CN105251198A - Mobile venue and building method thereof - Google Patents

Mobile venue and building method thereof Download PDF

Info

Publication number
CN105251198A
CN105251198A CN201510083321.7A CN201510083321A CN105251198A CN 105251198 A CN105251198 A CN 105251198A CN 201510083321 A CN201510083321 A CN 201510083321A CN 105251198 A CN105251198 A CN 105251198A
Authority
CN
China
Prior art keywords
flow
venue
flowing
unit
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510083321.7A
Other languages
Chinese (zh)
Other versions
CN105251198B (en
Inventor
戴见霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510083321.7A priority Critical patent/CN105251198B/en
Priority to TW104132282A priority patent/TWI711752B/en
Priority to PCT/CN2015/091205 priority patent/WO2016050212A1/en
Priority to TW104215708U priority patent/TWM527029U/en
Publication of CN105251198A publication Critical patent/CN105251198A/en
Application granted granted Critical
Publication of CN105251198B publication Critical patent/CN105251198B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/10Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports
    • E04H3/14Gymnasiums; Other sporting buildings

Abstract

The invention relates to a mobile venue. The mobile venue comprises at least one first molded wall, and the first molded wall can selectively provide or form at least one motion platform for providing a space such as various sport and activity fields and exposition halls for various activities. The first molded wall further comprises a sub-wall unit. The sub-wall unit individually provides a motion platform or the sub-wall units are combined to form the motion platform. The sub-wall unit can be moved so that the motion platform is moved and motion platform temporary needs are satisfied.

