CN206457729U - A kind of supporting bracket of bridge construction - Google Patents

A kind of supporting bracket of bridge construction Download PDF

Info

Publication number
CN206457729U
CN206457729U CN201720063171.8U CN201720063171U CN206457729U CN 206457729 U CN206457729 U CN 206457729U CN 201720063171 U CN201720063171 U CN 201720063171U CN 206457729 U CN206457729 U CN 206457729U
Authority
CN
China
Prior art keywords
support
bracket
support bracket
bridge
bridge construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720063171.8U
Other languages
Chinese (zh)
Inventor
刘继
杨勃
高珊珊
王新利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Railway Institute
Original Assignee
Shaanxi Railway Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Railway Institute filed Critical Shaanxi Railway Institute
Priority to CN201720063171.8U priority Critical patent/CN206457729U/en
Application granted granted Critical
Publication of CN206457729U publication Critical patent/CN206457729U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种桥梁施工支撑托架,包括预埋钢板、支撑平台、桥梁、爬梯、连接钢梁、锥形螺母、支撑柱和提升机,所述预埋钢板与桥墩锚栓连接,所述爬梯与支撑托架通过托架入口相连接,所述桥墩通过固定螺栓与支撑基座相连接,所述连接钢梁与支撑基座相连接。该桥梁施工支撑托架,结合现在使用的桥梁施工支撑托架进行创新设计,本桥梁施工支撑托架采用了预埋钢板作为支撑点,并辅助设置有固定螺栓对其进行固定,不需要通过焊接来固定装置,很好的避免了高空竖焊,焊缝质量难以保证,存在安全隐患的问题,而且工作量小、拆装的周期短,这样不仅能够很好的保护支撑托架,而且周转性好,能够很好的降低桥梁施工和维护的成本。

The utility model discloses a bridge construction support bracket, which comprises a pre-embedded steel plate, a support platform, a bridge, a ladder, a connecting steel beam, a tapered nut, a support column and a hoist, and the pre-embedded steel plate is connected with the anchor bolt of the bridge pier. The ladder is connected to the support bracket through the bracket entrance, the pier is connected to the support base through fixing bolts, and the connecting steel beam is connected to the support base. The bridge construction support bracket is innovatively designed in combination with the currently used bridge construction support bracket. The bridge construction support bracket uses a pre-embedded steel plate as a support point, and is auxiliary provided with fixing bolts to fix it without welding. To fix the device, it avoids the high-altitude vertical welding, the quality of the weld is difficult to guarantee, and there are safety hazards. Moreover, the workload is small and the cycle of disassembly and assembly is short. This not only protects the support bracket well, but also improves the turnover Well, it can reduce the cost of bridge construction and maintenance very well.

