CN206159649U - Pipeline suspends bracket in midair - Google Patents

Pipeline suspends bracket in midair Download PDF

Info

Publication number
CN206159649U
CN206159649U CN201620896343.5U CN201620896343U CN206159649U CN 206159649 U CN206159649 U CN 206159649U CN 201620896343 U CN201620896343 U CN 201620896343U CN 206159649 U CN206159649 U CN 206159649U
Authority
CN
China
Prior art keywords
bracket
pipeline
cross bar
suspension
vertical rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620896343.5U
Other languages
Chinese (zh)
Inventor
熊竺
杨燕伟
叶丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201620896343.5U priority Critical patent/CN206159649U/en
Application granted granted Critical
Publication of CN206159649U publication Critical patent/CN206159649U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a pipeline suspends bracket in midair, include bracket pole setting, bracket horizontal pole, hanging flower basket and hang the jib, the bottom of bracket pole setting and the steel sheet fixed connection of hat back setting, the top of bracket pole setting and the one end fixed connection of bracket horizontal pole, the top fixed connection of the other end through hanging jib and hanging flower basket of bracket horizontal pole, place the pipeline in the hanging flower basket. The utility model discloses a simple and easy steel construction welds to be assembled, utilizes the hanging flower basket method to carry out suspending in midair of pipeline, can according to the trend of pipeline to each pipeline suspends bracket in midair's width with highly carry out the appropriate allocation, simple manufacture can guarantee the safety of normal position pipeline when the excavation is moved back to foundation ditch construction and pipeline.