Description

A kind of flowing venue and method thereof
Technical field
The present invention relates to venue, particularly one flowing venue, this flowing venue is provided to a few flow unit, and be connected to form this flowing venue by what at least connect flow unit, wherein, this flow unit is removable, thus improves the service efficiency of this flow unit.
Background technology
Along with the growth in the living standard of people, people more and more focus on health.Therefore increasing people is by participating in various sports to take exercises.Therefore people are also increasing to the demand of sports buildings.Particularly Badminton Stadium and the such sports buildings of table tennis training hall.Existing sports buildings is all be fixed on a certain position, and people need to come sports buildings and move.Although only need vacant lot just can carry out as this type games of shuttlecock.But build a Badminton Stadium and need land resource.And soil is a kind of scarce resource, and this situation is particularly evident in the big and medium-sized cities of China.But but have a lot of idle soil in the big and medium-sized cities of China, these idle lands may be developed very soon, also likely continue idle, that is can not determine the standby time of these idle lands.If arrange Stadium on these idle lands, then can benefit the people lived near idle land.But arrange fixing Stadium on these idle lands, then, when idle land needs development, fixing Stadium then needs to be removed, thus causes waste.But the problem how utilizing these idle lands to solve sports buildings to lack, neither one solution so far.
Also the life enriching employee is focused on, as regularly held badminton game in some enterprise.But be not that each enterprise has Badminton Stadium.Therefore rent place plays and becomes unique selection.If only rent a place, then can only be that the employee involvement of participation match is in badminton game.If rent whole venue, although more employee involvement can be made in badminton game, the expense of renting fixing venue can become another problem again.Building a badminton game venue then spends larger.But some enterprise has vacant lot can hold interim activity.Even parking lot also can supply to utilize and hold provisional activity.This kind ofly need the motion of temporary venue a lot.Although build provisional place, for accomodation of activities in one piece of vacant lot.Then can dismantle after using, recover the purposes in original soil.But build and the impact of dismounting on soil, likely affect the original purposes in soil.And to build and in unloading process, the rubbish produced needs additionally to clear up, indirectly increase the cost holding activity.
Some development projects may need a lot of employee fixing local in life a period of time at one.Movable plank house becomes the first-selection that employee lives.Movable plank house just considers the living problem of employee, does not consider the physiology of employee and the construction of mental health.Although employee can carry out life spare time by watch TV or chess game etc. in movable plank house, movable plank house cannot provide place to carry out sports, as carried out shuttlecock, the motions such as table tennis for employee.Employee lacks motion, can affect operating efficiency.And movable plank house cannot provide employee to carry out the place of the motion such as shuttlecock or table tennis.Although movable plank house can reuse, be convenient to mobile.But movable plank house needs to depend on other conveying arrangements to carry out storing and moving to another location.That is, movable plank house needs extra carrier to transport.Movable plank house is an Analysis of Nested Design.That is, a set of movable plank house is by required room number, and structure carries out designing.If after this movable plank house is mounted well, need an extra increase room.For this cover movable plank house, implement also difficulty.Likely must reinstall.If this cover movable plank house is sandwich construction, only increase a room, also must consider overall structure, not easily realize.And increase corresponding room number according to the number of plies, then can cause waste again.
The shuttlecock place that fixing Badminton Stadium has is fixing, and the difficulty that additionally will increase place is very large.Even if add place, also expend huge.But some time period causes some place in Badminton Stadium to leave unused to these shuttlecock place demands less in certain areas, as be cold or rainy weather many etc.Simultaneously still large to these shuttlecock place demands in another area.As become a fine day or the area of sky hot air heating.If shuttlecock place idle for area of being cold can be used the area of day hot air heating, then improve the utilization rate in shuttlecock place.But be irrealizable for fixing sports buildings.
Fixing venue generally only has single function, if will change the function of venue, has just needed to make venue to build greatly.As being indoor swimming pool by the reconstruction of fixing Badminton Stadium, then need to make fixing Badminton Stadium to build greatly, as built swimming pool.The reconstruction of fixing natatorium also will be made for Badminton Stadium and build greatly, need at substantial cost.Now, do not have technical scheme only to need to make a change, can change the purposes of venue, as Badminton Stadium changes into natatorium, Badminton Stadium is changed in natatorium.
Container is by a large number for transport, but container also has useful life.That is, there is a large amount of containers exceeding useful life and need process.The container gone beyond the time limit how processing enormous amount is also a difficult problem.The external coating of container uses special paint, if the issue handling of the container gone beyond the time limit is bad, can cause serious environmental problem.And treating capacity is huge, required processing cost also spends huge.A kind of saving processing cost is not had at present yet, and the solution that environmental pollution is few.
Summary of the invention
One object of the present invention is to provide a flowing venue, and this flowing venue provides one group of flow unit, and the assembling of this group flow unit forms first-class moving base, and this flowing pedestal has a shop body space for carrying out activity.
Another object of the present invention is to provide a flowing venue, this group flow unit is convenient to transport, this group flow unit is convenient to assembling and is formed this flowing venue, also be convenient to be reduced to this group flow unit from the dismounting of flowing venue, the mode thus flowed by flow unit flows to another destination to make this flowing venue.
Another object of the present invention is to provide a flowing venue, and this flowing pedestal is provided to few two pedestal sidewalls, forms this shop body space between two these pedestal sidewalls, and this shop body space is for carrying out activity.
Another object of the present invention is to provide a flowing venue, and this shop body space is for arranging a performance platform, and described flow unit can be assembled and form this performance platform.
Another object of the present invention is to provide a flowing venue, this flow-based provides four pedestal sidewalls, four pedestal sidewalls are around this shop body space of formation, and this flowing venue provides a water-tight device, and this water-tight device is arranged on bottom this shop body space to form a swimming pool.
Another object of the present invention is to provide a flowing venue, and this flow unit provides a unitary space for arranging an energy supply assembly, thinks that this flowing venue provides electric energy.
Another object of the present invention is to provide a flowing venue, and this flow unit provides a unitary space for arranging a water treatment facilities, thinks that this flowing venue provides water resource.
Another object of the present invention is to provide a flowing Badminton Stadium, this flowing Badminton Stadium can move to another place by a place, thus according to each place, the quantity of Badminton Stadium demand to flowing Badminton Stadium is adjusted, to meet the demand to Badminton Stadium.
Another object of the present invention is to provide a flowing Badminton Stadium, and this flowing Badminton Stadium provides first-class moving base, and this flowing pedestal is provided to less first-class moving platform for carrying out badminton.
Another object of the present invention is to provide a flowing Badminton Stadium, and this flowing Badminton Stadium provides a flowing shop body, and this flowing shop body, by this flow-based seat supports, forms a shop body space for arranging described flowing platform for carrying out badminton.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flowing pedestal is provided to a few flow unit, and this flow unit is convenient to flowing, thus by the mode of each this flow unit of flowing by this flowing Badminton Stadium flow to destination.
Another object of the present invention is to provide a flowing Badminton Stadium, wherein, this flowing platform provides at least two platform elements, and this platform element is arranged at described flow unit, to be flowed to destination by described flow unit, and then connect two platform elements to form this flowing platform.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, for the ease of flowing, this flowing platform can be divided into multiple platform unit, to be suitable for being arranged at described flow unit, thus is flowed to destination by described flow unit.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a unitary space for providing service.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, the space that be connected two these flow units have can be communicated with, and provides service with extending space.
Another object of the present invention is to provide a flowing Badminton Stadium, wherein, by regulating this flowing Badminton Stadium of quantity regulating of this flow unit.
Another object of the present invention is to provide a flowing Badminton Stadium, wherein, by the quantity regulating the quantity of this flow unit to regulate this flowing platform.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a flow module, and this flow module provides one group of wall elements, this wall elements removably connect with around formation this unitary space.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flow module provides a component framework, so that install this wall elements.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flowing framework provides a group angle connector and one group of wall connector, so that install this wall elements.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a supporting and regulating device for supporting this flow module, for this flow module of support.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this supporting and regulating device can be incorporated in this unitary space, so that flowing.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this supporting and regulating device can make this diapire of each this flow module be connected be in same level.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a detection control apparatus, and this detection control apparatus is for the state of this supporting and regulating device of detection and control.Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flow unit, for arranging at least one power supply device, forms flowing supply unit with supplying energy to this flowing Badminton Stadium.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flow unit, for arranging at least one water treatment facilities, forms circulating water unit to supply water to this flowing Badminton Stadium.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flowing supply unit connects this circulating water unit and forms this flowing platform.
Another object of the present invention is to provide a flowing Badminton Stadium, wherein, this flow unit, for arranging at least one cooling, heating system, forms flowing cooling, thermal, with to flow unit cooling, hot gas, make to be adjusted in flowing Badminton Stadium space the temperature that suitable badminton is carried out.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this detection control apparatus provides the position of a positioner for obtaining flow unit.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this detection control apparatus provides a communicator to communicate for other this flow unit, thus collaborative work.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a motion generator can flow voluntarily to make this flow unit.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a guider, arrives preset object to guide this flow unit.
Another object of the present invention is to provide a flowing Badminton Stadium, wherein, this flowing shop body provides one group to connect support member and one group of shop wall elements, and this connection support member compartment of terrain is arranged at this flowing platform, and this shop wall elements is arranged between the wall elements of described shop.
Another object of the present invention is to provide a flowing Badminton Stadium, and wherein, this flowing shop body provides a top cover, this top cover support by each connection support member.
Another object of the present invention is to provide a kind of flowing venue, and described flowing venue is provided place platform for various sports, and as badminton, football, swimming exercise, and stage, meeting etc. are movable to cater to needed for use.
Another object of the present invention is to provide a kind of flowing venue, described flowing venue is moved to toss about in bed in each destination easily, and then the place platform met needed for various provisional activity, and can't be permanent and take environment place, and then solved the variation of limited environment space resource is utilized.
Another object of the present invention is to provide a kind of flowing venue, and described flowing venue is able to be obtained by rapid-assembling, is also quickly removed for providing place platform easily.
Another object of point of the present invention is to provide a kind of flowing venue, and described flowing venue comprises a supply unit, and described supply unit is able to described flowing venue water supply, the service condition powering to improve described flowing venue.
To achieve these goals, the invention provides a flowing venue, comprising:
First-class moving base, this flowing pedestal has a shop body space for carrying out activity; Wherein,
This flowing pedestal comprises one group of flow unit further, and the assembling of this flow unit forms at least two pedestal sidewalls, forms this shop body space between two pedestal sidewalls.
This pedestal sidewall comprises at least one layer assembly further, and wherein, when pedestal sidewall comprises at least two layer assemblies, wherein this layer assembly is set up and supports another this layer assembly, forms this pedestal sidewall with such stacked system.This layer assembly comprises this flow unit at least one, and wherein, when this layer assembly comprises at least two these flow units, one end of this flow unit of one end and another of one of them this flow unit is connected to form this layer assembly.This flow unit comprises a flow module further, this flow module has a unitary space so that provide service, the wherein further component framework of this flow module and one group of wall elements, respectively this wall elements is removably installed in this component framework, to form this unitary space.This flow unit comprises a serviced component further, and this serviced component is arranged in this unitary space to provide corresponding service.This serviced component comprises an energy supply assembly, and this energy supply assembly is arranged in this unitary space, to make this flow unit to this flowing venue supply electric energy.Wherein this serviced component comprises a water treatment facilities, this water treatment facilities is arranged in described unitary space, water treatment service is provided to this flowing venue to make this flow unit, wherein, this water treatment facilities comprises a water supply installation further, this water supply installation connects external water source to provide domestic water to this flowing venue, and wherein, this flowing venue comprises at least one described flow unit being provided with this water treatment facilities.
To achieve these goals, the invention provides a flowing Badminton Stadium, comprising:
First-class moving base, this flowing pedestal comprises at least one flowing platform for carrying out badminton; Wherein,
This flowing pedestal comprises at least two flow units further, forms this flowing platform by connecting flow unit described in two, wherein, flows pedestal so that provide service by regulating described in the quantity regulating of this flow unit.
This flowing Badminton Stadium comprises a flowing shop body further, this flowing shop body is by this flow-based seat supports, wherein, this flowing shop body is arranged at this flowing platform to form a shop body space, according to this flowing shop body of quantity regulating of this flowing platform, thus regulate this shop body space, so that provide service.
This flow unit comprises a flow module further, and this flow module comprises a component framework and one group of wall elements further, and respectively this wall elements is removably installed in described component framework, to form a unitary space for providing service.
This flow unit is further to comprise a platform element, and this platform element is removable installed in this flow module, wherein, forms this flowing platform by connecting at least two platform elements.
This flow unit comprises a supporting and regulating device further, this supporting and regulating device removably supports described flow module and stablizes for the described flow module of maintenance, wherein, when described flow unit is flowed, described supporting and regulating device is arranged at the unitary space of described flow module, so that flowing.
To achieve these goals, the invention provides another flowing Badminton Stadium, comprising:
First-class moving base, this flowing pedestal enters one and comprises at least two pedestal sidewalls, two these pedestal compartment of terrains are arranged, to form a shop body space for carrying out badminton between two these pedestal sidewalls, wherein, described pedestal sidewall comprises this flow unit at least one further, by adjusting described flow unit to regulate described shop body space.
This flowing pedestal comprises at least one flowing platform further, this flowing platform is arranged at this shop body space for carrying out badminton, wherein, this flowing platform comprises at least two platform elements further, described platform element is removably arranged at this flow unit, so that flow with described flow unit, wherein, described platform element moves to the body space connection of described shop to form described flowing platform for carrying out badminton after described flow unit is disassembled.
This flowing pedestal comprises four pedestal sidewalls, and four these pedestal sidewalls are around this shop body space of formation for carrying out badminton, and wherein this pedestal sidewall comprises at least two these flow units further, by adjusting this flow unit to regulate described flowing shop body space.
This flowing pedestal comprises at least one flowing platform further, this flowing platform is arranged at this shop body space for carrying out badminton, wherein, this flowing platform comprises at least two platform elements further, this platform element is removably arranged at this flow unit, so that flow with this flow unit, wherein, this platform element moves to this shop body space connection to form this flowing platform for carrying out badminton after this flow unit is disassembled.
The present invention's Badminton Stadium that flows comprises first-class moving base, and this flowing pedestal comprises at least one flow unit, and this flow unit is convenient to flowing by being arranged at conveying arrangement to make this flow unit.By regulating this flowing pedestal of the quantity regulating of this flow unit to provide service.This flowing pedestal comprises at least one flowing platform for carrying out badminton.This flowing platform comprises at least two platform elements, and two these platform elements are connected to each other to form this flowing platform.This platform element is arranged at this flow unit so that flow along with this flow unit.By the mode of each flow unit that flows, be convenient to the present invention's Badminton Stadium that flows and flow to each destination.After arriving each destination, form the present invention to flow Badminton Stadium by connecting each flow unit.This flow unit has a unitary space, for arranging each serviced component.Serviced component includes, but are not limited to power supply device, water treatment facilities, exhibiting device and rest assembly.This power supply device is arranged at this unitary space of this flow unit, to make this flow unit to this flowing Badminton Stadium supply electric energy.Be worth one, this flow unit being provided with this power supply device also can be applied to community and power.Such as community has a power failure suddenly, can call this flow unit arranging this power supply device and go to power supply.Water treatment facilities is arranged at this unitary space of this flow unit, provides water services to make this flow unit to this flowing Badminton Stadium and sewage is processed.This flow unit being arranged at water treatment facilities also can be applicable to supply water to community, or supplies water to disaster area when there is disaster.Similarly, this flow unit arranging this power supply device also can be powered to disaster area when there is disaster.Because flow unit is convenient to flowing, thus transport facility.This flow unit further can for arranging sanitary parts and culinary art assembly, the hygienic issues occurred during to provide and to solve the disaster relief and hungry problem.This exhibiting device is arranged at the unitary space of this flow unit, can supplies at this flowing Badminton Stadium displaying articles, for you to choose.Rest assembly is arranged at described flow unit, to provide relaxing area to have a rest for people.This flowing platform is for carrying out badminton.This shuttlecock platform is provided with a shuttlecock place.Preferably, this shuttlecock platform is provided with the shuttlecock place of a standard.For the ease of flowing, this shuttlecock platform is divided at least two platform elements.As this shuttlecock platform is divided into two these platform elements.Maybe this shuttlecock platform is divided into four these platform elements.Maybe this shuttlecock platform is divided into six these platform elements etc.When each platform element arrives object, then connect each platform element and form this flowing platform for carrying out shuttlecock activity.The platform element divided can divide according to the size of this flow unit, to mate this flow unit, thus makes this platform element also be convenient to flowing.Therefore can according to demand, by regulating the quantity of this flowing platform of quantity regulating of this flow unit.When large to badminton place demand, the mode by increasing this flow unit increases flowing platform, to satisfy the demands.When demand reduces, the quantity of this flow unit can be reduced, thus reduce flowing platform.And this flow unit be reduced is flowed to the area large to badminton place demand, thus improve the utilization rate of this flow unit.Two unitary spaces being connected this flow unit can be communicated with, and with expansion service space, improve and better serve.Further, this flowing Badminton Stadium can customize on demand, and this flow unit being provided with power supply device as selected and this flow unit being provided with this water treatment facilities form this flowing platform.This flow unit being provided with multiple exhibiting device is and for example selected to form this flowing platform.Thus many services is provided.The present invention comprises a flowing shop body further, and this flowing shop body is arranged at this flowing platform, to reduce weather to the impact carrying out badminton.And each installation component of this flowing shop body can be placed on the unitary space of this flow unit, flows with this flow unit.That is, the unitary space of this flow unit can supply containing objects when flowing.Outside a little, somewhere is because holding the shuttlecock race of the number of participant unprecedented large-scale sparetime, and existing shuttlecock place, this place quantity is far less than the quantity needed for this shuttlecock race, thus, cannot undertake so large-scale race.And we can apply flowing Badminton Stadium, neighbouring flowing Badminton Stadium is flow to temporarily this undertaking ground, the quantity of the Badminton Stadium on this ground that just can increase sharply at short notice.And after this race terminates, the flowing Badminton Stadium can will can assembled to this ground in the very short time again, turns back to it easily and carrys out local use temporarily.
For realizing above object, the invention provides a kind of flowing venue, described flowing venue comprises at least one first and forms wall, and described first formation wall selectively provides or surrounds at least one movement platform and carries out various activity to provide space, as various sports, movable meeting-place and exhibition room.
Preferably, described first forms wall comprises a sub-wall unit further, and described sub-wall unit comprises further:
One first group of wall elements;
One second group of wall elements; And
One ledge element, wherein, described second group of wall elements is installed on described first group of wall elements movably to form a container cavity between described first group of wall elements and described second group of wall elements, described movement platform is selectively formed at the surface of described first group of wall elements and described second group of wall elements, or in described container cavity, described first group of wall elements and described second group of wall elements are installed on described ledge element to form described sub-wall unit, described ledge element is determined described first group of wall elements and described second group of wall elements structural form and is strengthened the intensity of described first group of wall elements and described second group of wall elements.
Preferably, in another case, described first forms wall comprises at least two sub-wall unit further, described sub-wall unit forms described first by permutation and combination and forms wall, described movement platform is selectively formed at the space or described sub-wall cell surface that each described sub-wall unit surrounds, wherein, described sub-wall unit comprises further:
One first group of wall elements;
One second group of wall elements; And
One ledge element, wherein, described second group of wall elements is installed on described first group of wall elements movably to form a container cavity between described first group of wall unit and described second group of wall unit, described movement platform is selectively formed at the surface of described first group of wall elements and described second group of wall elements, or in described container cavity, described first group of wall elements and described second group of wall elements are installed on described ledge element to form described sub-wall unit, each described sub-wall unit is connected by described ledge components removable ground, described ledge element is determined described first group of wall elements and described second group of wall elements structural form and is strengthened the intensity of described first group of wall elements and described second group of wall elements, described first quantity forming described sub-wall unit needed for wall is able to arrange needed for environment for use.It is worth mentioning that, each described sub-wall unit selectively in the horizontal direction or vertical direction form various form through permutation and combination described first form wall and described movement platform.
Preferably, described flowing venue comprises at least one mobile unit further, described mobile unit is able to be had mobility by driving to toss about in bed in each destination, and at least one described sub-wall unit has mobility by being installed on described mobile unit to toss about in bed in each destination along with described mobile unit.
Preferably, described ledge element comprises further:
At least one locking member; And
At least one locking slot, described locking member is placed in described locking slot and is able to slide along described locking slot all the time, wherein, one end of described locking member is placed in described locking slot all the time, and the other end of described locking member is extended described locking slot and extends and be placed in locking slot described in sub-wall unit described in adjacent another at least to fix adjacent each described sub-wall unit in a direction.
Preferably, described locking slot comprises at least one locating slot further, and one end of described locking member is placed in described locating slot actively not fix described locking member slidably in described locking slot at least to fix adjacent each described sub-wall unit in a direction.
Preferably, in another case, described ledge element comprises further:
One locking member; And
One locking slot, wherein, described locking member is placed in described locking slot, when described locking member is subjected to voltage, formed electric current in described locking member and possessed magnetic, attracted each other when the described locking member be disposed adjacent has reversing the current and make can not move easily between each described sub-wall unit that is disposed adjacent.Preferably, described locking slot comprises at least two links further, described link is formed at the two ends of described locking slot, and the described locking slot of each described sub-wall unit is interconnected or is electrically connected by electrified wire to ensure to form electric current in described locking member optionally by each described link.Preferably, described ledge element comprises a cover layer further, described cover layer is in described locking member surface, and when described locking member is subjected to voltage and has magnetic, described cover layer is completely cut off the magnetic field of voltage and the described locking member generation putting on described locking member.
Preferably, described second group of wall elements exposes by being installed on described first group of wall elements movably or closing described container cavity with each described container cavity of UNICOM, form described movement platform between described first group of wall elements and described second group of wall elements of each described sub-wall unit, and in described container cavity.
Preferably, described flowing venue comprises a supply unit further, and described supply unit comprises further;
One electric supply installation; And
One water supply installation, wherein, described electric supply installation and described water supply installation are placed in described container cavity to make described flowing venue be supplied water, to power and improve the service condition of described flowing venue.
It is worth mentioning that, described flowing venue comprises one second further and forms wall, and described second forms wall is removably installed in described first formation wall to improve described movement platform.
For realizing above object, the present invention also provides a kind of formation method of the venue that flows, and described method comprises the steps:
1): be adjacent to arrange at least two sub-wall unit to obtain the first formation wall, wherein, be adjacent to arrange described sub-wall unit comprise and adjoin ground, relatively and with being separated by arrange each described sub-wall unit; And
2): regulate described first to form wall to obtain at least one movement platform, wherein, be able to convert the form of described movement platform by the quantity of carrying out permutation and combination to each described sub-wall unit or increasing and decreasing described sub-wall unit.
It is worth mentioning that, described movement platform is selectively formed at the space that each described sub-wall unit surrounds needed for use, or the first formation wall and second being formed at each described sub-wall unit forms the surface of wall.
Preferably, described step 1) comprise the steps: further
1.1): described sub-wall unit is arranged at mobile unit; And
1.2): drive described mobile unit to form wall to obtain described first.
Preferably, described step 2) comprise step 2.1 further): drive described mobile unit to adjust the form of described movable platform to regulate described first to form wall.
Preferably, described step 2) described step 2.1) also must think following steps: regulate described sub-wall unit to form wall to regulate described first, wherein, the adjustment of described sub-wall unit is comprised in the horizontal direction and the adjustment of vertical direction.
Preferably, described method also comprises step 3): form the described locking member of reverse electric current in every adjacent described sub-wall unit to reinforce the connection between each described sub-wall unit.
It is worth mentioning that, described method also comprises step 3) also must think following steps: the other end extending the described locking member of described sub-wall unit to the described locking slot of adjacent described sub-wall unit to ensure that each described sub-wall unit at least easily relative movement occurs in a direction.
Preferably, described step 3) comprise the steps: further to settle one end of described locking member in locating slot, described locking member to be immovably placed in described locking slot to ensure that each described sub-wall unit at least easily relative movement occurs in a direction.
For achieving the above object, the present invention also provides a kind of formation method of the venue that flows, and described method comprises the steps:
(1): the second group of wall unit that be movably connected in described first group of wall unit to expose container cavity; And
(2): be adjacent to arrange at least one sub-wall unit to form the first formation wall for obtaining at least one movable platform, wherein, described movable platform is selectively formed at described first group of wall elements of each described sub-wall unit and the surface of described second group of wall elements, or described container cavity.
Preferably, described method also comprises step (3): regulate described sub-wall unit to regulate described movable platform, wherein, to comprise in the horizontal direction and vertical direction regulates described sub-wall unit to the adjustment of described sub-wall unit.
Preferably, described flowing venue comprises at least one base unit, and described base unit is able to the described flowing venue being formed various form by permutation and combination, and wherein, described base unit comprises further:
One sub-platform unit, at least one described sub-platform unit forms at least one platform unit to provide activity space for user; And
One flow unit, wherein, described flow unit is able to move under external force drives, and described sub-platform unit is removably installed in described flow unit and moves along with described flow unit, and then makes described flowing venue be able to move between each destination.
Preferably, described sub-platform unit comprises a structural walls further, and described structural walls is able to structure chamber, besieged city one, and wherein, described structural walls comprises further;
One support element; And
At least one element wall, wherein, described element wall is installed on described support element movably to form described structure chamber, in the surface that described platform unit is selectively formed at least one described structural walls or described structure chamber, be installed on described support element movably by described element wall, described element wall is exposed described structure chamber or is closed described structure chamber.
It is worth mentioning that, when described platform unit is by when described at least two, sub-platform unit is formed, described structure chamber is selectively in vertical direction or horizontal direction or simultaneously in vertical direction and the mutual UNICOM of horizontal direction.
Preferably, described support element comprises at least one bracing frame and at least one fixed mount further, described fixed mount and described element wall are installed on support frame as described above respectively movably, described element wall comprises at least one fixture further, and described fixed mount is placed in described fixture and makes to keep between the described element wall of part and support frame as described above in a fixed angle to form described platform unit in described element wall.
Preferably, described support element comprises at least one bracing frame and at least one fixed mount further, described fixed mount and described element wall be removably installed in respectively support frame as described above with expose described structure chamber and each described structure chamber of UNICOM to form described platform unit in described structure chamber.
It is worth mentioning that, each described sub-platform unit is selectively placed in described flow unit and forms described platform unit or depart from described flowing platform and form described flow unit.
Preferably, described flow unit comprises a braking member, and described braking member is increased the degree-of-difficulty factor of described flow unit when movement and guarantees that described platform unit can not move easily with handle.
Preferably, described flowing venue comprises an energy resource supply unit further, described energy resource supply unit comprises one first feed unit and one second feed unit further, and described first feed unit and described second feed unit are able to provide water resource and electric energy respectively to described platform unit.
