CN204590684U - Flowing Badminton Stadium - Google Patents

Flowing Badminton Stadium Download PDF

Info

Publication number
CN204590684U
CN204590684U CN201520112214.8U CN201520112214U CN204590684U CN 204590684 U CN204590684 U CN 204590684U CN 201520112214 U CN201520112214 U CN 201520112214U CN 204590684 U CN204590684 U CN 204590684U
Authority
CN
China
Prior art keywords
flowing
wall
unit
flow
wall unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520112214.8U
Other languages
Chinese (zh)
Inventor
戴见霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520112214.8U priority Critical patent/CN204590684U/en
Application granted granted Critical
Publication of CN204590684U publication Critical patent/CN204590684U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/10Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports
    • E04H3/14Gymnasiums; Other sporting buildings

Landscapes

  • Architecture (AREA)
  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Toys (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Road Paving Structures (AREA)
  • Sanitary Device For Flush Toilet (AREA)
  • Battery Mounting, Suspending (AREA)
  • Special Spraying Apparatus (AREA)
  • Building Environments (AREA)
  • Apparatus Associated With Microorganisms And Enzymes (AREA)

Abstract

One flowing Badminton Stadium, comprise at least two wall devices, an activity space is formed between two these wall devices, wherein, this wall device comprises at least one wall unit further, this wall unit is arranged at the side of this activity space, and this wall unit has a unitary space further, and this unitary space is arranged at this wall unit the same side corresponding with this unitary space.