Description

A kind of conduit wiring suspension bracket
Technical field
The utility model belongs to underground engineering field, and in particular to for a kind of conduit wiring suspension bracket.
Background technology
For many China Democratic National Construction Associations and the deep basal pit of subway station, because construction site is restricted, the pipeline near foundation ditch away from Close to foundation ditch, pipeline carried out moving back during deep foundation pit construction and after the completion of foundation pit construction process when, can be attached to foundation ditch Near pipeline is impacted.Traditional processing mode is to carry out insulation blocking to pipeline, by the way of isolation dress or reinforcing, Cost is higher, and the duration is longer, and pipeline there is also larger security risk hidden danger during reinforcing.
Utility model content
A kind of simple structure is provided to solve above-mentioned technical problem the utility model, cabling is flexible, in Construction stage of Deep Excavation Between and foundation pit construction after the completion of pipeline is carried out moving back process when, will not be to the foundation ditch conduit wiring suspension that nearby pipeline be impacted Bracket.
The technical scheme that the utility model is adopted for:
A kind of conduit wiring suspension bracket, including bracket vertical rod, bracket cross bar, hanging basket and suspension suspension rod, the bracket vertical rod The Interal fixation that bottom is arranged with Guan Liang top is connected, and the top of bracket vertical rod is fixedly connected with one end of bracket cross bar, the support The other end of frame cross bar is fixedly connected by hanging suspension rod with the top of hanging basket, and in the hanging basket pipeline is placed.
Preferably, the hanging basket is by the two blocks of steel plates of two blocks of steel plates and connection below being arranged on pipeline top and pipeline Round steel composition, it is described suspension suspension rod together with the Interal fixation above pipeline.
Preferably, be provided with a diagonal brace between the bracket vertical rod and bracket cross bar, the diagonal brace and bracket vertical rod A block welding backing plate is respectively provided with the junction of bracket cross bar.
Preferably, the bracket vertical rod is identical with the length of bracket cross bar, and the bracket vertical rod and bracket cross bar Length is respectively less than 1500mm.
Preferably, the bracket vertical rod is welded with bracket cross bar using Two bors d's oeuveres channel-section steel.
Preferably, the bracket cross bar is respectively provided with up and down two blocks of batten plates.
Preferably, the diagonal brace is welded using Two bors d's oeuveres angle steel.
Preferably, the length for hanging suspension rod is the 1/3~1/2 of bracket vertical rod length.
This programme has the advantages that compared with prior art:
1st, a kind of conduit wiring suspension bracket that the utility model is provided, by fixed in the top bar planting of foundation pit enclosure structure Guan Liang One block of steel plate ensure that deep foundation pit construction as the basis of whole conduit wiring suspension bracket during pipeline safety.
2nd, the utility model carries out the suspention of pipeline using hanging basket method, single bracket can be adjusted flexibly according to the trend of pipeline Width and height, make simple, it is ensured that foundation pit construction and pipeline are moved back the safety of pipeline in situ when excavating.
3rd, the material needed for the conduit wiring suspension bracket that the utility model is provided can be using existing processing steel on building site Material, it is not necessary to carry out outside buying, reduces processing and use cost, while with bolts between most of parts Or welding procedure is relatively easy.
Description of the drawings
Fig. 1 is a kind of structural representation of conduit wiring suspension bracket of the utility model;
Shown in figure:1st, bracket vertical rod, bracket cross bar, hanging basket and suspension rod is hung, 2, bracket cross bar, 3, hanging basket, 4, hang Suspension rod, 5, diagonal brace, 6, backing plate, 7, batten plate.
Specific embodiment
In order that the purpose of the utility model embodiment, technical scheme and advantage are clearer, below in conjunction with this practicality Technical scheme in new embodiment carries out clear, complete description, it is clear that described embodiment is portion of the present utility model Divide embodiment, rather than whole embodiments.Based on embodiment of the present utility model, those of ordinary skill in the art are not paying The every other embodiment obtained on the premise of creative work, belongs to protection domain of the present utility model.
As shown in figure 1, a kind of conduit wiring suspension bracket is present embodiments provided, including bracket vertical rod 1, bracket cross bar 2, hanging basket 3 and hang suspension rod 4, the Interal fixation that the bottom of the bracket vertical rod 41 is arranged with Guan Liang top is connected, the top of bracket vertical rod 1 and One end of bracket cross bar 2 is fixedly connected, and the other end of the bracket cross bar 2 is connected by hanging suspension rod 3 and fixing with the top of hanging basket 4 Connect, pipeline is placed in the hanging basket 4.
As shown in figure 1, on foundation pit enclosure structure Guan Liang top, one block of thickness 20mm steel plate is fixed with 4 18 (HRB400) bar plantings, Basic as bracket vertical rod 1, the bracket vertical rod 1 is welded using 10# Two bors d's oeuveres channel-section steel, and vertical rod is connected with Guan Liang top steel plate full weld, To ensure Two bors d's oeuveres channel-section steel globality, strengthened using batten plate 7 in position while welding, according to the trend and the needs of site operation of pipeline Each height of bracket vertical rod 1 can be separately provided according to pipeline actual height.
The bracket cross bar 2 is identical with bracket vertical rod 1 to be also adopted by the welding of 10# Two bors d's oeuveres channel-section steel, one end and the support of bracket cross bar 2 The top for erecting bar 1 is fixedly connected, and the other end of bracket cross bar 2 is fixedly connected (the present embodiment with the upper end 3 for hanging suspension rod 3 Described in be fixedly connected can be bolt connection can also be welding, but do not limit with this its protection domain), the support Two blocks of batten plates 7 of Ge Jia up and down of frame cross bar 2.When Guan Liang edge is not waited away from pipe center distance, the length of bracket cross bar 2 can basis On-site actual situations determine.
A diagonal brace 5 is provided between the bracket vertical rod 1 and bracket cross bar 2, it is described oblique as the preferred of the present embodiment Support 5 is a 70# Two bors d's oeuveres angle steel, and the diagonal brace 5 is respectively provided with a block welding pad with the junction of bracket vertical rod 1 and bracket cross bar 2 Plate 6, the backing plate 6 is the thick steel plates of one piece of 5mm, is welded into diagonal brace 5, bracket vertical rod 1, bracket cross bar 2 by backing plate 6 whole Body.In order to the construction for ensureing coordinative construction scene needs and prevents the conduit wiring suspension bracket during construction from producing rollover, institute State that bracket vertical rod 1 is identical with the length of bracket cross bar 2, and the bracket vertical rod 1 is respectively less than with the length of bracket cross bar 2 1500mm。
The hanging basket 4 is by the round steel group being arranged on above pipeline with two blocks of steel plates of two blocks of steel plates below pipeline and connection Into the suspension suspension rod 3 is together with the Interal fixation above pipeline.Groove is dug below pipeline, by long 35cm, wide 10cm, Thick 2cm steel plates are placed on pipeline lower section, and same equally above pipeline to place one piece, two blocks of steel plates are connected with a diameter of 20 round steel, Round steel fixes (for convenience of being connected, finely tuning, steel plate bolt hole is slotted eye) with steel plate nut, forms " hanging basket " shape, Pipeline is sling.When pipeline caliber is less, space is stoppered with timber wedge between pipeline and round steel, prevents pipeline to be displaced sideways.It is described outstanding Hang suspension rod 3 also to connect using the round steel of diameter 20, nut is fixed, tightens, " hanging basket " and pipeline are sling, and round steel length can root It is adjusted according to on-site actual situations.
The conduit wiring suspension bracket that the utility model is provided is arranged at one, when pipe network ditch of moving back along 4~6m of foundation ditch fore-and-aft distance When groove is excavated near bracket, each bolt screw thread on hanging basket 4 need to be added stubborn half-turn by groove construction side again, hang whole pipeline Hang bracket and reach stress in advance, play camber effect, the unexpected stress of prevention earth's surface pipeline is sunk, and eliminates pipeline safety hidden Suffer from.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in the utility model Protection domain within.

