee the drip water injector of curing concrete of the Bridge High-pier of the curing requirements of the high pier durability concrete of no support.
In order to overcome the deficiency of the high pier maintenance difficulty that has erection without scaffolding now, the technical solution of the utility model is to solve like this: the Bridge High-pier concrete adopts the water injector maintenance of dripping, this device comprises water source and a water pump, special character of the present utility model is that the input of water pump is connected in the water source by pipeline, the output of water pump is connected on the main water pipeline by pipeline, at least one branch pipe(tube) in parallel on the main water pipeline, the other end of branch pipe(tube) is connected with valve, the valve other end is connected with water pipeline, diameter is just opened in water pipeline tube wall inboard along girth to multi-compartment 10cm be 2 millimeters water spray eye, water pipeline is installed in the Bridge High-pier top, and twines a week with nonwoven.
The utility model compared with prior art, have simple, easy to use, save time, laborsaving, cost is low, a plurality of bridge piers can uninterrupted maintenance in 24 hours simultaneously, maintenance effect well can satisfy the curing requirements of present durability concrete fully, the pier shaft surface does not almost have be full of cracks after the maintenance, the concrete strength qualification rate reaches 100% to adopt the novel bridge pier of this reality to drip, and maintenance efficient has improved more than 3 times.Be widely used in the maintenance construction of highway, railway high pier.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is A-A schematic cross-section of Fig. 1.
The specific embodiment
Accompanying drawing is embodiment of the present utility model.
Below in conjunction with accompanying drawing summary of the invention is described further:
With reference to Fig. 1, shown in Figure 2, the drip water injector of curing concrete of Bridge High-pier, comprise water source 1 and a water pump 2, the input of water pump 2 is connected in the water source 1 by pipeline, the output of water pump 2 is connected on the main water pipeline 3 by pipeline, four branch pipe(tube)s 4 in parallel on the main water pipeline 3, the other end of four branch pipe(tube)s 4 respectively with valve I, valve II, valve III, valve IV connects, the valve I other end is connected with water pipeline 5-1, valve II is connected with water pipeline 5-2, valve III is connected with water pipeline 5-3, valve IV is connected with water pipeline 5-4, it is 2 millimeters water spray eye that a diameter is just opened to multi-compartment 10cm in water pipeline perisporium inboard, and water pipeline is installed in the Bridge High-pier top, and twines a week with nonwoven.
The lift of water pump 2 may be selected to be 80 meters~150 meters, power is 5.0KW~7.5KW, φ 80 high-pressure water pipe that can connect full-bridge are main water pipeline 3, main water pipeline 3 can be controlled valve I, valve II, valve III, the valve IV of each pier shaft maintenance, the last branch pipe(tube) 4 control water pipelines 5-1~5-4 of each pier shaft.Each bridge pier place is provided with a subtube 4, subtube 4 is the high-voltage tube of diameter phi 30mm, length is greater than the height of bridge pier, and use valve I, valve II, valve III, valve IV connects, the other end at subtube 4 is connected with the water pipeline 5-1~5-4 that hard plastic tube is made, water pipeline 5-1~5-4 is around one week of pier shaft, the inboard water spray eye that φ 1~3mm is set every 3cm~10cm, the valve I that main water pipeline 3 connects, valve II, valve III, valve IV is placed on the ground, and each bridge pier is installed a branch pipe(tube) 4 and water pipeline 5-1~water pipeline 5-4.
In sum, using method of the present utility model is summarized as follows:
1, determines the quantity and the position of the required maintenance pier shaft of bridge;
2, water pump 2 is installed, is connected trunk line 3, by valve I serial connection branch pipe(tube) 4, connect water pipeline 5 at last, and water pipeline 5 is hung on the template, curing means connects to be finished.
When 3, pier shaft needs maintenance, connect water pump 2 power supplys, water is sent into pipeline, curing water is delivered to the pier shaft of required maintenance by valve I, by water pipeline 5 water on bridge pier top is gone downstream along bridge pier at last, promptly reach curing requirements after watering continuously, when not needing maintenance, as long as valve-off promptly stops maintenance.
4, adopt the maintenance of the utility model device, the pier shaft concrete is remained under the moistening health state, efficiently solve the difficult problem of pier shaft concrete surface cracking, and guaranteed effective lifting of concrete strength; But also accelerated construction speed.