Description

Flowing Badminton Stadium
Technical field
The utility model relates to venue, in particular to a kind of assemble method of flow venue and a kind of venue that flows, this flowing venue is provided to a few flow unit, by assemble this flow unit formed this flowing venue should, wherein this flow unit is convenient to transport to make to be flowed this flowing venue by the mode of traffic flow moving cell, wherein, this flowing venue is assembled by the assemble method of the venue that flows.
Background technology
Along with the growth in the living standard of people, people more and more focus on health.Therefore increasing people is by participating in various sports to take exercises.Therefore people are also increasing to the demand of sports buildings.Particularly Badminton Stadium and the such sports buildings of table tennis training hall.Existing sports buildings is all be fixed on a certain position, and people need to come sports buildings and move.Although only need vacant lot just can carry out as this type games of shuttlecock.But build a Badminton Stadium and need land resources.And soil is a kind of scarce resource, and this situation is particularly evident in the big and medium-sized cities of China.But but have a lot of idle soil in the big and medium-sized cities of China, these idle lands may be developed very soon, also likely continue idle, that is can not determine the standby time of these idle lands.If arrange Stadium on these idle lands, then can benefit the people lived near idle land.But arrange fixing Stadium on these idle lands, then, when idle land needs development, fixing Stadium then needs to be removed, thus causes waste.But the problem how utilizing these idle lands to solve sports buildings to lack, neither one solution so far.
Also the life enriching employee is focused on, as regularly held badminton game in some enterprise.But be not that each enterprise has Badminton Stadium.Therefore rent place plays and becomes unique selection.If only rent a place, then can only be that the employee involvement of participation match is in badminton game.If rent whole venue, although more employee involvement can be made in badminton game, the expense of renting fixing venue can become another problem again.Building a badminton game venue then spends larger.But some enterprise has vacant lot can hold interim activity.Even parking lot also can supply to utilize and hold provisional activity.This kind ofly need the motion of temporary venue a lot.Although build provisional place, for accomodation of activities in one piece of vacant lot.Then can dismantle after using, recover the purposes in original soil.But build and the impact of dismounting on soil, likely affect the original purposes in soil.And to build and in unloading process, the rubbish produced needs additionally to clear up, indirectly increase the cost holding activity.
Some development projects may need a lot of employee fixing local in life a period of time at one.Movable plank house becomes the first-selection that employee lives.Movable plank house just considers the living problem of employee, does not consider the physiology of employee and the construction of mental health.Although employee can carry out life spare time by watch TV or chess game etc. in movable plank house, movable plank house cannot provide place to carry out sports, as carried out shuttlecock, the motions such as table tennis for employee.Employee lacks motion, can affect operating efficiency.And movable plank house cannot provide employee to carry out the place of the motion such as shuttlecock or table tennis.Although movable plank house can reuse, be convenient to mobile.But movable plank house needs to depend on other conveying arrangements to carry out storing and moving to another location.That is, movable plank house needs extra carrier to transport.Movable plank house is an Analysis of Nested Design.That is, a set of movable plank house is by required room number, and structure carries out designing.If after this movable plank house is mounted well, need an extra increase room.For this cover movable plank house, implement also difficulty.Likely must reinstall.If this cover movable plank house is sandwich construction, only increase a room, also must consider overall structure, not easily realize.And increase corresponding room number according to the number of plies, then can cause waste again.
The shuttlecock place that fixing Badminton Stadium has is fixing, and the difficulty that additionally will increase place is very large.Even if add place, also expend huge.But some time period causes some place in Badminton Stadium to leave unused to these shuttlecock place demands less in certain areas, as be cold or rainy weather many etc.Simultaneously still large to these shuttlecock place demands in another area.As become a fine day or the area of sky hot air heating.If shuttlecock place idle for area of being cold can be used the area of day hot air heating, then improve the utilization rate in shuttlecock place.But be irrealizable for fixing sports buildings.
Fixing venue generally only has single function, if will change the function of venue, has just needed to make venue to build greatly.As being indoor swimming pool by the reconstruction of fixing Badminton Stadium, then need to make fixing Badminton Stadium to build greatly, as built swimming pool.The reconstruction of fixing swimming hall also will be made for Badminton Stadium and build greatly, need at substantial cost.Now, do not have technical scheme only to need to make a change, can change the purposes of venue, as Badminton Stadium changes into swimming hall, Badminton Stadium is changed in swimming hall.
Container is by a large number for transport, but container also has useful life.That is, there is a large amount of containers exceeding useful life and need process.The container gone beyond the time limit how processing enormous amount is also a difficult problem.The external coating of container uses special paint, if the issue handling of the container gone beyond the time limit is bad, can cause serious environmental problem.And treating capacity is huge, required processing cost also spends huge.A kind of saving processing cost is not had at present yet, and the solution that environmental pollution is few.
Utility model content
An object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flowing feather shop provides at least two wall devices, forms an activity space carry out activity to provide by the position arranging two these wall devices.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this wall device provides at least one wall unit, and this wall unit provides a unitary space.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this wall device provides an energy supply wall unit, to provide electric energy by this energy supply wall unit.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this wall device provides a unit for treating water, to provide water treatment service by this unit for treating water.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flowing Badminton Stadium provides a top cover to cover this activity space.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flowing Badminton Stadium provides a movable platform, and this movable platform is placed in the bottom of this activity space.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this movable platform provides a group platform element, and platform element described in adjacent two is connected to each other to assemble and forms described movable platform.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this top cover provides a bracing frame and at least one overburden further, and this bracing frame supports each described overburden.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this wall unit provides one group of wall elements and a wall elements framework further, and respectively this wall elements is set up this wall elements framework, to form this activity space.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, in this wall unit, respectively this wall elements is removable installed in this wall elements framework to form this activity space.
Another object of the present utility model is to provide a flowing Badminton Stadium, wherein, connects unitary space described in two by two adjacent these wall elements dismantling two adjacent these wall unit.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this wall unit provides at least one serviced component further, and this serviced component is arranged at this unitary space.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this serviced component provides power supply device, water treatment facilities, exhibiting device, rest assembly, guiding device and conditioner.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this wall unit comprises a supporting and regulating device further, and this supporting and regulating device removably supports this wall unit.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, during this wall unit, one step provides a management devices, and this management devices is for this wall unit of management.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flowing Badminton Stadium provides an administrative unit, and this administrative unit is passed through respectively this management devices and obtained the state of respectively this wall unit.Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flowing Badminton Stadium provides a shop body, and this shop body provides an activity space and a wall device, and this activity space is arranged at the top of this wall device.
Another object of the present utility model is to provide a flowing venue, and this flowing venue provides one group of flow unit, and the assembling of this group flow unit forms first-class moving base, and this flowing pedestal has a shop body space for carrying out activity.
Another object of the present utility model is to provide a flowing venue, this group flow unit is convenient to transport, this group flow unit is convenient to assembling and is formed this flowing venue, also be convenient to be reduced to this group flow unit from the dismounting of flowing venue, the mode thus flowed by flow unit flows to another destination to make this flowing venue.
Another object of the present utility model is to provide a flowing venue, and this flowing pedestal is provided to few two pedestal sidewalls, forms this shop body space between two these pedestal sidewalls, and this shop body space is for carrying out activity.
Another object of the present utility model is to provide a flowing venue, and this shop body space is for arranging a performance platform, and described flow unit can be assembled and form this performance platform.
Another object of the present utility model is to provide a flowing venue, this flow-based provides four pedestal sidewalls, four pedestal sidewalls are around this shop body space of formation, and this flowing venue provides a water-tight device, and this water-tight device is arranged on bottom this shop body space to form a swimming pool.
Another object of the present utility model is to provide a flowing venue, and this flow unit provides a unitary space for arranging an energy supply assembly, thinks that this flowing venue provides electric energy.
Another object of the present utility model is to provide a flowing venue, and this flow unit provides a unitary space for arranging a water treatment facilities, thinks that this flowing venue provides water resource.
Another object of the present utility model is to provide a flowing Badminton Stadium, this flowing Badminton Stadium can move to another place by a place, thus according to each place, the quantity of Badminton Stadium demand to flowing Badminton Stadium is adjusted, to meet the demand to Badminton Stadium.
Another object of the present utility model is to provide a flowing Badminton Stadium, and this flowing Badminton Stadium provides first-class moving base, and this flowing pedestal is provided to less first-class moving platform for carrying out badminton.
Another object of the present utility model is to provide a flowing Badminton Stadium, and this flowing Badminton Stadium provides a flowing shop body, and this flowing shop body, by this flow-based seat supports, forms a shop body space for arranging described flowing platform for carrying out badminton.
Another object of the present utility model is to provide a flowing Badminton Stadium, wherein, this flowing pedestal is provided to a few flow unit, and this flow unit is convenient to flowing, thus by the mode of each this flow unit of flowing by this flowing Badminton Stadium flow to destination.
Another object of the present utility model is to provide a flowing Badminton Stadium, wherein, this flowing platform provides at least two platform elements, and this platform element is arranged at described flow unit, to be flowed to destination by described flow unit, and then connect two platform elements to form this flowing platform.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, for the ease of flowing, this flowing platform can be divided into multiple platform unit, to be suitable for being arranged at described flow unit, thus is flowed to destination by described flow unit.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a unitary space for providing service.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, the space that be connected two these flow units have can be communicated with, and provides service with extending space.
Another object of the present utility model is to provide a flowing Badminton Stadium, wherein, by regulating this flowing Badminton Stadium of quantity regulating of this flow unit.
Another object of the present utility model is to provide a flowing Badminton Stadium, wherein, by the quantity regulating the quantity of this flow unit to regulate this flowing platform.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a flow module, and this flow module provides one group of wall elements, this wall elements removably connect with around formation this unitary space.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flow module provides a component framework, so that install this wall elements.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flowing framework provides a group angle connector and one group of wall connector, so that install this wall elements.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a supporting and regulating device for supporting this flow module, for this flow module of support.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this supporting and regulating device can be incorporated in this unitary space, so that flowing.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this supporting and regulating device can make this diapire of each this flow module be connected be in same level.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a detection control apparatus, and this detection control apparatus is for the state of this supporting and regulating device of detection and control.Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flow unit, for arranging at least one power supply device, forms flowing supply unit with supplying energy to this flowing Badminton Stadium.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flow unit, for arranging at least one water treatment facilities, forms circulating water unit to supply water to this flowing Badminton Stadium.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flowing supply unit connects this circulating water unit and forms this flowing platform.
Another object of the present utility model is to provide a flowing Badminton Stadium, wherein, this flow unit is for arranging at least one cooling, heating system, form flowing cooling, thermal, with to flow unit cooling, hot gas, make to be adjusted in flowing Badminton Stadium space the temperature that suitable badminton is carried out.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this detection control apparatus provides the position of a positioner for obtaining flow unit.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this detection control apparatus provides a communicator to communicate for other this flow unit, thus collaborative work.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a motion generator can flow voluntarily to make this flow unit.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flow unit provides a guider, arrives preset object to guide this flow unit.
Another object of the present utility model is to provide a flowing Badminton Stadium, wherein, this flowing shop body provides one group to connect support member and one group of shop wall elements, and this connection support member compartment of terrain is arranged at this flowing platform, and this shop wall elements is arranged between the wall elements of described shop.
Another object of the present utility model is to provide a flowing Badminton Stadium, and wherein, this flowing shop body provides a top cover, this top cover support by each connection support member.
To achieve these goals, the utility model provides a flowing venue, comprising:
First-class moving base, this flowing pedestal has a shop body space for carrying out activity; Wherein,
This flowing pedestal comprises one group of flow unit further, and the assembling of this flow unit forms at least two pedestal sidewalls, forms this shop body space between two pedestal sidewalls.
This pedestal sidewall comprises at least one layer assembly further, and wherein, when pedestal sidewall comprises at least two layer assemblies, wherein this layer assembly is set up and supports another this layer assembly, forms this pedestal sidewall with such stacked system.This layer assembly comprises this flow unit at least one, and wherein, when this layer assembly comprises at least two these flow units, one end of this flow unit of one end and another of one of them this flow unit is connected to form this layer assembly.This flow unit comprises a flow module further, this flow module has a unitary space so that provide service, the wherein further component framework of this flow module and one group of wall elements, respectively this wall elements is removably installed in this component framework, to form this unitary space.This flow unit comprises a serviced component further, and this serviced component is arranged in this unitary space to provide corresponding service.This serviced component comprises an energy supply assembly, and this energy supply assembly is arranged in this unitary space, to make this flow unit to this flowing venue supply electric energy.Wherein this serviced component comprises a water treatment facilities, this water treatment facilities is arranged in described unitary space, water treatment service is provided to this flowing venue to make this flow unit, wherein, this water treatment facilities comprises a water supply installation further, this water supply installation connects external water source to provide living water use to this flowing venue, and wherein, this flowing venue comprises at least one described flow unit being provided with this water treatment facilities.
To achieve these goals, the utility model provides a flowing Badminton Stadium, comprising:
First-class moving base, this flowing pedestal comprises at least one flowing platform for carrying out badminton; Wherein,
This flowing pedestal comprises at least two flow units further, forms this flowing platform by connecting flow unit described in two, wherein, flows pedestal so that provide service by regulating described in the quantity regulating of this flow unit.
This flowing Badminton Stadium comprises a flowing shop body further, this flowing shop body is by this flow-based seat supports, wherein, this flowing shop body is arranged at this flowing platform to form a shop body space, according to this flowing shop body of quantity regulating of this flowing platform, thus regulate this shop body space, so that provide service.
This flow unit comprises a flow module further, and this flow module comprises a component framework and one group of wall elements further, and respectively this wall elements is removably installed in described component framework, to form a unitary space for providing service.
This flow unit is further to comprise a platform element, and this platform element is removable installed in this flow module, wherein, forms this flowing platform by connecting at least two platform elements.
This flow unit comprises a supporting and regulating device further, this supporting and regulating device removably supports described flow module and stablizes for the described flow module of maintenance, wherein, when described flow unit is flowed, described supporting and regulating device is arranged at the unitary space of described flow module, so that flowing.
To achieve these goals, the utility model provides another flowing Badminton Stadium, comprising:
First-class moving base, this flowing pedestal enters one and comprises at least two pedestal sidewalls, two these pedestal compartment of terrains are arranged, to form a shop body space for carrying out badminton between two these pedestal sidewalls, wherein, described pedestal sidewall comprises this flow unit at least one further, by adjusting described flow unit to regulate described shop body space.
This flowing pedestal comprises at least one flowing platform further, this flowing platform is arranged at this shop body space for carrying out badminton, wherein, this flowing platform comprises at least two platform elements further, described platform element is removably arranged at this flow unit, so that flow with described flow unit, wherein, described platform element moves to the body space connection of described shop to form described flowing platform for carrying out badminton after described flow unit is disassembled.
This flowing pedestal comprises four pedestal sidewalls, and four these pedestal sidewalls are around this shop body space of formation for carrying out badminton, and wherein this pedestal sidewall comprises at least two these flow units further, by adjusting this flow unit to regulate described flowing shop body space.
This flowing pedestal comprises at least one flowing platform further, this flowing platform is arranged at this shop body space for carrying out badminton, wherein, this flowing platform comprises at least two platform elements further, this platform element is removably arranged at this flow unit, so that flow with this flow unit, wherein, this platform element moves to this shop body space connection to form this flowing platform for carrying out badminton after this flow unit is disassembled.
The utility model flowing Badminton Stadium comprises first-class moving base, and this flowing pedestal comprises at least one flow unit, and this flow unit is convenient to flowing by being arranged at conveying arrangement to make this flow unit.By regulating this flowing pedestal of the quantity regulating of this flow unit to provide service.This flowing pedestal comprises at least one flowing platform for carrying out badminton.This flowing platform comprises at least two platform elements, and two these platform elements are connected to each other to form this flowing platform.This platform element is arranged at this flow unit so that flow along with this flow unit.By the mode of each flow unit that flows, be convenient to the utility model flowing Badminton Stadium and flow to each destination.After arriving each destination, form the utility model flowing Badminton Stadium by connecting each flow unit.This flow unit has a unitary space, for arranging each serviced component.Serviced component includes, but are not limited to power supply device, water treatment facilities, exhibiting device and rest assembly.This power supply device is arranged at this unitary space of this flow unit, to make this flow unit to this flowing Badminton Stadium supply electric energy.Be worth one, this flow unit being provided with this power supply device also can be applied to community and power.Such as community has a power failure suddenly, can call this flow unit arranging this power supply device and go to power supply.Water treatment facilities is arranged at this unitary space of this flow unit, provides water services to make this flow unit to this flowing Badminton Stadium and sewage is processed.This flow unit being arranged at water treatment facilities also can be applicable to supply water to community, or supplies water to disaster area when there is disaster.Similarly, this flow unit arranging this power supply device also can be powered to disaster area when there is disaster.Because flow unit is convenient to flowing, thus transport facility.This flow unit further can for arranging sanitary parts and culinary art assembly, the hygienic issues occurred during to provide and to solve the disaster relief and hungry problem.This exhibiting device is arranged at the unitary space of this flow unit, can supplies at this flowing Badminton Stadium displaying articles, for you to choose.Rest assembly is arranged at described flow unit, to provide relaxing area to have a rest for people.This flowing platform is for carrying out badminton.This shuttlecock platform is provided with a shuttlecock place.Preferably, this shuttlecock platform is provided with the shuttlecock place of a standard.For the ease of flowing, this shuttlecock platform is divided at least two platform elements.As this shuttlecock platform is divided into two these platform elements.Maybe this shuttlecock platform is divided into four these platform elements.Maybe this shuttlecock platform is divided into six these platform elements etc.When each platform element arrives object, then connect each platform element and form this flowing platform for carrying out shuttlecock activity.The platform element divided can divide according to the size of this flow unit, to mate this flow unit, thus makes this platform element also be convenient to flowing.Therefore can according to demand, by regulating the quantity of this flowing platform of quantity regulating of this flow unit.When large to badminton place demand, the mode by increasing this flow unit increases flowing platform, to satisfy the demands.When demand reduces, the quantity of this flow unit can be reduced, thus reduce flowing platform.And this flow unit be reduced is flowed to the area large to badminton place demand, thus improve the utilization rate of this flow unit.Two unitary spaces being connected this flow unit can be communicated with, and with expansion service space, improve and better serve.Further, this flowing Badminton Stadium can customize on demand, and this flow unit being provided with power supply device as selected and this flow unit being provided with this water treatment facilities form this flowing platform.This flow unit being provided with multiple exhibiting device is and for example selected to form this flowing platform.Thus many services is provided.The utility model comprises a flowing shop body further, and this flowing shop body is arranged at this flowing platform, to reduce weather to the impact carrying out badminton.And each installation component of this flowing shop body can be placed on the unitary space of this flow unit, flows with this flow unit.That is, the unitary space of this flow unit can supply containing objects when flowing.Outside a little, somewhere is because holding the shuttlecock race of the number of participant unprecedented large-scale sparetime, and existing shuttlecock place, this place quantity is far less than the quantity needed for this shuttlecock race, thus, cannot undertake so large-scale race.And we can apply flowing Badminton Stadium, neighbouring flowing Badminton Stadium is flow to temporarily this undertaking ground, the quantity of the Badminton Stadium on this ground that just can increase sharply at short notice.And after this race terminates, the flowing Badminton Stadium can will can assembled to this ground in the very short time again, turns back to it easily and carrys out local use temporarily.
To achieve these goals, the utility model provides a flowing Badminton Stadium, comprising:
At least two wall devices, form an activity space described in two between wall device, wherein,
Described wall device comprises at least one wall unit further, described in two, wall unit is arranged at the side of described activity space, described wall unit has a unitary space further, and described unitary space is arranged at described wall unit the same side corresponding with described unitary space.
Described wall device comprises at least one energy supply wall unit further, described energy supply wall unit is connected with described wall unit, to supply electric energy, wherein, described energy supply wall unit comprises a power supply device further, described power supply device is arranged at the described unitary space of described wall unit, to be powered by described power supply device.
Described wall device comprises at least one water treatment wall unit further, described water treatment wall unit is connected with described wall unit, to provide water treatment service, wherein, described water treatment wall unit comprises a water treatment facilities further, described water treatment facilities is arranged at the described unitary space of described wall unit, to provide water treatment service by described water treatment facilities.
Described flowing Badminton Stadium comprises a top cover further, described top cover is supported by each described wall device, and wherein, described top cover comprises a bracing frame and at least one overburden further, each described wall device supports support frame as described above respectively, and support frame as described above supports each described overburden.
Described flowing Badminton Stadium comprises a movable platform further, and described movable platform is placed in the bottom of described activity space.
Described wall unit comprises one group of wall elements and a wall elements framework further, and each described wall elements is arranged at described wall elements framework to form described unitary space.
The utility model additionally provides a kind of method setting up flowing Badminton Stadium, comprises the following steps:
The each described wall dividing elements of the same described wall device of assembling is a wall unit group by steps A: the quantity of multiple wall unit according to the described wall unit be assembled into required for a wall device divided into groups;
Step B: assemble each described wall unit and form a shop body; With
Step C: assemble a top cover, is arranged at described shop body and is supported described top cover to make described top cover by described shop body by described top cover.
Described step B is further comprising the steps:
Steps A .1: judge whether each described wall unit group exists an independent described wall unit, if each described wall unit group does not exist an independent described wall unit, then performs step C, otherwise, perform steps A .2;
Steps A .2: select one of them to there is the described wall unit group of independent described wall unit, then at selected described wall unit group selection wall unit described in one of them;
Steps A .3: selected described wall unit is arranged at a predeterminated position;
Steps A .4; Selected described wall unit is connected with adjacent described wall unit; With
Steps A .5: return steps A .1.
Described step C is further comprising the steps:
Step is C.1: assemble multiple sub-bracing frame and form a bracing frame;
Step is C.2: multiple overburden is covered support frame as described above regularly, to form described top cover; With
Step is C.3: described top cover is placed in described shop body, with support by described shop body.
Further comprising the steps before described steps A:
Steps A ': the Badminton Stadium that flowed by the utility model dismounting is multiple described wall unit; With
Steps A ": multiple described wall unit is moved to object respectively.
Described steps A ' further comprising the steps:
Steps A ' .1: be separated described top cover and described shop body; With
Steps A ' .2: dismantle described shop body to dismantle described shop body for multiple described wall unit.
Described steps A ' .2 is further comprising the steps:
Steps A ' .2.1: judge whether each described wall device of described shop body exists two the described wall unit be connected to each other, if exist, then perform steps A ' .2.2; If do not exist, then perform steps A ' .2.6;
Steps A ' .2.2: one of them this wall device of two described wall unit that selected existence is connected to each other, then from the top of described wall device to the floor detection of described wall device to determine to be connected to each other two these wall unit; When detection is to first described wall unit of two of being connected to each other, then stop detecting, perform steps A ' .2.3;
Steps A ' .2.3: be connected to each other two described wall unit foldings are divided into two independent described wall unit;
Steps A ' .2.4: independent two described wall unit are dismantled respectively to supporting surface; With
Steps A ' .2.5: return steps A ' .2.1.
Steps A ' .2.6: first-class moving platform is dismantled for multiple platform element;
Steps A ' .2.7: each described platform element is arranged at described wall unit.
Also step D is comprised: assemble a movable platform after described step C.
Described steps A " further comprising the steps:
Steps A " 1: the described wall unitary space each described overburden and each described sub-bracing frame being accommodated in respectively corresponding described wall unit; With