Claims (5)

1. a kind of conduit wiring suspension bracket, it is characterised in that:Including bracket vertical rod, bracket cross bar, hanging basket and suspension suspension rod, the support The Interal fixation that the bottom of erection bar is arranged with Guan Liang top is connected, and the top of bracket vertical rod is fixed with one end of bracket cross bar and connected Connect, the other end of the bracket cross bar is fixedly connected by hanging suspension rod with the top of hanging basket, and in the hanging basket pipeline is placed;
The hanging basket is made up of the round steel of the two blocks of steel plates of two blocks of steel plates and connection below being arranged on pipeline top and pipeline, institute State suspension suspension rod to weld together with the steel plate above pipeline;The round steel is fixed with the steel plate with nut, steel plate bolt hole It is slotted eye;
The bracket vertical rod is identical with the length of bracket cross bar, and the bracket vertical rod is respectively less than with the length of bracket cross bar 1500mm;
The length for hanging suspension rod is the 1/3~1/2 of bracket vertical rod length;
When pipe network channel excavation is moved back to the bracket, again each bolt screw thread on the hanging basket is added into stubborn half-turn.
2. a kind of conduit wiring suspension bracket according to claim 1, it is characterised in that:In the bracket vertical rod and bracket cross bar Between be provided with a diagonal brace, the diagonal brace is respectively provided with a block welding backing plate with the junction of bracket vertical rod and bracket cross bar.
3. a kind of conduit wiring suspension bracket according to claim 1, it is characterised in that:The bracket vertical rod is equal with bracket cross bar It is welded using Two bors d's oeuveres channel-section steel.
4. a kind of conduit wiring suspension bracket according to claim 1, it is characterised in that:The bracket cross bar is respectively provided with up and down Two blocks of batten plates.
5. a kind of conduit wiring suspension bracket according to claim 2, it is characterised in that:The diagonal brace is welded using Two bors d's oeuveres angle steel Form.
CN201620896343.5U 2016-08-18 2016-08-18 Pipeline suspends bracket in midair Active CN206159649U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620896343.5U CN206159649U (en) 2016-08-18 2016-08-18 Pipeline suspends bracket in midair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620896343.5U CN206159649U (en) 2016-08-18 2016-08-18 Pipeline suspends bracket in midair

