CN214743759U - Foundation pit pipeline suspension frame - Google Patents

Foundation pit pipeline suspension frame Download PDF

Info

Publication number
CN214743759U
CN214743759U CN202120596737.XU CN202120596737U CN214743759U CN 214743759 U CN214743759 U CN 214743759U CN 202120596737 U CN202120596737 U CN 202120596737U CN 214743759 U CN214743759 U CN 214743759U
Authority
CN
China
Prior art keywords
bracket
otic placode
pipeline
horizontal pole
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120596737.XU
Other languages
Chinese (zh)
Inventor
赖永标
陈招军
杨黎明
杨扬
刘振伟
李�浩
李志展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Tietou Rail Transit Construction Co ltd
China State Railway Investment Construction Group Co Ltd
Original Assignee
China Construction Tietou Rail Transit Construction Co ltd
China State Railway Investment Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Tietou Rail Transit Construction Co ltd, China State Railway Investment Construction Group Co Ltd filed Critical China Construction Tietou Rail Transit Construction Co ltd
Priority to CN202120596737.XU priority Critical patent/CN214743759U/en
Application granted granted Critical
Publication of CN214743759U publication Critical patent/CN214743759U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a foundation ditch pipeline suspension bracket, including bracket horizontal pole, bracket pole setting, bracket oblique pull rod, hanging beam and suspension jib, U type bolt and crown beam top fixed connection are passed through to bracket horizontal pole one end, the one end that the bracket horizontal pole was equipped with U type bolt is equipped with otic placode one, and the other end is equipped with otic placode two, bracket pole setting bottom is through otic placode three and bracket horizontal pole otic placode fixed connection, and the other end passes through otic placode four and bracket oblique pull rod is connected, bracket oblique pull rod one end is equipped with the otic placode five of being connected with the bracket pole setting, and the other end is equipped with the otic placode six of being connected with bracket horizontal pole otic placode two, the bracket horizontal pole sets up the top fixed connection of hanging jib and hanging beam bottom the one end of otic placode two, place the pipeline in the hanging beam, the utility model provides a pipeline suspension bracket, has ensured the pipeline safety during deep construction period through the basis of hanging bracket in foundation ditch enclosure crown beam top U type bolt as whole pipeline suspension bracket .