Description

A kind of supporting bracket of bridge construction
Technical field
The utility model is related to Construction Support cradle technology field, specially a kind of supporting bracket of bridge construction.
Background technology
Supporting bracket of bridge construction is a kind of construction Support bracket of construction and later maintenance for bridge, thereon It can realize that workman normally constructs and places the construction tool and material of correlation, and the utility model supporting bracket of bridge construction Mainly by this seven part groups of support pedestal, fixing bolt, support platform, cushioning supportive post, cat ladder, elevator and bracket entrance Into the species of supporting bracket of bridge construction is more and more with the development of science and technology, for supporting bracket of bridge construction demand More and more higher.
And the supporting bracket of bridge construction used now also coming with some shortcomings more or less, such as conventional bracket is in bridge Pre-buried bulk steel plate in pier, by shelf bracket, monolithic lifting is welded with pre-embedded steel slab in place after the completion of the weldering of bridge the following group, still There is high-altitude vertical welding in conventional bracket, weldquality is difficult to ensure that, the problem of there is potential safety hazard in work progress, weld seam length, Overhead welding workload is big, bracket installation period is long, needs to use gas welding to cut off bracket on pre-embedded steel slab during dismounting, removes Difficulty, and the shelf bracket damage after gas welding is cut is serious, should not be used for multiple times, revolving difference, bracket input amount is big, support After frame is removed, realize that pre-buried bulk steel plate is difficult to handle, influence bridge pier outward appearance and quality, it is impossible to the need for meeting use, institute With the presence for such case, it is now desired to carry out the innovative design of relevant device.
Utility model content
The purpose of this utility model is to provide a kind of supporting bracket of bridge construction, to solve to propose in above-mentioned background technology The conventional bracket having in bridge pier pre-buried bulk steel plate, by shelf bracket bridge the following group weldering after the completion of monolithic lifting in place with The problem of pre-embedded steel slab is welded.
To achieve the above object, the utility model provides following technical scheme:A kind of supporting bracket of bridge construction, including it is pre- Bury steel plate, support platform, bridge, cat ladder, connection girder steel, tapered cup nut, support column and elevator, the pre-embedded steel slab and bridge pier Anchor bolts, and its upper end is provided with Support bracket, the Support bracket and is provided with bracket entrance, and bracket entrance upper end is set Guardrail is equipped with, the support column is connected with Support bracket, and is provided with control cabinet, the elevator is connected with control cabinet Connect, and it is connected with clip, the cat ladder is connected with Support bracket by bracket entrance, and the bridge pier passes through fixing bolt It is connected with support pedestal, and support pedestal is connected by fixing nut with fixing bolt, the support platform passes through lower edge Bar is connected with support pedestal, and it is connected by cushioning supportive post with Support bracket, and the tapered cup nut passes through finish rolling spiral shell Line steel is connected with support pedestal, is connected between the lower end of the bridge and bridge pier by bearing, the connection girder steel and support Pedestal is connected.
It is preferred that, the pre-embedded steel slab is each provided with two groups before and after bridge pier, and every group is provided with three pieces.
It is preferred that, the fining twisted steel through support pedestal be connected with tapered cup nut, and its bridge pier it is front and rear respectively etc. Away from being provided with the six roots of sensation.
It is preferred that, the height of the guardrail is 105cm, and it is mutually welded by steel pipe with Support bracket.
It is preferred that, the cushioning supportive post is equidistantly provided with three, and support platform is set on bridge pier in support platform It is equipped with four.
Compared with prior art, the beneficial effects of the utility model are:The supporting bracket of bridge construction, with reference to using now Supporting bracket of bridge construction carry out innovative design, this supporting bracket of bridge construction employs pre-embedded steel slab as the strong point, and Auxiliary is provided with fixing bolt and it is fixed, it is not necessary to by welding come fixing device, high-altitude vertical welding is avoided well, Weldquality is difficult to ensure that, the problem of there is potential safety hazard, and workload is small, the dismounting cycle is short, so can not only be very Good protection Support bracket, and it is revolving good, it can be good at the cost for reducing bridge construction and safeguarding.
Brief description of the drawings
Fig. 1 is the utility model positive structure diagram;
Fig. 2 is the utility model side structure schematic diagram.
In figure:1st, pre-embedded steel slab, 2, fining twisted steel, 3, bridge pier, 4, fixing bolt, 5, support pedestal, 6, lower boom, 7, Support platform, 8, cushioning supportive post, 9, Support bracket, 10, guardrail, 11, bridge, 12, bracket entrance, 13, cat ladder, 14, connection Girder steel, 15, fixing nut, 16, tapered cup nut, 17, support column, 18, control cabinet, 19, clip, 20, elevator.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of supporting bracket of bridge construction, including it is pre-buried Steel plate 1, fining twisted steel 2, bridge pier 3, fixing bolt 4, support pedestal 5, lower boom 6, support platform 7, cushioning supportive post 8, branch Bracketing frame 9, guardrail 10, bridge 11, bracket entrance 12, cat ladder 13, connection girder steel 14, fixing nut 15, tapered cup nut 16, support Post 17, control cabinet 18, clip 19 and elevator 20, pre-embedded steel slab 1 and the anchor bolts of bridge pier 3, and its upper end is provided with supporting bracket Frame 9, pre-embedded steel slab 1 is each provided with two groups before and after bridge pier 3, and every group is provided with three pieces, passes through the inside of reinforcing bar and bridge pier 3 Reinforcing bar is welded, then is fixed by concreting so that Support bracket 9 is more consolidated, and is set on Support bracket 9 Have a bracket entrance 12, and the upper end of bracket entrance 12 is provided with guardrail 10, the height of guardrail 10 is 105cm, and its by steel pipe with Support bracket 9 is mutually welded, and support column 17 is connected with Support bracket 9, and is provided with control cabinet 18, elevator 20 and control Case 18 is connected, and it is connected with clip 19, and cat ladder 13 is connected with Support bracket 9 by bracket entrance 12, and itself and bridge Pier 3 is connected, and support pedestal 5 is connected by fixing bolt 4 with bridge pier 3, and support pedestal 5 is by fixing nut 15 and fixes Bolt 4 is connected, and support platform 7 is connected by lower boom 6 with support pedestal 5, and it passes through cushioning supportive post 8 and supporting bracket Frame 9 is connected, and cushioning supportive post 8 is equidistantly provided with three, and support platform 7 is provided with four on bridge pier 3 in support platform 7 Individual so that Support bracket 9 is more steady, tapered cup nut 16 is connected by fining twisted steel 2 with support pedestal 5, finish rolling spiral shell Line steel 2 is connected through support pedestal 5 with tapered cup nut 16, and the front and rear of its bridge pier 3 has respectively been placed equidistant the six roots of sensation, and it is to install It is used for aiding in fixed support pedestal 5 in the front and rear sides of bridge pier 3 so that what support pedestal 5 can be consolidated more is fixed on bridge pier 3 On, connected between the lower end of bridge 11 and bridge pier 3 by bearing, connection girder steel 14 is connected with support pedestal 5.
Operation principle:, it is necessary to be carried out to whole supporting bracket of bridge construction before using the supporting bracket of bridge construction Simple structure understands, the pre-buried fixing bolt 4 first in bridge pier 3, and passes through fining twisted steel 2, fixing nut 15 and taper Nut 16 will support pedestal 5 to be firmly secured on bridge pier 3, then enter support platform 7 with support pedestal 5 by lower boom 6 Row welding, then Support bracket 9 is connected by cushioning supportive post 8 and pre-embedded steel slab 1 with support platform 7 and bridge pier 3, Ran Houshe Guardrail 10, bracket entrance 12 and cat ladder 13 are put, elevator 20 is finally installed, such Support bracket 9 is just installed, and workman just may be used To carry out the construction of bridge and the quality testing and maintenance of bridge on Support bracket 9, here it is whole bridge construction supporting bracket The laying method and the course of work of frame.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art Say, it can still be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered Row equivalent substitution, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvements made etc. all should Within protection domain of the present utility model.

Claims (5)

1.一种桥梁施工支撑托架,包括预埋钢板(1)、支撑平台(7)、桥梁(11)、爬梯(13)、连接钢梁(14)、锥形螺母(16)、支撑柱(17)和提升机(20),其特征在于:所述预埋钢板(1)与桥墩(3)镶嵌连接,且其上端设置有支撑托架(9),所述支撑托架(9)上设置有托架入口(12),且托架入口(12)上端设置有护栏(10),所述支撑柱(17)与支撑托架(9)相连接,且其上设置有控制箱(18),所述提升机(20)与控制箱(18)相连接,且其与夹子(19)相连接,所述爬梯(13)与支撑托架(9)通过托架入口(12)相连接,所述桥墩(3)通过固定螺栓(4)与支撑基座(5)相连接,且支撑基座(5)通过固定螺母(15)与固定螺栓(4)相连接,所述支撑平台(7)通过下弦杆(6)与支撑基座(5)相连接,且其通过缓冲支撑柱(8)与支撑托架(9)相连接,所述锥形螺母(16)通过精轧螺纹钢(2)与支撑基座(5)相连接,所述桥梁(11)的下端与桥墩(3)之间通过支座连接,所述连接钢梁(14)与支撑基座(5)相连接。1. A support bracket for bridge construction, comprising pre-embedded steel plates (1), support platforms (7), bridges (11), ladders (13), connecting steel beams (14), tapered nuts (16), support columns (17) and hoist (20), characterized in that: the embedded steel plate (1) is inlaid connected with the pier (3), and its upper end is provided with a support bracket (9), and the support bracket (9) A bracket entrance (12) is arranged on it, and a guardrail (10) is arranged on the upper end of the bracket entrance (12), the support column (17) is connected with the support bracket (9), and a control box ( 18), the hoist (20) is connected with the control box (18), and it is connected with the clamp (19), and the ladder (13) is connected with the support bracket (9) through the bracket entrance (12) connection, the pier (3) is connected to the support base (5) through the fixing bolt (4), and the support base (5) is connected to the fixing bolt (4) through the fixing nut (15), and the supporting platform (7) It is connected to the support base (5) through the lower chord (6), and it is connected to the support bracket (9) through the buffer support column (8). The steel (2) is connected to the supporting base (5), the lower end of the bridge (11) is connected to the pier (3) through a support, and the connecting steel beam (14) is connected to the supporting base (5). connect. 2.根据权利要求1所述的一种桥梁施工支撑托架,其特征在于:所述预埋钢板(1)在桥墩(3)的前后各设置有两组,且每组设置有三块。2. A support bracket for bridge construction according to claim 1, characterized in that: two groups of said pre-embedded steel plates (1) are arranged at the front and back of the pier (3), and each group is provided with three pieces. 3.根据权利要求1所述的一种桥梁施工支撑托架,其特征在于:所述精轧螺纹钢(2)贯穿支撑基座(5)与锥形螺母(16)相连接,且其桥墩(3)的前后各等距设置有六根。3. A support bracket for bridge construction according to claim 1, characterized in that: the finish-rolled rebar (2) runs through the support base (5) and is connected with the conical nut (16), and its pier Each equidistant front and back of (3) is provided with six. 4.根据权利要求1所述的一种桥梁施工支撑托架,其特征在于:所述护栏(10)的高度为105cm,且其通过钢管与支撑托架(9)相焊接。4. A bridge construction support bracket according to claim 1, characterized in that: the height of the guardrail (10) is 105 cm, and it is welded to the support bracket (9) through a steel pipe. 5.根据权利要求1所述的一种桥梁施工支撑托架,其特征在于:所述缓冲支撑柱(8)在支撑平台(7)上等距设置有三个,且支撑平台(7)在桥墩(3)上设置有四个。5. A bridge construction support bracket according to claim 1, characterized in that: said buffer support columns (8) are equidistantly arranged three on the support platform (7), and the support platform (7) is placed on the bridge pier (3) There are four upper sets.
CN201720063171.8U 2017-01-12 2017-01-12 A kind of supporting bracket of bridge construction Expired - Fee Related CN206457729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720063171.8U CN206457729U (en) 2017-01-12 2017-01-12 A kind of supporting bracket of bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720063171.8U CN206457729U (en) 2017-01-12 2017-01-12 A kind of supporting bracket of bridge construction