Preferably, when described element wall comprises fixture described at least two, described fixed mount is able to by being installed on different described fixtures with element wall described in adjustment portion and the angle that between described support member is.
For achieving the above object, the formation method of the present invention's also a kind of venue that flows, described method comprises the steps:
I: settle fixed mount in fixture to expose the structure chamber of sub-platform unit; And
II: drive flow unit to regulate the position of described sub-wall unit, wherein, described platform unit is formed at end face and the side of described sub-platform unit, is also formed at the described structure chamber of described sub-platform unit.
Preferably, also comprise the steps: after described step II that adjustable brake element can not move easily with fixing each described sub-platform unit.
Accompanying drawing explanation
Fig. 1 is that the present invention is flowed the structured flowchart of a flow unit of a preferred embodiment of venue.
Fig. 2 A is that the present invention is flowed the perspective view of a flow unit of a preferred embodiment of venue.
Fig. 2 B is that the present invention is flowed the perspective view of a flow unit of a preferred embodiment of venue, describes a power supply device and is arranged at this flow unit.
Fig. 2 C is that the present invention is flowed the perspective view of a flow unit of a preferred embodiment of venue, describes a water treatment facilities and is arranged at this flow unit.
Fig. 2 D is that the present invention is flowed the perspective view of a flow unit of a preferred embodiment of venue, describes an exhibiting device and is arranged at this flow unit.
Fig. 2 E is that the present invention is flowed the perspective view of a flow unit of a preferred embodiment of venue, describes a rest assembly and is arranged at this flow unit.
Fig. 3 is that the present invention is flowed the explosive view of a flow unit of another preferred embodiment of venue
Fig. 4 A is that the present invention is flowed the schematic diagram of a preferred embodiment of venue.
Fig. 4 B is that the present invention is flowed the schematic diagram of a preferred embodiment of venue, describes this flow unit and launches this platform element and form this flowing platform.
Fig. 4 C is that the present invention is flowed the schematic diagram of a preferred embodiment of venue, describes to launch this flow unit and form this flowing platform.
Fig. 4 D is that the present invention is flowed the schematic diagram of a preferred embodiment of venue, describes two these flow units and launches this platform element and form two these flowing platforms.
Fig. 5 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Fig. 6 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Fig. 7 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Fig. 8 is that the present invention is flowed the structural representation of this connection support member of another preferred embodiment of venue.
Fig. 9 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Figure 10 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Figure 11 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Figure 12 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Figure 13 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Figure 14 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Figure 15 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue.
Figure 16 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, illustrates that this flowing venue is for flowing Badminton Stadium.
Figure 17 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, illustrates that this flowing venue is for flowing Badminton Stadium.
Figure 18 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, illustrates that this flowing venue is for flowing natatorium.
Figure 19 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, illustrate that this flowing venue is for flowing natatorium, and this flowing natatorium is separated into two regions.
Figure 20 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, illustrate that this flowing venue is for flowing natatorium, and this flowing natatorium is separated into two regions.
Figure 21 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, describes to be re-assemblied by flowing natatorium to form outdoor pool afterwards.
Figure 22 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, describes to be re-assemblied by flowing natatorium to form outdoor pool afterwards.
Figure 23 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, describes a kind of embodiment of this flowing venue top cover.
Figure 24 is that the present invention is flowed the block diagram of another preferred embodiment of venue, describes the structure of this serviced component.Figure 25 is that the present invention is flowed the block diagram of another preferred embodiment of venue, describes the structure of this flow unit.
Figure 26 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, describes this flowing venue for flowing performance venue.
Figure 27 is that the present invention is flowed the schematic diagram of another preferred embodiment of venue, describes this flowing venue for flowing performance venue.
Figure 28 is that the present invention is flowed the schematic diagram of another preferred embodiments of venue, describes the venue that this flowing venue is open band ladder auditorium.
Figure 29 is the flow chart that the present invention sets up flowing venue method.
Figure 30 is that the present invention is flowed the another preferred embodiment schematic diagram of venue.
Figure 31 is that the present invention is flowed the schematic perspective view of sub-wall unit of the another preferred embodiment of venue.
Figure 32 is that the present invention is flowed another schematic perspective view of sub-wall unit of the another preferred embodiment of venue.
Figure 33 is that the present invention is flowed the schematic perspective view of a detailed description of the invention of the another preferred embodiment of venue.
Figure 34 is that the present invention is flowed the alternative of a specific embodiment of the another preferred embodiment of venue.
Figure 35 is that the present invention is flowed another detailed description of the invention schematic diagram of the another preferred embodiment of venue.
Figure 36 is that the present invention is flowed the another detailed description of the invention schematic diagram of the another preferred embodiment of venue.
Figure 37 is that the present invention is flowed a venue preferred embodiment top view again.
Figure 38 is that the present invention is flowed a venue preferred embodiment assembling process figure again.
Figure 39 is that the present invention is flowed venue another assembling process of preferred embodiment figure again.
Figure 40 is that the present invention is flowed the schematic perspective view of the venue sub-platform unit of a preferred embodiment again.
Figure 41 is that the present invention is flowed the top view of venue preferred embodiment one detailed description of the invention again.
Figure 42 is that the present invention is flowed the assembling process figure of venue another embodiment of preferred embodiment again.
Figure 43 is that the present invention is flowed the schematic perspective view of the venue another concrete mode of a preferred embodiment again.
Figure 44 is that the present invention is flowed the sectional view of the venue alternative of a preferred embodiment again.
Figure 45 is that a flow detailed description of the invention one of a venue preferred embodiment again of the present invention uses schematic diagram.
Figure 46 is that the present invention is flowed the another using state schematic diagram of venue another detailed description of the invention of a preferred embodiment again.
Figure 47 is that the present invention is flowed the schematic flow sheet of formation method of venue.
Figure 48 is that the present invention is flowed the part run schematic diagram of formation method of venue.
Figure 49 is that the present invention is flowed another part schematic flow sheet of formation method of venue.
Figure 50 is that the present invention is flowed the another part run schematic diagram of formation method of venue.
Figure 51 is that the present invention is flowed a part of again schematic flow sheet of formation method of venue.
Figure 52 is that the present invention is flowed another schematic flow sheet of formation method of venue.
Figure 53 is that the present invention is flowed the another schematic flow sheet of formation method of venue.
Detailed description of the invention
According to the content disclosed in claim of the present invention and description, described in technical scheme of the present invention literary composition specific as follows.
Shown in Fig. 3 is that the present invention is flowed a preferred embodiment of venue.In the present embodiment, this flowing venue is flowing feather shop.This flowing venue comprises at least one flow unit 10.This flow unit 10 be connected to each other is defined as first-class moving base 90.By regulating the quantity of this flow unit 10 to regulate this flowing pedestal 90, to meet the demand providing service.Preferably, at least two flow units 10 are connected to each other to form this flowing pedestal 90.That is, this flowing pedestal 90 comprises at least two these flow units 10.This flow unit 10 comprises at least one platform element 911, by connecting two these flow units 10, to make this platform element 911 of each this flow unit 10 be interconnected, for the first-class moving platform 91 of formation, thus carries out badminton at this flowing platform 91.
As shown in figure 1 and 2 a, this flow unit 10 comprises a flow module 30.This flow module 30 is convenient to be arranged at conveying arrangement, moves to destination with conveying arrangement.This flow module 30 has a unitary space 34, with in the process flowed with conveying arrangement in this flow module 30, provides spatial accommodation.This flow unit 10 can stop Preset Time in the destination of presetting, and provides shuttlecock place for carrying out badminton by being connected to form this flowing platform 91 with other flow unit 10.This unitary space 34 of each this flow module 30 as service clearance, to provide service.This flow module 30 comprises a component framework 35 and one group of wall elements 31 further, and respectively this wall elements 31 is removably installed in this component framework 35, with around formation this unitary space 34.This component framework 35 comprises a group angle connector 351 and one group of wall connector 352 further.The both ends of this wall connector 352 are permanently connected two angle connectors 352 respectively.Preferably, this group wall assembly 31 is installed on this component framework 35 this unitary space 34 around formation one right prism.Preferably, four angle connectors 351 and four wall connectors 352 are connected to form an installation frame 353, so that install this wall elements 31.Be worth one to obtain, this platform element 911 is removably installed in this component framework 35.Specifically, this platform element 911 is removably installed in this installation frame 353.That is, this platform element 911 is removably installed in this installation frame 353 as this wall elements 31.That is, this platform element 911 be connected 352 respectively at this angle connector 351 with this wall and connect.Preferably, at least one platform element 911 is removably installed in this component framework 35, so that form this flowing platform 91 by connecting this flow unit 10.That is, this flow module 30 comprises at least one platform element 911, so that form this flowing platform 91.It is worth mentioning that, this platform element 911 can be fixed in this wall elements 11.When two these flow units 10 are connected to each other, be connected to each other this component framework 35 of this flow module 30 of each this flow unit 10, firmly to connect two these flow units 10.This angle connector 351 has a spacing hole 3511 so that arrange the position of each this flow unit 10, thus is convenient to be connected to form this flowing platform 91 for carrying out badminton.
This flow unit 10 comprises a supporting and regulating device 20 further, and this supporting and regulating device 20 removably supports this flow module 30, to maintain the stable of this flow module 30.At this flow unit 10 in flow process, this supporting and regulating device 20 is incorporated in this unitary space 34 that this flow module 30 has, so that this flow unit 10 flows.This supporting and regulating device 20 comprises one group further and supports regulating part 21, and this group supports regulating part 21 and is installed on this flow module 30 removably respectively, supports this flow module 30 with adjustable ground, thus this flow module 30 maintained is stable.It is worth mentioning that, according to state of ground, regulate respectively this support regulating part 21 respectively, keep level to maintain this flow module 30, thus this flowing platform 91 being convenient to be formed by connecting this flow unit 10 moves.Respectively this support regulating part 21 removably connects one of them this wall elements 31 of this flow module 30 respectively.Preferably, respectively this support regulating part 21 and this wall elements 31 of bottom being arranged at this flow module 30.This supporting and regulating device 20 comprises a movable support regulating part 22 further, this movable support regulating part 22 removably supports this flow module 30, so that this flow module 30 mobile, thus be convenient to be permanently connected respectively this flow module 30 to form this flowing pedestal 30.As shown in Figure 5.
As shown in Fig. 2 B to Fig. 2 C, this flow module 30 comprises a serviced component 32 further, and this serviced component 32 is placed in this unitary space 34 that this flow module 30 has, thus provides this service.This serviced component 32 comprises a power supply device 321 further, and this power supply device 321 is fixedly arranged on this unitary space 34, to provide energy supply service.This power supply device 321 comprises a power interface 3211 further, and this power interface 3211 is electrically connected external power source, thus utilizes external power source to be this flowing Badminton Stadium supply electric energy.This power supply device 321 comprises an energy storage device 3212 further, and this energy storage device 3212 is connected with this power interface 3211, for depositing all external power sources.This power supply device comprises one group of solar panels 3213 further, and these group solar panels 3213 points add and are electrically connected with this energy storage device 3212, to convert solar energy into electrical energy, are then stored in this energy storage device 3212.This power supply device 321 comprises a generator 3214 further, and this generator 3214 can provide electric energy to meet the needs in this flow motion shop.This generator 3214 is electrically connected with this energy storage device 3212, with the electrical power storage produced by this generator 3214 in this energy storage device 3212.When having a power failure suddenly, this energy storage device 3212 can be this flowing Badminton Stadium supply electric energy immediately, thus maintains this flowing Badminton Stadium and normally work.This flow unit 10 being provided with this power supply device 321 is defined as the supply unit 19 that flows.This serviced component 32 comprises a water treatment facilities 322 further, and this water treatment facilities 322 is arranged at this flowing space 34, to put forward water services to this flowing Badminton Stadium, as supplied drinking water and providing sewage disposal.This water treatment facilities 322 comprises a water supply installation 3221 further, and this water supply installation 3221 can connect external water source, to supply drinking water to this flowing Badminton Stadium.This water treatment facilities 322 comprises a sewage-treatment plant 3222 further, and this sewage-treatment plant connects outside sewage disposal system, to be carried out by the sewage of generation processing and import outside sewage disposal system, thus avoids contaminated environment.The flow unit arranging this water treatment facilities 322 is defined as circulating water processing unit 18.This serviced component 32 comprises one group of exhibiting device 323 further, and this exhibiting device 323 is arranged at this unitary space 34 and shows service to provide.This flow unit 10 arranging this exhibiting device 323 is defined as Mobile display unit 17.This wall elements 31 arranging this flow unit 10 of this exhibiting device has an opening 311, so that show.This serviced component 32 comprises one group of rest assembly 324 further, provides service in this unitary space 34.This flow unit 10 arranging this rest assembly 324 is defined as flowing rest unit 16.It is worth mentioning that, this flowing space 34 that this flow unit 10 has can customize this serviced component 32 as required, provides service to utilize this flowing space 34.In the process of flowing, this serviced component 32 is incorporated in this flow unit 10, so that flowing.
As shown in Figure 1, during this flow unit, one step comprises a detection control apparatus 40, this detection control apparatus 40, and this detection control apparatus 40 connects this supporting and regulating device 20 communicatedly, maintains this flow module 30 stablize to control this supporting and regulating device 20.This detection control apparatus 40 comprises one group of monitoring element 41 and a control device 42 further.Respectively this monitoring element 41 connects each support regulating part 21 communicatedly respectively, to make respectively this support regulating part at least be connected communicatedly with this monitoring element 41, thus is convenient to obtain the state of respectively this support regulating part 41, is then sent to this control device 42.Analyzed the state of each support regulating part 21 by this control device 42, then each this support regulating part 21 is regulated, to maintain the stable of this flow module 30.This detection control apparatus 40 comprises a positioner further.This positioner 43 obtains the position of this flow unit 10.Preferably, this positioner 43 obtains the real time position of this flow unit 10.The real time position of this flow unit 10 is sent to this control device 42 by this positioner 43, so that manage this flow unit 10.This detection control apparatus 40 comprises a communicator 44 further, and this communicator 44 connects this control device 42 communicatedly so that exchange information with other this flow unit 10, thus collaborative work.That is, multiple this flow unit 10 exchanges information, so that collaborative work by each this communicator 44.This flow unit 10 receives a presupposed solution by this communicator 44, is then sent to this control module 42.This presupposed solution analyzed by this control device 42, and obtains the position of this flow unit by this positioner, arrives the E.T.A of presetting destination to obtain this flow unit 10.Then the information of this flow unit 10 and the default time of advent are coordinated with the flow unit that other receives this presupposed solution by this communicator 44, after obtaining this destination of arrival, the default stop place of this flow unit and the default connected mode with other flow unit.In other words, this communicator 44 can analyze this presupposed solution, obtains and presets destination, estimates the time of staying in default destination, in the position that the destination of presetting stops, and the state of this accommodation space 34 preset.It is worth mentioning that, the communication mode that this communicator 44 adopts includes but not limited to, Wi-Fi, Li-Fi, satellite network, communication network and internet.
This flow unit 10 comprises a power supplying apparatus 50 further, and this power supplying apparatus 50 can be this flow unit 10 and provides power, can flow voluntarily to make this flow unit 10.This power supplying apparatus 50 is connected with this detection control apparatus 40.This detection control apparatus 40 controls this power supplying apparatus 50 and provides power.Specifically, this control device 42 of this detection control apparatus 40 controls this motion generator 50 and provides motion.Preferably, if this flow unit arranges this power supply device 321, this power supply device 321 of side connects this power supplying apparatus 50, thinks that this power supplying apparatus 50 provides the energy, produces motion to make this power supplying apparatus 50.Preferably, this energy storage device 3212 of this power supply device 321 provides the energy to this power supplying apparatus 50.This power supplying apparatus 50 connects described movable support regulating part 22, to provide power to described movable support regulating part 22.This flow unit 10 comprises a guider 60 further, and this guider 50 is connected communicatedly with this detection control apparatus 40, flows to destination to guide this moving cell 10.That is, by this power supplying apparatus 50 and this guider 60, this flow unit 10 can flow to destination certainly.
As shown in Figure 3, at this preferred embodiment, two these flow units 10 are connected to form this flowing pedestal 90, and this flowing pedestal 90 provides this flowing platform 91 for carrying out shuttlecock activity.That is, this flowing platform 91 comprises two platform elements 911, is arranged at two these flow units 10 respectively.Preferably, this platform element 911 is installed in this installation frame 35 of this flow module 30 of this flow unit 10.This two stream unit 10 is permanently connected to make two these platform elements 911 be connected to form this flowing platform 90 for carrying out badminton.It is worth mentioning that, two these platform elements 911 are respectively defined as one first platform element 9111 and one second platform element 9112 further.That is, at this preferred embodiment, this flowing platform 10 comprises one first platform element 9111 and one second platform element 9112, and this first platform element 9111 and this second platform element 9112 are connected to form this flowing platform 91 for carrying out badminton.
As shown in Figure 4 A, at this preferred embodiment, this flow unit 10 comprises two these platform elements 911, and one of them this platform element 911 is installed in this component framework 35 of this flow module 30, and another this platform element 911 is removably fixed on the outside of this component framework 35.Preferably, this platform element 911 is installed in the top of this component framework 35, and another this platform element 911 and this platform element 911 are arranged at the top outer of this component framework 35 overlappingly.As shown in Figure 4 B, another this platform element 911 can be moved apart this flow unit 10, then support by each support regulating part 21, thus be connected with this platform element 911 and be in same level, thus forming this flowing platform 91 for carrying out badminton.Two these flow units 10 are connected to make another this platform element 911 of another this this flow unit 10 of platform element 911 and another of this flow unit 10 to be connected to form this flowing platform 91 for carrying out badminton.In addition, when this another this platform element 911 of this flow unit 10 moves apart this flow unit 10, then supported to make another this platform element 911 of this flow unit 10 be connected to form this flowing platform 91 for carrying out badminton with this platform element 911 of this flow unit 10 by each this support regulating part 21.It is worth mentioning that, by regulating respectively this support regulating part 21, the surface of the surface of another this platform element 911 of this flow unit 10 and this platform element 911 of this flow unit 10 is in same level, so that carry out badminton.And another this platform element 911 of another this flow unit 10 moves apart this flow unit 10, then supported to make this platform element 911 of another this this flow unit 10 of platform element 911 and another of another this flow unit 10 be connected to form this flowing platform 91 for carrying out badminton by each this support regulating part 21.Specifically, this flow unit 10 one of wherein, this first platform element 9111 is installed in this component framework 35 of this flow module 30.This second platform element 9112 is installed in the outside of this component framework 35 of this flow module 30 and overlapping with this first platform element 9111.Preferably, this first platform element 9111 is installed in the top of this component framework 35 of this flow module 30.At another this flow unit 10, this second platform element 9112 is installed in this component framework 35 of this flow module 30.This first platform element 9111 is installed in the outside of this component framework 35 of this flow module 30 and overlapping with this first platform element 9111.Preferably, this second platform element 9112 is installed in the top of this component framework 35 of this flow module 30.As shown in Figure 5, connecting by connecting two these flow units 10, being connected to form this flowing platform 90 for carrying out badminton to make this second platform element 9112 of one of them this flow unit 10 with this first platform 9111 of another this flow unit 10.When this flowing platform 90 can not satisfy the demands, by this, this second platform element 9112 of one of them this flow unit 10 moves apart this flow unit 10, then support by each this support regulating part 22, be connected to form this flowing platform 91 to make this second platform element 11 with this first platform element 9111 of this flow unit 10.This first platform element 9111 of another this flow unit 10 is moved apart this flow unit 10, then support by each this support regulating part 22 to make this first platform element 9111 be connected to form another this flowing platform 91, for carrying out badminton with this second platform element 9112 of another this flow unit 10.It is worth mentioning that, make this first platform element 9111 be in same level, so that carry out badminton with this second platform element 9112 by each this support regulating part.It is worth mentioning that, another platform element 911 of this flow unit 10 also can be placed in the bottom of this flow module 10 of this flow unit 10.That is, support another this platform element 911 by this supporting and regulating device 21, another this platform element 911 supports this flow module 30.
As shown in Figure 5, the present invention is flowed another preferred embodiment in venue shop.In the preferred embodiment, this flowing venue is used as Badminton Stadium.In order to make this flowing platform be convenient to transport, this flowing platform is divided at least two platform elements.In the present embodiment, this flowing platform is divided into four platforms element 911.This four platforms element is defined as the 3rd platform element 9113 respectively, 4th platform element 9114,5th platform element 9115 and the 6th platform element 9116. are in the preferred embodiment, four these flow units 10 are connected to form this flowing pedestal 90, and wherein respectively this flow unit 10 specifically has this platform element 911 at least one.To flow determining to set up the present invention the destination that Badminton Stadium will set up, and need the quantity of this flow unit 10.In the present embodiment, need four these flow units 10 to be connected to form this flowing pedestal 90, and respectively this flow unit 10 comprise this platform element 91 at least one.This platform element 91 of four these flow units 10 is connected to form this flowing platform 90 for carrying out badminton.According to setting up the present invention to flow the needs of Badminton Stadium, select four these flow units 10.The present invention's Badminton Stadium that flows needs to provide electric energy and water, then select be provided with this flow unit 10 of this power supply device 321 and be provided with this flow unit 10 of water treatment facilities 322.That is, select this flowing supply unit 19 and this circulating water processing unit 18 to provide energy supply service and water treatment service.Select two these flow units 10 again.It should be noted that respectively this platform element 911 of four selected these flow units 10 can be connected to form this flowing platform 91 for carrying out shuttlecock activity.It is worth mentioning that, the initial position of four these flow units 10 can be positioned at different places.One of them this flow unit 10 receives flowing Badminton Stadium information by this communicator 44 of this detection control apparatus 40, is then sent to this control module 42.The flowing Badminton Stadium information that the analysis of this control module 42 obtains, obtains destination information.Then this control module 42 obtains the real time position of this flow unit 10 by this positioner 43.Destination information and real time position are sent to this guider 60 by this control module 42, obtain the route or E.T.A that arrive this destination.One of them this flow unit 10 is by the current location of one of them this flow unit 10, and route and E.T.A are sent to other three these flow units 10, to coordinate a connection scheme by this communicator 44.That is, four these flow units 10 are in flow process, according to the position of destination, respectively this flow unit 10 current location and respectively this flow unit estimate to arrive time of destination, coordinate in stop place, destination, thus make to park to predeterminated position when this flow unit 10 arrived the earliest has been destination.And when last this flow unit 10 arriving destination is parked to predeterminated position, four these flow units 10 are connected to form this flowing pedestal 90.Four these flow units 10 comprise this platform element 911 respectively, are connected to form this flowing pedestal after 90s at four these flow units 10, and respectively this platform element 911 is connected to form this flowing platform 91 for carrying out shuttlecock activity.Shown in Fig. 6 is the process that four these flow units form this flowing platform.It is worth mentioning that, four these flow units 10 comprise this flowing supply unit 19 and this circulating water processing unit 18.
This flowing platform 91 supplies to arrange a flowing shop body 80, as shown in Figure 7.That is, this flowing platform 91 is as the diapire of this flowing shop body 80.This flowing shop body 80 comprises shop wall 82 and a top cover 83 further.This shop wall 82 is arranged at this flowing platform 91, for this top cover 83 of support.Preferably, this shop wall 82 is arranged at the edge part of this flowing platform 91, and the height of this shop wall 82 meets the requirement carrying out badminton, and this flowing shop body 80 provides space to be convenient to carry out shuttlecock activity.This shop wall 82 comprises one group further and connects support member 821 and one group of shop wall elements 822.The both ends of this shop wall elements 822 are connected support member 821 respectively and removably connect with two, this connection support member 821 removably connects two these shop walls 822.Form this shop wall 82 by this way.Respectively this connection support member 821 is removably fixedly arranged at the edge part of this flowing platform 91 respectively.Preferably, respectively this connection support member 821 is fixedly set in the corner portion 912 of this flowing platform 91.Further, this connection support member 81 is set at the connecting portion 913 of two these platform elements 911, so that be fixedly connected with this shop wall elements 821.This top cover 83 comprises a bracing frame 831 and at least one covering 832 further, and this covering 832 is covered in this bracing frame 831, to form this top cover 83.This bracing frame 831 comprises one group of supporting base end portion 8311 further.This group supporting base end portion 8311 respectively correspondence is arranged at respectively this connection bracing or strutting arrangement 821, with support by each this connection bracing or strutting arrangement 821.It is worth mentioning that, this connection support member 821 has a filling channel 8211.Arrange an aerating device 8212 to inflate to this filling channel in the bottom of this connection bracing or strutting arrangement 821.As shown in Figure 8.This bracing frame 831 is formed by inflation.It is worth mentioning that, the shop wall 82 of whole flowing shop body 80 and this top cover 83 are formed by inflation, as shown in Figure 9.It is worth mentioning that, whole flowing shop body 80 formed by filling, as shown in Figure 13, Figure 14.
Figure 10 is that the present invention is flowed another preferred embodiment of venue.In the preferred embodiment, described flowing venue is as flowing Badminton Stadium.One group of flow unit 10 is flowed to destination respectively.In this flow process, respectively this flow unit 10 is respectively by this communication device switches information of this detection control apparatus 40 of each flow unit 10, to coordinate the scheme forming flowing Badminton Stadium.Respectively this flow unit 10 is according to the scheme forming flowing Badminton Stadium, arranges respectively this flow unit 10 in the position of destination, to form this flowing pedestal 90A.In the present embodiment, this flowing pedestal 90A has a shop body space 92A, for holding this flowing platform 91A thus providing badminton.Specifically, this flowing pedestal 90A comprises at least two pedestal sidewall 93A, between two this pedestal sidewall 93A, have a shop body space 92A for carrying out shuttlecock activity.This pedestal sidewall 93A comprises this flow unit 10 at least one further.In this is preferably implemented, this pedestal sidewall 93A comprises two these these flow units 10 of flow unit 10, two and is connected to each other.It is worth mentioning that, this wall elements 31 dismantling the side that two these flow units 10 connect respectively is communicated with this unitary space 34 making two these flow units 10 and have respectively, thus is convenient to provide service.Preferably, respectively this moving cell 10 dismantles this platform element 911A of respectively this flow unit 10, and each this platform element 911A is arranged at this shop body space 92A.Respectively this platform element 911A is connected to each other and forms this flowing platform 91A, so that carry out badminton at this shop body space 92A.Preferably, respectively this platform element 911A support by each this supporting and regulating device 20.Coordinated by this communicator 44 of each this detection control apparatus 40 of this flow unit 10, respectively this control device 42 of this detection control apparatus 40 of this flow unit 10 regulates this supporting and regulating device 20 of respectively this flow unit 10, to make the surface of respectively this platform element 911A be in same level, thus be convenient to carry out badminton.It is worth mentioning that, this flowing platform 91 is for arranging a flowing shop body 80A.This flowing shop body 80A comprises an a shop wall 82A and top cover 83A further.This shop wall 82A is connected with this flowing platform 91A, this top cover 83A support by this shop wall 82A, to provide a shop body space 92A to meet the requirement carrying out shuttlecock activity around this flowing platform 91A.This shop wall 82A comprises one group further and connects support member 821A and group of shop wall elements 822A.Connection side 931A is defined as towards this side of this flowing platform 91A by this pedestal sidewall 93A.This group connects the top that support member 821A is respectively set at two these pedestal sidewalls.Specifically, this group connects the top that support member 821A is spaced apart and arranged in the connection side 931A of this pedestal sidewall 93A.This shop wall elements 822A is removably arranged between two this connection support member 821A, thus makes each shop wall elements 822A and this connection side 931A be arranged on this pedestal sidewall 93A form the sidewall of this flowing shop body 821.This top cover 83A comprises a bracing frame 831A and at least one covering 832A further, and this covering 832A is covered in this bracing frame 831A, to form this top cover 83A.This bracing frame 831A comprises one group of supporting base end portion 8311A further.This group supporting base end portion 8311 respectively correspondence is arranged at respectively this connection bracing or strutting arrangement 821A, with support by each this connection bracing or strutting arrangement 821A.It is worth mentioning that, this connection support member 821A has a filling channel 8211A.Arrange an aerating device 8212A in the bottom of this connection bracing or strutting arrangement 821A to inflate to this filling channel.This bracing frame 831A is formed by inflation.It is worth mentioning that, two this shop wall elements 822A are coupling in this wall connector 352 of this flow module 30 of two these flow units 10 removably respectively, to form a wherein end wall of this flowing shop body 80A.As shown in Figure 10.