Steps A " 2: each described wall unit is moved to destination respectively.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of a flow unit of a preferred embodiment of the utility model flowing venue.
Fig. 2 A is that the present invention is flowed the phantom drawing of a flow unit of a preferred embodiment of venue.
Fig. 2 B is that the present invention is flowed the phantom drawing of a flow unit of a preferred embodiment of venue, describes a power supply device and is arranged at this flow unit.
Fig. 2 C is that the present invention is flowed the phantom drawing of a flow unit of a preferred embodiment of venue, describes a water treatment facilities and is arranged at this flow unit.
Fig. 2 D is that the present invention is flowed the phantom drawing of a flow unit of a preferred embodiment of venue, describes an exhibiting device and is arranged at this flow unit.
Fig. 2 E is that the present invention is flowed the phantom drawing of a flow unit of a preferred embodiment of venue, describes a rest assembly and is arranged at this flow unit.
Fig. 3 is the explosive view of a flow unit of another preferred embodiment of the utility model flowing venue
Fig. 4 A is the schematic diagram of a preferred embodiment of the utility model flowing venue.
Fig. 4 B is the schematic diagram of a preferred embodiment of the utility model flowing venue, describes this flow unit and launches this platform element and form this flowing platform.
Fig. 4 C is the schematic diagram of a preferred embodiment of the utility model flowing venue, describes this flow unit and launches to form this flowing flowing platform.
Fig. 4 D is the schematic diagram of a preferred embodiment of the utility model flowing venue, describes two these flow units and launches this platform element formation two these flowing platforms.
Fig. 5 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Fig. 6 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Fig. 7 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Fig. 8 is the structural representation of this connection support member of another preferred embodiment of the utility model flowing venue.
Fig. 9 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Figure 10 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Figure 11 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Figure 12 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Figure 13 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Figure 14 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Figure 15 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Figure 16 is the schematic diagram of another preferred embodiment of the utility model flowing venue, illustrates that this flowing venue is for flowing Badminton Stadium.
Figure 17 is the schematic diagram of another preferred embodiment of the utility model flowing venue, illustrates that this flowing venue is for flowing Badminton Stadium.
Figure 18 is the schematic diagram of another preferred embodiment of the utility model flowing venue, illustrates that this flowing venue is for flowing swimming hall.
Figure 19 is the schematic diagram of another preferred embodiment of the utility model flowing venue, illustrate that this flowing venue is for flowing swimming hall, and this flowing swimming hall is separated into two regions.
Figure 20 is the schematic diagram of another preferred embodiment of the utility model flowing venue, illustrate that this flowing venue is for flowing swimming hall, and this flowing swimming hall is separated into two regions.
Figure 21 is the schematic diagram of another preferred embodiment of the utility model flowing venue, describes to be re-assemblied by flowing swimming hall to form outdoor pool afterwards.
Figure 22 is the schematic diagram of another preferred embodiment of the utility model flowing venue, describes to be re-assemblied by flowing swimming hall to form outdoor pool afterwards.
Figure 23 is the schematic diagram of another preferred embodiment of the utility model flowing venue, describes a kind of embodiment of this flowing venue top cover.
Figure 24 is the block diagram of another preferred embodiment of the utility model flowing venue, describes the structure of this serviced component.
Figure 25 is the block diagram of another preferred embodiment of the utility model flowing venue, describes the structure of this flow unit.
Figure 26 is the schematic diagram of another preferred embodiment of the utility model flowing venue, describes this flowing venue for flowing performance venue.
Figure 27 is the schematic diagram of another preferred embodiment of the utility model flowing venue, describes this flowing venue for flowing performance venue.
Figure 28 is the schematic diagram of another preferred embodiments of the utility model flowing venue, describes the venue that this flowing venue is open band ladder auditorium.
Figure 29 is the flow chart that the utility model sets up flowing venue method.
Figure 30 is the schematic diagram of another preferred embodiment of the utility model flowing Badminton Stadium.
Figure 31 is the schematic diagram of another preferred embodiment of the utility model flowing venue.
Figure 32 A is a layer assembly schematic diagram of another preferred embodiment of the utility model flowing venue.
Figure 32 B is this layer assembly of another preferred embodiment of the utility model flowing venue, describes and connects with the width of adjustment layer assembly side by side.
Figure 33 is the structured flowchart of another preferred embodiment of this wall unit of the utility model flowing venue.
Figure 34 is the block diagram of another preferred embodiment of the block diagram of this serviced component of this wall unit of another preferred embodiment of the dynamic venue of the utility model flowing.
Figure 35 is another preferred embodiment of the utility model flowing Badminton Stadium.。
Figure 36 is the schematic diagram of this platform element of another preferred embodiment of the utility model flowing venue.
Shown in Figure 37 is the bracing frame schematic diagram of another preferred embodiment of the utility model flowing Badminton Stadium.
Shown in Figure 38 is the schematic diagram of another preferred embodiment of the utility model flowing Badminton Stadium.
Shown in Figure 39 is the schematic diagram of another preferred embodiment of the utility model flowing Badminton Stadium.
Shown in Figure 40 is the bracing frame schematic diagram of another preferred embodiment of the utility model flowing Badminton Stadium.
Shown in Figure 41 is a kind of flow chart setting up the method in flowing feather shop of the present utility model.
Detailed description of the invention
According to the content disclosed in claim of the present utility model and manual, described in the technical solution of the utility model literary composition specific as follows.
Shown in Fig. 3 be the utility model flowing venue a preferred embodiment.In the present embodiment, this flowing venue is flowing feather shop.This flowing venue comprises at least one flow unit 10.This flow unit 10 be connected to each other is defined as first-class moving base 90.By regulating the quantity of this flow unit 10 to regulate this flowing pedestal 90, to meet the demand providing service.Preferably, at least two flow units 10 are connected to each other to form this flowing pedestal 90.That is, this flowing pedestal 90 comprises at least two these flow units 10.This flow unit 10 comprises at least one platform element 911, by connecting two these flow units 10, to make this platform element 911 of each this flow unit 10 be interconnected, for the first-class moving platform 91 of formation, thus carries out badminton at this flowing platform 91.
As shown in figure 1 and 2 a, this flow unit 10 comprises a flow module 30.This flow module 30 is convenient to be arranged at conveying arrangement, moves to destination with conveying arrangement.This flow module 30 has a unitary space 34, with in the process flowed with conveying arrangement in this flow module 30, provides spatial accommodation.This flow unit 10 can stop Preset Time in the destination of presetting, and provides shuttlecock place for carrying out badminton by being connected to form this flowing platform 91 with other flow unit 10.This unitary space 34 of each this flow module 30 as service clearance, to provide service.This flow module 30 comprises a component framework 35 and one group of wall elements 31 further, and respectively this wall elements 31 is removably installed in this component framework 35, with around formation this unitary space 34.This component framework 35 comprises a group angle connector 351 and one group of wall connector 352 further.The both ends of this wall connector 352 are permanently connected two angle connectors 352 respectively.Preferably, this group wall assembly 31 is installed on this component framework 35 this unitary space 34 around formation one right prism.Preferably, four angle connectors 351 and four wall connectors 352 are connected to form an installation frame 353, so that install this wall elements 31.Be worth one to obtain, this platform element 911 is removably installed in this component framework 35.Specifically, this platform element 911 is removably installed in this installation frame 353.That is, this platform element 911 is removably installed in this installation frame 353 as this wall elements 31.That is, this platform element 911 be connected 352 respectively at this angle connector 351 with this wall and connect.Preferably, at least one platform element 911 is removably installed in this component framework 35, so that form this flowing platform 91 by connecting this flow unit 10.That is, this flow module 30 comprises at least one platform element 911, so that form this flowing platform 91.It is worth mentioning that, this platform element 911 can be fixed in this wall elements 11.When two these flow units 10 are connected to each other, be connected to each other this component framework 35 of this flow module 30 of each this flow unit 10, firmly to connect two these flow units 10.This angle connector 351 has a spacing hole 3511 so that arrange the position of each this flow unit 10, thus is convenient to be connected to form this flowing platform 91 for carrying out badminton.
This flow unit 10 comprises a supporting and regulating device 20 further, and this supporting and regulating device 20 removably supports this flow module 30, to maintain the stable of this flow module 30.At this flow unit 10 in flow process, this supporting and regulating device 20 is incorporated in this unitary space 34 that this flow module 30 has, so that this flow unit 10 flows.This supporting and regulating device 20 comprises one group further and supports regulating part 21, and this group supports regulating part 21 and is installed on this flow module 30 removably respectively, supports this flow module 30 with adjustable ground, thus this flow module 30 maintained is stable.It is worth mentioning that, according to state of ground, regulate respectively this support regulating part 21 respectively, keep level to maintain this flow module 30, thus this flowing platform 91 being convenient to be formed by connecting this flow unit 10 moves.Respectively this support regulating part 21 removably connects one of them this wall elements 31 of this flow module 30 respectively.Preferably, respectively this support regulating part 21 and this wall elements 31 of bottom being arranged at this flow module 30.This supporting and regulating device 20 comprises a movable support regulating part 22 further, this movable support regulating part 22 removably supports this flow module 30, so that this flow module 30 mobile, thus be convenient to be permanently connected respectively this flow module 30 to form this flowing pedestal 30.As shown in Figure 5.
As shown in Fig. 2 B to Fig. 2 C, this flow module 30 comprises a serviced component 32 further, and this serviced component 32 is placed in this unitary space 34 that this flow module 30 has, thus provides this service.This serviced component 32 comprises a power supply device 321 further, and this power supply device 321 is fixedly arranged on this unitary space 34, to provide energy supply service.This power supply device 321 comprises a power interface 3211 further, and this power interface 3211 is electrically connected external power source, thus utilizes external power source to be this flowing Badminton Stadium supply electric energy.This power supply device 321 comprises an energy storage device 3212 further, and this energy storage device 3212 is connected with this power interface 3211, for depositing all external power sources.This power supply device comprises one group of solar panels 3213 further, and these group solar panels 3213 points add and are electrically connected with this energy storage device 3212, to convert solar energy into electrical energy, are then stored in this energy storage device 3212.This power supply device 321 comprises a generator 3214 further, and this generator 3214 can provide electric energy to meet the needs in this flow motion shop.This generator 3214 is electrically connected with this energy storage device 3212, with the electrical power storage produced by this generator 3214 in this energy storage device 3212.When having a power failure suddenly, this energy storage device 3212 can be this flowing Badminton Stadium supply electric energy immediately, thus maintains this flowing Badminton Stadium and normally work.This flow unit 10 being provided with this power supply device 321 is defined as the supply unit 19 that flows.This serviced component 32 comprises a water treatment facilities 322 further, and this water treatment facilities 322 is arranged at this flowing space 34, to put forward water services to this flowing Badminton Stadium, as supplied drinking water and providing sewerage treatment.This water treatment facilities 322 comprises a water supply installation 3221 further, and this water supply installation 3221 can connect external water source, to supply drinking water to this flowing Badminton Stadium.This water treatment facilities 322 comprises a sewage-treatment plant 3222 further, and this sewage-treatment plant connects outside sewage disposal system, to be carried out by the sewage of generation processing and import outside sewage disposal system, thus avoids contaminated environment.The flow unit arranging this water treatment facilities 322 is defined as circulating water processing unit 18.This serviced component 32 comprises one group of exhibiting device 323 further, and this exhibiting device 323 is arranged at this unitary space 34 and shows service to provide.This flow unit 10 arranging this exhibiting device 323 is defined as Mobile display unit 17.This wall elements 31 arranging this flow unit 10 of this exhibiting device has an opening 311, so that show.This serviced component 32 comprises one group of rest assembly 324 further, provides service in this unitary space 34.This flow unit 10 arranging this rest assembly 324 is defined as flowing rest unit 16.It is worth mentioning that, this flowing space 34 that this flow unit 10 has can customize this serviced component 32 as required, provides service to utilize this flowing space 34.In the process of flowing, this serviced component 32 is incorporated in this flow unit 10, so that flowing.
As shown in Figure 1, during this flow unit, one step comprises a detection control apparatus 40, this detection control apparatus 40, and this detection control apparatus 40 connects this supporting and regulating device 20 communicatedly, maintains this flow module 30 stablize to control this supporting and regulating device 20.This detection control apparatus 40 comprises one group of monitoring element 41 and a control device 42 further.Respectively this monitoring element 41 connects each support regulating part 21 communicatedly respectively, to make respectively this support regulating part at least be connected communicatedly with this monitoring element 41, thus is convenient to obtain the state of respectively this support regulating part 41, is then sent to this control device 42.Analyzed the state of each support regulating part 21 by this control device 42, then each this support regulating part 21 is regulated, to maintain the stable of this flow module 30.This detection control apparatus 40 comprises a positioner further.This positioner 43 obtains the position of this flow unit 10.Preferably, this positioner 43 obtains the real time position of this flow unit 10.The real time position of this flow unit 10 is sent to this control device 42 by this positioner 43, so that manage this flow unit 10.This detection control apparatus 40 comprises a communicator 44 further, and this communicator 44 connects this control device 42 communicatedly so that exchange information with other this flow unit 10, thus collaborative work.That is, multiple this flow unit 10 exchanges information, so that collaborative work by each this communicator 44.This flow unit 10 receives a presupposed solution by this communicator 44, is then sent to this control module 42.This presupposed solution analyzed by this control device 42, and obtains the position of this flow unit by this positioner, arrives the E.T.A of presetting destination to obtain this flow unit 10.Then the information of this flow unit 10 and the default time of advent are coordinated with the flow unit that other receives this presupposed solution by this communicator 44, after obtaining this destination of arrival, the default stop place of this flow unit and the default connected mode with other flow unit.In other words, this communicator 44 can analyze this presupposed solution, obtains and presets destination, estimates the time of staying in default destination, in the position that the destination of presetting stops, and the state of this accommodation space 34 preset.It is worth mentioning that, the communication mode that this communicator 44 adopts includes but not limited to, Wi-Fi, Li-Fi, satellite network, communication network and internet.
This flow unit 10 comprises a power supplying apparatus 50 further, and this power supplying apparatus 50 can be this flow unit 10 and provides power, can flow voluntarily to make this flow unit 10.This power supplying apparatus 50 is connected with this detection control apparatus 40.This detection control apparatus 40 controls this power supplying apparatus 50 and provides power.Specifically, this control device 42 of this detection control apparatus 40 controls this motion generator 50 and provides motion.Preferably, if this flow unit arranges this power supply device 321, this power supply device 321 of side connects this power supplying apparatus 50, thinks that this power supplying apparatus 50 provides the energy, produces motion to make this power supplying apparatus 50.Preferably, this energy storage device 3212 of this power supply device 321 provides the energy to this power supplying apparatus 50.This power supplying apparatus 50 connects described movable support regulating part 22, to provide power to described movable support regulating part 22.This flow unit 10 comprises a guider 60 further, and this guider 50 is connected communicatedly with this detection control apparatus 40, flows to destination to guide this moving cell 10.That is, by this power supplying apparatus 50 and this guider 60, this flow unit 10 can flow to destination certainly.
As shown in Figure 3, at this preferred embodiment, two these flow units 10 are connected to form this flowing pedestal 90, and this flowing pedestal 90 provides this flowing platform 91 for carrying out shuttlecock activity.That is, this flowing platform 91 comprises two platform elements 911, is arranged at two these flow units 10 respectively.Preferably, this platform element 911 is installed in this installation frame 35 of this flow module 30 of this flow unit 10.This two stream unit 10 is permanently connected to make two these platform elements 911 be connected to form this flowing platform 90 for carrying out badminton.It is worth mentioning that, two these platform elements 911 are respectively defined as one first platform element 9111 and one second platform element 9112 further.That is, at this preferred embodiment, this flowing platform 10 comprises one first platform element 9111 and one second platform element 9112, and this first platform element 9111 and this second platform element 9112 are connected to form this flowing platform 91 for carrying out badminton.
As shown in Figure 4 A, at this preferred embodiment, this flow unit 10 comprises two these platform elements 911, and one of them this platform element 911 is installed in this component framework 35 of this flow module 30, and another this platform element 911 is removably fixed on the outside of this component framework 35.Preferably, this platform element 911 is installed in the top of this component framework 35, and another this platform element 911 and this platform element 911 are arranged at the top outer of this component framework 35 overlappingly.As shown in Figure 4 B, another this platform element 911 can be moved apart this flow unit 10, then support by each support regulating part 21, thus be connected with this platform element 911 and be in same level, thus forming this flowing platform 91 for carrying out badminton.Two these flow units 10 are connected to make another this platform element 911 of another this this flow unit 10 of platform element 911 and another of this flow unit 10 to be connected to form this flowing platform 91 for carrying out badminton.In addition, when this another this platform element 911 of this flow unit 10 moves apart this flow unit 10, then supported to make another this platform element 911 of this flow unit 10 be connected to form this flowing platform 91 for carrying out badminton with this platform element 911 of this flow unit 10 by each this support regulating part 21.It is worth mentioning that, by regulating respectively this support regulating part 21, the surface of the surface of another this platform element 911 of this flow unit 10 and this platform element 911 of this flow unit 10 is in same level, so that carry out badminton.And another this platform element 911 of another this flow unit 10 moves apart this flow unit 10, then supported to make this platform element 911 of another this this flow unit 10 of platform element 911 and another of another this flow unit 10 be connected to form this flowing platform 91 for carrying out badminton by each this support regulating part 21.Specifically, this flow unit 10 one of wherein, this first platform element 9111 is installed in this component framework 35 of this flow module 30.This second platform element 9112 is installed in the outside of this component framework 35 of this flow module 30 and overlapping with this first platform element 9111.Preferably, this first platform element 9111 is installed in the top of this component framework 35 of this flow module 30.At another this flow unit 10, this second platform element 9112 is installed in this component framework 35 of this flow module 30.This first platform element 9111 is installed in the outside of this component framework 35 of this flow module 30 and overlapping with this first platform element 9111.Preferably, this second platform element 9112 is installed in the top of this component framework 35 of this flow module 30.As shown in Figure 5, connecting by connecting two these flow units 10, being connected to form this flowing platform 90 for carrying out badminton to make this second platform element 9112 of one of them this flow unit 10 with this first platform 9111 of another this flow unit 10.When this flowing platform 90 can not satisfy the demands, by this, this second platform element 9112 of one of them this flow unit 10 moves apart this flow unit 10, then support by each this support regulating part 22, be connected to form this flowing platform 91 to make this second platform element 11 with this first platform element 9111 of this flow unit 10.This first platform element 9111 of another this flow unit 10 is moved apart this flow unit 10, then support by each this support regulating part 22 to make this first platform element 9111 be connected to form another this flowing platform 91, for carrying out badminton with this second platform element 9112 of another this flow unit 10.It is worth mentioning that, make this first platform element 9111 be in same level, so that carry out badminton with this second platform element 9112 by each this support regulating part.It is worth mentioning that, another platform element 911 of this flow unit 10 also can be placed in the bottom of this flow module 10 of this flow unit 10.That is, support another this platform element 911 by this supporting and regulating device 21, another this platform element 911 supports this flow module 30.
As shown in Figure 5, another preferred embodiment of the utility model flowing venue.In the preferred embodiment, this flowing venue is used as Badminton Stadium.In order to make this flowing platform be convenient to transport, this flowing platform is divided at least two platform elements.In the present embodiment, this flowing platform is divided into four platforms element 911.This four platforms element is defined as the 3rd platform element 9113 respectively, 4th platform element 9114,5th platform element 9115 and the 6th platform element 9116. are in the preferred embodiment, four these flow units 10 are connected to form this flowing pedestal 90, and wherein respectively this flow unit 10 specifically has this platform element 911 at least one.In the destination determining to set up the utility model flowing Badminton Stadium to set up, and need the quantity of this flow unit 10.In the present embodiment, need four these flow units 10 to be connected to form this flowing pedestal 90, and respectively this flow unit 10 comprise this platform element 91 at least one.This platform element 91 of four these flow units 10 is connected to form this flowing platform 90 for carrying out badminton.According to the needs setting up the utility model flowing Badminton Stadium, select four these flow units 10.The utility model flowing Badminton Stadium needs to provide electric energy and water, then select be provided with this flow unit 10 of this power supply device 321 and be provided with this flow unit 10 of water treatment facilities 322.That is, select this flowing supply unit 19 and this circulating water processing unit 18 to provide energy supply service and water treatment service.Select two these flow units 10 again.It should be noted that respectively this platform element 911 of four selected these flow units 10 can be connected to form this flowing platform 91 for carrying out shuttlecock activity.It is worth mentioning that, the initial position of four these flow units 10 can be positioned at different places.One of them this flow unit 10 receives flowing Badminton Stadium information by this communicator 44 of this detection control apparatus 40, is then sent to this control module 42.The flowing Badminton Stadium information that the analysis of this control module 42 obtains, obtains destination information.Then this control module 42 obtains the real time position of this flow unit 10 by this positioner 43.Destination information and real time position are sent to this guider 60 by this control module 42, obtain the route or E.T.A that arrive this destination.One of them this flow unit 10 is by the current location of one of them this flow unit 10, and route and E.T.A are sent to other three these flow units 10, to coordinate a connection scheme by this communicator 44.That is, four these flow units 10 are in flow process, according to the position of destination, respectively this flow unit 10 current location and respectively this flow unit estimate to arrive time of destination, coordinate in stop place, destination, thus make to park to predeterminated position when this flow unit 10 arrived the earliest has been destination.And when last this flow unit 10 arriving destination is parked to predeterminated position, four these flow units 10 are connected to form this flowing pedestal 90.Four these flow units 10 comprise this platform element 911 respectively, are connected to form this flowing pedestal after 90s at four these flow units 10, and respectively this platform element 911 is connected to form this flowing platform 91 for carrying out shuttlecock activity.Shown in Fig. 6 is the process that four these flow units form this flowing platform.It is worth mentioning that, four these flow units 10 comprise this flowing supply unit 19 and this circulating water processing unit 18.
This flowing platform 91 supplies to arrange a flowing shop body 80, as shown in Figure 7.That is, this flowing platform 91 is as the diapire of this flowing shop body 80.This flowing shop body 80 comprises shop wall 82 and a top cover 83 further.This shop wall 82 is arranged at this flowing platform 91, for this top cover 83 of support.Preferably, this shop wall 82 is arranged at the edge part of this flowing platform 91, and the height of this shop wall 82 meets the requirement carrying out badminton, and this flowing shop body 80 provides space to be convenient to carry out shuttlecock activity.This shop wall 82 comprises one group further and connects support member 821 and one group of shop wall elements 822.The both ends of this shop wall elements 822 are connected support member 821 respectively and removably connect with two, this connection support member 821 removably connects two these shop walls 822.Form this shop wall 82 by this way.Respectively this connection support member 821 is removably fixedly arranged at the edge part of this flowing platform 91 respectively.Preferably, respectively this connection support member 821 is fixedly set in the corner portion 912 of this flowing platform 91.Further, this connection support member 81 is set at the connecting portion 913 of two these platform elements 911, so that be fixedly connected with this shop wall elements 821.This top cover 83 comprises a bracing frame 831 and at least one overburden 832 further, and this overburden 832 is covered in this bracing frame 831, to form this top cover 83.This bracing frame 831 comprises one group of supporting base end portion 8311 further.This group supporting base end portion 8311 respectively correspondence is arranged at respectively this connection bracing or strutting arrangement 821, with support by each this connection bracing or strutting arrangement 821.It is worth mentioning that, this connection support member 821 has a filling channel 8211.Arrange an aerating device 8212 to inflate to this filling channel in the bottom of this connection bracing or strutting arrangement 821.As shown in Figure 8.This bracing frame 831 is formed by inflation.It is worth mentioning that, the shop wall 82 of whole flowing shop body 80 and this top cover 83 are formed by inflation, as shown in Figure 9.It is worth mentioning that, whole flowing shop body 80 formed by filling, as shown in Figure 13, Figure 14.
Figure 10 is another preferred embodiment of the utility model flowing venue.In the preferred embodiment, described flowing venue is as flowing Badminton Stadium.One group of flow unit 10 is flowed to destination respectively.In this flow process, respectively this flow unit 10 is respectively by this communication device switches information of this detection control apparatus 40 of each flow unit 10, to coordinate the scheme forming flowing Badminton Stadium.Respectively this flow unit 10 is according to the scheme forming flowing Badminton Stadium, arranges respectively this flow unit 10 in the position of destination, to form this flowing pedestal 90A.In the present embodiment, this flowing pedestal 90A has a shop body space 92A, for holding this flowing platform 91A thus providing badminton.Specifically, this flowing pedestal 90A comprises at least two pedestal sidewall 93A, between two this pedestal sidewall 93A, have a shop body space 92A for carrying out shuttlecock activity.This pedestal sidewall 93A comprises this flow unit 10 at least one further.In this is preferably implemented, this pedestal sidewall 93A comprises two these these flow units 10 of flow unit 10, two and is connected to each other.It is worth mentioning that, this wall elements 31 dismantling the side that two these flow units 10 connect respectively is communicated with this unitary space 34 making two these flow units 10 and have respectively, thus is convenient to provide service.Preferably, respectively this moving cell 10 dismantles this platform element 911A of respectively this flow unit 10, and each this platform element 911A is arranged at this shop body space 92A.Respectively this platform element 911A is connected to each other and forms this flowing platform 91A, so that carry out badminton at this shop body space 92A.Preferably, respectively this platform element 911A support by each this supporting and regulating device 20.Coordinated by this communicator 44 of each this detection control apparatus 40 of this flow unit 10, respectively this control device 42 of this detection control apparatus 40 of this flow unit 10 regulates this supporting and regulating device 20 of respectively this flow unit 10, to make the surface of respectively this platform element 911A be in same level, thus be convenient to carry out badminton.It is worth mentioning that, this flowing platform 91 is for arranging a flowing shop body 80A.This flowing shop body 80A comprises an a shop wall 82A and top cover 83A further.This shop wall 82A is connected with this flowing platform 91A, this top cover 83A support by this shop wall 82A, to provide a shop body space 92A to meet the requirement carrying out shuttlecock activity around this flowing platform 91A.This shop wall 82A comprises one group further and connects support member 821A and group of shop wall elements 822A.Connection side 931A is defined as towards this side of this flowing platform 91A by this pedestal sidewall 93A.This group connects the top that support member 821A is respectively set at two these pedestal sidewalls.Specifically, this group connects the top that support member 821A is spaced apart and arranged in the connection side 931A of this pedestal sidewall 93A.This shop wall elements 822A is removably arranged between two this connection support member 821A, thus makes each shop wall elements 822A and this connection side 931A be arranged on this pedestal sidewall 93A form the sidewall of this flowing shop body 821.This top cover 83A comprises a bracing frame 831A and at least one overburden 832A further, and this overburden 832A is covered in this bracing frame 831A, to form this top cover 83A.This bracing frame 831A comprises one group of supporting base end portion 8311A further.This group supporting base end portion 8311 respectively correspondence is arranged at respectively this connection support member 821A, with support by each this connection support member 821A.It is worth mentioning that, this connection support member 821A has a filling channel 8211A.Arrange an aerating device 8212A in the bottom of this connection support member 821A to inflate to this filling channel.This bracing frame 831A is formed by inflation.It is worth mentioning that, two this shop wall elements 822A are coupling in this wall connector 352 of this flow module 30 of two these flow units 10 removably respectively, to form a wherein end wall of this flowing shop body 80A.As shown in Figure 10.
It is worth mentioning that, if the service that this flowing pedestal 90A provides can not satisfy the demands, satisfy the demands to make this flowing pedestal 90A by the quantity increasing this flow unit 10.Sent by this communicator 44 of this detection control apparatus 40 of one of them this flow unit 10 of this flowing pedestal 90A and increase unit requests.It is worth mentioning that, in this increase unit requests, comprise, the type of this serviced component 32 that destination locations, the quantity needing to increase this flow unit and this flow unit 10 needs are installed, as power supply device 321 or water treatment facilities 322 etc.After another this flow unit 10 to be received by this communicator 44 of this detection control apparatus 40 and increases unit requests, this another analyze this increase unit requests of this increase by this control device 42 of this detection control apparatus 40.If another this flow unit 10 meets this increase unit requests, then another this flow unit 10 sends a response request.This response request comprises the type of the serviced component 32 that another this flow unit 10 comprises, the current location of another this flow unit 10, arrives the scheduled time etc. of destination.After this flow unit 10 sending this increase unit requests receives this response request, this control device 42 of this detection control apparatus 40 of this flow unit 10 analyzes this response request to judge whether another this flow unit 10 satisfies the demands.If meet, send to another this flow unit 10 and receive information to make another this flow unit 10 receive the position flowing of this flow unit 10 backward of receiving information.If another this flow unit 10 does not meet demand, then send exclude information to refuse the request of another this flow unit 10 to another this flow unit 10.This control device 44 of this detection control apparatus 40 of this flow unit 10 judges whether the quantity of this flow unit 10 needed reaches further.Need the quantity increasing this flow unit 10 if reached, then this flow unit 10 is sent by this communicator 40 of this detection control apparatus 40 and stops increasing unit requests, to stop the response request receiving the transmission of other this flow unit 10.Stop increasing unit requests when other this flow unit 10 receives, then other this flow unit 10 stops sending response request to this flow unit 10.It is worth mentioning that, after this flow unit 10 receives the response request of this other flow unit multiple, arrive on the estimation and preferably select object time to estimate to arrive this short flow unit 10 of destination time.As shown in figure 11, in the preferred embodiment, this flowing pedestal 90A needs this flow unit 10 of increase by two.It is worth mentioning that, two these flow units 10 coordinate the stand of two these flow units 10 in the process flowing to this destination.After two these flow units 10 increased newly arrive destination, park by coordinated stand, be fixedly connected with wherein two these flow units 10 of this flowing pedestal 90A to make two these flow units 10.Two these flow units 10 increased newly comprise this platform element 911 respectively.This platform element 911 that wherein two these flow units 10 of two these platform elements 911 and this flowing pedestal 90A comprise respectively is connected, and to form another this flowing platform 91A, thus provides shuttlecock service.It is worth mentioning that, two these flow units 10 increased newly regulate respectively by this respective supporting and regulating device 20, to make the surface of each platform element 911 being connected to form another this flowing platform 91A be in same level, thus be convenient to carry out badminton.
If the utilization rate of this another this flowing platform 91A declines, after not needing to provide service, newly increase two these flow units 10 send free message respectively by this communicator 44 of this respective detection control apparatus 40, so that receive request.After newly increase two these flow units 10 receive and receive information, this respective supporting and regulating device 20 is received to this respective unitary space 34 by newly increase two these flow units 10 respectively, so that flowing.Then newly increase two these flow units 10 are flowed to another destination.It is worth mentioning that, newly increase two these flow units 10 can not be identical by the destination flowed to.
Figure 12 is another preferred embodiment of the utility model flowing Badminton Stadium.One group of this flow unit 10 is flowed to default destination.In flow process, coordinate the position of each this flowing moving cell 10 of this flowing Badminton Stadium scheme arrangement of formation of drawing according to this group flow unit 10, form this flowing pedestal 90B.This flowing pedestal 90B has a shop body space 92B, for holding this flowing platform 90B thus providing badminton.According to the needs carrying out badminton, this shop body space 90B provides at least one this flowing platform 91B of accommodation to carry out badminton.In the present embodiment, this shop body space 92B provides this flowing platform of accommodation two 91B for carrying out badminton.This flowing pedestal 90B comprises four pedestal sidewall 93B, and the both ends of four this pedestal sidewall 93B connect successively, with around formation this shop body space 92B.This pedestal sidewall 93B comprises at least two layer assembly 931B further, and one of them this layer assembly 931B is fixedly installed on another this layer assembly 931B overlappingly, with support by another this layer assembly 931B.This layer assembly 931B comprises at least two these these flow units 10 of flow unit 10, two further and is connected to each other.Dismantle this wall elements 31 of the vicinity of two these flow units 10 respectively, be communicated with this unitary space 34 making two these flow units 10 have respectively.It is worth mentioning that, dismantle two these wall elements 31 of two these flow units 10 of the two layer assembly 931B that two adjacent this pedestal sidewall 93B adjoin respectively, with this unitary space 34 that two these flow units 10 being communicated with two adjacent layer assembly 931B have respectively, thus form one deck passage 931B with the two-layer group of adjacent assembly 931B of through two adjacent this pedestal sidewall 93B.It is worth mentioning that, this serviced component 12 comprises a Stair element 125 further, for this unitary space 34 being arranged at this flow unit 10, thus is communicated with adjacent layer assembly 931B.
In the preferred embodiment, this shop body space 92B that this flowing pedestal 90B provides supplies to provide this flowing platform of accommodation two 91B to carry out shuttlecock activity.That is, this shop body space 92B can carry out two badmintons simultaneously.By being arranged on this platform element 911 of respectively this flow unit 10 from respectively this flow unit dismounting, then each platform element 911 is moved to this shop body space 92B.Then connect respectively this platform element 911 to form this flowing platform 91B.Be worth mentioning, respectively this platform element 911 can be set up this adjusting supporting device 20, to regulate this adjusting supporting device 20 of each this platform element 911 of support respectively, thus make the surface of respectively this platform element 911 be in same level, be beneficial to carry out badminton.Can for arranging this flowing shop body 80B at two this flowing platform 91B.Respectively this pedestal sidewall 93B is as the shop wall 82A of this flowing shop body 80B.This flowing shop body 80B comprises a top cover 83B further.This top cover 83B support by this pedestal sidewall 93B.This top cover 83B comprises an a bracing frame 831B and overburden 832B further, and this overburden 832B covers this bracing frame 831B.This bracing frame 831B support by each this pedestal sidewall 93B.It is worth mentioning that, be detachably positioned at this wall elements 31 of this flow module 30 of this flow unit 10 of this layer assembly 93B of the bottom of this pedestal sidewall 93B to form a passage 932B for this flowing platform of turnover 91B.
Shown in Figure 13 be the utility model flowing Badminton Stadium another preferred embodiment.In the preferred embodiment, two these flow units 10 are connected to form this flowing pedestal 90C.Two these flow units 10 receive a predetermined flow Badminton Stadium scheme, and respectively this flow unit 10 analyzes this predetermined flow Badminton Stadium scheme respectively by this control device 44 of this respective detection control apparatus 40, obtain and estimate destination information.Then respectively this flow unit 10 exchanges respectively by this respective communicator 44, according to the real time position of two these flow units 10, determines the assembling scheme in destination.Then each flow unit 10 is flowed to destination.When after wherein this flow unit 10 arrives destination arrival destination after, according to assembling scheme, be directed to preset stop place.Then from this unitary space 34, taking out one group of this support member 221 being installed on this adjusting device 21 respectively, for firmly supporting this flow module 30.After another this flow unit 10 is flowed to this default object, be directed to default stop local so that be connected with this flow unit 10.Then from this unitary space 34 of another this flow unit 10, take out this group support member 221, be arranged at this adjusting device 21, stablize to keep another this flow unit 10.Then the side of the selected side of this wall assembly 31 of this flow module 30 of another this flow unit 10 and this wall assembly 31 selected of this flow module 30 of this stream unit 10 is moved, connect to make two these flow units 10.Then this selected wall assembly 31 of this flow module 30 of this flow unit 10 and this selected wall assembly 31 of this flow module 30 of another this flow unit 10 is dismantled, thus this unitary space 34 making another this flow unit 10 have is communicated with this unitary space 34 of this flow unit 10, forms a service clearance 34A.It is worth mentioning that, this control device 42 of this this detection control apparatus 40 of flow unit 10 carries out collaborative work by this communicator 44 with another this flow unit 10.By each support regulating part 221 of each adjustment support member 221 and another this flow unit 10 that regulate this flow unit 10 respectively, same level is in, so that move with this wall assembly 31 being positioned at the bottom of this flow module 30 of another this flow unit 10 to make this wall assembly 31 being positioned at the bottom of this flow module 30 of this flow unit 10.Two these flow units 10 by respective detection control apparatus 20 collaborative work, with maintain two these flow module 30 be positioned at bottom two walls be in same level without part 31.It is worth mentioning that, one of them wall elements 31 can be dismantled in addition, to form an opening 314 for entering this activity space 34C.This activity space 34C formed after this two stream unit 10 combines can for movable.Two these flow units 10 are connected to form this flowing pedestal 90C.
It is worth mentioning that, if the space that this flowing pedestal 90C provides can not satisfy the demands, this communicator 44 by this detection control apparatus 40 of one of them this flow unit 10 sends this flow unit 10 of increase and asks, to increase space.A kind of mode increasing flow unit 10 on the basis of Fig. 2 A in the utility model one preferred embodiment shown in Figure 13.Flowing pedestal 90C increases flowing shop body 80C.This flow unit 10 of increase by two is asked by this communicator 44 of wherein this detection control apparatus 40 of this flow unit 10.After two these flow units 10 increased receive request, exchanged, so that collaborative work by respective communication module 44.According to the position of two these flow units 10 increased, determine newly-increased assembling scheme.After wherein a flow unit 10 increased flows to this destination, according to fixed assembling scheme, by this flowing platform 91 that this flow module 30 of this flow unit 10 is arranged.Then, two these wall elements 31 preset of two flow module 30 of two flow units 10 connected are preset in dismounting respectively, thus this unitary space 34 that this flow unit 10 increased newly is had is connected to form newly-increased activity space 34C with this unitary space 34 of another this newly-increased flow unit 10.Two newly-increased these flow units 10 are connected to form this flowing shop body 80C.Dismantle two selected wall elements 31 of newly-increased two these flow units 10 to be respectively communicated with this unitary space 34 making two flow units 10 increased newly and have respectively, to satisfy the demand.It is worth mentioning that, can before this flow unit 10 be arranged on this flowing pedestal 90, dismantle this wall elements 31 preset of this flow module 30 of this flow unit 10, and dismantle another this flow unit 10 this flow module 30 preset this wall elements 31, thus make two these flow units 10 increased newly be arranged on this flowing pedestal 90 and by presupposed solution connect after, this unitary space 34 that this unitary space 34 that this flow unit 10 has and another flow unit 10 have is communicated with, to satisfy the demand.Two these detection control apparatuss 40 of two newly-increased these flow units 10 control corresponding wall elements 31 respectively and regulate, and to raise corresponding wall elements 31, thus make the height of the activity space 34C increased newly meet the requirement carrying out shuttlecock activity.In addition, a fastening devices (not showing in figure) can be increased between each flow unit 10, can be fixedly connected with to make two flow units 10.
Shown in Figure 14 and Figure 15 is that the wall elements 31 being arranged at side and/or top of this flow unit 10 can be aerating device.In other words, this aerating device forms the side being arranged at side and top of this flow module 30 of this flow unit 10
Shown in Figure 16 be the utility model flowing venue another preferred embodiment.This flowing venue comprises first-class moving base 90D, and this flowing pedestal 90D has a shop body space 92D for carrying out badminton.This flowing Badminton Stadium comprises a top cover 83D further, and this top cover 83D is supported by this flowing pedestal 90D, and to cover this shop body space 92D, thus the other factors making to reduce outside this Badminton Stadium is on the impact carrying out badminton, as weather conditions.This flowing pedestal 90D comprises at least two pedestal sidewall 93D further, forming this shop body space 92D for carrying out activity, preferably carrying out shuttlecock activity between two this pedestal sidewall 93D.This top cover 83D is supported respectively by two this pedestal sidewall 93D.Preferably, this flowing pedestal 90D comprises four this pedestal sidewall 93D, this top cover 83D support by four this pedestal sidewall 93D.Four these pedestal sidewalls 93 supply to carry out activity around setting to form this shop body space 92D.This pedestal sidewall 93D comprises at least one layer assembly 931D further.If pedestal sidewall 93D comprises two layer assembly 931D.Respectively this layer assembly 931D forms this pedestal sidewall 93D in the mode of superposition.That is, one of them layer assembly 931D supports another this layer assembly 931D to form this pedestal sidewall 931D.It is worth mentioning that, make firmly connecting of each layer assembly 931D by linkage.Preferably, this pedestal sidewall 93D comprises three this layer assembly 931D.That is, three this layer assembly 931D form this pedestal sidewall 93D in the mode of superposition.For the ease of flowing, this layer assembly 931D comprises at least one flow unit 10D further.In the preferred embodiment, a wherein end of two this flow unit 10D connects mutually to form this layer assembly 931D.This flow unit 10D is convenient to flowing, and that is, this flow unit 10D is convenient to dismounting, assembling and transport.That is, this flowing venue can be disassembled into one group of flow unit 10D.In the mode of this group flow unit 10D that flows, this flowing venue is flowed to default destination, and then this group flow unit 10D is assembled into this flowing venue.It is worth mentioning that, by one group of serviced component 32D, this flowing Badminton Stadium can provide the service corresponding with this group serviced component 32D.Preferably, this serviced component 32D is arranged at this flow unit 10D, so that integrally dismantle with this flow unit 10D, assemble and transport.It is worth mentioning that, if this flowing venue can not meet the requirement of service, meeting demand to serving by increasing this flow unit 10D being provided with this serviced component 32D.If in this flowing venue, this flow unit of some of them 10D utilization rate is low, this flow unit 10D can be removed from this flowing venue.Then the flowing venue place needing to increase this flow unit 10D is flowed to, to improve the utilization rate of this flow unit 10D.
As shown in figure 25, this flow unit 10D comprises this flow module 30D.This flow module 30D comprises a component framework 35D and group wall elements 31D further, and described wall elements 31D removably connects described component framework 35D, to form a unitary space 34D.It is worth mentioning that, two this flow unit 10D connected, by dismantling the two adjacent wall elements 31D of two this flow unit 10D respectively, being communicated with the two unitary space 34D making two this flow unit 10D have respectively.By being communicated with the two adjacent unitary space 34D of two adjacent flow module 30D, to make two adjacent layer assembly 931D be communicated with, be convenient to provide service.By being communicated with the two adjacent unitary space 34D of two adjacent flow module 30D, also can making this serviced component of more spatial placements 32D, thus better service is provided.Preferably, this serviced component 32D is arranged on this flow module 30D single, so that dismantle, install and transport together with this flow unit 10D, thus provides the flow efficiency of this flowing Badminton Stadium.It is worth mentioning that, one of them two this wall elements 31D being arranged at this flow unit 10D bottom this flowing venue relative will be disassembled, and to form a unit channel 341D, enter venue by this unit channel.
As shown in figure 24, that is, this flow module 30D comprises at least one serviced component 32D further, and this serviced component 32D is arranged at this unitary space 34D that this flow module 30D has, with the service making this flow unit 34D provide this serviced component 32D.This serviced component 32D comprises a power supply device 321D further, and this power supply device 321D can be fixedly arranged on this unitary space 34D, provides energy supply service to make this flow unit 10D being provided with this power supply device 321D.Described energy supply service refers to that this flowing Badminton Stadium for being assembled formation by this group unitary space 34D provides electric energy.This power supply device 321D comprises a power interface 3211D further for connecting external power source, thus utilizes external power source to this flowing Badminton Stadium supply electric energy.This power supply device 321D comprises an energy storage device 3212D further, and this energy storage device 3212D is electrically connected this power interface 3211D, with store electrical energy.This energy storage device 3212D can be used as standby electric power, and when external power source stops powering to this flowing Badminton Stadium, this energy storage device 3212D powers to this flowing Badminton Stadium.This power supply device 321D comprises one group of solar-energy collector 3213D further, and this group solar-energy collector 3213D is electrically connected this energy storage device 3212D.This group solar-energy collector 3213D obtains solar energy, then converts solar energy into electrical energy and is stored in this energy storage device 3212D.Preferably, this group solar-energy collector 3213D is arranged at the outside of this wall elements 31D, so that collect solar energy.This power supply device 321D comprises a generator 3214D further, this energy storage device of this generator 3214D electrical links 3212D, with by generation electrical power storage in this energy storage device 3212D.This generator 3214D can directly to this flowing Badminton Stadium for electric energy.When external power source stops powering to this flowing Badminton Stadium, this generator 3214D powers to this flowing Badminton Stadium.When external power source recovers to power to this flowing Badminton Stadium, this generator 3214D stops powering to this flowing Badminton Stadium.When external power source and this generator 3214D stop powering to this flowing Badminton Stadium simultaneously, this energy storage device 3212D powers to this flowing Badminton Stadium.This serviced component 32D comprises a water treatment facilities 322D further, this water treatment facilities 322 is arranged at this unitary space 34D of this flow module 30D, to provide water treatment service to this flowing Badminton Stadium, as supplied drinking water, purified treatment is carried out so that recycle to water, sewage is processed.This water treatment facilities 322D device can connect external water source, to provide water source to this flowing Badminton Stadium.This water treatment facilities 322D can connect outside sewage disposal system, to be processed by the sewage in this flowing Badminton Stadium process, is then disposed to outside sewage disposal system, thus avoids polluting environment.This water treatment facilities 322D comprises a water supply installation 3221D further, and this water supply installation 3221D connects this external water source, to this flowing Badminton Stadium supply living water use.Further, this water supply installation 3221D processes external water source, to supply drinking water.This water treatment facilities 322D comprises sewage-treatment plant 3222D further, and this sewage-treatment plant 3222D connects outside sewage disposal system, to be carried out by the sewage of generation processing and import outside sewage disposal system, thus avoids contaminated environment.This water treatment facilities 322D comprises a water purification installation 3223D further, and this water purification installation 3223D can supply purified water source, so that Recycling.This water purification installation 3223D comprises at least two and is fixedly connected with portion 32231D.Wherein one this be fixedly connected with portion 32231D guide water enter this water purification installation 3223D to carry out Water warfare.Another this be fixedly connected with portion 32231D and guide the water purified to discharge this water purification installation 3223D.This serviced component 32D comprises one group of exhibiting device 323D further, and this exhibiting device 323D is arranged at this unitary space 34D that this flow module 30D has and shows service to provide.This wall elements 31D being provided with this flow unit 10D of this exhibiting device 34D has an opening 311D, so that show.This serviced component 32D comprises one group of rest assembly 324D further, provides service in this unitary space 34.This serviced component 32D comprises a temperature-controlled package 325D further to regulate the temperature of this flowing venue.This temperature-controlled package 325D is arranged in this unitary space 34D of this flow module 32D, to regulate the temperature in this flowing venue.It is worth mentioning that, this temperature-controlled package 325D for the quality regulating air, can have ozone to maintain in this venue.It is worth mentioning that, this unitary space 34D that this flow unit 10D has can customize this serviced component 32D as required, provides service to utilize this unitary space 34D.As needs provide the service of changing one's clothes, then customize one and to change one's clothes serviced component 326D, the serviced component 326D that then this changed one's clothes is arranged at this unitary space 34D of this flow module 30D of this flow unit 10D, provides to make this flow unit 10D the service of changing one's clothes.That is, by this serviced component 326D that changes one's clothes, dressing room service can be provided at this flowing space 34D.As needs provide washroom, then customize a sanitary parts 327D, then this Health Services assembly 326D is arranged at this unitary space 34D of this flow module 30D, to provide Health Services.As needs provide culinary art service, then a customizable culinary art assembly 328D, is then arranged at unitary space to provide culinary art service by this culinary art assembly 328D.It is worth mentioning that, in this unitary space 34D of this flow module 32D of this flow unit 10D, can for arranging at least one serviced component 32D.That is, in this unitary space 34D that can have at this flow module 32D as required, multiple serviced component 32D is set.Preferably, this serviced component 34D is separately set in the unitary space 34D of this flow module 32D of this flow unit 10D.This flow unit 10D being provided with this power supply device 321D is defined as flowing supply unit 19D.This flow unit 10D being provided with this unit for treating water 322D is defined as circulating water processing unit 18D.This flow unit 10D being provided with this exhibiting device 323D is defined as Mobile display unit 17D.This flow unit 10D being provided with this rest assembly 324D is defined as flowing rest unit 16D.This flow unit being provided with this temperature-controlled package 325D is defined as flowing temperature regulon 15D.This flow unit 10D being provided with this dressing room assembly 326D is defined as flowing dressing room unit 14D.This flow unit 10D being provided with this toilet components 327D is defined as Portable toilet unit 13D.It is worth mentioning that, at least one serviced component 32D can be arranged at this flow unit 10D, provides service to make this flow unit 10D for this flowing Badminton Stadium.Preferably, this flowing venue at least comprises a flowing supply unit 19D, and that is, this flowing venue at least comprises a flow unit 10D and arranges this power supply device 321D.This flowing venue at least comprises a flowing unit for treating water 322D, and namely this flowing venue comprises a flow unit 10D further and is provided with described water treatment facilities 322D.
This top cover 83D comprises an a bracing frame 831D and overburden 832D further, and this overburden 832D covers this bracing frame 831D, this bracing frame 831D support by each pedestal sidewall 93D.Preferably, this overburden 832D is that soft waterproof material is made, so that be contained this unitary space 34D to this flow module 30D.It is worth mentioning that, this bracing frame 831D also can be contained this unitary space 34D to this flow module 30D, is moved into destination with this flow unit 10D.It is worth mentioning that,
Shown in Figure 23 is another alternate embodiments of this top cover.This top cover 83E comprises at least one bracing or strutting arrangement 831E and at least one overburden 832E further, and this group bracing or strutting arrangement 831E compartment of terrain is arranged at described shop body space 92D, and preferably, this bracing or strutting arrangement 831E is arranged on the gap in two shuttlecock places.This group overburden 832E is fixed between two this bracing or strutting arrangement 831E respectively, for covering this shop body space 92D.This bracing or strutting arrangement 831E comprises a main support member 8311E further, at least two sub-support member 8312E and at least two connector 8313E, two these sub-support member 8312E are located at the outside of two this pedestal sidewall 93D respectively, and this main support member 8311E is arranged in the body space of described shop.Preferably, the gap in two shuttlecock places is arranged at.This connector 8313E connects main support member 8311E and sub-support member 8312E.Described overburden 832E be fixedly connected with two this connector 8313E respectively, to be fixed between two this bracing or strutting arrangement 831E.It is worth mentioning that, this flow unit 10D of a customizable type, to make the length of this flow unit 10D be greater than distance between two relative this wall assembly 93D, to be supported respectively by two these wall assemblies by this, thus form this top cover.It is worth mentioning that, this top cover can adopt jacking membrane structure, or other structure.
This flowing Badminton Stadium comprises first-class moving platform 91D further, and this flowing platform 91D is arranged at the bottom of this shop body space 92D, for carrying out badminton.It is worth mentioning that, this flowing platform 91D is provided with at least one piece of shuttlecock place.In the preferred embodiment, this flowing platform 91D has been provided with three pieces of shuttlecock places.This flowing platform 91D comprises a group platform element 911D further.Each this platform element 911D is respectively equipped with wherein a part of shuttlecock place.This platform element 911D can be arranged on this flow unit 10D respectively, flows to destination with this flow unit 10D.As, this platform element 911D is placed on this unitary space 34D of this flow module 30D of this flow unit 10D.It is worth mentioning that, this platform element 911D can be used as this wall elements 31D and is removably arranged on and is arranged on this component framework 35D, thus improves flow efficiency.
This flow unit 10D comprises a supporting and regulating device 20D further, this supporting and regulating device 20D removably supports this flow module 30D, to maintain the stable of this flow module 30D, this supporting and regulating device 20D can be incorporated in this unitary space 34D of this flow module 30D.This supporting and regulating device 20D comprises one group further and supports regulating part 21D, and this group supports regulating part 21D and is installed on this flow module 30D removably respectively, supports this flow module 30D with adjustable ground, thus maintains the stable of this flow module 30D.It is worth mentioning that, this support regulating part 21D can be arranged on respectively this platform element 911D, stably to support respectively this platform element 911D.It is worth mentioning that, adjustable respectively this support regulating part 21D, to make respectively this platform element 911D be in same level, thus make each this platform element 911D assemble formation this flowing platform 91D be convenient to carry out badminton.
It is worth mentioning that, in order to make in flowing, this flow unit 10D can be customized to plurality of specifications.In the preferred embodiment, this flow unit 10D comprises two kinds of specifications, first-class moving cell 101D and second moving cell 102D.Preferably, the type of this first-class moving cell 101D is the specification of 20 chi containers, and the type of this second moving cell 102D is the specification of 40 chi containers.Be the specification of the first container by the type of first-class moving cell 101D, the type of this second moving cell 102D is that the advantage of the specification of the second container is, after next destination is determined, determine the service that this flowing Badminton Stadium provides in the service that this destination provides further.Then this flowing Badminton Stadium is dismantled.Being dismantled by this flowing Badminton Stadium and arranging is one group of flow unit 10D, so that flowing.This group flow unit 10D is flowed to next destination, then in this destination, this group flow unit 10D is assembled and form this flowing Badminton Stadium.It is worth mentioning that, after at this flowing Badminton Stadium, to be disassembled arrangement be one group of flow unit 10D, the service provided required for this flowing Badminton Stadium of next destination, flows to this destination by this group flow unit 10D being provided with respective service assembly 32D.Meanwhile, prepare one group of container in advance in this destination, be shaped as another this flowing Badminton Stadium with this group flow unit 10D coordinated groups being provided with respective service assembly 32D.That is, this flowing Badminton Stadium is dismantled, and this group flow unit 10D after arrangement can be flowed to different destinations according to demand respectively.This group flow unit 10D can form this flowing Badminton Stadium with collaborative assembling of container.It is worth mentioning that, according to the quantity of this flow module 10D, this flowing Badminton Stadium being formed and there is multiple shuttlecock place can be assembled.Preferably, the first specifications of container is 20 chi containers.The second specifications of container is 40 chi containers.It is worth mentioning that, this serviced component 32D can for being installed on container.
This flow unit 10D comprises a detection control apparatus 40D further, and this detection control apparatus 40D connects this supporting and regulating device 20D communicatedly, remains stable to control this supporting and regulating device 20D.This detection control apparatus 40D comprises an one group of monitoring element 41D and control device 42D further.Respectively this monitoring element 41D connects each support regulating part 21D communicatedly respectively, at least be connected communicatedly with this monitoring element 41D to make respectively this support regulating part 21D, thus be convenient to obtain the state of respectively this support regulating part 21D, be then sent to this control device 42D.Analyzed the state of each support regulating part 21D by this control device 42D, then each this support regulating part 21D is regulated, to maintain the stable of this flow module 30D or this platform element 911D.This detection control apparatus 40D comprises a positioner 43D further.This positioner 43D obtains the position of this flow unit 10D.Preferably, this positioner 43D obtains the real time position of this flow unit 10D.The real time position of this flow unit 10D is sent to this control device 42D by this positioner 43D, so that manage this flow unit 10D.This detection control apparatus 40D comprises a communicator 44D further, and this communicator 44D connects this control device 42D communicatedly so that exchange information with other this flow unit 10D, thus collaborative work.That is, multiple this flow unit 10D passes through respectively this communicator 44D exchange information, so that collaborative work.This flow unit 10D receives a presupposed solution by this communicator 44D, is then sent to this control module 42D.This control device 42D analyzes this presupposed solution, and obtains the position of this flow unit 10D by this positioner 43D, arrives the E.T.A of presetting destination to obtain this flow unit 10D.Then the flow unit that the information of this flow unit 10D and the default time of advent receive this presupposed solution by this communicator 44D and other is coordinated, after obtaining this destination of arrival, the default stop place of this flow unit and the default assembling mode with other flow unit 10D.In other words, this communicator 44D can analyze this presupposed solution, obtains and presets destination, estimates the time of staying in default destination, in the position that the destination of presetting stops, and the state of this spatial accommodation of default destination.It is worth mentioning that, the communication mode that this communicator 44D adopts includes but not limited to, Wi-Fi, Li-Fi, satellite network, communication network and internet.
This flow unit of this group 10D is flowed to default destination.In flow process, this group flow unit 10D tunable draws the scheme forming this flowing Badminton Stadium.When this group flow unit 10D arrives this destination, assemble according to coordinated scheme.Such as, assembling this flowing Badminton Stadium as shown in figure 18, first respectively this layer assembly 931D of assembling bottom.In the preferred embodiment, this layer assembly 931D comprises two this flow unit 10D.Respectively this flow unit 10D needing respectively this layer assembly 931D carrying out bottom to assemble is guided to predetermined assembling region.Connect two this flow unit 10D to form this layer assembly 931D.After respectively this layer assembly 931D completing bottom assembles, respectively this layer assembly 931D at assembling middle part.Respectively this flow unit 10D at assembling middle part is located on respectively this layer assembly 931D of bottom, to be supported by respectively this layer assembly 931D of bottom respectively.Connect two this flow unit 10D and form this layer assembly 931D being arranged at middle part.Finally complete the assembling of respectively this layer assembly 931D at top.Each this flow unit 10 is placed on this layer assembly 931D in the middle part of this, support by this layer assembly 931D at middle part.Then this layer assembly 931D that two these flow units 10 form top is connected.In the preferred embodiment, this layer assembly 931D at this layer assembly 931D of bottom and this layer assembly 931D at middle part and top assembles and forms this wall assembly 93D.The each layer assembly 931D this bracing frame 831D of this top cover 83D being placed in top with make this bracing frame 831D of this top cover 83D support by each layer assembly 931D at each top.Then this overburden 832D is covered this bracing frame 831D to form this top cover 83D.It is worth mentioning that, this serviced component 32D can be arranged on respectively this flow unit 10D before assembly, also can be arranged on each flow unit 10D after assembling.
Shown in Figure 18 be the utility model flowing venue another preferred embodiment.In the preferred embodiment, this flowing venue is as flowing swimming hall, and this flowing swimming hall has at least one swimming pool 70D.It is worth mentioning that, in the preferred embodiment shown in Figure 16, only need increase by water-tight device 71D, then the utility model flowing venue can be made to change flowing swimming hall into by the Badminton Stadium that flows.This water-tight device 71D is arranged on the bottom of this shop body space 92D, and is installed in the bottom inside of respectively this pedestal sidewall 93D, to form a swimming pool 70D in the bottom of this shop body space 92D.This water-tight device 71D is provided with at least two flow-guiding mouth 711D further, for drainage current.Preferably, this of this flow-guiding mouth 711D and this water purification installation 3223D is fixedly connected with portion 32231D (not representing in the drawings) and is connected, with by this be fixedly connected with portion 32231D (not representing in the drawings) fix.The water be arranged in this water-tight device 71D enters one of them through one of them this flow-guiding mouth 711D, and this is fixedly connected with portion 32231D, then enters water purification installation 3223D and carries out purified treatment.Then the water after purification is fixedly connected with portion 32231D (not representing in the drawings) and this flow-guiding mouth 711D and is returned in this water-tight device 71D by drainage by another this, thus ensures the quality of water.This water-tight device 71D can be set as required, to form the swimming pool 70D meeting demand.Preferably, each this water-tight device 71D correspondence arranges each this swimming pool 70D.The degree of depth of this swimming pool can be arranged on the height of this pedestal sidewall 93D according to this water-tight device 70D and determine.In the preferred embodiment, preferably, the height of this water-tight device 70D reaches this layer assembly 931D at middle part.Preferably, this water-tight device 70D is soft waterproof material, so that be incorporated in this unitary space 34D, thus is convenient to flowing.It is worth mentioning that, in a wherein part for the bottom of formed swimming pool, at least one this flow unit 10D is set to form different depth of water regions in this swimming pool.
As illustrated in figures 19 and 20, it is worth mentioning that, multiple this flow unit 10D can be set, swimming pool be divided at least two regions, to provide different services in different regions.First, the border of zoning is determined at swimming pool.Then some this flow unit 10D are set in a stacked fashion along border, with by the moisture of boundaries on either side every, form at least two regions.Preferably, some this flow unit 10D are stacked to the depth of water of this swimming pool 70D.Respectively the water in two regions is processed by arranging this flow unit 10D with water treatment facilities 322D, to provide different services.As provided warm pond and water cooling pond respectively by water treatment facilities 322D.As shown in figure 19.Preferably, the both sides of a partition wall 72D that respectively this flow unit 10D of separated region is formed are set up this water-tight device 71D, respectively to stop the water in two regions by this partition wall 72D.Preferably, multiple unit for treating water 322D can be set at multiple this flow unit 10D of the bottom of this flowing swimming hall, when swimming pool occurs unexpected, as time drowned, two of purifier 3223D can be fixedly connected with portion 32231D (not indicating in the drawings) to be all set to guide water to flow to this purifier 3223D, this purifier 3223D stops purifying waste water, but water is excluded swimming pool, to save the people be drown.Owing to arranging multiple purifier 3223D, drainage efficiency improves, and the efficiency of being rescued to make people improves.It is worth mentioning that, be set to flow in the process of swimming hall from flowing Badminton Stadium, the service that this flowing Badminton Stadium is provided by serviced component, as power supply, water treatment, dressing room, washroom, the service such as rest room is all retained, thus continues as this flowing swimming hall and provide service.
It is worth mentioning that, if this swimming pool 70D of this flowing swimming hall can not satisfy the demands, this flowing swimming hall can be dismantled, then re-assembly, form outdoor pool, thus increase the area of swimming pool and satisfy the demand.The swimming pool in a region can be formed, as shown in figure 21.Or form the swimming pool in multiple region, as shown in figure 22.If this flowing swimming hall needs to flow to another destination, then the same with this shop, flowing feather shop, this flowing swimming hall is carried out dismantling and then arranges as each flow unit 10D.Flow in units of flow unit 10D.Assemble again after flowing to another destination.
Shown in Figure 26 and Figure 27 be the utility model flowing venue another preferred embodiment.This flowing venue is flowing performance shop.At the shop body space 92D of flowing Badminton Stadium, one performance platform 73D is set.This performance platform 73D comprises at least one this flow unit 10D.That is, by arranging this flow unit 10 to form this performance platform 73D in this shop body space 92D assembling.Preferably, this flow units 10 some are connected side by side in the bottom of this shop body space 92D to form this performance platform 73D.It is worth mentioning that, in this performance platform 73D, two adjacent this wall elements 31D dismantling two these flow module 30D of two this flow unit 10D of connection are respectively communicated with this unitary space 34D making respectively this flow unit 10D and have, thus formation one space, backstage 731D.According to the needs of performance, the position-adjustable of this performance platform 731.As being arranged on the one end bottom the body space 92D of this shop, or the middle part bottom the body space 92D of this shop.It is worth mentioning that, this performance platform 73D is arranged the middle part bottom the body space 92D of this shop, can be used as the match platform of combat sports.As boxing, tae kwon do etc.
It is worth mentioning that, this flowing venue comprise one group of flow unit 10D, can arranging to adapt to different purposes to this group flow unit 10D as required, as increased this flow unit 10, or re-assemblying flow unit 10 etc.Thus make, flowing Badminton Stadium is converted to flowing swimming hall or flowing performance shop.Flowing swimming hall is performed shop with flowing and also can be changed mutually.
It is worth mentioning that, this group flow unit 10D of this flowing venue same, can be flowed to different destinations respectively, coordinates other flow unit 10D to form different flowing venues.Such as, this flowing venue is as this flowing Badminton Stadium.This flowing venue receives the request of two destinations, and the request of one of them destination is for setting up flowing swimming hall, and the request of another destination is for setting up flowing performance shop.This flowing venue cannot meet the request of these two destinations simultaneously.If but the specification of each flow unit 10D of this flowing venue is consistent with the specification of container, then respectively this flow unit 10 of this flowing venue can carry out collaborative assembling with container, forms flowing venue.Preferably, this flow unit 10D is container.Therefore, according to the demand of destination, this flowing venue can be dismantled, arrange and become this group flow unit 10D.Then this group flow unit 10D is divided into two parts, in base, a part is flowed to the destination needing flowing swimming hall, and another part is needed the destination of this flowing performance venue by flowing to.By this group flow unit 10D divide different piece time it is noted that due to one of them destination it is desirable that swimming hall of flowing, therefore can overabsorption circulating water processing unit 18D to this grouping.The venue size simultaneously set up as required distributes the quantity of supply unit 19D.Service is provided to distribute the quantity being provided with service unit again required for basis.Respectively by vehicle, each this flow unit 10D is transported to respective destination.After each flow unit 10D arrives destination, start and the collaborative assembling of container.
As shown in figure 28, this flowing venue comprises first-class moving base 90E, and this flowing pedestal 90E has a shop body space 92E.Preferably, this shop body space 92E provides and carries out shuttlecock activity.This flowing pedestal 90E comprises at least two pedestal sidewall 93E further, forming this shop body space 92E for carrying out activity, preferentially carrying out shuttlecock activity between two this pedestal sidewall 93E.Preferably, this flowing pedestal 90E comprises four this pedestal sidewall 93E, and four this pedestal sidewall 93E supply to carry out activity around setting to form this shop body space 92D.This pedestal sidewall comprises at least one layer assembly 931E further.In the preferred embodiment, this pedestal sidewall 93E comprises three this layer assembly 931E, and the layer assembly 931E being arranged at middle part is connected with the layer assembly 931E being arranged at outside respectively with the layer assembly 931E being arranged at inside respectively.That is, three this layer assembly 931E connect to form a viewing portion 9311E side by side.Preferably, three this layer assembly 931E are respectively three highly different this flow unit 10D.This pedestal sidewall 93E has another alternative.This pedestal sidewall 93E has two layer assembly 931E, and wherein a layer assembly 931E arranges inside, and another layer assembly arranges outside this layer assembly 931E being arranged at inside with this and is connected.It is worth mentioning that, the quantity of included this flow unit 10D of outside this layer assembly 931E is greater than the quantity of included this flow unit 10D of interior layer assembly 931E.Preferably, the quantity of included this flow unit 10D of outside this layer assembly 931E is the twice of the quantity of included this flow unit 10D of interior layer assembly 931E.Outside this layer assembly 931E has sandwich construction, and in other words, this flow unit 10D forms this in the mode of superposition and is arranged at outside this layer assembly 931D.Form this pedestal sidewall 93E of hierarchic structure thus.
That is, this flow unit 10D of prefabricated at least two types, wherein the height of this flow unit of type 10D is greater than this flow unit 10D of another kind of type.That is, this flow unit 10D of two types has difference in height.This flow unit 10D of identical type is carried out assembling to form this layer assembly 931E.That is, this flow unit 10 of two types is able to the layer assembly 931E of assembling formation two type.Then layer assembly 931E described in two types is connected side by side.Further, all types of described layer assembly 931E is to the distance of described shop body space from far near according to the height descending of all types of described layer assembly 931E.
As shown in figure 29, set up this flowing venue to comprise the following steps:
Step 1001: determine required this flow unit 10D setting up this flowing venue.
Step 1002: respectively this flow unit 10D participating in this flowing venue of assembling is flowed to destination of setting up an embassy.
Step 1003: assembling respectively this flow unit 10D to set up this flowing venue.
Step 1001 is further comprising the steps:
Step 10011: the type determining this flowing venue.As, determine that the flowing venue set up is flowing Badminton Stadium or flowing swimming hall.Further, also need to determine that the type of this flowing venue is the need of transformation.As this flowing Badminton Stadium changes this flowing swimming hall into.
Step 10012: that determines this flowing venue sets up mode.Determine that this flowing venue all adopts flow unit 10D to assemble or adopts the mode of flow unit 10D and container Hybrid assembling.
Step 10013: determine required this flow unit 10D setting up this flowing venue.First, determine to set up that this flow unit 10D needs arrange this serviced component 32D type.As arranged this flowing supply unit 19D of this power supply device 321D of this serviced component 32D at this flow unit 10D, or this circulating water processing unit 18D of this water treatment facilities 322D of this serviced component 32D is set at this flow unit 10D, or this Mobile display unit 17D etc.Then, the quantity required for all types of this flow unit 10D is determined further.Then, determine the original position of this flow unit 10D participating in setting up this flowing venue, and determine the original position of respectively this flow unit 10D being provided with this serviced component 32D.It is worth mentioning that, in determined this flow unit 10D, comprise at least one this flowing supply unit 19D to provide electric energy to this flowing venue.Determined this flow unit 10D comprises at least one this circulating water processing unit 18D further to provide water treatment service to this flowing venue.It is worth mentioning that, respectively this flow unit 10D participating in setting up this flowing venue need not start flowing in same original position.That is, this flow unit 10D of this flowing venue also can be used to assemble another this flowing venue.
It is worth mentioning that, before step 1002, also can comprise a step: dismantle this flow unit 10D from another this flowing venue.Then this flow unit 10D is assembled into the state of being convenient to transport.
Step 1003 is further comprising the steps:
Step 10031: determine that the assembling mode of venue is moved in this flowing.Assembling mode comprises at least two kinds: a kind of is assemble according to the number of plies of this flowing venue, and that is, the bottom of this flowing venue is installed to top layer, and one deck of this flowing venue comprises at least two layer assembly 931D.Another kind of with this pedestal sidewall 93D for assembly unit is assembled.That is, first assemble this pedestal sidewall 93D, then assemble another this pedestal sidewall 93D, until assembled.Determine the assembling mode of respectively this layer assembly 931D further.This layer assembly 931D comprises at least this flow unit 10D.That is, determine whether quantity, respectively this flow unit 10D that this layer assembly 931D comprises this flow unit 10D arrange this serviced component 32D, respectively this flow unit 10D and arrange the type of service unit 32D.It is worth mentioning that, in this flowing venue, at least one layer assembly 931D comprises and is provided with this flow unit 10D that this energy supply arranges 321D.That is, in this flowing venue, at least one layer assembly 321D comprises this flowing supply unit 19D.In this flowing venue, at least one layer assembly 931D comprises this flow unit 10D being provided with this water treatment facilities 321D.That is, in this flowing venue, at least one layer assembly 321D comprises this circulating water processing unit 18D.
Step 10032: form this flowing venue.Corresponding respectively this flow unit 10D is selected to carry out assembling to form this layer assembly 931D according to the determined assembling mode of step 10031.It is worth mentioning that, if be according to the number of plies group number of this flowing venue in step 10031, then first form respectively this layer assembly 931D of this flowing venue bottom, then assemble respectively this layer assembly 931D and form this flowing venue bottom.Then assemble respectively this layer assembly 931D in intermediate layer, each this layer assembly 931D is assembled with the intermediate layer forming this flowing venue.Finally assemble respectively this layer assembly 931D of the top layer of this flowing venue.Again each layer assembly 931D is formed the top layer of this flowing venue 931D.This top cover 83D is finally installed.First this bracing frame 831D is installed, and then overburden 832D is covered in this 831D, form this top cover 83D.If select in this step 10031 with the assembling mode of pedestal sidewall 93D.First the assembling sequence of respectively this pedestal sidewall 93D is determined.Then wherein this pedestal sidewall 93D is selected to assemble.The first, form this layer assembly 931D of the bottom of this pedestal sidewall 93D.The second, form this layer assembly 931D in the middle level of this pedestal sidewall 93D.Again by this mid-tier component 931D arrange to this layer assembly 931D of this bottom, support by the layer assembly 931D assembly of this bottom.3rd, form this layer assembly 931D of this top layer of this pedestal sidewall 93D.On this layer assembly 931D again this layer assembly 931D of this top layer being arranged on this intermediate layer, support by the layer assembly in this middle level.This pedestal sidewall 93D is assembled to be completed.Then all the other pedestal sidewalls 93D is assembled according to the mode of this pedestal sidewall of assembling 93D.After respectively this pedestal sidewall 93D has assembled, assemble this top cover 83D.First, this bracing frame 831D is arranged at the top layer of respectively this pedestal sidewall 93D, with support by the top layer of each pedestal sidewall.Then overburden 832D is arranged at this bracing frame 831D supported.Thus form this flow motion shop.
Step 1004 is comprised further: the purposes changing this flowing venue after step 1003.Change the purposes of visiting flowing venue and comprise two kinds of modes, wherein a kind of method is for increasing device.Increase by one water-tight device 71D is only needed as this flowing Badminton Stadium changed into this flowing swimming hall.This water-tight device is arranged at the bottom of this flowing Badminton Stadium, is transformed into this flowing swimming hall to make this flowing Badminton Stadium shape.Another kind method is the structure changing this flowing venue.Such as, flowing swimming hall as shown in figure 17, is multiple this flow unit 10D by the dismounting of this flowing swimming hall, then assembles multiple this flow unit 10D to form 3 swimming pools.In affiliated three swimming pools, the area of each swimming pool is consistent with the area of the swimming pool of former flowing swimming hall.Or by multiple this flow unit 10D assembling formation swimming pool.
Shown in Figure 30 and Figure 31 be the utility model flowing Badminton Stadium another preferred embodiment.This flowing venue comprises a shop body 90F further, and this shop body 90F has an activity space 92F.This shop body 90F comprises at least two wall device 93F further, forms this activity space 92F by arranging respectively this wall device 93F.Preferably, the position relationship by arranging respectively this wall device 90F forms this activity space 92F.Such as, the setting that two this wall device 93F are relative, forms this activity space 92F between two this wall device 93F.Or two adjacent this wall device 93F are connected to each other, and form this activity space 92F between two this wall device 93F.This activity space 92F provides and carries out shuttlecock activity, etc.It is worth mentioning that, regulating this activity space 92F by regulating the position relationship of respectively this wall device 93F.In the preferred embodiment, preferably, this shop body 90F comprises four this wall device 93F further, and the two ends of four this wall device 93F connect respectively successively, forms this activity space 92F.That is, four this wall device 93F are configured to around this activity space 92F.
This wall device 93F comprises at least one wall unit 931F further, and this wall unit 931F has a wall unitary space 9311F.This wall device 93F is formed by stacking respectively this wall unit 931F.It is worth mentioning that, by the mode of stacking this wall unit 931F, regulate the height of this wall device 93F.Describedly stackingly to refer to, this wall unit 931F be arranged at the top of another this wall unit 931F, with make this wall unit 931F support by another this wall unit 931F.As shown in fig. 32b.By connecting the mode of this wall unit 931F side by side, regulate the width of this wall device 93F.As shown in fig. 32 a.Connected the mode of one end of another this wall unit 931F by one end of one of them this wall unit 931F, regulate the length of this wall device 93F.
This wall unit 931F comprises an one group of wall elements 9312F and wall unit framework 9313F further.Respectively this wall elements 9312F is arranged at this wall unit framework 9313F.Preferably, respectively wall elements 9312F described in this is removable installed in this wall unit framework 9313F to form this wall unitary space 9311F.It is worth mentioning that, two adjacent this wall unit 931F are communicated with two this wall unitary space 9311F by dismantling two adjacent this wall elements 9312F respectively, thus are convenient to provide service by this wall unitary space 9311F.This wall unitary space 9311F is arranged on the side of this activity space 92F.It is worth mentioning that, this wall unit 931F can be prefabricated.Specifically, when this wall unit 931F is prefabricated, demand fulfillment, is convenient to be dismantled by this wall device 93F as at least one this wall unit 931F; This wall unit 931F is convenient to transport; This wall device 93F is convenient to be assembled into this wall device 93F.That is, flowing refers to that this flowing venue is convenient to be disassembled into multiple this wall unit 931F, and multiple this wall unit 931F is convenient to be transported, and this wall unit multiple is convenient to be assembled into this flowing venue.If flowed by the utility model, venue flows to a destination, and the venue that first flowed by the utility model dismounting is multiple this wall unit 931F.Then multiple this wall unit 931F is transported to destination respectively.Finally in object, the plurality of this wall unit 931F is assembled into flowing venue.It is worth mentioning that, this destination can preset.
As shown in figure 34, this wall unit 931F comprises at least one serviced component 9314F further, and this serviced component 9314F is arranged at this wall unitary space 9311F, to provide service.This serviced component 9314F comprises at least one power supply device 93141F further, and this power supply device 93141F is arranged at this wall unitary space 9311F.This power supply device 93141F is to the utility model flowing venue supply electric energy.It is worth mentioning that, this power supply device 93141F can supply electric energy to fixed buildings.This wall unit 931F being provided with this power supply device 93141F is defined as energy supply wall unit 101F.This energy supply wall unit 101F can be connected with this wall unit, thinks the utility model flowing Badminton Stadium supply electric energy.Preferably, the utility model flowing venue comprises at least one energy supply wall unit 101F.This energy supply wall unit 931F can be connected with this wall unit 931F, forms this wall device 93F to assemble with each this wall unit 931F.This serviced component 9314F comprises at least one water treatment facilities 93142F further, and this water treatment facilities 93142F is arranged at this wall unitary space 9311F.This water treatment facilities 93142F provide water treatment service.This water treatment facilities 93142F comprises at least one water generator 931421F further, to provide living water use to the utility model flowing venue.This water treatment facilities 93142F comprises a sewage-treatment plant 931422F further, to provide sewerage treatment service.This sewage-treatment plant 931422F connects outside sewage disposal system, carries out processing and import outside sewage disposal system, thus avoid contaminated environment with sewage system produced.This water treatment facilities 9314F comprises a water purification installation 931423F further, to provide purified water source service.This wall unit 931F being provided with this water treatment facilities 931423F is defined as water treatment wall unit 102F.This water treatment wall unit 102F is connected with each this wall unit 931F, forms this wall device 93F to assemble.
This serviced component 9314F comprises at least one exhibiting device 93143F further, and this exhibiting device 93143F can be arranged at this wall unitary space 9311F of this wall unit 931F.This wall unit 931F being provided with this exhibiting device 93143F is defined as showing wall unit 103F.This serviced component 931F comprises one group of rest assembly 93144F further, thinks that this flowing venue provides the service of rest.This group rest assembly 93144F is arranged at this wall unitary space 9311F of this wall unit 931F.This wall unit 931F being provided with this group rest assembly 93144F is defined as rest wall unit 104F.This serviced component 9314F comprises at least one guiding device 93145F further, enters another this wall unitary space 9311F to guide user from one of them this wall unitary space 9311F.Such as, two adjacent this wall unit 931F, two this wall unit 931F are in stacked state.That is, one of them this wall unit 931F is arranged at the top of another this wall unit 931F, support by another this wall unit 931F.This guiding device 93145F is arranged at another this wall unit 931F, with the unitary space 9311F making user to enter another this wall unit 931F from this wall unitary space 9311F of one of them this wall unit 931F by this guiding device 93145F.This wall unit 931F being provided with guiding device 93145F is defined as guiding wall unit 105F.This serviced component 9314F comprises at least one conditioner 93146F further, for the air themperature regulated in the utility model flowing venue and/or humidity.This conditioner 93146F can for this wall unitary space 9311F being arranged at this wall unit 931F.This wall unit 931F being provided with this conditioner 93146F is defined as air conditioning wall unit 106F.Preferably, the utility model flowing venue is provided with at least one flowing supply unit 101F.According to the quantity of needs this flowing supply unit adjustable 101F of the utility model flowing venue.
It is worth mentioning that, this energy supply wall unit 101F also can power to fixed buildings, to meet the needs of fixed buildings to electric power.This water treatment wall unit 102F can supply water to fixed buildings and/or carry out sewerage treatment.This displaying wall unit 103F can be arranged at fixed buildings, thinks that this fixed buildings provides and shows service.This rest wall unit 104F can be arranged at fixed buildings, thinks that this fixed buildings provides service.This air conditioning wall unit 106F can provide air conditioning service to fixed buildings.
This flowing venue comprises a top cover 94F further, and this top cover 94F is supported by this shop body 90F.Specifically, this top cover 94F respectively support by each wall device 93F.This top cover 94F covers this activity space 92F.This top cover 94F comprises a bracing frame 941F and at least one overburden 942F further, and this overburden 942F covers this bracing frame 941F to form this top cover 94F.This bracing frame 941F comprises one group of sub-bracing frame 9411F further, and the sub-bracing frame 9411F of this group assembles and forms this bracing frame 941F.It is worth mentioning that this sub-bracing frame 941F is scalable or folding, to be incorporated in this wall unitary space 34F that this wall unit 931F has, thus this sub-bracing frame 9411F is flowed together with this wall unit 931F.Two these sub-bracing frame 9411F also can be connected to each other, to form this bracing frame 941F.That is, this sub-bracing frame 9411F is suitable for being incorporated in this wall unitary space 9311F that this wall unit 931F has.Preferably, this overburden 942F is flexible material, is covered in this sub-bracing frame 9411F.This overburden 942F can be incorporated in this flow unit 10F this unitary space 34F had, so that flowing.
This shop body 90F comprises a movable platform 95F further, and this movable platform 95F is arranged at the bottom of this activity space 92F, so that carry out shuttlecock activity on this flowing platform 95F.This flowing platform 95F comprises a group platform element 951F further.Each this platform element 951F is carried out assembling to form this movable platform 95F.Adjacent this platform element 951F is connected to each other.Preferably, this group platform element 951F is arranged with the form of array, and adjacent two these platform elements 951 are connected to each other.It is worth mentioning that, this platform element 951F can be arranged at this wall unit 931F, to be flowed together with this wall unit 931F.Preferably, this platform element 951F can be arranged at the wherein side of this wall unit framework 9313F of this wall unit 931F, using wherein this wall elements 9312F as this wall unit 931F.It is worth mentioning that, this platform element 951F also can be fixed in the top of this wall unit 10F to be flowed together with this wall unit 931F.
It is worth mentioning that, this movable platform 95F supplies to preset a Site characteristic 952F, so that carry out activity.Preferably, described Site characteristic 952F is arranged at the surface of described movable platform 95F.This Site characteristic 952F comprises one group of place subcharacter 9521F further.This place subcharacter 9521F can for being arranged at this platform element 951F, to make to combine after this platform element 951F forms this flowing platform 95F, forms this Site characteristic 952F.Preferably, this Site characteristic 952F is shuttlecock Site characteristic.
It is worth mentioning that, this flowing platform 95F comprises at least one additional Site characteristic 953F further, and this additional Site characteristic is removably layed in this flowing platform 95F, carries out other activity to make this flowing venue.Such as, be that shuttlecock Site characteristic is layed in this flowing platform 95F by this additional Site characteristic 953F, be suitable for carrying out shuttlecock activity to make this flowing venue.It is worth mentioning that, this additional Site characteristic 953F directly can be layed in ground.This additional Site characteristic 953F comprises one group of additional Site characteristic 9531F of son further, and adjacent two these additional Site characteristic 9531F are connected to each other.The additional Site characteristic 9531F of this son is easy to this unitary space 34F being incorporated in this flow unit 10F.By arranging this additional Site characteristic 953F, this flowing venue is carried out other activity.Such as, this additional Site characteristic 953F provides and carries out shuttlecock activity.After being provided with this additional Site characteristic 953F,
It is worth mentioning that, this wall unit 931F can be arranged at this activity space 92F.Such as, in this activity space 92F stacking multiple this wall unit 931F to form at least one partition wall 72F.Activity space 92F is divided at least two this subactivity space 921F by this partition wall 72F.
As shown in figure 33, this wall unit 931F comprises a supporting and regulating device 9314F further, and this supporting and regulating device 9314F is removable installed in this wall unit 931F, stablizes to maintain this wall unit 9314F.This supporting and regulating device can be arranged at this wall elements 9311F of this wall unit 931F.It is worth mentioning that, regulate to make this wall unit 9314F can adapt to different terrain environments to this stream wall unit 9311F by this supporting and regulating device 9314F.This supporting and regulating device 9314F can for being arranged at this platform element 951F.This supporting and regulating device 9314F, comprises one group further and supports regulating part 93141F.This group supports regulating part 93141F, and this group supports regulating part 93141F and is installed on this wall unit 931F removably respectively.Maintaining this wall unit 931F by regulating respectively this support regulating part 93141 respectively to stablize, being suitable for make this wall unit 931F using at different terrain environments.
As shown in figure 33, this wall unit 931F comprises a management devices 9317F further, and this management devices 9317F connects this supporting and regulating device 9314F communicatedly, remains stable to manage this supporting and regulating device 9314F.This supporting and regulating device 9314F is arranged at this wall unit 931F.Preferably, this management devices 9317F is arranged at this wall unit 931F.This management devices 9317F comprises an one group of monitoring element 93171F and control device 93172F further.Respectively this monitoring element 93171F connects respectively this support regulating part 93141F communicatedly respectively, at least be connected communicatedly with this monitoring element 93171F to make respectively this support regulating part 93141F, thus be convenient to obtain the state of respectively this support regulating part 931411F, be then sent to this control device 93172F.Analyzed the state of each support regulating part 93141F by this control device 93172F, then each this support regulating part 93141F is regulated, to maintain the stable of this wall unit 931F or this platform element 951F.This management devices 9317F comprises a communicator 93173F further, and this communicator 93173F connects this control device 93172F communicatedly so that communicate with other this wall unit 931F so that with other wall unit 931F collaborative work.
This wall unit 931F comprises a guider 9316F further, and this guider 9316F connects this management devices 9317F communicatedly.Specifically, this guider 9316F connects this communicator 93173F of this management devices 9317F communicatedly.This guider 9316F guides this wall unit 931F to move to destination.This guider 9316F comprises a positioner 93161F further.This positioner 93161F obtains the position of this wall unit 931F.Preferably, this positioner 93161F obtains the real time position of this wall unit 931F.The real time position of this wall unit 931F is sent to this control device 93172F by this positioner 93161F, so that manage this wall unit 931F.It is worth mentioning that, this positioner can obtain this wall unit 931F in the position of this wall device 93F.This guider 9316F comprises a route device 93162F further, and this route device 93162F connects this positioner 93161F communicatedly.This route device 93162F sets at least one mobile alignment according to the position of this wall unit 931F and the position of destination, moves to destination to guide this wall unit 931F.
It is worth mentioning that, this supporting and regulating device 9314F comprises at least one movable support regulating part 93142F further.This movable support regulating part 93142F removably supports this wall unit 931F.By this movable support regulating part 93142F, this wall unit 931F is moved.
This wall unit 931F comprises a power supplying apparatus 9315F further, and this power supplying apparatus 9315F is connected with this movable support regulating part 93142F, to provide power to this movable support regulating part 93142F.This power supplying apparatus 9315F is connected with this management devices 9317F with controlling, to be controlled to provide power by this management devices 9317F.
The utility model flowing Badminton Stadium comprises an administrative unit 4F further, and this administrative unit 4F is connected with this management devices 9317F of each this wall unit 931F, to obtain the state of each wall unit 9317F respectively communicatedly respectively.Specifically, this administrative unit 4F connects this control device 93172F of this management devices 9317F of each wall unit 931F communicatedly respectively.This administrative unit 4F manages according to the state of each this wall unit 931F.Such as, when this flowing venue of the utility model is dismantled, this administrative unit 4F by this positioner of each this guider 9316F of this wall unit 931F obtain respectively respectively this wall unit 931F in the position of this wall device 93F.Then according to each this wall unit 931F disassembly sequence at each this flow unit 10F of position arrangement of this wall device 93F.Further, this platform element 951F is arranged to be arranged at corresponding this stream wall elements 951F.When respectively this wall elements 931F moves, coordinate the mobile route of respectively this wall unit 931F, obtain the real time position of respectively this wall unit 931F.When this flowing venue of the utility model is assembled, arrange the assembling sequence of respectively this wall unit 931F.Preferably, this administrative unit 4F, can preset assembling plan.Preferably, this wall device 93F arranges respectively this wall unit 931F in the mode of array.That is, this wall device 93F can be used as the array of one group of this wall unit 931F.It is worth mentioning that, this administrative unit 4F can be arranged in the wall unitary space 9311F of this wall unit 931F.This wall unit being provided with this administrative unit 4F is defined as management wall unit 107F.
Figure 35 is another preferred embodiment of the utility model flowing Badminton Stadium.The utility model flowing venue comprises a shop body 90G, and this shop body 93G has an activity space 92G, and this activity space 92G is positioned at the top of this shop body 93G.This shop body 90G comprises a wall device 93G further, and this activity space 92G is positioned at the top of this wall device 93G.That is, this wall device 93G is positioned at the bottom of this activity space 92G.This wall device 93G comprises one group of wall unit 931F further.Adjacent wall unit 931F is connected to each other and forms this wall device 93G.Preferably, this group wall unit 931F assembles in the mode of array and forms this wall device 93G.It is worth mentioning that, two adjacent this wall elements 9312F of two adjacent this wall unit 931F can be dismantled respectively, to connect this wall unitary space 9311F of two adjacent this wall unit 931F, so that this wall unitary space 9311F be communicated with provides service.It is worth mentioning that, this wall device 93G comprises at least one energy supply wall unit 101F, and this energy supply wall unit 101F is connected with other this wall unit 931F, to provide electric energy to the utility model flowing Badminton Stadium.
It is worth mentioning that, this shop body 90G comprises a movable platform 95G further.This flowing platform 95G is arranged between this wall device 93G and this activity space 92G, support by this wall device 93G.This movable platform 95G comprises a group platform element 951G further, and adjacent two this platform element 951G are connected to each other.Respectively this platform element 951G respectively support by each this wall elements 931G.It is worth mentioning that, this platform element 951G can for customizing in advance.
As shown in figure 36, this platform element 951G comprises an at least two elements support portion 9511G and element body 9512G further, and two these element support 9511G are arranged on the both sides of this element body 9512G respectively, to support this element body 9511G.It is worth mentioning that, this element body 9512G has one group of through hole 95121G.It is worth mentioning that, the surface supporting the object of this two this element support 9511 is defined supporting surface, by two these element support 9511, a cushion space 9513G is formed between this element body 9512G and supporting surface, reduce supporting surface surface environment to the impact of this element body 9512G by described cushion space 9513G, thus reduce supporting surface environment to the impact of the motion carried out on platform element 951G.As shown in figure 36.It is worth mentioning that, this platform element 951G also can be applied to other preferred embodiment of the utility model flowing venue.It is worth mentioning that, by regulating the length of two these element support 9511G to adjust described cushion space 9513G.
This flowing platform 95G comprises an additional Site characteristic 953G further, and this additional Site characteristic 953G is layed in the top of this flowing platform 95G.That is, respectively this platform element 951G supports this additional Site characteristic 953G.This additional Site characteristic 953G comprises one group of additional Site characteristic 9531G of son further, and adjacent two these additional Site characteristic 9531G are connected to each other.The additional Site characteristic 9531G of this son is easy to this unitary space 34G being incorporated in this flow unit 10G.In the preferred embodiment, preferably, this additional Site characteristic 9531G is shuttlecock place.
Preferably, this platform element 951G is prefabricated component, can preset as required.It is worth mentioning that, this flowing platform 95G directly can be layed in ground.Respectively this element support 9511G supports this element body 9512G respectively, to form cushion space 9513G between ground and this element body 9512G, thus reduces ground environment to the impact of element body 9512G.
As shown in Figure 37 and Figure 38, the utility model flowing venue comprises a shop body 90H, and this shop body 90H has an activity space 92H.This shop body 90H comprises at least two wall device 93H further, forms this activity space 92H between two this wall device 93H.That is, respectively this wall device 93H is arranged on the wherein side of this activity space 92H respectively, with around this activity space 92H.The utility model flowing venue comprises a top cover 94H further, and this top cover 94H covers this activity space 92H.Preferably, this top cover 94H covers respectively this wall device 93H.
This top cover 94H comprises a bracing frame 941H and at least one overburden 942H further.This overburden 942H covers this bracing frame 941H.This bracing frame 941H is fixedly set in supporting surface, to support this overburden 942H.This bracing frame 941H comprises an a support portion 9411H and covering part 9412H further.This support portion 9411H supports this covering part 9412H, this covering part 9412H cover by this overburden 942H.That is, this overburden 942H is covered in this covering part 9412H.Preferably, this overburden 942H is solar attachment.This support portion 9411H comprises one group of support column 94111H further, and respectively this support column 94111H supports this covering part 9412H respectively.
This wall device 93H comprises one group of wall unit 931F further, is adjacent to two this wall unit 931F and connects.This group wall unit 931F forms this wall device 93F in a stacked fashion.It is worth mentioning that, by dismantling as each this wall unit 931F by this wall device 93H, then each this wall unit 931F being moved to destination respectively.It is worth mentioning that, this wall device 93F comprises at least one this wall unit 931F being provided with this serviced component 9314F.That is, this wall device 93F can comprise this supply unit 101F further, this water treatment wall unit 102F, this displaying wall unit 103F, this rest wall unit 104F and this air conditioning wall unit 106F etc.Preferably, this wall device 93F comprises at least one energy supply wall unit 101F.There is provided electric service if on purpose need, this energy supply wall unit 101F can be dismantled from this wall device 93F, then move to this destination to provide electric service.When destination does not need electric service, this energy supply wall unit 101F can be moved go back to the utility model flowing venue location, and then this power supply device is assembled to this wall device 93F again.There is provided water treatment service if on purpose need, this water treatment wall unit 931F can be dismantled from this wall device 93F, then this water treatment wall unit 931F be moved to destination to put forward water services.After service, this water treatment wall unit 931F returns to the utility model flowing venue location, then re-assemblies to this wall device 93F.That is, need the COS provided according to each destination, dismantle this wall unit 931F being provided with corresponding serviced component 9314F from each this wall device 93F respectively.Then this wall unit 931F being provided with corresponding serviced component 9314F is moved to corresponding destination, to provide service.After service, this wall unit 931F being provided with corresponding serviced component 9314F is back to the utility model flowing venue location, then is reassembled into this wall device 93F.That is, respectively this wall unit 931F of this wall device 93F can be individually displaced to different destinations, provides service.
It is worth mentioning that, respectively this wall device 93F can be moved into same destination, then be assembled into another kind of the utility model flowing Badminton Stadium service is provided.
It is worth mentioning that, manage the dismounting of respectively this wall unit 931F by this management platform 4F, flowing and assembling.
Shown in Figure 39 be the utility model flowing venue another preferred embodiment (roof is supported by bracing frame, and frame is removable or do not move).The utility model flowing venue comprises a shop body 90J, and this shop body 90J has an activity space 92J.This shop body 90J comprises at least two wall device 93J further, forms this activity space 92J between two this wall device 93J.That is, respectively this wall device 93J is arranged on the wherein side of this activity space 92J respectively, with around this activity space 92J.
As shown in figure 40, this wall device 93J comprises a wall framework 939J and group of wall unit 931J further.Respectively this wall unit 931F is arranged at this wall framework 939J respectively.This wall framework 939J has one group of wall unit container cavity 9391J.This wall unit container cavity 9391J is for holding this wall unit 931F.It is worth mentioning that, on this wall framework 939J, form pattern by this wall unit container cavity 9391J and this wall unit container cavity 9391J being provided with this wall unit 931F.According to the activity carried out at this activity space 92J, at this wall framework 939J, forming pattern by arranging this wall unit 931F in the position of this group wall unit container cavity 9391J, being engaged in this activity space 92J.It is worth mentioning that, respectively this wall unit container cavity 9391J being positioned at this wall framework 939J top can not arrange this wall unit 931F, to make this wall unit container cavity 9391J as scavenge duct, carries out interchange of air for this activity space 92J and the external world.Preferably, this wall unit 931F adopts the mode embedding this wall unit container cavity 9391J to install this wall unit 931F in this wall unit container cavity 9391J.The mode that this wall unit 931F extracts this wall unit container cavity 9391F out dismantles this wall unit 931F.
It is worth mentioning that, this wall device 93J comprises at least one this wall unit 931F being provided with this serviced component 9314F.That is, this wall device 93J can comprise this supply unit 101F, this water treatment wall unit 102F, this displaying wall unit 103F, this rest wall unit 104F and/or this air conditioning wall unit 106F etc.This wall unit 931F being provided with this serviced component 9314F can be incorporated in this wall unit container cavity 9391J.That is, this supply unit 101F, this unit for treating water 102F, this displaying wall unit 103F, this rest wall unit 104F or this air conditioning wall unit 106F can be incorporated in this wall unit container cavity 9391J.The service provided is provided according to destination, this wall unit 931F being provided with corresponding this serviced component 9314F can be dismantled from this wall device 93J.Then this wall unit 931F being provided with corresponding this serviced component 9314F is moved to the destination needing to provide service.After providing service, this wall unit 931F being provided with this serviced component 9314F has returned to the location of the utility model flowing venue.Then this wall unit 931F being provided with this serviced component 9314F is re-installed in this wall unit container cavity 9391J of this wall device 93J.Such as destination needs to carry electric service, then dismantled from this wall unit container cavity 9391J of this wall device 93J by this energy supply wall unit 101F.Then this energy supply wall unit 101F is moved to destination, to provide electric service in this destination.After service is complete, this energy supply wall unit 101F is moved go back to this flowing venue location, is then again installed on this wall unit container cavity 9391J.It is worth mentioning that, respectively this wall unit 931F being provided with serviced component 9314F can be moved into corresponding destination respectively provides different services, also can be moved into the service that same destination provides identical.Such as, in the present embodiment, respectively this wall unit 931F can be moved into a destination, with the sidewall collaborative work of a fixed buildings, forms an interim flowing venue, as shown in Figure 37 or 38.It is worth mentioning that, be respectively provided with respectively this wall unit 931F of serviced component 9314F by this administrative unit 4F management.
This wall framework 939J comprises one group of wall unit connector 9398J further.This wall unit connector 9398J is arranged between two adjacent this wall unit 931F, to connect two adjacent this wall unit 931F.Adjacent two this wall unit 931F, dismantle two mutually adjacent wall elements 931F respectively, are communicated with to make two adjacent this wall unitary space 9311F.Multiple this wall unit connector 9398J is connected to form this wall unit container cavity 9391J.
The utility model flowing venue comprises a top cover 94J further, and this top cover 94J covers this activity space 92J.Preferably, this top cover 94J covers respectively this wall device 93J.This top cover 94J is removably supported by this shop body 90J.This top cover 94J is supported respectively by each this wall device 93J.Further, this top cover 94J support by this wall framework 939J of each this wall device 93J.This top cover 94J comprises a bracing frame 941J and at least one overburden 942J further, and this overburden 942F covers this bracing frame 941J with this top cover of shape 94J.This bracing frame 941J comprises one group of sub-bracing frame 9411J further, and the sub-bracing frame 9411J of this group can assemble and form this bracing frame 941J.It is worth mentioning that this sub-bracing frame 941J is scalable or folding, to be incorporated in this wall unitary space 9311F that this flow unit 10F has, thus this sub-bracing frame 9411F is flowed together with this wall unit 931F.That is, this sub-bracing frame 9411F is suitable for being incorporated in this wall unitary space 9311F that this wall unit 931F has.Preferably, this overburden 942F is flexible material, is covered in this sub-bracing frame 9411F.This overburden 942F can be incorporated in this wall unitary space 9311F that this wall unit 931F has, so that flowing.。
This shop body 90J comprises a movable platform 95F further, and this movable platform 95F is arranged at the bottom of this activity space 92J, so that carry out shuttlecock activity on this movable platform 95F.This movable platform 95F can be used for the flowing Badminton Stadium shown in Figure 37 and Figure 38.
Shown in Figure 41 is that a kind of assemble method setting up flow chart the utility model flowing Badminton Stadium of the method in flowing feather shop of the present utility model comprises the following steps:
Step 2001: the Badminton Stadium that flowed by the utility model dismounting is multiple this wall unit 10F.
Step 2002: multiple this wall unit 10F is moved to destination respectively.Preferably, this destination can preset.
Step 2003: assemble multiple this flow unit 10F to form the utility model flowing Badminton Stadium.
Wherein, step 2001 is further comprising the steps:
Step 20011: be separated this top cover 94F and this shop body 90F, no longer supports this top cover 93F to make this shop body 90F.This top cover 94F and this shop body 90F is separated by the mode of dismounting.This top cover 94F is disassembled further as this bracing frame 941F and at least one overburden 942F.This bracing frame 941F is split as one group of this submounts further, so that with this wall unitary space 9311F being contained in this wall unit 931F.
Step 20012: dismantle this shop body 90F.Step 20012 is further comprising the steps:
Step 200121: judge whether respectively this wall device 93F of this shop body 90F exists two this wall unit 931F be connected to each other, if there are two this wall unit 931F be connected to each other, then performs step 200122; Two that are connected to each other if do not exist this wall unit 931F, then perform step 200126.
Step 200122: one of them this wall device 93F of two this wall unit 931F that selected existence is connected to each other, then from the top of this wall device 93F to the floor detection of this wall device 93F to determine to be connected to each other two this wall unit 931F.When detecting that first this wall unit of two of being connected to each other 931F then stops detecting, perform step 200123.
Step 200123: be connected to each other two this wall unit 931F are split as two independent this wall unit 931F.
Step 200124: independent two this wall unit 931F are dismantled respectively to supporting surface, then returns step 200121.Preferably, this supporting surface is ground.
Step 200125: return step 200121.
Step 200126: this flowing platform 95F is dismantled as multiple platform element 951F.
Step 200127: this platform element 951F is arranged at this wall unit 10F.Specifically, this platform element 951F is incorporated in this wall unitary space 9311F of this wall unit 931F.This platform element 951F also can be arranged at this wall unit framework 9313F of corresponding this wall unit 931F, using as one of them this wall elements 9312F.
Step 2002 is further comprising the steps:
Step 20021: by each this overburden 942F and respectively this sub-bracing frame 9411F receive this wall unitary space 9311F of this wall unit 931F to correspondence respectively so that respectively this overburden and respectively this sub-bracing frame 9411F move along with each this wall unit 931F.
Step 20022: each this wall unit 931F is moved to destination respectively.Preferably, respectively this wall unit is incited somebody to action respectively by conveying arrangement.
Step 2003 is further comprising the steps:
Step 20031: each this wall unit 931F is divided into groups.First the quantity of the wall device 93F of assembled the utility model flowing Badminton Stadium is determined.Then each this wall unit 931F is divided into groups according to same this wall device 93F of assembling.Respectively this wall unit 931F of same this wall device 93F of assembling is divided into a wall unit group.
Step 20032: assembling respectively this wall unit 10F to form this shop body 90F.Step 20032 is further comprising the steps:
Step 200321: judge respectively whether this wall unit group exists independent this wall unit 931F.If respectively this wall unit group does not exist independent this wall unit 931F, then perform step 20033; Otherwise, perform step 200322.Described this wall unit 931F separately refers to that this wall unit 931F is not assembled as this wall device.
Step 200322: select one of them to there is this wall unit group of independent this wall unit 931F, then at selected one of them this wall unit of this wall unit group selection 931F.
Step 200323: selected this wall unit 931F is arranged at a predeterminated position.Specifically, if the position arranging selected this wall device 93F belonging to this wall unit 931F does not arrange this wall unit 931F, then selected this wall unit 931F is arranged at the position arranging this wall device 93F.If the position arranging belonging this wall device 93F of selected this wall unit 931F is provided with this wall unit 931F, then selected this wall unit 931F is arranged at the position be connected with this wall unit 931F arranged.Be worth one, this predeterminated position is preferentially arranged at the one end of this wall unit 931F set, to meet the preset length of this wall device 93F.Secondly, this predeterminated position is arranged at and is connected side by side, to meet the predetermined width of this wall device 93F with this wall unit 931F set.Finally, this predeterminated position is arranged at this wall unit 931F set superimposed, that is, this wall unit 931F of selecting superimposedly supported by this wall unit 931F set, to meet the preset height of this wall device 93F.
Step 200324: selected this wall unit 931F is connected with adjacent this wall unit 931F.According to the quantity of this wall unit 931F adjacent with selected this wall unit 931F, selected this wall unit 931F is permanently connected with adjacent this wall unit 931F successively.
Step 200325: return step 200321.
Step 20033: assemble this top cover 94F, this top cover 94F is arranged at this shop body 90F with make this top cover 94F support by this shop body 90F.This top cover 94F support by each this wall device 93F.First, each sub-bracing frame 9411 is assembled this bracing frame of formation 941F.Then each overburden 942F is covered in this bracing frame 941F regularly, to form this top cover 94F.Finally this top cover 94F is placed in this shop body 90F, with support by each this wall device 93F.
Step 20034: assemble this movable platform 95F.Respectively will assemble the described movable platform 951F of formation by this platform element 951F.It is worth mentioning that, if respectively this platform element 951F is preset with this sub-Site characteristic 9521F, then respectively this platform element 951F is assembled complete after this Site characteristic of formation 952F.Preferably, this Site characteristic 952F is shuttlecock Site characteristic.If respectively this sub-Site characteristic 9521F of this platform element 951F Non-precondition, then can be arranged at this movable platform 95F by this additional Site characteristic further.Preferably, this additional place is characterized as shuttlecock Site characteristic.
The utility model flowing Badminton Stadium provides a kind of method being provided service by wall unit.
Step 3001: receive a service request.This administrative unit 4F of the utility model flowing Badminton Stadium receives service request.
Step 3002: Analysis Service request, obtains and needs the destination providing service, COS, the information such as service time.This administrative unit 4F Analysis Service request, obtains and needs the destination providing service, need the type providing service, provide the information such as service time.
Step 3003: select and provide this wall unit 931F of service in the position of this wall device 93J, dismantles selected this wall unit 93F of service that provides from this wall device 93J.This administrative unit 4F, by the search respectively available COS of this wall unit 931F, selectes this wall unit 931F providing service.Then this wall unit 931F of service is provided to dismantle from this wall device 93J by selected.If desired multiple this wall unit 931F could meet the requirement of service, then this administrative unit 4F selectes multiple service available this wall unit 931F, is then dismantled from this wall device 93F respectively by selected multiple this wall unit 931F of service that provide.
Step 3004: mobile selected this wall unit 931F to destination, and provides service.
Step 3005: after service, mobile selected this wall unit 931F is to this flowing venue location.
Step 3006: selected this wall unit 931F is installed on corresponding this wall unit container cavity 9391J.
Foregoing is exemplifying of specific embodiment of the utility model, for equipment and the structure of wherein not detailed description, should be understood to take the existing common apparatus in this area and universal method to be implemented.
The utility model above-described embodiment is only the use that technical solutions of the utility model are described simultaneously, is only enumerating of technical solutions of the utility model, is not limited to the technical solution of the utility model and protection domain thereof.Equivalent technologies means, equivalent apparatus etc. is adopted to be considered to be to the improvement of the technical scheme disclosed in the utility model claims and manual the scope do not exceeded disclosed in the utility model claims and manual.