Description

Foundation pit pipeline suspension frame
Technical Field
The utility model relates to an underground works field, concretely relates to foundation ditch pipeline suspension frame.
Background
For the deep foundation pit of many civil constructions and subway station, because the construction site receives the restriction, near the pipeline of foundation pit is nearer apart from the foundation pit, during the deep foundation pit construction and when accomplishing the back migration processing to the pipeline after the foundation pit construction, all can cause the influence to the pipeline near the foundation pit. The traditional processing mode is to carry out isolation protection on the pipeline, and an isolation device or a reinforcement mode is adopted, so that the cost is higher, the construction period is longer, and the pipeline has larger potential safety risk hazards during reinforcement.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a technical scheme does: the utility model provides a foundation ditch pipeline frame that suspends in midair, includes bracket horizontal pole, bracket pole setting, bracket oblique pull rod, hanging beam and hangs the jib, U type bolt and crown beam top fixed connection are passed through to bracket horizontal pole one end, the one end that the bracket horizontal pole was equipped with U type bolt is equipped with otic placode one, and the other end is equipped with otic placode two, bracket pole setting bottom is through otic placode three and bracket horizontal pole otic placode fixed connection, and the other end passes through otic placode four and bracket oblique pull rod connection, bracket oblique pull rod one end is equipped with the otic placode five of being connected with the bracket pole setting, and the other end is equipped with the otic placode six of being connected with bracket horizontal pole otic placode two, the bracket horizontal pole sets up the top fixed connection of the one end bottom of otic placode two through hanging jib and hanging beam, place the pipeline in the hanging beam.
As an improvement, the bracket cross rod and the bracket upright rod are made of I-shaped steel.
As an improvement, the hanging beam is angle steel.
As an improvement, the bracket diagonal draw bar is a single steel pipe.
As an improvement, the lengths of the bracket cross rod and the bracket vertical rod are both less than 1500 mm.
As an improvement, the length of the hanging rod is 1/3-1/2 of the length of the cross rod of the bracket.
After the structure more than adopting, the utility model has the advantages of as follows: 1. the utility model provides a pair of pipeline suspends bracket in midair has ensured the pipeline safety during the deep basal pit construction through the basis of suspending the bracket in midair as whole pipeline at the pre-buried U type bolt in foundation ditch envelope crown beam top.
2. The utility model discloses utilize the hanging beam method to carry out hanging in midair of pipeline, can be according to the width and the height of the nimble single bracket of adjustment of the trend of pipeline, simple manufacture can guarantee the safety of in situ pipeline when foundation ditch construction and pipeline migrate back and excavate.
3. The utility model provides a required material of pipeline suspension bracket all can use the current processing steel in ground, need not carry out outside purchase, has reduced processing and use cost, all adopts bolted connection or welding process simple relatively between most spare parts simultaneously, improves material turnover rate and utilization ratio.
Drawings
Fig. 1 is a schematic structural view of a foundation pit pipeline suspension frame according to the present invention.
Fig. 2 is a schematic view of a three-dimensional structure of a foundation pit pipeline suspension frame according to the present invention.
As shown in the figure: 1. a bracket cross rod 2, a bracket upright rod 3, a bracket diagonal draw bar 4, a hanging beam 5, a hanging suspension rod 6 and a U-shaped bolt,
Detailed Description
Combine the attached drawing, a foundation ditch pipeline suspension frame, including bracket horizontal pole 1, bracket pole setting 2, bracket oblique pull rod 3, hanging beam 4 and hang jib 5, U type bolt 6 and crown beam top fixed connection are passed through to 1 one end of bracket horizontal pole, bracket horizontal pole 1 is equipped with U type bolt 6's one end and is equipped with otic placode one 7, and the other end is equipped with otic placode two 8, three 9 and 7 fixed connection of bracket horizontal pole otic placode ear are passed through to 2 bottoms of bracket pole setting, and the other end passes through otic placode four 10 and is connected with bracket oblique pull rod 3, bracket oblique pull rod 3 one end is equipped with the otic placode five 11 of being connected with bracket pole setting 2, and the other end is equipped with the otic placode six 12 of being connected with bracket horizontal pole otic placode two 8, bracket horizontal pole 1 sets up the top fixed connection of the bottom of the one end of otic placode two 8 through hanging jib 5 and hanging beam 4, place the pipeline in the hanging beam 4.
As a preferred embodiment of the present embodiment, the bracket cross bar 1 and the bracket upright bar 2 are i-shaped steel.
As a preferred embodiment of the present embodiment, the hanging beam 4 is an angle iron.
In a preferred embodiment of the present invention, the bracket diagonal draw bar 3 is a single steel pipe.
As the preferred embodiment of the embodiment, the lengths of the bracket cross rod 1 and the bracket upright rod 2 are both less than 1500 mm.
As a preferred embodiment of the embodiment, the length of the suspension hanger 5 is 1/3-1/2 of the length of the bracket cross bar 1.
As shown in the figure, 2 pre-buried U-shaped bolts with the diameter of 20mm are used as a base of a bracket cross rod on the top of a crown beam of a foundation pit support structure, the bracket cross rod is made of 10# I-steel, and the bracket cross rod is connected with the top of the crown beam through bolts; the bracket upright stanchion and the bracket cross rod are made of 10# I-steel, one end of the bracket cross rod is in bolted connection with the top of the bracket upright stanchion, and the other end of the bracket cross rod is fixedly connected with the upper end of the suspension hanger rod; the bracket diagonal draw bar is a phi 48.3 multiplied by 3.5mm, the joints of the bracket diagonal draw bar, the bracket cross rod and the bracket upright rod are respectively provided with a welding lug plate, the lug plates are steel plates with the thickness of 10mm, and the bracket diagonal draw bar, the bracket upright rod and the bracket cross rod are connected into a whole through the lug plates. In order to ensure that construction requirements of a construction site are matched and prevent the pipeline suspension bracket from being broken in the construction process, the length of each bracket cross rod 1 is less than 1500 mm; the hanging beam is composed of angle steel arranged below the pipeline, and the hanging suspension rod is fixed with the angle steel below the pipeline through bolts; during operation, a groove is dug below a pipeline, angle steel with the length of 35cm, the width of 5cm and the thickness of 0.6cm is placed below the pipeline, the pipeline is hoisted, when the diameter of the pipeline is smaller, a gap between the pipeline and the round steel is plugged by a wood wedge, the pipeline is prevented from moving laterally, the suspension hanger rod 4 is also connected by the round steel with the diameter of 20, a nut is fixed and screwed, a 'hoisting beam' and the pipeline are hoisted, and the length of the round steel can be adjusted according to the actual situation on site; the utility model provides a pipeline suspends bracket in midair sets up a department along foundation ditch longitudinal distance 4 ~ 6m, when moving back near pipe network slot excavation to bracket, the slot construction side needs again with each bolt screw thread on the hanging beam add twist the half-turn, makes whole pipeline suspend bracket in midair reach the stress state in advance, plays the effect of arch degree in advance, and the sudden atress of prevention earth's surface pipeline sinks, eliminates pipeline potential safety hazard.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (6)