It is worth mentioning that, if the service that this flowing pedestal 90A provides can not satisfy the demands, satisfy the demands to make this flowing pedestal 90A by the quantity increasing this flow unit 10.Sent by this communicator 44 of this detection control apparatus 40 of one of them this flow unit 10 of this flowing pedestal 90A and increase unit requests.It is worth mentioning that, in this increase unit requests, comprise, the type of this serviced component 32 that destination locations, the quantity needing to increase this flow unit and this flow unit 10 needs are installed, as power supply device 321 or water treatment facilities 322 etc.After another this flow unit 10 to be received by this communicator 44 of this detection control apparatus 40 and increases unit requests, this another analyze this increase unit requests of this increase by this control device 42 of this detection control apparatus 40.If another this flow unit 10 meets this increase unit requests, then another this flow unit 10 sends a response request.This response request comprises the type of the serviced component 12 that another this flow unit 10 comprises, the current location of another this flow unit 10, arrives the scheduled time etc. of destination.After this flow unit 10 sending this increase unit requests receives this response request, this control device 42 of this detection control apparatus 40 of this flow unit 10 analyzes this response request to judge whether another this flow unit 10 satisfies the demands.If meet, send to another this flow unit 10 and receive information to make another this flow unit 10 receive the position flowing of this flow unit 10 backward of receiving information.If another this flow unit 10 does not meet demand, then send exclude information to refuse the request of another this flow unit 10 to another this flow unit 10.This control device 44 of this detection control apparatus 40 of this flow unit 10 judges whether the quantity of this flow unit 10 needed reaches further.Need the quantity increasing this flow unit 10 if reached, then this flow unit 10 is sent by this communicator 40 of this detection control apparatus 40 and stops increasing unit requests, to stop the response request receiving the transmission of other this flow unit 10.Stop increasing unit requests when other this flow unit 10 receives, then other this flow unit 10 stops sending response request to this flow unit 10.It is worth mentioning that, after this flow unit 10 receives the response request of this other flow unit multiple, arrive on the estimation and preferably select object time to estimate to arrive this short flow unit 10 of destination time.As shown in figure 11, in the preferred embodiment, this flowing pedestal 90A needs this flow unit 10 of increase by two.It is worth mentioning that, two these flow units 10 coordinate the stand of two these flow units 10 in the process flowing to this destination.After two these flow units 10 increased newly arrive destination, park by coordinated stand, be fixedly connected with wherein two these flow units 10 of this flowing pedestal 90A to make two these flow units 10.Two these flow units 10 increased newly comprise this platform element 911 respectively.This platform element 911 that wherein two these flow units 10 of two these platform elements 911 and this flowing pedestal 90A comprise respectively is connected, and to form another this flowing platform 91A, thus provides shuttlecock service.It is worth mentioning that, two these flow units 10 increased newly regulate respectively by this respective supporting and regulating device 20, to make the surface of each platform element 911 being connected to form another this flowing platform 91A be in same level, thus be convenient to carry out badminton.
If the utilization rate of this another this flowing platform 91A declines, after not needing to provide service, newly increase two these flow units 10 send free message respectively by this communicator 44 of this respective detection control apparatus 40, so that receive request.After newly increase two these flow units 10 receive and receive information, this respective supporting and regulating device 20 is received to this respective unitary space 34 by newly increase two these flow units 10 respectively, so that flowing.Then newly increase two these flow units 10 are flowed to another destination.It is worth mentioning that, newly increase two these flow units 10 can not be identical by the destination flowed to.
Figure 12 is that the present invention is flowed another preferred embodiment of Badminton Stadium.One group of this flow unit 10 is flowed to default destination.In flow process, coordinate the position of each this flowing moving cell 10 of this flowing Badminton Stadium scheme arrangement of formation of drawing according to this group flow unit 10, form this flowing pedestal 90B.This flowing pedestal 90B has a shop body space 92B, for holding this flowing platform 90B thus providing badminton.According to the needs carrying out badminton, this shop body space 90B provides at least one this flowing platform 91B of accommodation to carry out badminton.In the present embodiment, this shop body space 92B provides this flowing platform of accommodation two 91B for carrying out badminton.This flowing pedestal 90B comprises four pedestal sidewall 93B, and the both ends of four this pedestal sidewall 93B connect successively, with around formation this shop body space 92B.This pedestal sidewall 93B comprises at least two layer assembly 931B further, and one of them this layer assembly 931B is fixedly installed on another this layer assembly 931B overlappingly, with support by another this layer assembly 931B.This layer assembly 931B comprises at least two these these flow units 10 of flow unit 10, two further and is connected to each other.Dismantle this wall elements 31 of the vicinity of two these flow units 10 respectively, be communicated with this unitary space 34 making two these flow units 10 have respectively.It is worth mentioning that, dismantle two these wall elements 31 of two these flow units 10 of the two layer assembly 931B that two adjacent this pedestal sidewall 93B adjoin respectively, with this unitary space 34 that two these flow units 10 being communicated with two adjacent layer assembly 931B have respectively, thus form one deck passage 931B with the two-layer group of adjacent assembly 931B of through two adjacent this pedestal sidewall 93B.It is worth mentioning that, this serviced component 12 comprises a Stair element 125 further, for this unitary space 34 being arranged at this flow unit 10, thus is communicated with adjacent layer assembly 931B.
In the preferred embodiment, this shop body space 92B that this flowing pedestal 90B provides supplies to provide this flowing platform of accommodation two 91B to carry out shuttlecock activity.That is, this shop body space 92B can carry out two badmintons simultaneously.By being arranged on this platform element 911 of respectively this flow unit 10 from respectively this flow unit dismounting, then each platform element 911 is moved to this shop body space 92B.Then connect respectively this platform element 911 to form this flowing platform 91B.Be worth mentioning, respectively this platform element 911 can be set up this adjusting supporting device 20, to regulate this adjusting supporting device 20 of each this platform element 911 of support respectively, thus make the surface of respectively this platform element 911 be in same level, be beneficial to carry out badminton.Can for arranging this flowing shop body 80B at two this flowing platform 91B.Respectively this pedestal sidewall 93B is as the shop wall 82A of this flowing shop body 80B.This flowing shop body 80B comprises a top cover 83B further.This top cover 83B support by this pedestal sidewall 93B.This top cover 83B comprises an a bracing frame 831B and covering 832B further, and this covering 832B covers this bracing frame 831B.This bracing frame 831B support by each this pedestal sidewall 93B.It is worth mentioning that, be detachably positioned at this wall elements 31 of this flow module 30 of this flow unit 10 of this layer assembly 93B of the bottom of this pedestal sidewall 93B to form a passage 932B for this flowing platform of turnover 91B.
Shown in Figure 13 is that the present invention is flowed another preferred embodiment of Badminton Stadium.In the preferred embodiment, two these flow units 10 are connected to form this flowing pedestal 90C.Two these flow units 10 receive a predetermined flow Badminton Stadium scheme, and respectively this flow unit 10 analyzes this predetermined flow Badminton Stadium scheme respectively by this control device 44 of this respective detection control apparatus 40, obtain and estimate destination information.Then respectively this flow unit 10 exchanges respectively by this respective communicator 44, according to the real time position of two these flow units 10, determines the assembling scheme in destination.Then each flow unit 10 is flowed to destination.When after wherein this flow unit 10 arrives destination arrival destination after, according to assembling scheme, be directed to preset stop place.Then from this unitary space 34, taking out one group of this support member 221 being installed on this adjusting device 21 respectively, for firmly supporting this flow module 30.After another this flow unit 10 is flowed to this default object, be directed to default stop local so that be connected with this flow unit 10.Then from this unitary space 34 of another this flow unit 10, take out this group support member 221, be arranged at this adjusting device 21, stablize to keep another this flow unit 10.Then the side of the selected side of this wall assembly 31 of this flow module 30 of another this flow unit 10 and this wall assembly 31 selected of this flow module 30 of this stream unit 10 is moved, connect to make two these flow units 10.Then this selected wall assembly 31 of this flow module 30 of this flow unit 10 and this selected wall assembly 31 of this flow module 30 of another this flow unit 10 is dismantled, thus this unitary space 34 making another this flow unit 10 have is communicated with this unitary space 34 of this flow unit 10, forms a service clearance 34A.It is worth mentioning that, this control device 42 of this this detection control apparatus 40 of flow unit 10 carries out collaborative work by this communicator 44 with another this flow unit 10.By each support regulating part 221 of each adjustment support member 221 and another this flow unit 10 that regulate this flow unit 10 respectively, same level is in, so that move with this wall assembly 31 being positioned at the bottom of this flow module 30 of another this flow unit 10 to make this wall assembly 31 being positioned at the bottom of this flow module 30 of this flow unit 10.Two these flow units 10 by respective detection control apparatus 20 collaborative work, with maintain two these flow module 30 be positioned at bottom two walls be in same level without part 31.It is worth mentioning that, one of them wall elements 31 can be dismantled in addition, to form an opening 314 for entering this activity space 34C.This activity space 34C formed after this two stream unit 10 combines can for movable.Two these flow units 10 are connected to form this flowing pedestal 90C.
It is worth mentioning that, if the space that this flowing pedestal 90C provides can not satisfy the demands, this communicator 44 by this detection control apparatus 40 of one of them this flow unit 10 sends this flow unit 10 of increase and asks, to increase space.A kind of mode increasing flow unit 10 on the basis of Fig. 2 in one embodiment of the present invention shown in Figure 13.Flowing pedestal 90C increases flowing shop body 80C.This flow unit 10 of increase by two is asked by this communicator 44 of wherein this detection control apparatus 40 of this flow unit 10.After two these flow units 10 increased receive request, exchanged, so that collaborative work by respective communication module 44.According to the position of two these flow units 10 increased, determine newly-increased assembling scheme.After wherein a flow unit 10 increased flows to this destination, according to fixed assembling scheme, by this flowing platform 91 that this flow module 30 of this flow unit 10 is arranged.Then, two these wall elements 31 preset of two flow module 30 of two flow units 10 connected are preset in dismounting respectively, thus this unitary space 34 that this flow unit 10 increased newly is had is connected to form newly-increased activity space 34C with this unitary space 34 of another this newly-increased flow unit 10.Two newly-increased these flow units 10 are connected to form this flowing shop body 80C.Dismantle two selected wall elements 31 of newly-increased two these flow units 10 to be respectively communicated with this unitary space 34 making two flow units 10 increased newly and have respectively, to satisfy the demand.It is worth mentioning that, can before this flow unit 10 be arranged on this flowing pedestal 90, dismantle this wall elements 31 preset of this flow module 30 of this flow unit 10, and dismantle another this flow unit 10 this flow module 30 preset this wall elements 31, thus make two these flow units 10 increased newly be arranged on this flowing pedestal 90 and by presupposed solution connect after, this unitary space 34 that this unitary space 34 that this flow unit 10 has and another flow unit 10 have is communicated with, to satisfy the demand.Two these detection control apparatus 40 of two newly-increased these flow units 10 control corresponding wall elements 31 respectively and regulate, and to raise corresponding wall elements 31, thus make the height of the activity space 34C increased newly meet the requirement carrying out shuttlecock activity.In addition, a fixture (not showing in figure) can be increased between each flow unit 10, can be fixedly connected with to make two flow units 10.
Shown in Figure 14 and Figure 15 is that the wall elements 31 being arranged at side and/or top of this flow unit 10 can be aerating device.In other words, this aerating device forms the side being arranged at side and top of this flow module 30 of this flow unit 10
Shown in Figure 16 is that the present invention is flowed another preferred embodiment of venue.This flowing venue comprises first-class moving base 90D, and this flowing pedestal 90D has a shop body space 92D for carrying out badminton.This flowing Badminton Stadium comprises a top cover 83D further, and this top cover 83D is supported by this flowing pedestal 90D, and to cover this shop body space 92D, thus the other factors making to reduce outside this Badminton Stadium is on the impact carrying out badminton, as weather conditions.This flowing pedestal 90D comprises at least two pedestal sidewall 93D further, forming this shop body space 92D for carrying out activity, preferably carrying out shuttlecock activity between two this pedestal sidewall 93D.This top cover 83D is supported respectively by two this pedestal sidewall 93D.Preferably, this flowing pedestal 90D comprises four this pedestal sidewall 93D, this top cover 83D support by four this pedestal sidewall 93D.Four these pedestal sidewalls 93 supply to carry out activity around setting to form this shop body space 92D.This pedestal sidewall 93D comprises at least one layer assembly 931D further.If pedestal sidewall 93D comprises two layer assembly 931D.Respectively this layer assembly 931D forms this pedestal sidewall 93D in the mode of superposition.That is, one of them layer assembly 931D supports another this layer assembly 931D to form this pedestal sidewall 931D.It is worth mentioning that, make firmly connecting of each layer assembly 931D by jockey.Preferably, this pedestal sidewall 93D comprises three this layer assembly 931D.That is, three this layer assembly 931D form this pedestal sidewall 93D in the mode of superposition.For the ease of flowing, this layer assembly 931D comprises at least one flow unit 10D further.In the preferred embodiment, a wherein end of two this flow unit 10D connects mutually to form this layer assembly 931D.This flow unit 10D is convenient to flowing, and that is, this flow unit 10D is convenient to dismounting, assembling and transport.That is, this flowing venue can be disassembled into one group of flow unit 10D.In the mode of this group flow unit 10D that flows, this flowing venue is flowed to default destination, and then this group flow unit 10D is assembled into this flowing venue.It is worth mentioning that, by one group of serviced component 32D, this flowing Badminton Stadium can provide the service corresponding with this group serviced component 32D.Preferably, this serviced component 32D is arranged at this flow unit 10D, so that integrally dismantle with this flow unit 10D, assemble and transport.It is worth mentioning that, if this flowing venue can not meet the requirement of service, meeting demand to serving by increasing this flow unit 10D being provided with this serviced component 32D.If in this flowing venue, this flow unit of some of them 10D utilization rate is low, this flow unit 10D can be removed from this flowing venue.Then the flowing venue place needing to increase this flow unit 10D is flowed to, to improve the utilization rate of this flow unit 10D.
As shown in figure 25, this flow unit 10D comprises this flow module 30D.This flow module 30D comprises a component framework 35D and group wall elements 31D further, and described wall elements 31D removably connects described component framework 35D, to form a unitary space 34D.It is worth mentioning that, two this flow unit 10D connected, by dismantling the two adjacent wall elements 31D of two this flow unit 10D respectively, being communicated with the two unitary space 34D making two this flow unit 10D have respectively.By being communicated with the two adjacent unitary space 34D of two adjacent flow module 30D, to make two adjacent layer assembly 931D be communicated with, be convenient to provide service.By being communicated with the two adjacent unitary space 34D of two adjacent flow module 30D, also can making this serviced component of more spatial placements 32D, thus better service is provided.Preferably, this serviced component 32D is arranged on this flow module 30D single, so that dismantle, install and transport together with this flow unit 10D, thus provides the flow efficiency of this flowing Badminton Stadium.It is worth mentioning that, one of them two this wall elements 31D being arranged at this flow unit 10D bottom this flowing venue relative will be disassembled, and to form a unit channel 341D, enter venue by this unit channel.
As shown in figure 24, that is, this flow module 30D comprises at least one serviced component 32D further, and this serviced component 32D is arranged at this unitary space 34D that this flow module 30D has, with the service making this flow unit 34D provide this serviced component 32D.This serviced component 32D comprises a power supply device 321D further, and this power supply device 321D can be fixedly arranged on this unitary space 34D, provides energy supply service to make this flow unit 10D being provided with this power supply device 321D.Described energy supply service refers to that this flowing Badminton Stadium for being assembled formation by this group unitary space 34D provides electric energy.This power supply device 321D comprises a power interface 3211D further for connecting external power source, thus utilizes external power source to this flowing Badminton Stadium supply electric energy.This power supply device 321D comprises an energy storage device 3212D further, and this energy storage device 3212D is electrically connected this power interface 3211D, with store electrical energy.This energy storage device 3212D can be used as stand-by power supply, and when external power source stops powering to this flowing Badminton Stadium, this energy storage device 3212D powers to this flowing Badminton Stadium.This power supply device 321D comprises one group of solar-energy collector 3213D further, and this group solar-energy collector 3213D is electrically connected this energy storage device 3212D.This group solar-energy collector 3213D obtains solar energy, then converts solar energy into electrical energy and is stored in this energy storage device 3212D.Preferably, this group solar-energy collector 3213D is arranged at the outside of this wall elements 31D, so that collect solar energy.This power supply device 321D comprises a generator 3214D further, this energy storage device of this generator 3214D electrical links 3212D, with by generation electrical power storage in this energy storage device 3212D.This generator 3214D can directly to this flowing Badminton Stadium for electric energy.When external power source stops powering to this flowing Badminton Stadium, this generator 3214D powers to this flowing Badminton Stadium.When external power source recovers to power to this flowing Badminton Stadium, this generator 3214D stops powering to this flowing Badminton Stadium.When external power source and this generator 3214D stop powering to this flowing Badminton Stadium simultaneously, this energy storage device 3212D powers to this flowing Badminton Stadium.This serviced component 32D comprises a water treatment facilities 322D further, this water treatment facilities 322 is arranged at this unitary space 34D of this flow module 30D, to provide water treatment service to this flowing Badminton Stadium, as supplied drinking water, purified treatment is carried out so that recycle to water, sewage is processed.This water treatment facilities 322D device can connect external water source, to provide water source to this flowing Badminton Stadium.This water treatment facilities 322D can connect outside sewage disposal system, to be processed by the sewage in this flowing Badminton Stadium process, is then disposed to outside sewage disposal system, thus avoids polluting environment.This water treatment facilities 322D comprises a water supply installation 3221D further, and this water supply installation 3221D connects this external water source, to this flowing Badminton Stadium supply domestic water.Further, this water supply installation 3221D processes external water source, to supply drinking water.This water treatment facilities 322D comprises sewage-treatment plant 3222D further, and this sewage-treatment plant 3222D connects outside sewage disposal system, to be carried out by the sewage of generation processing and import outside sewage disposal system, thus avoids contaminated environment.This water treatment facilities 322D comprises a water purification installation 3223D further, and this water purification installation 3223D can supply purified water source, so that Recycling.This water purification installation 3223D comprises at least two and is fixedly connected with portion 32231D.Wherein one this be fixedly connected with portion 32231D guide water enter this water purification installation 3223D to carry out Water warfare.Another this be fixedly connected with portion 32231D and guide the water purified to discharge this water purification installation 3223D.This serviced component 32D comprises one group of exhibiting device 323D further, and this exhibiting device 323D is arranged at this unitary space 34D that this flow module 30D has and shows service to provide.This wall elements 31D being provided with this flow unit 10D of this exhibiting device 34D has an opening 311D, so that show.This serviced component 32D comprises one group of rest assembly 324D further, provides service in this unitary space 34.This serviced component 32D comprises a temperature-controlled package 325D further to regulate the temperature of this flowing venue.This temperature-controlled package 325D is arranged in this unitary space 34D of this flow module 32D, to regulate the temperature in this flowing venue.It is worth mentioning that, this temperature-controlled package 325D for the quality regulating air, can have ozone to maintain in this venue.It is worth mentioning that, this unitary space 34D that this flow unit 10D has can customize this serviced component 32D as required, provides service to utilize this unitary space 34D.As needs provide the service of changing one's clothes, then customize one and to change one's clothes serviced component 326D, the serviced component 326D that then this changed one's clothes is arranged at this unitary space 34D of this flow module 30D of this flow unit 10D, provides to make this flow unit 10D the service of changing one's clothes.That is, by this serviced component 326D that changes one's clothes, dressing cubicle service can be provided at this flowing space 34D.As needs provide toilet, then customize a sanitary parts 327D, then this Health Services assembly 326D is arranged at this unitary space 34D of this flow module 30D, to provide Health Services.As needs provide culinary art service, then a customizable culinary art assembly 328D, is then arranged at unitary space to provide culinary art service by this culinary art assembly 328D.It is worth mentioning that, in this unitary space 34D of this flow module 32D of this flow unit 10D, can for arranging at least one serviced component 32D.That is, in this unitary space 34D that can have at this flow module 32D as required, multiple serviced component 32D is set.Preferably, this serviced component 34D is separately set in the unitary space 34D of this flow module 32D of this flow unit 10D.This flow unit 10D being provided with this power supply device 321D is defined as flowing supply unit 19D.This flow unit 10D being provided with this unit for treating water 322D is defined as circulating water processing unit 18D.This flow unit 10D being provided with this exhibiting device 323D is defined as Mobile display unit 17D.This flow unit 10D being provided with this rest assembly 324D is defined as flowing rest unit 16D.This flow unit being provided with this temperature-controlled package 325D is defined as flowing temperature regulon 15D.This flow unit 10D being provided with this dressing cubicle assembly 326D is defined as flowing dressing cubicle unit 14D.This flow unit 10D being provided with this toilet components 327D is defined as Portable toilet unit 13D.It is worth mentioning that, at least one serviced component 32D can be arranged at this flow unit 10D, provides service to make this flow unit 10D for this flowing Badminton Stadium.Preferably, this flowing venue at least comprises a flowing supply unit 19D, and that is, this flowing venue at least comprises a flow unit 10D and arranges this power supply device 321D.This flowing venue at least comprises a flowing unit for treating water 322D, and namely this flowing venue comprises a flow unit 10D further and is provided with described water treatment facilities 322D.
This top cover 83D comprises an a bracing frame 831D and covering 832D further, and this covering 832D covers this bracing frame 831D, this bracing frame 831D support by each pedestal sidewall 93D.Preferably, this covering 832D is that soft waterproof material is made, so that be contained this unitary space 34D to this flow module 30D.It is worth mentioning that, this bracing frame 831D also can be contained this unitary space 34D to this flow module 30D, is moved into destination with this flow unit 10D.It is worth mentioning that,
Shown in Figure 23 is another alternate embodiments of this top cover.This top cover 83E comprises at least one bracing or strutting arrangement 831E and at least one covering 832E further, and this group bracing or strutting arrangement 831E compartment of terrain is arranged at described shop body space 92D, and preferably, this bracing or strutting arrangement 831E is arranged on the gap in two shuttlecock places.This group covering 832E is fixed between two this bracing or strutting arrangement 831E respectively, for covering this shop body space 92D.This bracing or strutting arrangement 831E comprises a main support member 8311E further, at least two sub-support member 8312E and at least two connector 8313E, two these sub-support member 8312E are located at the outside of this two walls assembly 93D respectively, and this main support member 8311E is arranged in the body space of described shop.Preferably, the gap in two shuttlecock places is arranged at.This connector 8313E connects main support member 8311E and sub-support member 8312E.Described covering 832E is fixedly connected with this connector, to be fixed between two this bracing or strutting arrangement 831E.It is worth mentioning that, this flow unit 10D of a customizable type, to make the length of this flow unit 10D be greater than on two relative this wall assembly 93D, to be supported respectively by two these wall assemblies by this, thus form this top cover.It is worth mentioning that, this top cover can adopt jacking membrane structure, or other structure.
This flowing Badminton Stadium comprises first-class moving platform 91D further, and this flowing platform 91D is arranged at the bottom of this shop body space 92D, for carrying out badminton.It is worth mentioning that, this flowing platform 91D is provided with at least one piece of shuttlecock place.In the preferred embodiment, this flowing platform 91D has been provided with three pieces of shuttlecock places.This flowing platform 91D comprises a group platform element 911D further.Each this platform element 911D is respectively equipped with wherein a part of shuttlecock place.This platform element 911D can be arranged on this flow unit 10D respectively, flows to destination with this flow unit 10D.As, this platform element 911D is placed on this unitary space 34D of this flow module 30D of this flow unit 10D.It is worth mentioning that, this platform element 911D can be used as this wall elements 31D and is removably arranged on and is arranged on this component framework 35D, thus improves flow efficiency.
This flow unit 10D comprises a supporting and regulating device 20D further, this supporting and regulating device 20D removably supports this flow module 30D, to maintain the stable of this flow module 30D, this supporting and regulating device 20D can be incorporated in this unitary space 34D of this flow module 30D.This supporting and regulating device 20D comprises one group further and supports regulating part 21D, and this group supports regulating part 21D and is installed on this flow module 30D removably respectively, supports this flow module 30D with adjustable ground, thus maintains the stable of this flow module 30D.It is worth mentioning that, this support regulating part 21D can be arranged on respectively this platform element 911D, stably to support respectively this platform element 911D.It is worth mentioning that, adjustable respectively this support regulating part 21D, to make respectively this platform element 911D be in same level, thus make each this platform element 911D assemble formation this flowing platform 91D be convenient to carry out badminton.
It is worth mentioning that, in order to make in flowing, this flow unit 10D can be customized to plurality of specifications.In the preferred embodiment, this flow unit 10D comprises two kinds of specifications, first-class moving cell 101D and second moving cell 102D.Preferably, the type of this first-class moving cell 101D is the specification of 20 chi containers, and the type of this second moving cell 102D is the specification of 40 chi containers.Be the specification of the first container by the type of first-class moving cell 101D, the type of this second moving cell 102D is that the advantage of the specification of the second container is, after next destination is determined, determine the service that this flowing Badminton Stadium provides in the service that this destination provides further.Then this flowing Badminton Stadium is dismantled.Being dismantled by this flowing Badminton Stadium and arranging is one group of flow unit 10D, so that flowing.This group flow unit 10D is flowed to next destination, then in this destination, this group flow unit 10D is assembled and form this flowing Badminton Stadium.It is worth mentioning that, after at this flowing Badminton Stadium, to be disassembled arrangement be one group of flow unit 10D, the service provided required for this flowing Badminton Stadium of next destination, flows to this destination by this group flow unit 10D being provided with respective service assembly 32D.Meanwhile, prepare one group of container in advance in this destination, be shaped as another this flowing Badminton Stadium with this group flow unit 10D coordinated groups being provided with respective service assembly 32D.That is, this flowing Badminton Stadium is dismantled, and this group flow unit 10D after arrangement can be flowed to different destinations according to demand respectively.This group flow unit 10D can form this flowing Badminton Stadium with collaborative assembling of container.It is worth mentioning that, according to the quantity of this flow module 10D, this flowing Badminton Stadium being formed and there is multiple shuttlecock place can be assembled.Preferably, the first specifications of container is 20 chi containers.The second specifications of container is 40 chi containers.It is worth mentioning that, this serviced component 32D can for being installed on container.
This flow unit 10D comprises a detection control apparatus 40D further, and this detection control apparatus 40D connects this supporting and regulating device 20D communicatedly, remains stable to control this supporting and regulating device 20D.This detection control apparatus 40D comprises an one group of monitoring element 41D and control device 42D further.Respectively this monitoring element 41D connects each support regulating part 21D communicatedly respectively, at least be connected communicatedly with this monitoring element 41D to make respectively this support regulating part 21D, thus be convenient to obtain the state of respectively this support regulating part 21D, be then sent to this control device 42D.Analyzed the state of each support regulating part 21D by this control device 42, then each this support regulating part 21D is regulated, to maintain the stable of this flow module 30D or this platform element 911D.This detection control apparatus 40D comprises a positioner 43D further.This positioner 43D obtains the position of this flow unit 10D.Preferably, this positioner 43D obtains the real time position of this flow unit 10D.The real time position of this flow unit 10D is sent to this control device 42D by this positioner 43D, so that manage this flow unit 10D.This detection control apparatus 40D comprises a communicator 44D further, and this communicator 44D connects this control device 42D communicatedly so that exchange information with other this flow unit 10D, thus collaborative work.That is, multiple this flow unit 10D passes through respectively this communicator 44D exchange information, so that collaborative work.This flow unit 10D receives a presupposed solution by this communicator 44D, is then sent to this control module 42D.This control device 42D analyzes this presupposed solution, and obtains the position of this flow unit 10D by this positioner 43D, arrives the E.T.A of presetting destination to obtain this flow unit 10D.Then the flow unit that the information of this flow unit 10D and the default time of advent receive this presupposed solution by this communicator 44D and other is coordinated, after obtaining this destination of arrival, the default stop place of this flow unit and the default assembling mode with other flow unit 10D.In other words, this communicator 44D can analyze this presupposed solution, obtains and presets destination, estimates the time of staying in default destination, in the position that the destination of presetting stops, and the state of this spatial accommodation of default destination.It is worth mentioning that, the communication mode that this communicator 44D adopts includes but not limited to, Wi-Fi, Li-Fi, satellite network, communication network and internet.
This flow unit of this group 10D is flowed to default destination.In flow process, this group flow unit 10D tunable draws the scheme forming this flowing Badminton Stadium.When this group flow unit 10D arrives this destination, assemble according to coordinated scheme.Such as, assembling this flowing Badminton Stadium as shown in figure 18, first respectively this layer assembly 931D of assembling bottom.In the preferred embodiment, this layer assembly 931D comprises two this flow unit 10D.Respectively this flow unit 10D needing respectively this layer assembly 931D carrying out bottom to assemble is guided to predetermined assembling region.Connect two this flow unit 10D to form this layer assembly 931D.After respectively this layer assembly 931D completing bottom assembles, respectively this layer assembly 931D at assembling middle part.Respectively this flow unit 10D at assembling middle part is located on respectively this layer assembly 931D of bottom, to be supported by respectively this layer assembly 931D of bottom respectively.Connect two this flow unit 10D and form this layer assembly 931D being arranged at middle part.Finally complete the assembling of respectively this layer assembly 931D at top.Each this flow unit 10 is placed on this layer assembly 931D in the middle part of this, support by this layer assembly 931D at middle part.Then this layer assembly 931D that two these flow units 10 form top is connected.In the preferred embodiment, this layer assembly 931D at this layer assembly 931D of bottom and this layer assembly 931D at middle part and top assembles and forms this wall assembly 93D.The each layer assembly 931D this bracing frame 831D of this top cover 83D being placed in top with make this bracing frame 831D of this top cover 83D support by each layer assembly 931D at each top.Then this covering 832D is covered this bracing frame 831D to form this top cover 83D.It is worth mentioning that, this serviced component 32D can be arranged on respectively this flow unit 10D before assembly, also can be arranged on each flow unit 10D after assembling.
Shown in Figure 18 is that the present invention is flowed another preferred embodiment of venue.In the preferred embodiment, this flowing venue is as flowing natatorium, and this flowing natatorium has at least one swimming pool 70D.It is worth mentioning that, in the preferred embodiment shown in Figure 16, only need increase by water-tight device 71D, then can make the present invention flow venue by the Badminton Stadium that flows change into flowing natatorium.This water-tight device 71D is arranged on the bottom of this shop body space 92D, and is installed in the bottom inside of respectively this pedestal sidewall 93D, to form a swimming pool 70D in the bottom of this shop body space 92D.This water-tight device 71D is provided with at least two flow-guiding mouth 711D further, for drainage current.Preferably, this of this flow-guiding mouth 711D and this water purification installation 3223D is fixedly connected with portion 32231D (not representing in the drawings) and is connected, with by this be fixedly connected with portion 32231D (not representing in the drawings) fix.The water be arranged in this water-tight device 71D enters one of them through one of them this flow-guiding mouth 711D, and this is fixedly connected with portion 32231D, then enters water purification installation 3223D and carries out purified treatment.Then the water after purification is fixedly connected with portion 32231D (not representing in the drawings) and this flow-guiding mouth 711D and is returned in this water-tight device 71D by drainage by another this, thus ensures the quality of water.This water-tight device 71D can be set as required, to form the swimming pool 70D meeting demand.Preferably, each this water-tight device 71D correspondence arranges each this swimming pool 70D.The degree of depth of this swimming pool can be arranged on the height of this pedestal sidewall 93D according to this water-tight device 70D and determine.In the preferred embodiment, preferably, the height of this water-tight device 70D reaches this layer assembly 931D at middle part.Preferably, this water-tight device 70D is soft waterproof material, so that be incorporated in this unitary space 34D, thus is convenient to flowing.It is worth mentioning that, in a wherein part for the bottom of formed swimming pool, at least one this flow unit 10D is set to form different depth of water regions in this swimming pool.
As illustrated in figures 19 and 20, it is worth mentioning that, multiple this flow unit 10D can be set, swimming pool be divided at least two regions, to provide different services in different regions.First, the border of zoning is determined at swimming pool.Then some this flow unit 10D are set in a stacked fashion along border, with by the moisture of boundaries on either side every, form at least two regions.Preferably, some this flow unit 10D are stacked to the depth of water of this swimming pool 70D.Respectively the water in two regions is processed by arranging this flow unit 10D with water treatment facilities 322D, to provide different services.As provided warm pond and water cooling pond respectively by water treatment facilities 322D.As shown in figure 19.Preferably, the both sides of a partition wall 72D that respectively this flow unit 10D of separated region is formed are set up this water-tight device 71D, respectively to stop the water in two regions by this partition wall 72D.Preferably, multiple unit for treating water 322D can be set at multiple this flow unit 10D of the bottom of this flowing natatorium, when swimming pool occurs unexpected, as time drowned, two of purifier 3223D can be fixedly connected with portion 32231D (not indicating in the drawings) to be all set to guide water to flow to this purifier 3223D, this purifier 3223D stops purifying waste water, but water is excluded swimming pool, to save the people be drown.Owing to arranging multiple purifier 3223D, drainage efficiency improves, and the efficiency of being rescued to make people improves.It is worth mentioning that, be set to flow in the process of natatorium from flowing Badminton Stadium, the service that this flowing Badminton Stadium is provided by serviced component, as power supply, water treatment, dressing cubicle, toilet, the service such as lobby is all retained, thus continues as this flowing natatorium and provide service.
It is worth mentioning that, if this swimming pool 70D of this flowing natatorium can not satisfy the demands, this flowing natatorium can be dismantled, then re-assembly, form outdoor pool, thus increase the area of swimming pool and satisfy the demand.The swimming pool in a region can be formed, as shown in figure 21.Or form the swimming pool in multiple region, as shown in figure 22.If this flowing natatorium needs to flow to another destination, then the same with this shop, flowing feather shop, this flowing natatorium is carried out dismantling and then arranges as each flow unit 10D.Flow in units of flow unit 10D.Assemble again after flowing to another destination.
Shown in Figure 26 and Figure 27 is that the present invention is flowed another preferred embodiment of venue.This flowing venue is flowing performance shop.At the shop body space 92D of flowing Badminton Stadium, one performance platform 73D is set.This performance platform 73D comprises at least one this flow unit 10D.That is, by arranging this flow unit 10 to form this performance platform 73D in this shop body space 92D assembling.Preferably, this flow units 10 some are connected side by side in the bottom of this shop body space 92D to form this performance platform 73D.It is worth mentioning that, in this performance platform 73D, two adjacent this wall elements 31D dismantling two these flow module 30D of two this flow unit 10D of connection are respectively communicated with this unitary space 34D making respectively this flow unit 10D and have, thus formation one space, backstage 731D.According to the needs of performance, the position-adjustable of this performance platform 731.As being arranged on the one end bottom the body space 92D of this shop, or the middle part bottom the body space 92D of this shop.It is worth mentioning that, this performance platform 73D is arranged the middle part bottom the body space 92D of this shop, can be used as the match platform of combat sports.As boxing, tae kwon do etc.
It is worth mentioning that, this flowing venue comprise one group of flow unit 10D, can arranging to adapt to different purposes to this group flow unit 10D as required, as increased this flow unit 10, or re-assemblying flow unit 10 etc.Thus make, flowing Badminton Stadium is converted to flowing natatorium or flowing performance shop.Flowing natatorium is performed shop with flowing and also can be changed mutually.
It is worth mentioning that, this group flow unit 10D of this flowing venue same, can be flowed to different destinations respectively, coordinates other flow unit 10D to form different flowing venues.Such as, this flowing venue is as this flowing Badminton Stadium.This flowing venue receives the request of two destinations, and the request of one of them destination is for setting up flowing natatorium, and the request of another destination is for setting up flowing performance shop.This flowing venue cannot meet the request of these two destinations simultaneously.If but the specification of each flow unit 10D of this flowing venue is consistent with the specification of container, then respectively this flow unit 10 of this flowing venue can carry out collaborative assembling with container, forms flowing venue.Preferably, this flow unit 10D is container.Therefore, according to the demand of destination, this flowing venue can be dismantled, arrange and become this group flow unit 10D.Then this group flow unit 10D is divided into two parts, in base, a part is flowed to the destination needing flowing natatorium, and another part is needed the destination of this flowing performance venue by flowing to.By this group flow unit 10D divide different piece time it is noted that due to one of them destination it is desirable that natatorium of flowing, therefore can overabsorption circulating water processing unit 18D to this grouping.The venue size simultaneously set up as required distributes the quantity of supply unit 19D.Service is provided to distribute the quantity being provided with service unit again required for basis.Respectively by means of transport, each this flow unit 10D is transported to respective destination.After each flow unit 10D arrives destination, start and the collaborative assembling of container.
As shown in figure 28, this flowing venue comprises first-class moving base 90E, and this flowing pedestal 90E has a shop body space 92E.Preferably, this shop body space 92E provides and carries out shuttlecock activity.This flowing pedestal 90E comprises at least two pedestal sidewall 93E further, forming this shop body space 92E for carrying out activity, preferentially carrying out shuttlecock activity between two this pedestal sidewall 93E.Preferably, this flowing pedestal 90E comprises four this pedestal sidewall 93E, and four this pedestal sidewall 93E supply to carry out activity around setting to form this shop body space 92D.This pedestal sidewall comprises at least one layer assembly 931E further.In the preferred embodiment, this pedestal sidewall 93E comprises three this layer assembly 931E, and the layer assembly 931E being arranged at middle part is connected with the layer assembly 931E being arranged at outside respectively with the layer assembly 931E being arranged at inside respectively.That is, three this layer assembly 931E connect to form a viewing portion 9311E side by side.Preferably, three this layer assembly 931E are respectively three highly different this flow unit 10D.This pedestal sidewall 93E has another alternative.This pedestal sidewall 93E has two layer assembly 931E, and wherein a layer assembly 931E arranges inside, and another layer assembly arranges outside this layer assembly 931E being arranged at inside with this and is connected.It is worth mentioning that, the quantity of included this flow unit 10D of outside this layer assembly 931E is greater than the quantity of included this flow unit 10D of interior layer assembly 931E.Preferably, the quantity of included this flow unit 10D of outside this layer assembly 931E is the twice of the quantity of included this flow unit 10D of interior layer assembly 931E.Outside this layer assembly 931E has sandwich construction, and in other words, this flow unit 10D forms this in the mode of superposition and is arranged at outside this layer assembly 931D.Form this pedestal sidewall 93E of hierarchic structure thus.
As shown in figure 29, set up this flowing venue to comprise the following steps:
Step 1001: determine required this flow unit 10D setting up this flowing venue.
Step 1002: respectively this flow unit 10D participating in this flowing venue of assembling is flowed to destination of setting up an embassy.
Step 1003: assembling respectively this flow unit 10D to set up this flowing venue.
Step 1001 is further comprising the steps:
Step 10011: the type determining this flowing venue.As, determine that the flowing venue set up is flowing Badminton Stadium or flowing natatorium.Further, also need to determine that the type of this flowing venue is the need of transformation.As this flowing Badminton Stadium changes this flowing natatorium into.
Step 10012: that determines this flowing venue sets up mode.Determine that this flowing venue all adopts flow unit 10D to assemble or adopts the mode of flow unit 10D and container Hybrid assembling.
Step 10013: determine required this flow unit 10D setting up this flowing venue.First, the type that this flow unit of this serviced component 32D is set setting up this flow unit 10D needs is determined.As arranged this flowing supply unit 19D of this power supply device 321D of this serviced component 32D at this flow unit 10D, or this circulating water processing unit 18D of this water treatment facilities 322D of this serviced component 32D is set at this flow unit 10D, or this Mobile display unit 17D etc.Then, the quantity required for all types of this flow unit 10D is determined further.Then, determine the original position of this flow unit 10D participating in setting up this flowing venue, and be really provided with the original position of respectively this flow unit 10D of this serviced component 32D.It is worth mentioning that, in determined this flow unit 10D, comprise at least one this flowing supply unit 19D to provide electric energy to this flowing venue.Determined this flow unit 10D comprises at least one this circulating water processing unit 18D further to provide water treatment service to this flowing venue.It is worth mentioning that, respectively this flow unit 10D participating in setting up this flowing venue need not start flowing in same original position.That is, this flow unit 10D of this flowing venue also can be used to assemble another this flowing venue.
It is worth mentioning that, before step 1002, also can comprise a step: dismantle this flow unit 10D from another this flowing venue.Then this flow unit 10D is assembled into the state of being convenient to transport.
Step 1003 is further comprising the steps:
Step 10031: determine that the assembling mode of venue is moved in this flowing.Assembling mode comprises at least two kinds: a kind of is assemble according to the number of plies of this flowing venue, and that is, the bottom of this flowing venue is installed to top layer, and one deck of this flowing venue comprises at least two layer assembly 931D.Another kind of with this pedestal sidewall 93D for assembly unit is assembled.That is, first assemble this pedestal sidewall 93D, then assemble another this pedestal sidewall 93D, until assembled.Determine the assembling mode of respectively this layer assembly 931D further.This layer assembly 931D comprises at least this flow unit 10D.That is, determine whether quantity, respectively this flow unit 10D that this layer assembly 931D comprises this flow unit 10D arrange this serviced component 32D, respectively this flow unit 10D and arrange the type of service unit 32D.It is worth mentioning that, in this flowing venue, at least one layer assembly 931D comprises and is provided with this flow unit 10D that this energy supply arranges 321D.That is, in this flowing venue, at least one layer assembly 321D comprises this flowing supply unit 19D.In this flowing venue, at least one layer assembly 931D comprises this flow unit 10D being provided with this water treatment facilities 321D.That is, in this flowing venue, at least one layer assembly 321D comprises this circulating water processing unit 18D.
Step 10032: form this flowing venue.Corresponding respectively this flow unit 10D is selected to carry out assembling to form this layer assembly 931D according to the determined assembling mode of step 10031.It is worth mentioning that, if be according to the number of plies group number of this flowing venue in step 10031, then first form respectively this layer assembly 931D of this flowing venue bottom, then assemble respectively this layer assembly 931D and form this flowing venue bottom.Then assemble respectively this layer assembly 931D in intermediate layer, each this layer assembly 931D is assembled with the intermediate layer forming this flowing venue.Finally assemble respectively this layer assembly 931D of the top layer of this flowing venue.Again each layer assembly 931D is formed the top layer of this flowing venue 931D.This top cover of nearest installation 83D.First this bracing frame 831D is installed, and then covering 832D is covered in this 831D, form this top cover 83D.If select in this step 10031 with the assembling mode of pedestal sidewall 93D.First the assembling sequence of respectively this pedestal sidewall 93D is determined.Then wherein this pedestal sidewall 93D is selected to assemble.The first, form this layer assembly 931D of the bottom of this pedestal sidewall 93D.The second, form this layer assembly 931D in the middle level of this pedestal sidewall 93D.Again by this mid-tier component 931D arrange to this layer assembly 931D of this bottom, support by the layer assembly 931D assembly of this bottom.3rd, form this layer assembly 931D of this top layer of this pedestal sidewall 93D.On this layer assembly 931D again this layer assembly 931D of this top layer being arranged on this intermediate layer, support by the layer assembly in this middle level.This pedestal sidewall 93D is assembled to be completed.Then all the other pedestal sidewalls 93D is assembled according to the mode of this pedestal sidewall of assembling 93D.After respectively this pedestal sidewall 93D has assembled, assemble this top cover 83D.First, this bracing frame 831D is arranged at the top layer of respectively this pedestal sidewall 93D, with support by the top layer of each pedestal sidewall.Then covering 832D is arranged at this bracing frame 831D supported.Thus form this flow motion shop.
Step 1004 is comprised further: the purposes changing this flowing venue after step 1003.Change the purposes of visiting flowing venue and comprise two kinds of modes, wherein a kind of method is for increasing device.Increase by one water-tight device 71D is only needed as this flowing Badminton Stadium changed into this flowing natatorium.This water-tight device is arranged at the bottom of this flowing Badminton Stadium, is transformed into this flowing natatorium to make this flowing Badminton Stadium shape.Another kind method is the structure changing this flowing venue.Such as, flowing natatorium as shown in figure 17, is multiple this flow unit 10D by the dismounting of this flowing natatorium, then assembles multiple this flow unit 10D to form 3 swimming pools.In affiliated three swimming pools, the area of each swimming pool is consistent with the area of the swimming pool of former flowing natatorium.Or by multiple this flow unit 10D assembling formation swimming pool.
As Figure 30, Figure 31 and Figure 32 are depicted as the schematic perspective view of a kind of venue that flows of the present invention, described flowing venue is preferably used for sports items and various project activity, as the Stadium of all kinds of sports such as shuttlecock, table tennis, billiard ball, vollyball, tennis, basketball, the places etc. such as stage, party meeting-place, music meeting-place, movable meeting-place, show room.
Particularly, described flowing venue comprises one first and forms wall 100G, and at least one described first formation wall 100G is provided or surrounds to be used to be provided as Badminton Stadium at least one movement platform 300G that is closed or semiclosed or Full-open form.In other words, the form that represents of described movement platform 300G is able to form wall 100G by described first and determines, wherein, the form of described movement platform 300G comprise described movement platform 300G size, represent shape and described movement platform 300G envelope, close form etc.
Further, described first forms wall 100G comprises at least two sub-wall unit 10G further, each described sub-wall unit 10G forms described first through removably permutation and combination and forms wall 100G, that is, described first form that represents forming wall 100G is determined by described sub-wall unit 10G, and namely described sub-wall unit 10G is determined the form of described movement platform 300G.Needed for the described movement platform 300G that between each described sub-wall unit 10G, mutual dismounting is presented variform uses for user.
It is worth mentioning that, each described sub-wall unit 10G be able to selectively adjacent, relatively or end to end arrange, to provide the described movement platform 300G of different shape for user.
It is worth mentioning that, each described sub-wall unit 10G is able to realize adjacent, relative or ending phase ground connection setting at vertical direction and horizontal direction, and that is, each described sub-wall unit 10G is able to overlapping placement.
It is worth mentioning that, described movement platform 300G is formed between described sub-wall unit 10G surface or described sub-wall unit 10G to make described movement platform 300G present multiple pattern for use needed for environment for use and use.
Described sub-wall unit 10G has at least one container cavity 11G, and described container cavity 11G is able to as activity space or accommodation space etc. to use together in conjunction with described movement platform 300G.
Be worth mentioning to and be, the described container cavity 11G of adjacent described sub-wall unit 10G arranges to utilize each described sub-wall unit 10G according to required with being interconnected.
It is worth mentioning that, described container cavity 11G is utilized places various object, if various water and electricity supply facility, various life, sporting goods etc. are to improve the environment for use of the described venue that flows.
It is worth mentioning that, described sub-wall unit 10G is able to be prepared to plurality of specifications model needed for basis.
Described sub-wall unit 10G is able to realize being transported to another destination from a destination by means of transport, and between each described sub-wall unit 10G by rearrange combination with the described flowing venue obtaining required form for needed for, that is, described flowing venue be able to along with described sub-wall unit 10G be transported to different destinations and be formed at different location with provide described movement platform 300G for needed for.
Described flowing venue further preferably comprises at least one mobile unit 400G, and described mobile unit 400G is able to be driven under external force, and that is, described mobile unit 400G has mobility.The described first described sub-wall unit 10G forming wall 100G is removably installed in described mobile unit 400G, and then, each described sub-wall unit 10G is moved by mobile described mobile unit 400G, that is, described sub-wall unit 10G has mobility by being placed in described mobile unit 400G, and namely described flowing venue has mobility.
As shown in figure 33, described flowing venue also comprises at least one second and forms wall 200G, and described second forms wall 200G is removably installed in described first formation wall 100G with further complete described movement platform 300G.Wherein, described second formation wall 200G forms morphosis that is closed or semiclosed or Full-open by being removably connected to described first formation wall 100G to make described movement platform 300G.
Further, described second forms wall 200G is formed at described movement platform 300G front or side by being installed on described sub-wall unit 10G, thus adapts to the use of the described movement platform 300G of various form.
To sum up state, described movement platform 300G is moved by mobile described sub-wall unit 10G, and the permutation and combination method of each described sub-wall unit 10G is also affected the form of described movement platform, and then described movement platform 300G is possessed mobility and diversity.
It is worth mentioning that, described flowing venue is provided interim required space for activities to lack to make up in object environment equipment and the space enrironment that sports and stage activity are carried out in place, and by removably connecting between each described sub-wall unit 10G, described flowing venue is able to the described movement platform 300G according to using required and environment for use to provide various form.
Be a detailed description of the invention of this preferred embodiment as shown in figure 33, in the detailed description of the invention of this preferred embodiment, described flowing venue uses preferably as shuttlecock venue, that is, the described movement platform 300G of described flowing venue is preferably used for badminton, and namely described flowing venue uses as Badminton Stadium.
In this specific embodiment, described flowing venue comprises sub-wall unit 10G described at least four, each described sub-wall unit 10G is adjacent to arrange and forms wall 100G to form described first, form at least one described movement platform 300G between described sub-wall unit 10G simultaneously, that is, described movement platform 300G is formed by each described sub-wall unit 10G and carries out badminton for user.
Further, each described sub-wall unit 10G is preferably arranged end to end, preferably, in this specific embodiment, each described sub-wall unit 10G preferably surrounds a quadrangle, forms described movement platform 300G and carry out badminton for user in the quadrangle that wall unit 10G described in four surrounds.
It is worth mentioning that, each described sub-wall unit 10G is able to the described movement platform 300G being presented various form by various set-up mode.
It is worth mentioning that, at least one badminton place being able to formation standard in the quadrangle that described sub-wall unit 10G surrounds uses for user.
It is worth mentioning that, each described sub-wall unit 10G is able to by being placed in means of transport and is handled upside down, that is, the detachable interface of each described sub-wall unit 10G is able to described sub-wall unit 10G and is able to be transported to another destination by a destination, and then, make described flowing venue possess mobility, namely described movement platform 300G is possessed mobility.
It is worth mentioning that, badminton venue in the face of the common peopleization uses the present situation of number wretched insufficiency, described flowing venue assembled temporarily and pass through dismounting reduction environment for use with provide various provisional needed for and can not impact environment for use, possess larger activity.
Preferably, in this embodiment, described flowing venue comprises at least one described mobile unit 400G, at least one described sub-wall unit 10G is removably installed in described mobile unit 400G, and then each described sub-wall unit 10G is able to be transported to each destination and through permutation and combination to provide described flowing venue along with described mobile unit 400G, that is, described flowing venue is able to along with described mobile unit 400G possesses mobility.
Be worth mentioning to and be, each described sub-wall unit 10G is also able on the basis of described mobile unit 400G, carry out permutation and combination to form described movement platform 300G.
The described container cavity 11G of described sub-wall unit 10G is provided space for containing objects or is provided usage space, as as described in container cavity 11G must for the environment for use of placing the auxiliary facility such as hydroelectric system and using as Badminton Stadium to improve the described venue that flows, or as rest area, dressing cubicle or article drainage area to cater to needed for user.Each described container cavity 11G is also able to a part as described motion platform 300 as badminton place.
It is worth mentioning that, each described container cavity 11G is able to use as separate space according to required or be communicated with each described container cavity 11G and used as blended space by described container cavity 11G.
More specifically, described sub-wall unit 10G comprises at least one first group of wall elements 12G and at least one second group of wall elements 13G further, and described second group of wall elements 13G is installed on described first group of wall elements 12G movably to form described container cavity 11G.Wherein, described second group of wall elements 13G is able to by being installed on described first group of wall elements 12G movably and exposing described container cavity 11G or make described container cavity 11G to form a space closed for needed for use.
It is worth mentioning that, described platform unit 100 is selectively formed at described container cavity 11G or described first group of wall elements 12G and described second group of wall elements 13G of each described sub-wall unit 10G.
When described first group of wall elements 12G and described second group of wall elements 13G is movably connected and exposes described container cavity 11G, each described container cavity 11G is able to mutual UNICOM to use as connected space, and then described platform unit 100 is selectively formed at each described container cavity 11G be connected.
Described second forms wall 200G is selectively installed on described first formation wall 100G, and namely described second formation wall 200G is installed on each described sub-wall unit 10G to improve described movement platform 300G further.In this embodiment, described second forms the top that wall 200G is installed on the quadrangle that each described sub-wall unit 10G surrounds, in other words, described second forms wall 200G is covered in by being installed on described sub-wall unit 10G above the quadrangle that described sub-wall unit 10G formed, so make described movement platform 300G formed one completely space cell carry out badminton for user.
To sum up state, arrangement mode between each described sub-wall unit 10G and described second forms wall 200G and makes described movement platform 300G be able to formation one complete space, and then described movement platform 300G is got rid of the impact of the environmental factor such as strong wind, rainwater on badminton.
It is worth mentioning that, described second forms wall 200G is made up of the material of adjustable form and area coverage, and as awning, and then the size that described second formation wall 200G is able to the quadrangle surrounded according to each described sub-wall unit 10G regulates.
Described first length forming wall 100G is affected the area of described movement platform 300G, wherein, described first length forming wall 100G is determined by the length of described sub-wall unit 10G and quantity, and that is, described sub-wall unit 10G is affected the area of described movement platform 300G.
Preferably, in this embodiment, described movement platform 300G is square setting, and then described movement platform 300G is able to more preferably use as badminton venue.
Described sub-wall unit 10G comprises a ledge element 14G further, and described first group of wall elements 12G and described second group of wall elements 13G is preferably installed on described ledge element 14G to form described sub-wall unit 10G.
It is worth mentioning that, described ledge element 14G is strengthened described first group of wall elements 12G and described second group of wall elements 13G intensity and is determined the morphosis of described first group of wall elements 12G and described second group of wall elements 13G.
Described ledge element 14G comprises at least one locking member 141G and at least one locking slot 142G further, and described locking member 141G is placed in described locking slot 142G and described locking member 141G is able to slide along described locking slot 142G.Wherein, the groove depth of described locking slot 142G is greater than the length of described locking member 141G, and that is, described locking member 141G is placed in described locking slot 142G completely.
It is worth mentioning that, the cell wall of described locking slot 142G is half transparent design, and then ensures that described locking member 141G is placed in slip in described locking slot 142G all the time and can not shifts out in described locking slot 141.
Described locking slot 142G comprises at least one locating slot 1421G further, one end of described locking member 141G is placed in described locating slot 1421G actively moves in described locking slot 142G to prevent it, that is, described locking member 141G is immovably fixed to described locking slot 142G by the described locating slot 1421G of described locking slot 142G.
It is worth mentioning that, one end along with described locking member 141G is placed in described locating slot 1421G, the other end of described locking member 141G is extended described locking slot 142G, that is, one end of described locking member 141G is placed in described locking slot 142G all the time, and the other end of described locking member 141G is extended described locking slot 142G.In other words, the described locking member 141G length of extending described locking slot 142G switches at each described locating slot 1421G along with one end of described locking member 141G and changes.
It is worth mentioning that, the length that described locking member 141G is placed in described locking slot 142G is selected along with one end of described locking member 141G the described locating slot 1421G that is placed near described locking slot 142G notch and reduces.
It is worth mentioning that, when each described sub-wall unit 10G is disposed adjacent, the other end of adjacent described locking member 141G is able to by moving in described locking slot 142G at described locking member 141G and gos deep into the described locking slot 141 of sub-wall unit 10G described in another, simultaneously, described holddown groove is arranged at by one end of described locking member 141G, described locking member 141G is able to be placed in the described locking slot 142G of sub-wall unit 10G described in two regularly simultaneously, and then, described locking member 141G is ensured that described in adjacent two, sub-wall unit 10G at least one direction relative displacement can not occur, namely described locking member 141G and described locking slot 142G is realized locking action at least one direction, adjacent each described sub-wall unit 10G is made to be achieved together semifixed.That is, each described sub-wall unit 10G is able to realize removably connecting by described ledge element 14G.
Preferably, in this embodiment, described sub-wall unit 10G is prism structure, the drift angle of each prism preferably has the described locking member 141G and locking slot 142G that the length of side along prism arranges, that is, every described prism each drift angle there is described locking member 141G and described locking slot 142G respectively that realized locking action in three directions.And then when each described sub-wall unit 10G is adjacent to arrange, described locking member 141G is reinforced the connection between each described sub-wall unit 10G.
In this embodiment, each described container cavity 11G must for the auxiliary facility arranging described flowing venue.Described flowing venue comprises a supply unit 500G further, and described supply unit 500G is arranged at least one described container cavity 11G to realize providing required conventional energy resource to described movement platform 300G, and that improves described movement platform 300G supports the use condition.
Preferably, in this embodiment, described supply unit 500G comprises an an electric supply installation 51G and water supply installation 52G further, described electric supply installation 51G and described water supply installation 52G is able to power respectively to described movement platform 300G, supply water, and then needed for must to meet in badminton various.
As shown in figure 33, when exposing described container cavity 11G by regulating described second group of wall elements 13G, each described second group of wall elements 13G is spliced to form a continuous print platform mutually, that is, the described continuous print platform that each described second group of wall elements 13G phase is spliced to form is able to use as described movement platform 300G.It is worth mentioning that, when obtaining described movement platform 300G by the described second group of wall elements 13G of splicing, scribble the boundary line in standard badminton place according to standard badminton place in described movement platform 300G, when using described flowing venue to use as shuttlecock venue next time, be able to carry out badminton by splicing described second group of wall elements 13G, and without the need to reformulating the boundary line of feather device standard using area.It is worth mentioning that, the impact that the place out-of-flatness etc. that the described motion platform 300 obtained by described second group of wall elements 13G is utilized described second group of wall elements 13G and avoids extraneous using area to exist brings badminton.
Be a kind of alternative of this detailed description of the invention as shown in figure 34, each described sub-wall unit 10G of described flowing venue is able to all be adjacent to arrange at vertical direction and horizontal direction simultaneously, and that is, each described sub-wall unit 10G is able to mutually arrange to superposition.
It is worth mentioning that, the described container cavity 11G of each described sub-wall unit 10G be disposed adjacent at vertical direction is selectively independently arranged or UNICOM mutually, needed for use at vertical direction and horizontal direction.
The each described sub-wall unit 10G be disposed adjacent at vertical direction and horizontal direction is able to by described locking member 141G and described locking slot 142G dismounting regularly fast mutually.
It is worth mentioning that, be able to pass to mutually make user be able to toss about in bed between container cavity 11G described in each by the mode such as taking at each described container cavity 11G that vertical direction is adjacent.
It is worth mentioning that, each described container cavity 11G be also able to as viewing badminton grandstand for use needed for.
In the alternative of this detailed description of the invention, the described ledge element 14G of described sub-wall unit 10G is able to preferentially selectively be adjacent to arrange at vertical direction and horizontal direction, then more described first group of wall elements 12G and described second group of wall elements 13G is installed on described ledge element 14G and forms described first formation wall 100G.In other words, by to be adjacent in the horizontal direction and vertical direction arranges described ledge element 14G, then more described first group of wall elements 12G and described second group of wall elements 13G to be embedded in each described ledge element 14G and to be obtained described sub-wall unit 10G and described first and form wall 100G.Preferably, be able to obtain described first formation wall 100G by semifixed for adjacent each described sub-wall unit 10G by adjacent each described locking member 141G and each described locking slot 142G together, obtain described movement platform 300G simultaneously.In the alternative of this detailed description of the invention, described flowing venue comprises sub-wall unit 10G described at least three at vertical direction, and then is able to utilize the described container cavity 11G of described sub-wall unit 10G.
The other two detailed description of the invention schematic diagrames of this preferred embodiment are respectively as shown in Figure 35, Figure 36, in this embodiment, each described sub-wall unit 10G relatively arranges and forms at least one described movement platform 300G between each described sub-wall unit 10G.
More specifically, as described in Figure 35, at least one described sub-wall unit 10G and at least one described sub-wall unit 10G relatively arranges and is formed described in described movement platform 300G and two between sub-wall unit 10G, and the badminton place of at least one standard is formed at described movement platform 300G.In other words, described movement platform 300G is by first forming wall 100G and surrounded described in two, and namely described movement platform 300G to be formed at described in two first and to be formed between wall 100G.
It is worth mentioning that, the shuttlecock place of at least one standard is formed at described movement platform 300G.