Publications (1)

Publication Number Publication Date
CN206457729U true CN206457729U (en) 2017-09-01

Family

ID=59698509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720063171.8U Expired - Fee Related CN206457729U (en) 2017-01-12 2017-01-12 A kind of supporting bracket of bridge construction

Country Status (1)

Country Link
CN (1) CN206457729U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542037A (en) * 2017-09-28 2018-01-05 谢晓燕 A kind of new supporting bracket of bridge construction
CN108978475A (en) * 2018-07-18 2018-12-11 芜湖青悠静谧环保科技有限公司 A kind of bridge hoisting buffering positioning base
CN109371841A (en) * 2018-11-22 2019-02-22 中建七局安装工程有限公司 A hoop operating platform for elevated bridge construction
CN109385957A (en) * 2018-11-22 2019-02-26 中建七局安装工程有限公司 A kind of pier stud bent cap protective platform
CN109811663A (en) * 2019-04-02 2019-05-28 山东科达基建有限公司 An adjustable bridge construction support device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542037A (en) * 2017-09-28 2018-01-05 谢晓燕 A kind of new supporting bracket of bridge construction
CN107542037B (en) * 2017-09-28 2018-12-04 谢志坚 A kind of supporting bracket of bridge construction
CN108978475A (en) * 2018-07-18 2018-12-11 芜湖青悠静谧环保科技有限公司 A kind of bridge hoisting buffering positioning base
CN109371841A (en) * 2018-11-22 2019-02-22 中建七局安装工程有限公司 A hoop operating platform for elevated bridge construction
CN109385957A (en) * 2018-11-22 2019-02-26 中建七局安装工程有限公司 A kind of pier stud bent cap protective platform
CN109811663A (en) * 2019-04-02 2019-05-28 山东科达基建有限公司 An adjustable bridge construction support device

Similar Documents

Publication Publication Date Title
CN206457729U (en) A kind of supporting bracket of bridge construction
CN103452126B (en) Light combined hanging box with recyclable baseplate steels and construction technology thereof
CN105696747A (en) Construction method for aerial large-span reinforced concrete beam
CN105971294A (en) Stereoscopic supporting scaffold composed of universal standard joints and mounting method
CN113585075A (en) Cast-in-place bridge deck formwork for steel-concrete composite beam
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN209780193U (en) Suspension type scaffold
CN105350760A (en) Edge-beam-supporting steel-rod-inclined-pulling and wire-rope-unloading overhanging scaffold construction method
CN107012795A (en) A kind of continuous bridge pre-pressing bracket device and its construction method
CN204940861U (en) Adjustable case beam side steel bracket
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN102002912A (en) Simultaneous construction type wide-flanged guyed traveler
CN205116030U (en) No. 0 three angle brackets of piece of box girder bridge have just been constructed in succession
CN204753397U (en) Temporary mounting hanger for steel box bridge
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN106758855B (en) Arc-shaped pier cap construction arch support component and arc-shaped pier cap construction method
CN102661035A (en) Tool type wall connecting piece for exterior wall scaffold
CN201347616Y (en) Split type steel welding operation platform
CN212866793U (en) Assembled construction elevator stops layer platform
CN205116776U (en) Support access structure
CN116025170B (en) A device for tying and positioning steel bars of a horizontal beam on water in a wharf project and a construction method thereof
CN210420898U (en) Novel No. 0 block support of steel box girder
CN211689927U (en) An operating platform device for construction in bridge towers
CN106522531A (en) Ring lock scaffold opening portion bracket supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170901