CN105201194B - Connection system for guide rail for removing large-scale gas chamber - Google Patents

Connection system for guide rail for removing large-scale gas chamber Download PDF

Info

Publication number
CN105201194B
CN105201194B CN201510440489.9A CN201510440489A CN105201194B CN 105201194 B CN105201194 B CN 105201194B CN 201510440489 A CN201510440489 A CN 201510440489A CN 105201194 B CN105201194 B CN 105201194B
Authority
CN
China
Prior art keywords
anchors
gas chamber
buckle
panels
supporting layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510440489.9A
Other languages
Chinese (zh)
Other versions
CN105201194A (en
Inventor
张凤勇
李世嵩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai Mcc No13 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mcc No13 Construction Co Ltd filed Critical Shanghai Mcc No13 Construction Co Ltd
Priority to CN201510440489.9A priority Critical patent/CN105201194B/en
Publication of CN105201194A publication Critical patent/CN105201194A/en
Application granted granted Critical
Publication of CN105201194B publication Critical patent/CN105201194B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to engineering works Demolition Construction field, it is particularly used for removing the connection system for guide rail of large-scale gas chamber;It includes operating space module, it is characterized in that:Also include wall draw piece;Wall draw piece includes cylinder, capping, two panels anchors, rotating shaft and coil spring, cylinder one end is provided with notch, anchors is in notch, two panels anchors through the cylinder side end and is rotated connection by rotating shaft, coil spring is also arranged in rotating shaft and the two ends of coil spring are connected with two panels anchors respectively, so that realizing that elastic rotation is connected between two panels anchors, capping is at the cylinder side end opening and then limits the resilience amplitude of anchors, and two overlapping steel pipes for constituting longitudinal horizontal bracing are connected by clip with cylinder respectively.This connection system for guide rail uses said structure design, and it makes easy, easy for installation, with strong points, simple to operate, improves gas chamber and removes the efficiency of construction of operation and ensure that engineering safety, reduces engineering cost.

Description

Connection system for guide rail for removing large-scale gas chamber
Technical field
The present invention relates to engineering works Demolition Construction field, it is particularly used for removing the scaffold system of large-scale gas chamber System.
Background technology
In the Demolition Construction of large-scale gas chamber, without special connection system for guide rail, installed using only common scaffold In the outer surface of gas chamber, due to traditional scaffold in setting it is inconvenient, can influence to remove the construction speed of operation, thus compared with The step of multiple-project eliminates installation scaffold, and then make the safety of operating personnel be difficult to be guaranteed;Meanwhile, it is large-scale cutting A large amount of fiery slags can be produced during gas chamber, such as without unified collection, then also there are a large amount of hidden fire-fighting dangers.
The content of the invention
It is an object of the present invention to provide it is a kind of install, the easy to use, connection system for guide rail that can be used in turn, it can Gas chamber is improved to remove the efficiency of operation and improve the security for removing operation.
In order to achieve the above object, the present invention is realized in:
A kind of connection system for guide rail for being used to remove large-scale gas chamber, it includes the multilayer planar branch of level laying from top to bottom Support layer and tiltedly choose layer for connect levels horizontal support layer;Vertically disposed joint steel pipe is used between each planar support layer Connection;Planar support layer includes top horizontal supporting layer and remaining horizontal support layer being disposed below, top horizontal supporting layer The plane longitudinal bracing overlapped including two steel pipes, remaining horizontal support layer includes the plane longitudinal direction branch that single steel pipe is constituted Support;Wherein, two steel pipes for supporting layer plane longitudinal bracing as top horizontal are fixed on one by steel tube fastener respectively The two ends of anchor tube, the anchor tube is arranged on the sash rib of gas chamber outer wall vertically;Remaining horizontal support layer plane is constituted to indulge It is connected to realize the connection with gas chamber outer surface with a wall draw piece by steel tube fastener to the single steel pipe of support;It is described Wall draw piece includes cylinder, capping, two panels anchors, rotating shaft and coil spring, and cylinder one end is symmetrical above and below to be provided with two notches, two panels Anchors is in the notch, and two panels anchors through the cylinder side end and is rotated connection by rotating shaft, and coil spring, which is also arranged in, to be turned On the axle and two ends of coil spring are connected with two panels anchors respectively, so that realize that elastic rotation is connected between two panels anchors, envelope It is covered at the cylinder side end opening and then limits the resilience amplitude of anchors;In top horizontal supporting layer and remaining each level branch Buckle is equipped with support layer.
The described connection system for guide rail for being used to remove large-scale gas chamber, in addition to fiery slag collecting vessel, the fiery slag collecting vessel bag Staving, magnet and handle are included, staving open top and lateral wall are provided with handle, and magnet is on the inwall of staving madial wall; The madial wall of staving is in the circular arc of indent, and the outer surface of its gas chamber that is used to fitting, magnet is received whole fiery slag by magnetic force Collection bucket is adsorbed on the outer surface of gas chamber.
The described connection system for guide rail for being used to remove large-scale gas chamber, is laid on top horizontal supporting layer and remaining each level Buckle on supporting layer includes horizontal buckle and longitudinal buckle of several laterally consecutive layings, the horizontal buckle, longitudinal buckle Constituted by symmetrically arranged pull bar and the connection sheet being layed between two pull bars and for two pull bars to be connected, the pull bar is in Direct rod shape, its both ends are bent downwards, when buckle is laid on supporting layer, the kink formation drag hook at pull bar both ends, so that Buckle is held on the steel pipe for constituting supporting layer, horizontal buckle after supporting layer fastening with forming operating surface, and longitudinal buckle is continuous Laterally lay and with forming working face after supporting layer fastening.
This connection system for guide rail uses said structure design, and it makes easy, easy for installation, with strong points, simple to operate, carries High gas chamber removes the efficiency of construction of operation and ensure that engineering safety, reduces engineering cost.
Brief description of the drawings
Fig. 1 is the side view of this connection system for guide rail.
Fig. 2 is the top view of this connection system for guide rail.
Fig. 3 is the structural representation of wall draw piece.
Fig. 4 is the installation steps schematic diagram of wall draw piece.
Fig. 5 is the side view of buckle.
Fig. 6 is the top view of buckle.
Fig. 7 is the structural representation of fiery slag collecting vessel.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of connection system for guide rail for being used to remove large-scale gas chamber, as shown in Figure 1 and Figure 2, it spreads including level from top to bottom If multilayer planar supporting layer and for by levels horizontal support layer connect tiltedly choose layer 5;With vertical between each planar support layer The joint steel pipe connection directly set;Planar support layer includes top horizontal supporting layer 3 and remaining horizontal support being disposed below Layer 4, top horizontal supporting layer 3 includes the plane longitudinal bracing that two steel pipes are overlapped, and remaining horizontal support layer 4 includes single The plane longitudinal bracing that steel pipe is constituted;Wherein, pass through respectively as two steel pipes of the plane longitudinal bracing of top horizontal supporting layer 3 Steel tube fastener and the two ends for being fixed on an anchor tube, the anchor tube are arranged on the sash rib 2 of the outer wall of gas chamber 1 vertically;Structure Into remaining plane longitudinal bracing of horizontal support layer 4 single steel pipe by steel tube fastener be connected with a wall draw piece so as to realize with The connection of the outer surface of gas chamber 1;The wall draw piece as described in Fig. 3,4 includes cylinder 10, capping 11, two panels anchors 12,13, the and of rotating shaft 14 Coil spring 15, the one end of cylinder 10 is symmetrical above and below to be provided with two notches, and two panels anchors 12,13 is in the notch, rotating shaft 14 Through the side end of cylinder 10 and two panels anchors 12,13 is rotated and connected, coil spring 15 is also arranged in rotating shaft 14 and rolls up bullet The two ends of spring 15 are connected with two panels anchors 12,13 respectively, so that realize that elastic rotation is connected between two panels anchors 12,13, envelope Lid 11 is at the cylinder 10 side end opening and then limits the resilience amplitude of anchors 12,13;In top horizontal supporting layer 3 and respectively Buckle is equipped with remaining horizontal support layer 4.
As shown in fig. 7, the described connection system for guide rail for being used to remove large-scale gas chamber, in addition to fiery slag collecting vessel, the fire Slag collecting vessel includes staving 19, magnet 21 and handle 20, and the open top of staving 19 and lateral wall are provided with handle 20, and magnet 21 is set In on the inwall of the madial wall of staving 19;The madial wall of staving 19 is in the circular arc of indent, the appearance of its gas chamber 1 that is used to fitting Whole fiery slag collecting vessel is adsorbed on the outer surface of gas chamber 1 by face, magnet 21 by magnetic force.
As shown in Fig. 2 the described connection system for guide rail for being used to remove large-scale gas chamber, is laid on top horizontal supporting layer 3 Include horizontal buckle 7 and longitudinal buckle 6 of several laterally consecutive layings, such as Fig. 5,6 with the buckle on remaining each horizontal support layer 4 Shown, the horizontal buckle 7, longitudinal buckle 6 are by symmetrically arranged pull bar 8 and are layed between two pull bars 8 and for by two The connection sheet 9 that pull bar 8 is connected is constituted, and the pull bar 8 is in direct rod shape, and its both ends is bent downwards, and buckle is laid on supporting layer When, the both ends of pull bar 8 kink formation drag hook so that by buckle be held in constitute supporting layer steel pipe on, horizontal buckle 7 with Operating surface is formed after supporting layer fastening, longitudinal continuous transverse of buckle 6 is laid and with forming working face after supporting layer fastening.
As shown in figure 4, the installation method of wall draw piece is:
1st, punched in gas chamber steel wall;
2nd, wall draw piece is carried in the incoming hole in end of anchors and opens anchors, whole wall draw piece is anchored at gas chamber On 1 steel wall;
3rd, the single steel pipe for constituting remaining plane longitudinal bracing of horizontal support layer 4 is locked by steel tube fastener and wall draw piece Jail.
This connection system for guide rail uses said structure design, and it makes easy, easy for installation, with strong points, simple to operate, carries High gas chamber removes the efficiency of construction of operation and ensure that engineering safety, reduces engineering cost.

Claims (3)

1. a kind of connection system for guide rail for being used to remove large-scale gas chamber, it is characterized in that:It includes many of level laying from top to bottom Layer plane supporting layer and for by levels horizontal support layer connect tiltedly choose layer;With vertically disposed between each planar support layer Joint steel pipe is connected;Planar support layer includes top horizontal supporting layer and remaining horizontal support layer being disposed below, top water Flat supporting layer includes the plane longitudinal bracing that two steel pipes are overlapped, and remaining horizontal support layer includes the flat of single steel pipe composition Face longitudinal bracing;Wherein, two steel pipes of layer plane longitudinal bracing are supported to consolidate respectively by steel tube fastener as top horizontal Due to the two ends of an anchor tube, the anchor tube is arranged on the sash rib of gas chamber outer wall vertically;Constitute remaining horizontal support The single steel pipe of layer plane longitudinal bracing is connected to realize and gas chamber outer surface by steel tube fastener with a wall draw piece Connection;The wall draw piece includes cylinder, capping, two panels anchors, rotating shaft and coil spring, and cylinder one end is symmetrical above and below to be provided with two Notch, two panels anchors is in the notch, and two panels anchors through the cylinder side end and is rotated connection by rotating shaft, and coil spring is also It is arranged in rotating shaft and the two ends of coil spring is connected with two panels anchors respectively, so that realizes elastic rotation between two panels anchors Connection, capping is at the cylinder side end opening and then limits the resilience amplitude of anchors;In top horizontal supporting layer and Ge Qi Buckle is equipped with remaining horizontal support layer.
2. the connection system for guide rail according to claim 1 for being used to remove large-scale gas chamber, it is characterized in that:Also include fiery slag to receive Collect bucket, the fiery slag collecting vessel includes staving, magnet and handle, and staving open top and lateral wall are provided with handle, and magnet is located at On the inwall of staving madial wall;The madial wall of staving is in the circular arc of indent, and the outer surface of its gas chamber that is used to fitting, magnet leads to Cross magnetic force whole fiery slag collecting vessel is adsorbed on the outer surface of gas chamber.
3. the connection system for guide rail according to claim 1 for being used to remove large-scale gas chamber, it is characterized in that:It is laid on top water Buckle on flat supporting layer and remaining each horizontal support layer includes horizontal buckle and longitudinal buckle of several laterally consecutive layings, institute Horizontal buckle, longitudinal buckle are stated by symmetrically arranged pull bar and the company between two pull bars and for two pull bars to be connected is layed in Contact pin is constituted, and the pull bar is in direct rod shape, and its both ends is bent downwards, when buckle is laid on supporting layer, pull bar both ends Kink formation drag hook, so as to buckle is held on the steel pipe for constituting supporting layer, horizontal buckle after supporting layer fastening with forming Operating surface, longitudinal buckle continuous transverse is laid and with forming working face after supporting layer fastening.
CN201510440489.9A 2015-07-24 2015-07-24 Connection system for guide rail for removing large-scale gas chamber Active CN105201194B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510440489.9A CN105201194B (en) 2015-07-24 2015-07-24 Connection system for guide rail for removing large-scale gas chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510440489.9A CN105201194B (en) 2015-07-24 2015-07-24 Connection system for guide rail for removing large-scale gas chamber

Publications (2)

Publication Number Publication Date
CN105201194A CN105201194A (en) 2015-12-30
CN105201194B true CN105201194B (en) 2017-08-25

Family

ID=54949120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510440489.9A Active CN105201194B (en) 2015-07-24 2015-07-24 Connection system for guide rail for removing large-scale gas chamber

Country Status (1)

Country Link
CN (1) CN105201194B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113369B (en) * 2018-10-04 2020-07-31 司风兵 Safe demolition method for manual demolition of cylindrical building
CN109372260A (en) * 2018-11-16 2019-02-22 中国二十二冶集团有限公司 Chimney reinforces scaffold connection construction method
CN111502221A (en) * 2020-04-24 2020-08-07 付祖伟 Dismounting-free scaffold for construction of building external wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0821083A (en) * 1994-07-07 1996-01-23 Kawasaki Heavy Ind Ltd Spherical tank internal scaffold device
CN1313923A (en) * 1999-07-28 2001-09-19 汇隆棚业有限公司 Scaffolding
GB2419372A (en) * 2004-10-21 2006-04-26 Alun Willis A scaffolding tie
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN103243900A (en) * 2013-05-13 2013-08-14 蒙理明 Wall connecting assembly of steel pipe scaffold
CN203846750U (en) * 2014-05-21 2014-09-24 云南建工安装股份有限公司 Buoyancy lift and turnover type external scaffolding tooling device special for installation of gas holder
CN205116682U (en) * 2015-07-24 2016-03-30 上海十三冶建设有限公司 A scaffold system for removing large -scale gas chamber

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0821083A (en) * 1994-07-07 1996-01-23 Kawasaki Heavy Ind Ltd Spherical tank internal scaffold device
CN1313923A (en) * 1999-07-28 2001-09-19 汇隆棚业有限公司 Scaffolding
GB2419372A (en) * 2004-10-21 2006-04-26 Alun Willis A scaffolding tie
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN103243900A (en) * 2013-05-13 2013-08-14 蒙理明 Wall connecting assembly of steel pipe scaffold
CN203846750U (en) * 2014-05-21 2014-09-24 云南建工安装股份有限公司 Buoyancy lift and turnover type external scaffolding tooling device special for installation of gas holder
CN205116682U (en) * 2015-07-24 2016-03-30 上海十三冶建设有限公司 A scaffold system for removing large -scale gas chamber

Also Published As

Publication number Publication date
CN105201194A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN105201194B (en) Connection system for guide rail for removing large-scale gas chamber
CN109972623A (en) A kind of construction method and device carrying out pipeline suspension using Bailey beam
CN203270578U (en) Underground pile removing apparatus provided with steel wire rope clamps
CN203583493U (en) Combined lattice steel frame spray anchoring foundation pit supporting structure
CN204282851U (en) The protective guard that a kind of building operations is provisional
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN205116682U (en) A scaffold system for removing large -scale gas chamber
CN209839352U (en) Horizontal mounting bracket for heavy pipeline of steel structure building
CN202658867U (en) Overhanging construction platform
CN206159649U (en) Pipeline suspends bracket in midair
CN204238443U (en) A kind of detachable suspension column fastening devices
CN104343406B (en) Horizontal directional drill emergency device and its application process
CN103334433B (en) A kind of construction method of pile pulling
CN209397944U (en) A kind of safety belt suspension device of falling from high altitude when preventing construction
CN208535316U (en) Assembled piping lane bracket
CN204358665U (en) A kind of reversing warning lamp bearing
CN206769387U (en) Different labels concrete blocking apparatus
CN206396757U (en) New Anchor Cable removes machine
CN206858018U (en) A kind of tool-type tower crane passageway
CN205421332U (en) Contrary coincide underground continuous wall that does of a core section of thick bamboo
CN204326658U (en) LNG storage tank reinforced mesh wind-resistant column bracing means
CN205476507U (en) Inside pump line fixing device of jacking platform
CN204753607U (en) That encloses purlin hangs muscle construction structures
CN212958686U (en) Combined type easily-detachable gangue blocking frame for coal face
CN203755712U (en) Multifunctional high-rise building border protection steel pipe fixing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Fengyong

Inventor after: Duan Rongzong

Inventor after: Li Shisong

Inventor before: Zhang Fengyong

Inventor before: Li Shisong

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 2469, Baoshan District iron road, Shanghai, Shanghai

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: No. 2469, Baoshan District iron road, Shanghai, Shanghai

Patentee before: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190730

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: China Twenty Metallurgical Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: Shanghai twenty Metallurgical Construction Co., Ltd.