Described sub-wall unit 10G comprises a ledge element 14G further, at least one first group of wall elements 12G and at least one second group of wall elements 13G, described first group of wall elements 12G and described second group of wall elements 13G removably connects mutually, and described first group of wall elements 12G and described second group of wall elements 13G is preferably installed on described ledge element 14G to form described sub-wall unit 10G.Described ledge element 14G must affect described first group of wall elements 12G and described second group of wall elements 13G presents form for the connection of reinforcing described first group of wall elements 12G and described second group of wall elements 13G, and namely described ledge element 14G is affected the form of described container cavity 11G.
It is worth mentioning that, described ledge element 14G is strengthened described first group of wall elements 12G and described second group of wall elements 13G intensity, and namely described ledge element 14G is improved the intensity that described sub-wall unit 10G and described first forms wall 100G.
Described ledge element 14G comprises at least one locking member 141G` further, and described 141` is preferably formed at the outer surface of described ledge element 14G, and when each described sub-wall unit 10G is disposed adjacent, described locking member 141G` is also preferably in adjacent position.Wherein, described locking member 141G` is the good conductor of electricity, and when each described locking member 141G` is subjected to voltage, is formed the electronics of movement and attract magnetic material in described locking member 141G`, that is, described locking member 141G` possesses magnetic.It is worth mentioning that, the described locking member 141G` towards oppositely movement is attracted each other.And then if apply to adjacent described locking member 141G` the electric current possessing reverse movement in described locking member 141G` that voltage makes this adjacent, this locking member 141G` described in adjacent two is able to attract each other under the effect of magnetic action power and keep geo-stationary.
It is worth mentioning that, described locking member 141G` is when being applied in voltage, and along with the enhancing of the voltage applied, the magnetic of described locking member 141G` strengthens thereupon, and that is, the active force between each described locking member 141G` is larger.When putting on described locking member 141G` voltage and being removed, the active force between each described locking member 141G` is disappeared thereupon, that is, by whether being controlled the active force between each described locking member 141G` to described locking member 141G` applying voltage.When making to form the electric current relative to oppositely movement in adjacent described locking member 141G` when applying voltage to adjacent described locking member 141G`, adjacent described locking member 141G` is attracted each other, and then adjacent described sub-wall unit 10G is able to be attracted each other; When putting on the loss of voltage of described locking member 141G`, attraction between adjacent described locking member 141G` disappears thereupon, namely each described locking member 141G` no longer attracts each other, that is, attraction between adjacent described sub-wall unit 10G disappears thereupon, and adjacent described sub-wall unit 10G no longer attracts each other.
A cover layer 143G` is coated with outside described locking member 141G`, namely described cover layer 143G` is formed and is covered in described locking member 141G` outer surface, and then, described locking member 141G` is being energized and is being hedged off from the outer world under producing magnetic case, makes external environment can not be subject to putting on the impact in the magnetic field that the voltage of described locking member 141G` and described lock machine button 141` produce.
Described ledge element 14G comprises at least one locking slot 142G` further, described locking member 141G` is placed in described locking slot 142G`, electrified wire is equipped with in described locking slot 142G, described locking member 141G` is connected with described electrified wire, and then described electrified wire is able to make generation current in described locking member 141G` to described locking member 141G` applying voltage and possess magnetic.Preferably, described locking slot 142G` comprises at least two link 1421G` further, described link 1421G` is preferably formed at the two ends of described locking slot 142G`, when each described sub-wall unit 10G is disposed adjacent, the described electrified wire laid in the described locking slot 142G` of each described sub-wall unit 10G is able to be interconnected by described link 1421G`, and the described electrified wire namely in each described locking slot 142G` is able to by the described mutual UNICOM of link 1421G`.That is, for the described sub-wall unit 10G be disposed adjacent, when there is electric current in the described electrified wire in the described locking slot 142G` of wherein sub-wall unit 10G described in, described electrified wire in each adjacent described locking member 141G` is had electric current simultaneously, that is, formed contrary electric current between each described sub-wall unit 10G being subjected to the voltage of counter electrode and attracted each other, and then, be able to by firmly arranging between each described sub-wall unit 10G and easily relative movement can not occur.
It is worth mentioning that, described link 1421G` is able to be connected with electrified wire, then, when each described sub-wall unit 10G is adjacent to arrange and possess certain distance, each described sub-wall unit 10G is able to be realized electrically connecting between the described electrified wire in described locking slot 142G` to each other by electrified wire.
Must for the described supply unit 500G of placement in the described container cavity 11G of described sub-wall unit 10G, described supply unit 500G comprises an electric supply installation 51G further, described electric supply installation 51G is able to provide electric energy to the described electrified wire in described locking slot 142G` and make described locking member 141G` produce magnetic, that is, described electric supply installation 51G is ensured that being able between described locking member 141G` is avoided by attracting each other relative displacement occurs, and affects formation and the form thereof of described movement platform 300G.
Removably connecting between shown sub-wall unit 10G makes described sub-wall unit 10G be able to freely be moved under external force, that is, described sub-wall unit 10G is determined that described first formation wall 100G has variform, as as described in sub-wall unit 10G when be adjacent to arrange, described sub-wall unit 10G is able to be adjacent to arrange according in the horizontal direction described or vertical direction, and namely described sub-wall unit 10G is also able to arrange superimposedly.
It is worth mentioning that, described electric supply installation 51G must think mobile battery, rotor machine or external power supply etc.
Described flowing venue preferably includes at least one described mobile unit 400G, and described mobile unit 400G possesses mobility, and that is, described mobile unit 400G is able to mobile between each destination use.Preferably, at least one described sub-wall unit 10G is placed in described mobile unit 400G and is moved along with described mobile unit 400G, that is, described sub-wall unit 10G possesses mobility, thus described sub-wall unit 10G is displaced between each destination and is not limited by place to realize the provisional demand of described movement platform 300G.
It is worth mentioning that, described container cavity 11G is used to put other objects to provide required service, as food and drink supply room, dressing cubicle, reserve room, rest area etc.
Preferably, described supply unit 500G comprises a water supply installation 52G further, and described water supply installation 52G is able to supply water for needed for environment for use to described flowing venue.It is worth mentioning that, described water supply installation 52G is able to be called the water resource in described water supply installation 52G by the article such as water pipe, water tank.
It is worth mentioning that, described water supply installation 52G must think that water storage box, cistern etc. have the retaining object of water storage function or be able to transfer the equipment of water resource from environment, as water pump, and guiding water pipe etc.
It is worth mentioning that, when described first group of wall elements 12G is installed on described second group of wall elements 13G movably and exposes described container cavity 11G, each described second group of wall elements 13G is spliced to form described movement platform 300G, and then, described movement platform 300G only just need be made to avoid environment for use to there is the rugged problem of height by the position adjusting described sub-wall unit 10G.
Described second forms wall 200G is installed on described sub-wall unit 10G, and described second formation wall 200G is able to described movement platform 300G to cover, namely described second formation wall 200G covers described movement platform 300G by being installed on described sub-wall unit 10G, thus, described second formed wall 200G made described movement platform 300G formed one close or semi-enclosed space with needed for environment for use for isolating the outside environmental elements such as wind, rain.
As shown in figure 36, each described sub-wall unit 10G is realized in the horizontal direction simultaneously and vertical direction is adjacent to arrange, and then uses with being achieved or mutual UNICOM independent to the described container cavity 11G of described sub-wall unit 10G.Simultaneously, the form of described platform unit 300 is changed by the quantity increasing adjacent described sub-wall unit 10G, comprise the area increasing described platform unit 300, and then be achieved the shuttlecock place that forms at least one standard at described platform unit 300 with needed for adapting to use.
As shown in Figure 47 to Figure 51, the present invention also provides a kind of formation method of described flowing venue, and described method comprises the steps:
1): be adjacent to arrange each described sub-wall unit 10G and form wall 100G to obtain described first, wherein, be adjacent to arrange described sub-wall unit 10G comprise and adjoin ground, relatively and with being separated by arrange each described sub-wall unit 10G; And
2): regulate described first to form wall 100G to obtain described movement platform 300G, wherein, the form of described movement platform 300G is obtained by the quantity of carrying out permutation and combination to each described sub-wall unit 10G or increasing and decreasing described sub-wall unit 10G, is converted.
It is worth mentioning that, described movement platform 300G is able to form according to being formed at space that each described sub-wall unit 10G surrounds needed for using or being formed at described first of each described sub-wall unit 10G the surface that wall 12 and described second forms wall 13.
Preferably, as shown in figure 47, described step 1) comprise the steps: further
1.1): described sub-wall unit 10G is arranged at described mobile unit 400G; And
1.2): drive described mobile unit 400G to form wall 100G to obtain described first.
Preferably, as shown in figure 48, described step 2) comprise step 2.1 further): drive described mobile unit 400G to form wall 100G to regulate described first, and then adjust the form of described movement platform 300G.
It is worth mentioning that, as shown in figure 49, described step 2.1) also must think following steps: regulate described sub-wall unit 10G to form wall 100G to regulate described first, wherein, the adjustment of described sub-wall unit 10G is comprised in the horizontal direction and the adjustment of vertical direction, that is, be able to regulate described first formation wall 100G by moving horizontally described sub-wall unit 10G or vertically superposing described sub-wall unit 10G, thus change the pattern of described movement platform 300G.
As shown in figure 50, preferably, described method also comprises step 3): the described locking member 141G forming reverse electric current and often adjacent described sub-wall unit 10G, and then, be able to be attracted each other by magnetic force between each adjacent described locking member 141G, and then reinforce the connection between each described sub-wall unit 10G.
It is worth mentioning that, the magnetic that the described cover layer outside described locking member 141G makes described locking member 141G produce in energising situation can not have an impact to the use of described flowing venue.
It is worth mentioning that, as shown in figure 51, described step 3) also must think following steps: the other end extending the described locking member 141G of described sub-wall unit 10G to ensure that each described sub-wall unit 10G at least easily relative movement occurs in a direction, and then reinforces the connection between each described sub-wall unit 10G to the described locking slot 142G of adjacent described sub-wall unit 20.Described step 3) after also preferably include following steps: settle one end of described locking member 141G in described locating slot 1421G, thus make described locking member 141G immovably be placed in described locking slot 142G, to ensure that each described sub-wall unit 10G at least easily relative movement occurs in a direction, and then reinforce the connection between each described sub-wall unit 10G.
Present invention also offers the formation method of another kind of described flowing venue, as in figure 52, described method comprises the steps:
(1): the described second group of wall unit 13G that be movably connected in described first group of wall unit 12G to expose described container cavity 11G; And
(2): being adjacent to, each described sub-wall unit 10G is set and forming wall 100G for obtaining described movement platform 300G to form described first, wherein, described movement platform 300G is formed at each described first group of wall elements 12G of described sub-wall unit 10G and the surface of described second group of wall elements 13G or described container cavity 11G.
Preferably, described method also comprises step (3): regulate the position of described sub-wall unit 10G to regulate the form of described movement platform 300G.
It is worth mentioning that, the adjustment of the position of described sub-wall unit 10G to be comprised in the horizontal direction and vertical direction regulates described sub-wall unit 10G, that is, described sub-wall unit 10G is moved in the horizontal direction or is applied at vertical direction, wherein, when moving described sub-wall unit 10G in the horizontal direction, described sub-wall unit 10G moves along with the movement of described mobile unit 400G after being able to carry out moving or be placed in described mobile unit 400G under external force drives.
As Figure 37 to Figure 40 is depicted as another preferred embodiment one flowing venue of the present invention, described flowing venue comprises at least one base unit 10F, and described base unit 10F is able to the described flowing venue being formed various form by permutation and combination.Described base unit 10F comprises a sub-platform unit 11F and at least one flow unit 12F further, and described sub-platform unit 11F is installed on described flow unit 12F, as shown in figure 40.Wherein, at least one described sub-platform unit 11F is provided at least one platform unit 100F by permutation and combination, and described platform unit 100F is provided activity space for user.The mode that described flow unit 12F is able to preferably with rolling friction under driving force effect moves, thus, described sub-platform unit 11F is able to move along with described flow unit 12F and possess mobility, that is, described platform unit 100F has mobility, and namely described flowing venue has mobility to toss about in bed between each destination.Wherein, the space that described platform unit 100F provides must for various activities such as various sports, stage activity, meeting reports.
It is worth mentioning that, the mobility of described flowing venue makes described flowing venue be achieved to build to use and the object of dismounting in time temporarily, and then is able to fluidly to use described flowing venue or the object of Interim use.
It is worth mentioning that, each described sub-platform unit 11F is able to along with described flow unit 12F is moved by driving, and then, be able between each described sub-platform unit 11F along with described flow unit 12F re-starts permutation and combination to obtain the described platform unit 100F of different shape.
It is worth mentioning that, when described sub-platform unit 11F is used for providing described platform unit 100F, described flow unit 12F is able to be combined according to required and described sub-platform unit 11F or be separated use.
Described flow unit 12F comprises a braking member 121F further, when described flow unit 12F utilizes rolling friction to move, described braking member 121F is made rolling friction change sliding friction into, that is, the described braking member 121F described flow unit 12F that is increased carries out the degree-of-difficulty factor of movement, namely mobile by regulating described braking member 12F to be made described flow unit 12F be difficult to.It is worth mentioning that, when described sub-platform unit 11F is for the formation of described platform unit 100F, described flow unit 12F is able to selectively carry out the degree-of-difficulty factor of movement for carrying described flow unit 12F and controlling described sub-platform unit 11F along with described flow unit 12F by described braking member 121F, and then described sub-platform unit 11F is promptly carried out permutation and combination with movable platform described in quick-detachment 100.Meanwhile, described flow unit 12F is able to adjust by carrying the height of described sub-platform unit 11F to described platform unit 100F.
It is worth mentioning that, the assembled arrangement mode conversion between described platform unit 100F is able to according to each described sub-platform unit 11F becomes multiple different pattern for needed for environment for use.
Described sub-platform unit 11F comprises at least one structural walls 101F, and described structural walls 101F is able to around formation one structure chamber 102F, and described platform unit 100F is selectively formed in described structural walls 101F surface or described structure chamber 102F.Wherein, when in the described structure chamber 12 that described platform unit 100F is formed at described sub-platform unit 11F and described platform unit 100F by when described at least two, sub-platform unit 11F is formed, the described structure chamber 102F of each described sub-platform unit 11F is able to be arranged by the mutual UNICOM of described structural walls, that is, when described platform unit 100F is formed at the described structure chamber 102F of sub-platform unit 11F described at least two, each described structure chamber 102F is able to by the mutual UNICOM of described structural walls 101F.
It is worth mentioning that, described structure chamber 102F is alternatively in vertical direction or horizontal direction or simultaneously in vertical direction and the mutual UNICOM of horizontal direction.
In the preferred embodiment, described sub-platform unit 11F is preferably in prismatic designs, and that is, the described element wall 1012F of every described sub-platform unit 11F is had stays a plane perpendicular to each other, namely every described sub-platform unit 11F is had a surface, a lower surface and four sides.In other words, described support element 1011F is also prismatic Frame Design.Each described sub-platform unit 11F is preferably adjacent to arrange, and then the upper surface of described sub-platform unit 11F is adjacent to each other arranged to form described platform unit 100F.
Preferably, each described sub-platform unit 11F is installed on described flow unit 12F to form described flowing venue and to be able under external force driving mobile to rearrange combination to adjust the form of described sub-platform unit 11F or move described flowing venue by mobile described sub-platform unit 11F needed for use.When each described sub-platform unit 11F is adjacent to arrange and makes its upper surface want to arrange with adjoining, be able to be fixed the position of each described sub-platform unit 11F by fixing each described flow unit 12F, that is, by fixing each described flow unit 12F, described platform unit 100F is able to stably be arranged.
In the preferred embodiment, described platform unit 100F is preferably used for football, that is, described flowing venue is able to use as football shop, and namely the upper surface of each described sub-platform unit 11F is used to carry out football by adjacent to each other arranging.
It is worth mentioning that, the area of described platform unit 100F is able to the quantity by flexibly increasing or reduce described sub-platform unit 11F and adjusts, and is also able to realize adjusting the area of described platform unit 100F by the described sub-platform unit 11F of adjustment, formulation different size.
As shown in figure 38, described flowing venue comprises an energy resource supply unit 200F further, described energy resource supply unit 200F comprises one first feed unit 201F and one second feed unit 202F further, needed for described first feed unit 201F and described second feed unit 202F is provided water respectively, electricity uses for user.Described energy resource supply unit 200F is preferably placed in described structure chamber 102F, and then, described energy resource supply unit 200F is able to be placed in described flow unit 12F along with described sub-platform unit 11F and have mobility, and namely described energy resource supply unit 200F is able to move along with described platform unit 100F and move with the service condition improving described platform unit 100F.
It is worth mentioning that, described flowing venue is able to by laying electrified wire and supply socket element 1011 between described in described sub-platform unit 11F, when each described sub-platform unit 11F is adjacent to arrange, be able between each described sub-platform unit 11F realize electrically connecting by electrified wire etc., and by supply socket etc., the electric energy that described second feed unit 202F can provide utilized.
It is worth mentioning that, described structure chamber 102F is able to as space utilizations such as lobby, material storage room, auditoriums to improve the use of described platform unit 100F.
It is worth mentioning that, described flow unit 12F is independently comprised a drive unit to be moved or to be moved under additional activation force effect.
As shown in figure 40, described sub-platform unit 11F comprises a support element 1011F and at least one element wall 1012F further, and described element wall 1012F is installed on described support element 1011F movably to form described sub-platform unit 11F.Preferably, in the preferred embodiment, described element wall 1012F is installed on described support element 1011F by mechanical connection, waits active link as screw is fixing.
It is worth mentioning that, described element wall 1012F is that multi-hull type is installed on described support element 1011F, and that is, in the alternative of this preferred embodiment, described sub-platform unit 11F comprises element wall 1012F described at least five.When described element wall 1012F is connected to described support element 1011F actively, described element wall 1012F is exposed or is closed described structure chamber 102F.
Described support element comprises at least one bracing frame 10111F and at least one fixed mount 10112F further, and described fixed mount 10112F is fixedly connected on support frame as described above 10111F movably to form described support element 1011F.Wherein, the wall edge of described element wall 1012F has at least one fixture 10121F, and described fixed mount 10112F is removably installed in described fixture 10121F to keep between support frame as described above 10111F and described element wall 1012F in required angle.It is worth mentioning that, each described sub-platform unit 11F is able to realize keeping geo-stationary by described braking member 121F, and the described platform unit 100F that namely upper surface of each described sub-platform unit 11F and side are formed is able under the effect of described braking member 121F, keep stable.
It is worth mentioning that, connected mode between each support frame as described above 10111F and each described fixed mount 10112F is demountable structure, and then the free matched combined of specification be able between each support frame as described above 10111F and each described 10112 according to described sub-platform unit 11F, and when indivedual support frame as described above 10111F and described fixed mount 10112F exist situation about damaging, be able to by changing indivedual support frame as described above 10111F, indivedual described fixed mount 10112F makes described sub-platform unit 11F again be come into operation.
As shown in Figure 41, Figure 42 and Figure 43, be respectively three kinds of detailed description of the invention schematic diagrames of this preferred embodiment, described platform unit 100F is preferably formed at upper surface and the side of described sub-platform unit 11F.Particularly, described fixture 10121F is installed on by described fixed mount 10112F, the described element wall 1012F of vertical direction is able under described fixed mount 10112F and described fixture 10121F effect and at right angles arranges between the support frame as described above 10111F of vertical direction, namely the described element wall 1012F of vertical direction be able under described fixed mount 10112F and described fixture 10121F effect in be horizontally disposed with to be formed described platform unit 100F for needed for.That is, described fixed mount 10112F be placed in described fixture 10121F make to keep between part described element wall 1012F and support frame as described above 10111F in by fixed angle to form described platform unit 100F in described element wall 1012F.
It is worth mentioning that, described sub-platform unit 11F is able to by the required side of at least one described sub-platform unit 11F of selectively selecting to adapt to the described platform unit 100F of place situation also needed for formation of environment for use, as shown in Figure 41 F, described platform unit 100F is formed at each side and the end face of described sub-platform unit 11F simultaneously, shown in Figure 42 F and Figure 43 F, described platform unit 100F is formed at the respective side of described sub-wall unit 11F and described end face.
Described structure chamber 102F by the adjustment of described element wall 1012F to present closed form or semiclosed form or open form for needed for use.It is worth mentioning that, each described structure chamber 102F is able to use according to the required UNICOM mutually of use or use independently.
It is worth mentioning that, the height of described platform unit 100F is able to be adjusted by described support member 10111.
It is worth mentioning that, described structure chamber 102F must for other objects such as the described energy resource supply unit 200F of placement.
When described fixed mount 10112F and described fixture 10121F phase from time, the each described side of described sub-platform unit 11F is able to touch with the support frame as described above 10111F of described sub-platform unit 11F closes and hides described structure chamber 102F, thus described platform unit 100F is removed, simultaneously, by mobile described flow unit 12F, each described sub-platform unit 11F is able to be adjacent to arrange, and then, the upper surface of described sub-platform unit 11F arranges and again obtains platform unit 100F described in another with being adjoined, and the area of the described platform unit 100F obtained after regulating is reduced, thus needed for the use being adapted to described flowing venue and environment for use.In other words, the described upper end face of each described sub-platform unit 11F is adjacent to arrange to obtain described platform unit 100F, when needs obtain more large-area described platform unit 100F, each described sub-platform unit 11F is able to by mobile described flow unit 12F and selectively makes the side of at least one described sub-platform unit 11F and its upper surface arrange abreast, is then obtained more large-area described platform unit 100F by mobile each described sub-platform unit 11F again.Preferably, by described flow unit 12F, described sub-platform unit 11F is able to move neatly between each destination, and then described platform unit 100F is able to be arranged in neatly between each destination and obtains the described platform unit 100F of various form through permutation and combination.
It is worth mentioning that, described platform unit 100F is also placed at least one described sub-platform unit 11F, and then is able to utilize the described structure chamber 102F of described sub-platform unit 11F.
It is worth mentioning that, utilize various support member by carrying out supporting, reinforcing at the described upper surface of sub-platform unit 11F and the below of side, the described platform unit 100F of the upper surface and side that are formed at described sub-platform unit 11F is stablized more.
Be an alternative of this preferred embodiment as shown in figure 44, when described platform unit 100F is formed at structure chamber 102F described at least two, when being installed on described fixture 10121F by described fixture 10112F and exposing described structure chamber 102F, each described sub-wall unit 11F is able to move along with described flow unit 12F and be adjacent to arrange and make each described structure chamber 102F, thus individual described structure chamber 102F is able to by UNICOM.
It is worth mentioning that, the specification of described sub-platform unit 11F is able to be specified artificially by the specification of described support element 1011F and described frame wall elements 1012, and then described sub-platform unit 11F is able to according to required formulation centering specification, and namely described structure chamber 102F is possessed plurality of specifications.
It is worth mentioning that, when described flowing venue uses as football shop, the scale in football shop is able to be determined by the quantity of described sub-platform unit 11F and specification.
Particularly, the specifications and standards specification of described flowing venue and the football pitch of size consistent, that is, each described sub-platform unit 11F is more than or equal to the space that normal soccer field possesses through the space that the described platform unit 100F that permutation and combination is formed is provided.Each described sub-platform unit 11F forms enough large usage space by being adjacent to arrange surrounded, in the concrete mode of this preferred embodiment, each described sub-evaluation unit 11 preferably surrounds a square place to form the place of described platform unit 100F as football.Wherein, each described sub-platform unit 11F is able to by selectively removing the described element wall 1012F that is installed on described support element 1011F and makes the described structure chamber mutual UNICOM of 102F of each described sub-platform unit.
It is worth mentioning that, around formed the described sub-platform unit 11F of described platform unit 100F be able to simultaneously in the horizontal direction and vertical direction be adjacent to arrange, that is, each described sub-platform unit 11F is superposed setting mutually.
Preferably, in this embodiment, each described element wall 1012F of described sub-platform unit 11F is able to be removed by described support element 1011F, and that is, described element wall 1012F is used independently.Preferably, the described element wall 1012F removed from described element wall 1012F is layed in the described platform unit 100F that each described sub-platform unit 11F surrounds, that is, described flowing venue comprises multiple described sub-platform unit 11F and how described element wall 1012F.
It is worth mentioning that, the described platform unit 100F problem such as avoided the place of causing because of factors such as environment not steady.
Preferably, the described element wall 1012F be separated from described support element 1011F is able to preferably must be installed on described flow unit 12F and repave and be located at described platform unit 100F, preferably, described flow unit 12F is placed in the joint in element wall 1012F described at least two, that is, element wall 1012F described at least two is installed on described flow unit 12F, and element wall 1012F described in is installed at least one described flow unit 12F.
It is worth mentioning that, when described element wall 1012F is installed on described flow unit 12F, described element wall 1012F is able to the mode by mechanical connection, as screw to screw etc. be installed on as described in flow unit 12F.
It is worth mentioning that, when described element wall 1012F is installed on described flow unit 12F, each described element wall 1012F is able to the height by adjusting between described flow unit 12F and kiss the earth or adjusts height between described element wall 1012F and described flow unit 12F with the flatness between each described element wall 1012F ensureing to be layed in described platform unit 100F.
It is worth mentioning that, for ensureing the planarization be layed between each described element wall 1012F of described platform unit 100F, be able to by laying cover layer in each described element wall 1012F surface with needed for adapting to use, as artificial turf is able to as football place using platform unit 100F as described in making.
It is worth mentioning that, the mode that the described sub-platform unit 11F surrounding described platform unit 100F is able to be placed by superposition provides more described structure chamber 102F for use.
It is worth mentioning that, being avoided the football carried out in described platform unit 100F to be subject to various environmental factor, as strong wind and rain water mitigation by arranging the object such as awning, ceiling above described platform unit 100F.
In like manner, the using state schematic diagram of a detailed description of the invention of this preferred embodiment as shown in figure 45, by covering a fluid-tight cover layer in described platform unit 100F, described flowing venue is able to use preferably as natatorium, that is, be covered in the described structure chamber 102F of described platform unit 100F and at least one described sub-platform unit 11F by described cover layer, be achieved and make described flowing venue become natatorium to the water filling of described flowing venue.Wherein, area as the described flowing venue of natatorium is able to by regulating described support and between that 1011 and described element wall 1012F realizes or the quantity of each described sub-platform unit 11F realizes, the usable floor area that namely described flowing venue uses as natatorium controls artificially.It is worth mentioning that, as natatorium described flowing venue by be equipped with water transfer equipment as water pumper be achieved to as described in water in flowing venue replace.
Be the using state schematic diagram of another detailed description of the invention of this preferred embodiment as shown in figure 46, described platform unit 100F is formed in the described structure chamber 102F of at least one described sub-platform unit 11F, when described platform unit 100F is formed at the described structure chamber 102F of sub-platform unit 11F described at least two, each described sub-platform unit 11F is able to by removing the described element wall 1012F of part and each described structure chamber 102F of each described sub-platform unit 11F is connected, that is, the each described structure chamber 102F of sub-platform 11F described at least two is combined and is formed described platform unit 11F.Described platform unit 100F is able to use as places such as indoor sport shop, lobby, material storage room, amusement and leisure rooms.
It will be further appreciated that, while the structure chamber 102F of described sub-platform unit 11F is provided and is formed described platform unit 100F, the described end face of described sub-platform unit 11F and side are provided to form described platform unit 100F simultaneously, that is, described flowing venue is provided at least one described platform unit 100F.
The present invention also discloses the formation method of another kind of described flowing venue, and as described in Figure 53, described method comprises the steps:
I: settle described fixed mount 10112F in described fixture 10121F to expose the structure chamber 102F of described sub-platform unit 11F, make the side of described sub-platform unit 11F and upper surface keep is fixed angle simultaneously; And
II: drive described flow unit 12F to regulate the position of described sub-wall unit 10F, wherein, described platform unit 100F is formed at end face and the side of described sub-platform unit 11F, is also formed at the described structure chamber 102F of described sub-platform unit 10F.
Preferably, after described step II, comprise the steps: to regulate described braking member 121 with fixing described flow unit 12F further, and then, relative movement can not be there is easily between each described sub-platform unit 11F and affect the form of described platform unit 100F.
Foregoing is exemplifying of specific embodiments of the invention, for equipment and the structure of wherein not detailed description, should be understood to take the existing common apparatus in this area and universal method to be implemented.
The above embodiment of the present invention is only the use that technical solution of the present invention is described simultaneously, is only enumerating of technical solution of the present invention, is not limited to technical scheme of the present invention and protection domain thereof.Equivalent technologies means, equivalent apparatus etc. is adopted to be considered to be to the improvement of the technical scheme disclosed in claims of the present invention and description the scope do not exceeded disclosed in claims of the present invention and description.

Claims (52)

1. a flowing venue, is characterized in that, comprising:
First-class moving base, described flowing pedestal has a shop body space for carrying out activity, wherein,
Described flowing pedestal comprises at least two pedestal sidewalls further, forms described shop body space described in two between pedestal sidewall.
2. flow venue as claimed in claim 1, it is characterized in that, wherein, described pedestal sidewall comprises at least one layer assembly further, described layer assembly is arranged at the side of described shop body space, regulated the height of described pedestal sidewall by the mode of stacking described layer assembly, regulated the width of described pedestal sidewall by the mode connecting described layer assembly side by side.
3. flow venue as claimed in claim 2, it is characterized in that, wherein, described layer assembly comprises at least one flow unit further, flow unit described in adjacent two is connected to each other to form described layer assembly, and wherein, described flow unit comprises a flow module, described flow module has a unitary space, and described unitary space is arranged at the side of described shop body space.
4. flow venue as claimed in claim 3, it is characterized in that, described flow module comprises a component framework and one group of wall elements further, and described wall elements is installed in described component framework removably respectively, to form described unitary space.
5. flow venue as claimed in claim 4, it is characterized in that, wherein, described flow unit comprises a supporting and regulating device further, and described supporting and regulating device removably supports described flow module, wherein, described supporting and regulating device comprises one group further and supports regulating part, and described group supports regulating part and be installed on described flow module removably respectively, to support described flow module, wherein, described support regulating part is incorporated in described unitary space after removal.
6. flow venue as claimed in claim 5, it is characterized in that, wherein, described flow unit comprises a detection control apparatus further, described detection control apparatus connects described supporting and regulating device communicatedly, and wherein, described detection control apparatus comprises one group of monitoring element and a control device further, by respectively connecting each support regulating part communicatedly respectively by this monitoring element, described control device will be regulated each support regulating part.
7. flow venue as claimed in claim 6, it is characterized in that, wherein, described flow unit comprises a positioner and a communicator further, described positioner obtains the position of described flow unit, then the real time position of obtained described flow unit is sent to described control device, and described communication ground connects described control device, with the communication device switches information by described communicator and flow unit described in other, thus be convenient to collaborative work.
8. flow venue as claimed in claim 7, it is characterized in that, wherein, described supporting and regulating device comprises one group of moveable support further, described moveable support is removably installed in described moving assembly, wherein, during described flow unit, one step comprises a power supplying apparatus and a guider, described power supplying apparatus is connected with described detection control apparatus respectively communicatedly with described guider, wherein, described power supplying apparatus provides power to described flow unit, and described guider guides described flow unit to flow.
9. flow venue as claimed in claim 8, it is characterized in that, wherein, described flow unit is made in advance according to preset standard, so that described flow unit is assembled into personalized flowing venue.
10. flow venue as claimed in claim 9, it is characterized in that, described flow unit is container.
11. flow venue as claimed in claim 4, and it is characterized in that, described flowing venue comprises a top cover further, described top cover is supported respectively by described pedestal sidewall, wherein, described top cover comprises a bracing frame and at least one covering further, and described covering covers support frame as described above.
12. flow venue as claimed in claim 11, and it is characterized in that, support frame as described above comprises one group of sub-bracing frame further, described submounts is incorporated in described unitary space, so that flowing, wherein, described covering is flexible material, so that be incorporated in described unitary space.
13. flow venue as claimed in claim 4, it is characterized in that, described flowing venue comprises a top cover further, described top cover comprises at least one bracing or strutting arrangement and at least one covering further, described group of bracing or strutting arrangement compartment of terrain is arranged at described shop body space, and the described covering of this group covers and to be fixed in described in two between bracing or strutting arrangement respectively.
14. flow venue as claimed in claim 13, it is characterized in that, described bracing or strutting arrangement comprises a main support member further, at least two sub-support members and at least two connectors, sub-support member described in two is respectively set at the relative outside stating pedestal sidewall, described main support member is arranged in the body space of described shop, and described connector connects described main support member and described sub-support member, and described covering is permanently connected with connector described in two respectively.
15. flow venue as described in claim 4 or 11, and it is characterized in that, described flowing venue comprises first-class moving platform further, and described flowing platform is placed in the bottom of described shop body space.
16. flow venue as claimed in claim 15, and it is characterized in that, wherein, described flowing platform comprises a group platform element further, and platform element described in adjacent two is connected to each other to form described flowing platform.
17. flow venue as claimed in claim 15, and it is characterized in that, described flowing venue comprises at least one water-tight device further, by described water-tight device being arranged at the bottom of this shop body space, forms a swimming pool in the bottom of described flowing pedestal.
18. flow venue as claimed in claim 17, it is characterized in that, wherein, arrange described flow unit in a wherein part for the bottom of described swimming pool, to form the region of different water depth at described swimming pool.
19. flow venue as claimed in claim 18, and it is characterized in that, wherein, form a partition wall by arranging flow unit described in a group in described swimming pool, described swimming pool is divided at least two functional areas to provide service by described partition wall.
20. flow venue as claimed in claim 17, and it is characterized in that, wherein, form at least one partition wall by arranging one group of flow unit in described swimming pool, described swimming pool is divided at least two functional areas to provide service respectively by described partition wall.
21. flow venue as claimed in claim 15, it is characterized in that, wherein, described in described shop body space assembling at least two, flow unit forms a performance platform, wherein, by dismantle respectively flow unit described in adjacent two adjacent two described in the two adjacent wall elements of flow module, be communicated with two unitary spaces that described in two, flow module has respectively, form a space, backstage.
22. flow venue as claimed in claim 9, it is characterized in that, wherein, the described flow unit of prefabricated at least two types, the described flow unit of two types has difference in height, wherein, respectively the described flow unit assembling of identical type is formed layer assembly described in two types respectively, layer assembly described in two types is connected side by side.
23. flow venue as claimed in claim 22, it is characterized in that, wherein, described pedestal sidewall has hierarchic structure, described pedestal sidewall comprises an interior layer assembly and an exterior layer assembly further, described interior layer assembly connects described exterior layer assembly side by side, and wherein, the quantity that described exterior layer assembly comprises described flow unit is the twice that described interior layer assembly comprises the quantity of described flow unit.
24. flow venue as claimed in claim 16, it is characterized in that, wherein, each described platform element respectively support by each described supporting and regulating device, regulated the described supporting and regulating device of each described flow unit by the described control device of the described detection control apparatus of each described flow unit.
25. flow venue as claimed in claim 24, it is characterized in that, described flowing shop body comprises a shop wall and a top cover further, described shop wall is connected with described flowing platform, described top cover support by described shop wall, wherein, described shop wall comprises one group further and connects support member and one group of shop wall elements, each described connection support member is spaced apart and arranged in the top of the described connection side of its sidewall described, and each described shop wall elements is removable installed in described in two respectively to be connected between support member.
26. flow venue as claimed in claim 25, it is characterized in that, described top cover comprises a bracing frame and at least one covering further, described covering covers support frame as described above, wherein, support frame as described above comprises one group of supporting base end portion further, and this group described supporting base end portion correspondence is arranged at each connection support member.
27. flow venue as claimed in claim 3, and it is characterized in that, wherein, described flow module comprises a serviced component further, and described serviced component is set up described unitary space, to provide service.
28. flow venue as claimed in claim 27, and it is characterized in that, wherein, described serviced component comprises and comprises at least one energy supply assembly further, and described energy supply assembly is arranged at described unitary space, to provide electric energy.
29. flow venue as claimed in claim 28, and it is characterized in that, wherein, described serviced component comprises at least one water treatment facilities further, and described water treatment facilities is arranged at described unitary space.
30. flow venue as claimed in claim 29, it is characterized in that, wherein, described serviced component comprises at least one exhibiting device further, at least one deck connector and at least one group of rest assembly, described exhibiting device, described rest assembly are arranged at described unitary space respectively, and described layer connector is arranged at described unitary space.
31. flow venue as claimed in claim 30, and it is characterized in that, wherein, described serviced component comprises at least one conditioner further, and described conditioner is arranged at described unitary space.
32. flow venue as claimed in claim 2, and it is characterized in that, wherein, layer assembly described in one of them comprises a flowing supply unit further, and described flowing supply unit is connected with described flow unit, to supply electric energy.
33. flow venue as claimed in claim 32, it is characterized in that, wherein, the flowing unit for treating water after meal further of layer assembly described in one of them, described circulating water processing unit is connected with described flow unit, to provide water treatment service.
34. flow venue as claimed in claim 33, and it is characterized in that, wherein, described flow unit is container.
35. 1 flowing venues, is characterized in that, comprising:
At least two flow units, described flow unit has a unitary space; Wherein, described flow unit comprises at least one platform element, and by connecting respectively this flow unit, respectively this platform element is connected to form first-class moving platform for carrying out activity.
36. flow venue as claimed in claim 35, and it is characterized in that, wherein, this flow unit comprises a component framework and one group of wall elements further, and each described wall elements is arranged at described component framework, to form described unitary space.
37. flow venue as claimed in claim 36, and it is characterized in that, wherein, described flow module comprises a serviced component further, and described serviced component is placed in described unitary space to provide service.
38. flow venue as claimed in claim 37, and it is characterized in that, wherein, described serviced component is selected from power supply device, water treatment facilities, exhibiting device and rest assembly.
39. flow venue as claimed in claim 38, and it is characterized in that, wherein, flow unit described in one of them comprises a power supply device further, and described power supply device is arranged at described unitary space.
40. flow venue as claimed in claim 39, and it is characterized in that, wherein, flow unit described in one of them comprises a water treatment facilities further, and described water treatment facilities is arranged at described unitary space.
41. flow venue as claimed in claim 40, it is characterized in that, wherein, described flow unit comprises a supporting and regulating device further, described supporting and regulating device removably supports described flow module, wherein, described supporting and regulating device comprises one group further and supports regulating part, and each described support regulating part is removably connected to described flow module respectively.
42. flow venue as claimed in claim 41, it is characterized in that, wherein, described flow unit comprises a detection control apparatus and a guider further, described detection control apparatus and described guider, wherein, described detection control apparatus comprises one group of monitoring element, a control device, a positioner and a communicator further, and described control device connects each described monitoring element, described control device, described positioner and described communicator respectively communicatedly.
43. flow venue as claimed in claim 42, and it is characterized in that, described flowing venue comprises four described flow units, and wherein, by connecting four described flow units, four described platform elements are connected to form described flowing platform, for carrying out activity.
44. flow venue as described in claim 39 or 43, and it is characterized in that, described flow unit is container.
45. 1 kinds set up flowing venue method, it is characterized in that, comprise the following steps:
Step 1: determine the required described flow unit setting up a flowing venue;
Step 2: respectively this flow unit participating in this flowing venue of assembling is flowed to destination of setting up an embassy; With
Step 3: assemble each described flow unit to set up described flowing venue.
46. methods setting up flowing venue as claimed in claim 45, it is characterized in that, described step 1 is further comprising the steps:
Step 11: the type determining described flowing venue;
Step 12: that determines described flowing venue sets up mode; With
Step 13: determine required described flow unit type and the quantity of setting up described flowing venue.
47. methods setting up flowing venue as claimed in claim 45, it is characterized in that, described step 3 is further comprising the steps:
Step 31: determine to assemble according to the number of plies of described flowing venue or install in units of pedestal sidewall, assembles according to the number of plies of described flowing venue if determine, performs step 32, installs if determine in units of pedestal sidewall, then perform step 33;
Step 32: the number of plies according to described flowing venue is assembled to form described flowing venue; With
Step 33: with pedestal sidewall for unit carries out assembling to form described flowing venue.
48. methods setting up flowing venue as claimed in claim 45, be is characterized in that, also comprise a step after step 3: the purposes being changed described flowing venue by the mode increasing device.
49. methods setting up flowing venue as claimed in claim 45, is characterized in that, also comprise a step after step 3: the purposes being changed described flowing venue by the mode changing flowing venue structure.
50. methods setting up flowing venue as claimed in claim 46, it is characterized in that, described step 13 is further comprising the steps:
Step 131: determine the type that a serviced component is set setting up described flow unit needs;
Step 132: determine the quantity required for all types of described flow unit; With
Step 133: determine the original position participating in this flow unit setting up this flowing venue, and determine the original position of each described flow unit being provided with described serviced component.
51. methods setting up flowing venue as claimed in claim 47, it is characterized in that, described step 32 is further comprising the steps:
Step 321: each described layer assembly of bottom forming described flowing venue, assembles each described layer assembly and forms described flowing venue bottom;
Step 322: each described layer assembly in intermediate layer forming described flowing venue, assembles each described layer assembly and forms described flowing venue intermediate layer;
Step 323: each described layer assembly of top layer forming described flowing venue, assembles each described layer assembly and forms described flowing venue top layer; With
Step 324: install described top cover and form described flowing venue.
52. methods setting up flowing venue as claimed in claim 47, it is characterized in that, described step 33 is further comprising the steps:
Step 331: the assembling sequence determining each described pedestal sidewall;
Step 332: judge whether all described pedestal sidewalls are assembled complete, if not, select a described pedestal sidewall in base to assemble, perform step 333, if it is complete to state the assembling of pedestal sidewall described in all, then perform step 336;
Step 333: the described layer assembly of the bottom of the described pedestal sidewall selected by formation;
Step 334: the described layer assembly in the intermediate layer of the described pedestal sidewall selected by formation, on the described layer assembly layer assembly in described intermediate layer being arranged at bottom;
Step 335: the described layer assembly of the top layer of the described pedestal sidewall selected by formation, is arranged at the described layer assembly in intermediate layer, returns step 332 by the described layer assembly of top layer; With
Step 336: assemble described top cover and form described flowing venue.
CN201510083321.7A 2014-07-10 2015-02-15 Mobile venue and method thereof Active CN105251198B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201510083321.7A CN105251198B (en) 2014-07-10 2015-02-15 Mobile venue and method thereof
TW104132282A TWI711752B (en) 2014-07-10 2015-09-30 Stadiums with mobile units
PCT/CN2015/091205 WO2016050212A1 (en) 2014-07-10 2015-09-30 Stadium having movable unit and method thereof
TW104215708U TWM527029U (en) 2014-07-10 2015-09-30 Stadium with mobile cell

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201410327874 2014-07-10
CN2014103278748 2014-07-10
CN201510083321.7A CN105251198B (en) 2014-07-10 2015-02-15 Mobile venue and method thereof

Publications (2)

Publication Number Publication Date
CN105251198A true CN105251198A (en) 2016-01-20
CN105251198B CN105251198B (en) 2020-05-01

Family

ID=53926850

Family Applications (8)

Application Number Title Priority Date Filing Date
CN201410523315.4A Pending CN105239801A (en) 2014-07-10 2014-09-30 Mobile stadium and establishing method thereof
CN201510083539.2A Active CN105275230B (en) 2014-07-10 2015-02-15 Mobile venue and method thereof
CN201520112106.0U Expired - Fee Related CN204663050U (en) 2014-07-10 2015-02-15 Flowing venue
CN201510083321.7A Active CN105251198B (en) 2014-07-10 2015-02-15 Mobile venue and method thereof
CN201520112075.9U Expired - Fee Related CN204663049U (en) 2014-07-10 2015-02-15 There is the venue of flow unit
CN201520112214.8U Expired - Fee Related CN204590684U (en) 2014-07-10 2015-02-15 Flowing Badminton Stadium
CN201510083527.XA Active CN105298168B (en) 2014-07-10 2015-02-15 Stadium with mobile unit and method thereof
CN201510083242.6A Active CN105332525B (en) 2014-07-10 2015-02-15 Mobile badminton stadium and method thereof

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201410523315.4A Pending CN105239801A (en) 2014-07-10 2014-09-30 Mobile stadium and establishing method thereof
CN201510083539.2A Active CN105275230B (en) 2014-07-10 2015-02-15 Mobile venue and method thereof
CN201520112106.0U Expired - Fee Related CN204663050U (en) 2014-07-10 2015-02-15 Flowing venue

Family Applications After (4)

Application Number Title Priority Date Filing Date
CN201520112075.9U Expired - Fee Related CN204663049U (en) 2014-07-10 2015-02-15 There is the venue of flow unit
CN201520112214.8U Expired - Fee Related CN204590684U (en) 2014-07-10 2015-02-15 Flowing Badminton Stadium
CN201510083527.XA Active CN105298168B (en) 2014-07-10 2015-02-15 Stadium with mobile unit and method thereof
CN201510083242.6A Active CN105332525B (en) 2014-07-10 2015-02-15 Mobile badminton stadium and method thereof

Country Status (3)

Country Link
CN (8) CN105239801A (en)
TW (2) TWI711752B (en)
WO (1) WO2016050212A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239801A (en) * 2014-07-10 2016-01-13 戴见霖 Mobile stadium and establishing method thereof
CN107633658A (en) * 2017-09-30 2018-01-26 伍胜资 A kind of drowned salvage system of swimming pool
CN110150916A (en) * 2019-06-11 2019-08-23 马宏波 A kind of double-deck exhibition position device of folding easy to remove
CN114590373A (en) * 2022-03-11 2022-06-07 岭南师范学院 Movable hydropneumatic diving training experience pool

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101994406A (en) * 2009-08-12 2011-03-30 鸿富锦精密工业(深圳)有限公司 House
CN202187579U (en) * 2011-08-09 2012-04-11 泰山体育产业集团有限公司 Quick assembled and disassembled sports table
CN202810245U (en) * 2012-09-07 2013-03-20 广州爱奇实业有限公司 Movable mini gymnasium
US20130180182A1 (en) * 2010-09-20 2013-07-18 Seung Hyeup Yoo Container-type system booth for an indoor/outdoor exhibition or event
CN203547176U (en) * 2013-09-24 2014-04-16 曹悦龙 Special-effect slam-dunk moving field with combination of spring and moving platform
CN203577271U (en) * 2013-09-24 2014-05-07 曹悦龙 Basketball court convenient for moving
CN102362039B (en) * 2009-03-23 2014-05-21 克里斯托夫·马约 Above-ground, compact, multi-purpose pool for practicing stationary swimming

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01271582A (en) * 1988-04-22 1989-10-30 Shimizu Corp Assembly set for calisthenics gymnasium
TWM250970U (en) * 2004-02-06 2004-11-21 Bi-Shia Jang Collapsible multi-function house
CN200982088Y (en) * 2006-11-17 2007-11-28 王远 Detachable swimming pool
US20090193722A1 (en) * 2008-02-01 2009-08-06 Carlson Eric T Event structures
TW201111597A (en) * 2009-09-29 2011-04-01 Hon Hai Prec Ind Co Ltd Housing
CN103104109B (en) * 2011-11-10 2015-09-09 熊伟 Mobile, pin-connected panel Badminton Stadium
CN202416926U (en) * 2011-11-10 2012-09-05 熊伟 Moveable and assembling type badminton hall
CN202882531U (en) * 2012-11-02 2013-04-17 张云龙 Hexagonal cross arch-shaped inflatable tent
CN202882532U (en) * 2012-11-02 2013-04-17 张云龙 Inflating type double-arch stage shed
CN203296456U (en) * 2012-12-17 2013-11-20 东莞市大成充气模型制品有限公司 Inflatable tent
CN203669096U (en) * 2013-11-22 2014-06-25 扬州通利冷藏集装箱有限公司 Room box
CN105239801A (en) * 2014-07-10 2016-01-13 戴见霖 Mobile stadium and establishing method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102362039B (en) * 2009-03-23 2014-05-21 克里斯托夫·马约 Above-ground, compact, multi-purpose pool for practicing stationary swimming
CN101994406A (en) * 2009-08-12 2011-03-30 鸿富锦精密工业(深圳)有限公司 House
US20130180182A1 (en) * 2010-09-20 2013-07-18 Seung Hyeup Yoo Container-type system booth for an indoor/outdoor exhibition or event
CN202187579U (en) * 2011-08-09 2012-04-11 泰山体育产业集团有限公司 Quick assembled and disassembled sports table
CN202810245U (en) * 2012-09-07 2013-03-20 广州爱奇实业有限公司 Movable mini gymnasium
CN203547176U (en) * 2013-09-24 2014-04-16 曹悦龙 Special-effect slam-dunk moving field with combination of spring and moving platform
CN203577271U (en) * 2013-09-24 2014-05-07 曹悦龙 Basketball court convenient for moving

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李天华等: "装配式建筑全寿命周期管理中BIM 与RFID 的应用", 《工程管理学报》 *

Also Published As

Publication number Publication date
TW201612390A (en) 2016-04-01
WO2016050212A9 (en) 2016-05-26
WO2016050212A1 (en) 2016-04-07
CN204663049U (en) 2015-09-23
CN105332525A (en) 2016-02-17
CN204590684U (en) 2015-08-26
CN105275230B (en) 2020-05-19
CN105251198B (en) 2020-05-01
CN105298168A (en) 2016-02-03
CN105239801A (en) 2016-01-13
CN105298168B (en) 2020-07-24
CN204663050U (en) 2015-09-23
TWI711752B (en) 2020-12-01
CN105332525B (en) 2020-07-21
TWM527029U (en) 2016-08-11
CN105275230A (en) 2016-01-27

Similar Documents

Publication Publication Date Title
US8763314B2 (en) Container-type system booth for an indoor/outdoor exhibition or event
CN105251198A (en) Mobile venue and building method thereof
CA2795035C (en) Multi-dwelling structure
US20180313076A1 (en) Maritime green human settlement system and modularized construction method therefor
Modi Improving the social sustainability of high-rises.
US20160024781A1 (en) Robotically controlled architectural elements
CN204910727U (en) Venue flows
CN102444206A (en) Prefabricated modular building supporting overlapping and combination
US6126551A (en) Rink and corridor recreational facility
CN110847384A (en) Plug-in sharing box
CN107407101B (en) Entertainment venue
CN206438801U (en) The TV broadcast Room
CN202202580U (en) Precast modular building capable of being subjected to overlapping combination
CN212154297U (en) Special spatial cultural entertainment room for escape from secret room
CN213063069U (en) Ecological landscape pavilion with body-building and greening functions
CN204370854U (en) A kind of large-scale combined mobile arenas
CN206174506U (en) Appearance diversified prefabricated house
CN213501936U (en) Sightseeing vehicle for tourist attraction
US11225762B2 (en) Modular landing port
WO2008065071A1 (en) Method to build a multi-functional sports structure, and multi-functional sports structure thus built
JP3438591B2 (en) Passenger accommodation facilities
Renalto The changing city: flessibilità e trasformazione d'uso di tre strutture industriali a Carpi
CN106760685A (en) The TV broadcast Room
CN115306187A (en) Lightweight shelter type medical treatment system
CN110778163A (en) Multi-dimensional theater for unmanned drama

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant