CN105207197A - 包含风电场的电力系统可靠性评估方法 - Google Patents
包含风电场的电力系统可靠性评估方法 Download PDFInfo
- Publication number
- CN105207197A CN105207197A CN201510461247.8A CN201510461247A CN105207197A CN 105207197 A CN105207197 A CN 105207197A CN 201510461247 A CN201510461247 A CN 201510461247A CN 105207197 A CN105207197 A CN 105207197A
- Authority
- CN
- China
- Prior art keywords
- turbine set
- energy turbine
- wind energy
- state
- wind
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510461247.8A CN105207197B (zh) | 2015-07-31 | 2015-07-31 | 包含风电场的电力系统可靠性评估方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510461247.8A CN105207197B (zh) | 2015-07-31 | 2015-07-31 | 包含风电场的电力系统可靠性评估方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105207197A true CN105207197A (zh) | 2015-12-30 |
CN105207197B CN105207197B (zh) | 2017-08-01 |
Family
ID=54954707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510461247.8A Active CN105207197B (zh) | 2015-07-31 | 2015-07-31 | 包含风电场的电力系统可靠性评估方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105207197B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106094790A (zh) * | 2016-06-03 | 2016-11-09 | 内蒙古大唐国际新能源有限公司 | 风电设备可靠性管理信息系统 |
CN108446483A (zh) * | 2018-03-16 | 2018-08-24 | 太原理工大学 | 计及风电机组传动系统疲劳的风电场可靠性评估方法 |
CN109740853A (zh) * | 2018-12-05 | 2019-05-10 | 新奥数能科技有限公司 | 一种用电需量分析方法、装置、可读介质及电子设备 |
CN110570122A (zh) * | 2019-09-10 | 2019-12-13 | 重庆大学 | 一种计及风速季节特性及集电系统元件故障的海上风电场可靠性评估方法 |
CN111882228A (zh) * | 2020-07-31 | 2020-11-03 | 国网重庆市电力公司电力科学研究院 | 一种含分布式电源的配电网可靠性评估方法 |
CN113193657A (zh) * | 2021-06-04 | 2021-07-30 | 绍兴建元电力集团有限公司 | 基于人工智能的安全隐患排查治理策略匹配方法及系统 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101794995A (zh) * | 2010-01-22 | 2010-08-04 | 广东天富风光潮发电设备有限公司 | 一种离网型风力发电系统的能量管理方法 |
-
2015
- 2015-07-31 CN CN201510461247.8A patent/CN105207197B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101794995A (zh) * | 2010-01-22 | 2010-08-04 | 广东天富风光潮发电设备有限公司 | 一种离网型风力发电系统的能量管理方法 |
Non-Patent Citations (2)
Title |
---|
陈凡等: "《风电接入后的电力系统可靠性研究综述及展望》", 《南京工程学院学报》 * |
陈树勇等: "《基于聚类算法的风电场动态等值》", 《中国电机工程学报》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106094790A (zh) * | 2016-06-03 | 2016-11-09 | 内蒙古大唐国际新能源有限公司 | 风电设备可靠性管理信息系统 |
CN106094790B (zh) * | 2016-06-03 | 2018-12-07 | 内蒙古大唐国际新能源有限公司 | 风电设备可靠性管理信息系统 |
CN108446483A (zh) * | 2018-03-16 | 2018-08-24 | 太原理工大学 | 计及风电机组传动系统疲劳的风电场可靠性评估方法 |
CN109740853A (zh) * | 2018-12-05 | 2019-05-10 | 新奥数能科技有限公司 | 一种用电需量分析方法、装置、可读介质及电子设备 |
CN109740853B (zh) * | 2018-12-05 | 2021-01-05 | 新奥数能科技有限公司 | 一种用电需量分析方法、装置、可读介质及电子设备 |
CN110570122A (zh) * | 2019-09-10 | 2019-12-13 | 重庆大学 | 一种计及风速季节特性及集电系统元件故障的海上风电场可靠性评估方法 |
CN111882228A (zh) * | 2020-07-31 | 2020-11-03 | 国网重庆市电力公司电力科学研究院 | 一种含分布式电源的配电网可靠性评估方法 |
CN113193657A (zh) * | 2021-06-04 | 2021-07-30 | 绍兴建元电力集团有限公司 | 基于人工智能的安全隐患排查治理策略匹配方法及系统 |
CN113193657B (zh) * | 2021-06-04 | 2022-04-08 | 绍兴建元电力集团有限公司 | 基于人工智能的安全隐患排查治理策略匹配方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN105207197B (zh) | 2017-08-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105207197A (zh) | 包含风电场的电力系统可靠性评估方法 | |
Singh et al. | An efficient technique for reliability analysis of power systems including time dependent sources | |
CN104485665B (zh) | 计及风速预测误差时空相关性的动态概率潮流计算方法 | |
CN107591800A (zh) | 基于场景分析的含分布式电源配电网运行状态预测方法 | |
CN106557828A (zh) | 一种长时间尺度光伏出力时间序列建模方法和装置 | |
CN103810535B (zh) | 电力系统风电消纳能力评估方法 | |
Cai et al. | A novel importance sampling method of power system reliability assessment considering multi-state units and correlation between wind speed and load | |
CN103986156A (zh) | 一种考虑风电接入的动态概率潮流计算方法 | |
CN103746370A (zh) | 一种风电场可靠性建模方法 | |
CN104331572A (zh) | 考虑风速和风电机组故障相关性的风电场可靠性建模方法 | |
CN104573876A (zh) | 基于时序长记忆模型的风电场短期风速预测方法 | |
Cui et al. | Statistical scenarios forecasting method for wind power ramp events using modified neural networks | |
CN103887795A (zh) | 电力系统实时概率潮流在线的计算方法 | |
CN103020743A (zh) | 风电场超短期风速预测方法 | |
CN106611243A (zh) | 一种基于garch模型的风速预测残差修正方法 | |
CN105225000A (zh) | 一种基于模糊序优化的风功率概率模型非参数核密度估计方法 | |
CN105305488A (zh) | 一种考虑新能源并网对输电网利用率影响的评价方法 | |
CN107239856A (zh) | 一种风向数据插补方法 | |
CN105449667A (zh) | 一种发输电系统可靠性预测方法 | |
CN105634018A (zh) | 一种基于随机响应面法和内点法的含风电随机最优潮流求解方法 | |
CN103971293B (zh) | 一种考虑天气的风电场可靠性建模方法 | |
CN104951654A (zh) | 基于控制变量抽样的大规模风电场可靠性评估方法 | |
CN106410862A (zh) | 基于有功恢复斜率校正的风电场单机等值方法 | |
CN106056305A (zh) | 一种基于状态聚类的发电系统可靠性快速评估方法 | |
CN104834816A (zh) | 一种短期风速预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181122 Address after: 211800 Room 242, Building 13, Buyue Road, 29 Qiaolin Street, Pukou District, Nanjing City, Jiangsu Province Patentee after: Nanjing Changyuan Mdt InfoTech Ltd Address before: 211167 1 Hong Kong Avenue, Jiangning Science Park, Nanjing, Jiangsu Patentee before: Nanjing Institute of Technology |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201229 Address after: No.107-1, Puxia village, Hushan Town, Yongchun County, Quanzhou City, Fujian Province 362600 Patentee after: Quanzhou Yuchen Logistics Co.,Ltd. Address before: 211800 Room 242, Building 13, Buyue Road, 29 Qiaolin Street, Pukou District, Nanjing City, Jiangsu Province Patentee before: NANJING CHANGYUAN INFORMATION TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210129 Address after: Liu'an Development Zone, Yongchun County, Quanzhou City, Fujian Province (east side of Taoxi bridge) Patentee after: Yongchun County Product Quality Inspection Institute Fujian fragrance product quality inspection center, national incense burning product quality supervision and Inspection Center (Fujian) Address before: No.107-1, Puxia village, Hushan Town, Yongchun County, Quanzhou City, Fujian Province 362600 Patentee before: Quanzhou Yuchen Logistics Co.,Ltd. |