Claims (1)

1, the drip water injector of curing concrete of a kind of Bridge High-pier, comprise a water source (1) and a water pump (2), the input that it is characterized in that water pump (2) is connected in the water source (1) by pipeline, the output of water pump (2) is connected on the main water pipeline (3) by pipeline, main water pipeline (3) is gone up at least one branch pipe(tube) (4) in parallel, the other end of branch pipe(tube) (4) is connected with valve (I), valve (I) other end is connected with water pipeline (5-1), water pipeline (5-1) tube wall upper edge girth is just opened a water spray eye to multi-compartment 10cm, and water pipeline is hung on the template of Bridge High-pier top.
CNU2008200300701U 2008-08-26 2008-08-26 Sprayer for dripping water-curing concrete of bridge high pier Expired - Fee Related CN201245815Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200300701U CN201245815Y (en) 2008-08-26 2008-08-26 Sprayer for dripping water-curing concrete of bridge high pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200300701U CN201245815Y (en) 2008-08-26 2008-08-26 Sprayer for dripping water-curing concrete of bridge high pier

Publications (1)

Publication Number Publication Date
CN201245815Y true CN201245815Y (en) 2009-05-27

Family

ID=40729635

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200300701U Expired - Fee Related CN201245815Y (en) 2008-08-26 2008-08-26 Sprayer for dripping water-curing concrete of bridge high pier

Country Status (1)

Country Link
CN (1) CN201245815Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102120338A (en) * 2010-12-16 2011-07-13 中建三局建设工程股份有限公司 Time control water saving and maintaining device for high-strength concrete on outer wall of core tube structure
CN102677590A (en) * 2012-05-16 2012-09-19 中铁四局集团第一工程有限公司 Multiple pier-shared high pier maintenance control system
CN105507589A (en) * 2015-11-30 2016-04-20 王豪 Automatic curing equipment and curing method for concrete for truss type integral steel forms
CN106223340A (en) * 2016-08-19 2016-12-14 国网新疆电力公司经济技术研究院 Automatic flow controls to drip curing system
CN107524084A (en) * 2016-06-21 2017-12-29 中国十七冶集团有限公司 A kind of high pier stud pier top rotary type health preserving equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102120338A (en) * 2010-12-16 2011-07-13 中建三局建设工程股份有限公司 Time control water saving and maintaining device for high-strength concrete on outer wall of core tube structure
CN102677590A (en) * 2012-05-16 2012-09-19 中铁四局集团第一工程有限公司 Multiple pier-shared high pier maintenance control system
CN105507589A (en) * 2015-11-30 2016-04-20 王豪 Automatic curing equipment and curing method for concrete for truss type integral steel forms
CN107524084A (en) * 2016-06-21 2017-12-29 中国十七冶集团有限公司 A kind of high pier stud pier top rotary type health preserving equipment
CN106223340A (en) * 2016-08-19 2016-12-14 国网新疆电力公司经济技术研究院 Automatic flow controls to drip curing system

Similar Documents

Publication Publication Date Title
CN201245815Y (en) Sprayer for dripping water-curing concrete of bridge high pier
CN204024928U (en) One can assemble self-erecting type wind power generating set prestressed concrete steel combination pylon
CN101585024A (en) Portable artificial rain simulating device
CN203755778U (en) Assembly external pre-stress reactive powder concrete wind power tower
CN103867019A (en) Assembly type external prestressing active powder concrete wind power tower
CN208415968U (en) Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system
CN202688841U (en) Concrete pavement normal-temperature caulk compound crack-seal machine
CN202194159U (en) Square pipe gallery bracket and square pipe gallery
CN202055558U (en) Concrete crack roulette grouting device
CN201347556Y (en) Concrete pipe pile cut-off device
CN204024929U (en) A kind of steel concrete combination pylon prestressed concrete steel transformation segment
CN201856290U (en) Bridge pier body concrete curing device
CN202369987U (en) Spiral ground pile
CN205389801U (en) Plant spray truck
CN106818412A (en) A kind of buffer zone of the municipal administration with spray irrigation function
CN209163582U (en) A kind of prepackage type concrete tower of variable cross-section thickness
CN206713662U (en) A kind of buffer zone of the municipal administration with spray irrigation function
CN201491573U (en) Novel farmland irrigating device
CN201643975U (en) Spraying device of circulating slurry for desulfurizing flue gas
CN202628408U (en) Split type sleeve connection concrete-steel combined tower frame for wind turbine generator
CN205444197U (en) Batter pile test model concrete placement stand pipe inclines
CN204163937U (en) A kind of wind power generating set concrete pylon prestressing with bond Shu Zhangla bindiny mechanism
CN203403445U (en) Steel sleeve used for plugging basement tube well
CN205617162U (en) Novel sleeper
CN207678509U (en) A kind of automatic watering type Green protection fence

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090527

Termination date: 20170826