Claims (15)

1. a flowing Badminton Stadium, is characterized in that, comprising:
At least two wall devices, form an activity space described in two between wall device, wherein,
Described wall device comprises at least one wall unit further, and described wall unit is arranged at the side of described activity space, and described wall unit has a unitary space further, and described unitary space is arranged at described wall unit the same side corresponding with described unitary space.
2. flow Badminton Stadium as claimed in claim 1, it is characterized in that, described wall device comprises at least one energy supply wall unit further, described energy supply wall unit is connected with described wall unit, to supply electric energy, wherein, described energy supply wall unit comprises a power supply device further, described power supply device is arranged at the described unitary space of described wall unit, to be powered by described power supply device.
3. flow Badminton Stadium as claimed in claim 2, it is characterized in that, described wall device comprises at least one water treatment wall unit further, described water treatment wall unit is connected with described wall unit, to provide water treatment service, wherein, described water treatment wall unit comprises a water treatment facilities further, described water treatment facilities is arranged at the described unitary space of described wall unit, to provide water treatment service by described water treatment facilities.
4. flow Badminton Stadium as claimed in claim 1, it is characterized in that, comprise a top cover further, described top cover is supported by each described wall device, wherein, described top cover comprises a bracing frame and at least one overburden further, and each described wall device supports support frame as described above respectively, and support frame as described above supports each described overburden.
5. flow Badminton Stadium as claimed in claim 1, it is characterized in that, comprise a movable platform further, described movable platform is placed in the bottom of described activity space.
6. flow Badminton Stadium as claimed in claim 5, it is characterized in that, described movable platform presets a Site characteristic, and described Site characteristic is arranged at the surface of described movable platform.
7. flow Badminton Stadium as claimed in claim 5, it is characterized in that, described movable platform comprises a group platform element further, and adjacent described platform element is connected to each other to form described movable platform.
8. the flowing Badminton Stadium as described in claim 1,2,3,4 or 5, is characterized in that, described wall unit comprises one group of wall elements and a wall elements framework further, and each described wall elements is arranged at described wall elements framework to form described unitary space.
9. flow Badminton Stadium as claimed in claim 8, it is characterized in that, wherein, each described wall elements is removably arranged at described wall elements framework to form described unitary space, wherein, by dismantle respectively wall unit described in adjacent two adjacent two described in wall elements be communicated with unitary space described in two.
10. flow Badminton Stadium as claimed in claim 8, it is characterized in that, wherein, described wall unit comprises at least one serviced component further, and described serviced component is arranged at described unitary space.
11. flow Badminton Stadium as claimed in claim 10, and it is characterized in that, wherein, described serviced component is selected from power supply device, water treatment facilities, exhibiting device, rest assembly, guiding device and conditioner.
12. flow Badminton Stadium as claimed in claim 8, it is characterized in that, described wall unit comprises a supporting and regulating device further, described supporting and regulating device is removable installed in described wall unit, wherein said supporting and regulating device comprises one group further and supports regulating part, and each described support regulating part is removable installed in described wall unit.
13. flow Badminton Stadium as claimed in claim 12, it is characterized in that, described wall unit comprises a management devices further, described management devices connects described supporting and regulating device communicatedly, wherein said management devices comprises one group of monitoring element, a control device and a communicator further, each described monitoring element connects described control device communicatedly, described control device connects described communicator communicatedly, wherein, the described communication of described communicator and wall unit described in other, with collaborative work.
14. flow Badminton Stadium as claimed in claim 13, it is characterized in that, described wall unit comprises a guider further, described guider connects the described communicator of described management devices communicatedly, wherein said guider comprises a positioner and a route device further, described positioner connects described route device communicatedly, and wherein, described positioner can obtain described wall unit in the position of described wall device.
15. flow Badminton Stadium as claimed in claim 14, it is characterized in that, described flowing Badminton Stadium comprises an administrative unit further, and described administrative unit is connected with the described management devices of each described wall unit, respectively communicatedly to obtain the state of each described wall unit.
CN201520112214.8U 2014-07-10 2015-02-15 Flowing Badminton Stadium Expired - Fee Related CN204590684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520112214.8U CN204590684U (en) 2014-07-10 2015-02-15 Flowing Badminton Stadium

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN2014103278748 2014-07-10
CN201410327874 2014-07-10
CN201520112214.8U CN204590684U (en) 2014-07-10 2015-02-15 Flowing Badminton Stadium

Publications (1)

Publication Number Publication Date
CN204590684U true CN204590684U (en) 2015-08-26

Family

ID=53926850

Family Applications (8)

Application Number Title Priority Date Filing Date
CN201410523315.4A Pending CN105239801A (en) 2014-07-10 2014-09-30 Mobile stadium and establishing method thereof
CN201520112106.0U Expired - Fee Related CN204663050U (en) 2014-07-10 2015-02-15 Flowing venue
CN201520112214.8U Expired - Fee Related CN204590684U (en) 2014-07-10 2015-02-15 Flowing Badminton Stadium
CN201510083321.7A Active CN105251198B (en) 2014-07-10 2015-02-15 Mobile venue and method thereof
CN201510083539.2A Active CN105275230B (en) 2014-07-10 2015-02-15 Mobile venue and method thereof
CN201520112075.9U Expired - Fee Related CN204663049U (en) 2014-07-10 2015-02-15 There is the venue of flow unit
CN201510083242.6A Active CN105332525B (en) 2014-07-10 2015-02-15 Mobile badminton stadium and method thereof
CN201510083527.XA Active CN105298168B (en) 2014-07-10 2015-02-15 Stadium with mobile unit and method thereof

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201410523315.4A Pending CN105239801A (en) 2014-07-10 2014-09-30 Mobile stadium and establishing method thereof
CN201520112106.0U Expired - Fee Related CN204663050U (en) 2014-07-10 2015-02-15 Flowing venue

Family Applications After (5)

Application Number Title Priority Date Filing Date
CN201510083321.7A Active CN105251198B (en) 2014-07-10 2015-02-15 Mobile venue and method thereof
CN201510083539.2A Active CN105275230B (en) 2014-07-10 2015-02-15 Mobile venue and method thereof
CN201520112075.9U Expired - Fee Related CN204663049U (en) 2014-07-10 2015-02-15 There is the venue of flow unit
CN201510083242.6A Active CN105332525B (en) 2014-07-10 2015-02-15 Mobile badminton stadium and method thereof
CN201510083527.XA Active CN105298168B (en) 2014-07-10 2015-02-15 Stadium with mobile unit and method thereof

Country Status (3)

Country Link
CN (8) CN105239801A (en)
TW (2) TWI711752B (en)
WO (1) WO2016050212A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332525A (en) * 2014-07-10 2016-02-17 戴见霖 Mobile badminton stadium and building method thereof

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107633658A (en) * 2017-09-30 2018-01-26 伍胜资 A kind of drowned salvage system of swimming pool
CN110150916A (en) * 2019-06-11 2019-08-23 马宏波 A kind of double-deck exhibition position device of folding easy to remove
CN114590373A (en) * 2022-03-11 2022-06-07 岭南师范学院 Movable hydropneumatic diving training experience pool

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01271582A (en) * 1988-04-22 1989-10-30 Shimizu Corp Assembly set for calisthenics gymnasium
TWM250970U (en) * 2004-02-06 2004-11-21 Bi-Shia Jang Collapsible multi-function house
CN200982088Y (en) * 2006-11-17 2007-11-28 王远 Detachable swimming pool
US20090193722A1 (en) * 2008-02-01 2009-08-06 Carlson Eric T Event structures
FR2943373B1 (en) * 2009-03-23 2011-04-08 Christophe Mayaud COMPACT AND VERSATILE OFF-SOIL SWIMMING POOL FOR THE PRACTICE OF STATIONARY SWIMMING
CN101994406A (en) * 2009-08-12 2011-03-30 鸿富锦精密工业(深圳)有限公司 House
TW201111597A (en) * 2009-09-29 2011-04-01 Hon Hai Prec Ind Co Ltd Housing
KR101022975B1 (en) * 2010-09-20 2011-03-22 유승협 Container type system booth for display and event of indoor and outdoor
CN202187579U (en) * 2011-08-09 2012-04-11 泰山体育产业集团有限公司 Quick assembled and disassembled sports table
CN202416926U (en) * 2011-11-10 2012-09-05 熊伟 Moveable and assembling type badminton hall
CN103104109B (en) * 2011-11-10 2015-09-09 熊伟 Mobile, pin-connected panel Badminton Stadium
CN202810245U (en) * 2012-09-07 2013-03-20 广州爱奇实业有限公司 Movable mini gymnasium
CN202882532U (en) * 2012-11-02 2013-04-17 张云龙 Inflating type double-arch stage shed
CN202882531U (en) * 2012-11-02 2013-04-17 张云龙 Hexagonal cross arch-shaped inflatable tent
CN203296456U (en) * 2012-12-17 2013-11-20 东莞市大成充气模型制品有限公司 Inflatable tent
CN203577271U (en) * 2013-09-24 2014-05-07 曹悦龙 Basketball court convenient for moving
CN203547176U (en) * 2013-09-24 2014-04-16 曹悦龙 Special-effect slam-dunk moving field with combination of spring and moving platform
CN203669096U (en) * 2013-11-22 2014-06-25 扬州通利冷藏集装箱有限公司 Room box
CN105239801A (en) * 2014-07-10 2016-01-13 戴见霖 Mobile stadium and establishing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332525A (en) * 2014-07-10 2016-02-17 戴见霖 Mobile badminton stadium and building method thereof
WO2016050212A1 (en) * 2014-07-10 2016-04-07 戴见霖 Stadium having movable unit and method thereof

Also Published As

Publication number Publication date
CN105251198B (en) 2020-05-01
CN204663050U (en) 2015-09-23
CN105332525A (en) 2016-02-17
CN105251198A (en) 2016-01-20
WO2016050212A1 (en) 2016-04-07
CN105298168A (en) 2016-02-03
WO2016050212A9 (en) 2016-05-26
CN105298168B (en) 2020-07-24
CN105239801A (en) 2016-01-13
TW201612390A (en) 2016-04-01
CN105275230A (en) 2016-01-27
CN105332525B (en) 2020-07-21
TWM527029U (en) 2016-08-11
CN204663049U (en) 2015-09-23
CN105275230B (en) 2020-05-19
TWI711752B (en) 2020-12-01

Similar Documents

Publication Publication Date Title
CN204590684U (en) Flowing Badminton Stadium
US8763314B2 (en) Container-type system booth for an indoor/outdoor exhibition or event
CA2795035C (en) Multi-dwelling structure
Modi Improving the social sustainability of high-rises.
AU2009220034A1 (en) Interactive Building Module
US20180313076A1 (en) Maritime green human settlement system and modularized construction method therefor
US20160024781A1 (en) Robotically controlled architectural elements
CN105299803A (en) Cooling type evaporating cooling system used for outdoor sentry box
CN204910727U (en) Venue flows
Aleksandrov NEW SOLUTION-CULTIVATION AND STORAGE OF SOFT FRUITS AND VEGETABLES IN CHAMBERS OF THE" CONTAINERS" TYPE WITH POSITIVE TEMPERATURES (CONTAINER SKYSCRAPER, MUMBAI, INDIA).
Ming et al. HDB's next generation of eco-districts at Punggol and eco-modernisation of existing towns
CN212154297U (en) Special spatial cultural entertainment room for escape from secret room
CN110424540A (en) Bay section formula pneumatic die cushion membrane building house
CN202017359U (en) Detachable mobile movie theatre
RU53339U1 (en) INDOOR STADIUM FOR ICE SPORTS
CN213063069U (en) Ecological landscape pavilion with body-building and greening functions
CN115306187B (en) Lightweight shelter type medical treatment system
CN205174651U (en) Cooling formula evaporative cooling air -conditioning system suitable for outdoor sentry box
CN213501936U (en) Sightseeing vehicle for tourist attraction
EP1334315A1 (en) System and method of climate control in a room, a ceiling for this purpose and a method of installation of such system
Moon et al. Solar Decathlon 2005: The event in review
CN208578405U (en) Novel assembled scenic spot tent
CN115306187A (en) Lightweight shelter type medical treatment system
WO2008065071A1 (en) Method to build a multi-functional sports structure, and multi-functional sports structure thus built
Warwicker et al. Exhibition and Congress Halls Sustainable Design.

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20220215

CF01 Termination of patent right due to non-payment of annual fee