Publications (1)

Publication Number Publication Date
CN206159649U true CN206159649U (en) 2017-05-10

Family

ID=58648189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620896343.5U Active CN206159649U (en) 2016-08-18 2016-08-18 Pipeline suspends bracket in midair

Country Status (1)

Country Link
CN (1) CN206159649U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023712A (en) * 2017-05-27 2017-08-08 南昌浩牛科技有限公司 A kind of transport burial equipment buried for underground piping
CN110701384A (en) * 2019-11-04 2020-01-17 中建一局集团第一建筑有限公司 Pipe joint reinforcing method during hanging of socket pipe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023712A (en) * 2017-05-27 2017-08-08 南昌浩牛科技有限公司 A kind of transport burial equipment buried for underground piping
CN107023712B (en) * 2017-05-27 2019-03-08 北京京水建设集团有限公司 One kind transport burial equipment inbuilt for underground piping
CN110701384A (en) * 2019-11-04 2020-01-17 中建一局集团第一建筑有限公司 Pipe joint reinforcing method during hanging of socket pipe
CN110701384B (en) * 2019-11-04 2021-08-13 中建一局集团第一建筑有限公司 Pipe joint reinforcing method during hanging of socket pipe

Similar Documents

Publication Publication Date Title
CN206159649U (en) Pipeline suspends bracket in midair
CN203583493U (en) Combined lattice steel frame spray anchoring foundation pit supporting structure
CN102926554B (en) Steel hanging seat shuttering supporting and construction method thereof
CN105782576B (en) Fluted tube line guard method is excavated below interim pipeline
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN209523198U (en) A kind of underpinning structure supporting lattice column
CN107060093B (en) The support system and assembling method of large-scale oblique braiding gusset plate latticed shell structure
CN205504219U (en) Interim pipeline below hoist and mount bracket
CN205776259U (en) A kind of deep basal pit retaining wall one side formwork constructing device
CN105152039A (en) Slope building tower crane ultralong attachment device and slope building inverted sequence construction method
CN204849792U (en) Precipitation well well casing underpins support
CN209323527U (en) A kind of frame-type double-row pile foundation pit enclosure structure
CN203795824U (en) Suspension type fastener scaffold erecting device
CN207633773U (en) A kind of glomeration building prefabricated construction reinforcing bar guiding tube dismounting system
CN207063676U (en) Swing suspension column
CN218176635U (en) Caisson support rod for floor settlement
CN214743759U (en) Foundation pit pipeline suspension frame
CN207776412U (en) It is a kind of to prevent sagging assembly braced frame pedestal for building
CN206722856U (en) A kind of construction working platform for vertical shaft grouting behind shaft or drift lining
CN201627203U (en) Revolvable ground anchor device for single-side support form
CN206128082U (en) Foundation fit base plate or floor slab rebar wear transform structure of shaped steel stand
CN204590553U (en) Semi-automaticly climb formula exterior wall safeguard structure
CN211371492U (en) Formula antidetonation pipeline bracket sways
CN205742960U (en) A kind of vertical scaffold reinforcement assembly across Bars In Poured Concrete Slab
CN203782717U (en) Connecting device for hanging plates in deep foundation pit supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180605

Address after: 650206 Kunming, Guandu, Yunnan province Guandu town Guangfu Road 5349, Yinhai Cherry Blossom happiness square F

Co-patentee after: The forth Survey and Design Institute (Group) Co., Ltd. Of CRCC

Patentee after: SW survey and Design Co., Ltd.

Address before: 432100 No. 745, Ping Yuan Road, Yangyuan, Wuchang, Wuhan, Hubei

Patentee before: The forth Survey and Design Institute (Group) Co., Ltd. Of CRCC