1. The utility model provides a foundation ditch pipeline frame that suspends in midair, a serial communication port, including bracket horizontal pole, bracket pole setting, bracket diagonal draw bar, hanging beam and suspension jib, U type bolt and crown beam top fixed connection are passed through to bracket horizontal pole one end, the one end that the bracket horizontal pole was equipped with U type bolt is equipped with otic placode one, and the other end is equipped with otic placode two, bracket pole setting bottom is through otic placode three and bracket horizontal pole otic placode fixed connection, and the other end passes through otic placode four and is connected with the bracket diagonal draw bar, bracket diagonal draw bar one end is equipped with the otic placode five of being connected with the bracket pole setting, and the other end is equipped with the otic placode six of being connected with bracket horizontal pole otic placode two, the bracket horizontal pole sets up the top fixed connection of the bottom of the one end of otic placode two through suspension jib and hanging beam, place the pipeline in the hanging beam.
2. The foundation pit pipeline suspension bracket of claim 1, wherein the bracket cross rod and the bracket upright rod are I-shaped steel.
3. A foundation pit pipeline suspension as claimed in claim 1, wherein the suspension beam is an angle iron.
4. A foundation pit pipeline suspension bracket as claimed in claim 1, wherein the bracket diagonal draw bar is a single steel pipe.
5. A foundation pit pipeline suspension as claimed in claim 1, wherein the length of the bracket rail and bracket riser are less than 1500 mm.
6. A foundation pit pipeline suspension bracket as claimed in claim 1, wherein the length of the suspension hanger is 1/3-1/2 of the length of the bracket rail.
CN202120596737.XU 2021-03-24 2021-03-24 Foundation pit pipeline suspension frame Active CN214743759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120596737.XU CN214743759U (en) 2021-03-24 2021-03-24 Foundation pit pipeline suspension frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120596737.XU CN214743759U (en) 2021-03-24 2021-03-24 Foundation pit pipeline suspension frame

Publications (1)

Publication Number Publication Date
CN214743759U true CN214743759U (en) 2021-11-16

Family

ID=78595732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120596737.XU Active CN214743759U (en) 2021-03-24 2021-03-24 Foundation pit pipeline suspension frame

Country Status (1)

Country Link
CN (1) CN214743759U (en)

Similar Documents

Publication Publication Date Title
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN206457729U (en) A kind of supporting bracket of bridge construction
CN205591231U (en) Steel shotcrete dropout prevention means
CN207362717U (en) A kind of device replaced for main rope of suspension bridge cord clip
CN204080650U (en) A kind of end bay for road and bridge construction closes up suspension bracket
CN214743759U (en) Foundation pit pipeline suspension frame
CN102926554B (en) Steel hanging seat formwork support and construction method thereof
CN213804905U (en) Bailey beam suspension structure
CN213461075U (en) Protection device for underground original pipeline
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN205313982U (en) Basket side form reinforced structure is hung to continuous beam midspan section of foling
CN205934931U (en) Lid is in same direction as foundation ditch structure of digging way of doing things construction
CN105782576B (en) Fluted tube line guard method is excavated below interim pipeline
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN206159649U (en) Pipeline suspends bracket in midair
CN217711628U (en) Channel steel cantilever support template supporting device
CN204298830U (en) Based on lattice column plane in subterranean excavation and elevation regulation device
CN213014358U (en) Pipeline suspension structure
CN209179519U (en) Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top
CN209779639U (en) supporting construction who is applied to foundation ditch in facade interior support
CN210087319U (en) Intelligent hydraulic lifting sliding module for hanging large-section special-shaped shaft steel strand
CN203555690U (en) Fence-sitting suspension bracket
CN206418388U (en) The prefabricated middle cross beam of large-span steel bowstring arch bridge, which is installed, uses hanging structure system
CN202926348U (en) U-shaped shed fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant