CN101575914A - Retractable unit horizontal hard protection - Google Patents
Retractable unit horizontal hard protection Download PDFInfo
- Publication number
- CN101575914A CN101575914A CNA2009103031814A CN200910303181A CN101575914A CN 101575914 A CN101575914 A CN 101575914A CN A2009103031814 A CNA2009103031814 A CN A2009103031814A CN 200910303181 A CN200910303181 A CN 200910303181A CN 101575914 A CN101575914 A CN 101575914A
- Authority
- CN
- China
- Prior art keywords
- underframe
- protective
- protection
- retractable unit
- horizontal hard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/166—Landings, receiving platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Emergency Lowering Means (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种超高层建筑施工中外立面的施工防护,以及应用这种防护的施工方法。The invention relates to a construction protection of an outer facade in the construction of a super high-rise building and a construction method using the protection.
背景技术 Background technique
目前在超高层建筑施工中出现竖向交叉施工时,多采用钢管搭设水平硬防护,上铺底板,为整体搭设。搭设完成后,下部材料和机具的倒运受到很大制约,倒运难度很大;同时由于为散件在工程外立面组拼,占用工期长,工人劳动强度大、操作风险高,而且出现高空坠物机率也较大。At present, when there is a vertical cross construction in the construction of super high-rise buildings, steel pipes are often used to erect horizontal hard protection, and the bottom plate is laid on top, which is erected as a whole. After the erection is completed, the transportation of the lower materials and machinery is greatly restricted, and transportation is very difficult; at the same time, because the parts are assembled on the facade of the project, it takes a long construction period, the labor intensity of the workers is high, the operation risk is high, and there is a high-altitude fall. The chances are also higher.
发明内容 Contents of the invention
为了克服现有技术的不足,本发明提供一种可收放单元式水平硬防护及其施工方法,要解决现有水平硬防护施工不便、安全风险高等问题。In order to overcome the deficiencies of the prior art, the present invention provides a retractable unit type horizontal hard protection and its construction method, which should solve the problems of inconvenient construction and high safety risk of the existing horizontal hard protection.
本发明解决其技术问题所采用的技术方案是:The technical solution adopted by the present invention to solve its technical problems is:
这种可收放单元式水平硬防护,包括防护底架和防护栏杆,防护底架的外侧边与防护栏杆垂直连接,其特征在于:所述防护底架由两根主横梁和次横梁交接而成,防护底架上铺设有底板,底板上设有横肋;This retractable unit horizontal hard protection includes a protective chassis and a protective railing. The outer side of the protective chassis is vertically connected to the protective railing. It is characterized in that the protective chassis is connected by two main beams and secondary beams. Formed, the bottom frame is laid with a bottom plate, and the bottom plate is provided with transverse ribs;
上述主横梁的内端由转动轴与连接在两层结构楼板之间的层间钢支撑架的底部外侧铰接,两根主横梁的重心外侧分别固定有两个吊环,上述吊环与层间钢支撑架的顶部内侧之间连接钢丝绳。The inner ends of the above-mentioned main beams are hinged by the rotating shaft and the bottom outer side of the interstory steel support frame connected between the two-story structural floors. Two suspension rings are respectively fixed on the outside of the center of gravity of the two main beams. Connect wire ropes between the top insides of the racks.
上述层间钢支撑架是由四根钢管柱、横撑、底部型钢和顶部型钢固定连接而成,底部型钢的外端固定有用于连接防护底架的轴座,顶部型钢的内侧固定有用于连接钢丝绳的栓座。The above-mentioned interlayer steel support frame is composed of four steel pipe columns, cross braces, bottom section steel and top section steel. Wire rope hitch.
上述防护底架的横肋可以是钢筋或型钢。The transverse ribs of the above-mentioned protective underframe can be steel bars or shaped steel.
上述主横梁和次横梁为型钢。The above-mentioned main crossbeam and secondary crossbeam are shaped steel.
这人种可收放单元式水平硬防护的施工方法:其特征在于:The construction method of this kind of retractable unit type horizontal hard protection: it is characterized in that:
步骤1,加工可收放单元式水平硬防护,用主横梁、次横梁和横肋分片整体安装成防护底架,并在防护底架上铺设底板,将防护底架的外侧边与防护栏杆垂直连接,用转动轴将主横梁与连接在两层结构楼板之间的层间钢支撑架的底部外侧铰接,并在主横梁上固定吊环,在吊环与层间钢支撑架的顶部内侧之间连接钢丝绳;Step 1, process the retractable unit horizontal hard protection, install the main beam, the secondary beam and the ribs as a whole to form a protective chassis, and lay a bottom plate on the protective chassis, and connect the outer edge of the protective chassis with the protective chassis. The railings are vertically connected, and the main beam is hinged to the bottom outer side of the interstory steel support frame connected between the two-story structural floors with a rotating shaft, and the suspension ring is fixed on the main beam, and the top inner side of the suspension ring and the interstory steel support frame is connected. between connecting wire rope;
步骤2,将可收放单元式水平硬防护的主横梁设置为与结构楼板平行;
步骤3,在需要上下垂直运送材料时,通过转动轴将上述防护单元立起后,将钢丝绳的前端固定在层间钢支撑架上,末端固定在两个吊环上。Step 3, when the material needs to be transported vertically up and down, after the above-mentioned protective unit is erected through the rotating shaft, the front end of the steel wire rope is fixed on the interlayer steel support frame, and the end is fixed on the two suspension rings.
本发明的有益效果如下:The beneficial effects of the present invention are as follows:
本发明采用型钢、底板和钢筋加工制作成硬防护单元,并在主龙骨上设置转动轴,需要时可将防护单元立起。通过使用可收放单元式水平硬防护,能够解决同一竖向上下不同作业区同时施工的安全需求和施工需求,减少工人临边作业时间,降低高空坠物的风险,同时通过防护单元收放,为下部区段材料机具倒运提供便利。该水平防护体系便于加工、安拆方便、快捷,开启便利,可周转使用,成本较低。The present invention adopts section steel, base plate and steel bars to process and manufacture hard protection unit, and sets rotating shaft on the main keel, and the protection unit can be erected when necessary. By using retractable unit-type horizontal hard protection, it can solve the safety and construction needs of simultaneous construction in different work areas in the same vertical direction, reduce the time for workers to work on the sidelines, and reduce the risk of falling objects. At the same time, the protection unit can be retracted, It provides convenience for the reverse transportation of materials and tools in the lower section. This horizontal protection system is easy to process, convenient and quick to install and disassemble, easy to open, can be used repeatedly, and has low cost.
本发明所采用的施工方法可在对下部施工没有影响的前提下,使用规格、数量较少的简单构件,拼装成不同单元,分片整体安装。在下部需要材料垂直倒运时,可将局部单元翻转立起,以便于材料、机具的倒运,简化施工,提高工人操作的安全性。The construction method adopted in the present invention can be assembled into different units by using simple components with small specifications and quantities without affecting the construction of the lower part, and install them as a whole in pieces. When materials need to be transported vertically in the lower part, partial units can be turned upside down to facilitate the transport of materials and machines, simplify construction and improve the safety of workers’ operations.
附图说明 Description of drawings
下面结合附图和实施例对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
图1是本发明的俯视结构示意图。Fig. 1 is a top view structural diagram of the present invention.
图2是本发明呈水平状态的示意图。Fig. 2 is a schematic diagram of the present invention in a horizontal state.
图3是本发明呈收起状态的示意图。Fig. 3 is a schematic diagram of the present invention in a folded state.
附图标记:1-主横梁、2-转动轴、3-次横梁、4-底板、5-横肋、6-吊环、7-防护栏杆、8-层间钢支撑架、8.1-钢管柱、8.2-横撑、8.3-底部型钢、8.4-顶部型钢、8.5-轴座、8.6-栓座、9-结构楼板、10-钢丝绳。Reference signs: 1-main beam, 2-rotation shaft, 3-secondary beam, 4-bottom plate, 5-cross rib, 6-hanging ring, 7-protective railing, 8-interlayer steel support frame, 8.1-steel pipe column, 8.2-cross brace, 8.3-bottom section steel, 8.4-top section steel, 8.5-axle seat, 8.6-bolt seat, 9-structural floor, 10-wire rope.
具体实施方式 Detailed ways
参见图1所示,这种可收放单元式水平硬防护,包括防护底架和防护栏杆,防护底架的外侧边与防护栏杆7垂直连接,所述防护底架由两根主横梁1和次横梁3交接而成,防护底架上铺设有底板4,底板上设有横肋5;所述主横梁和次横梁为型钢,防护栏杆可由?12钢筋焊接而成,防护底架的横肋5可以是四道?12钢筋。防护底架上铺设的底板可为木板。Referring to Fig. 1, this retractable unit horizontal hard protection includes a protective chassis and a protective railing, the outer side of the protective chassis is vertically connected to the protective railing 7, and the protective chassis is composed of two main beams 1 It is formed by handing over with the secondary beam 3, the protective chassis is laid with a
主横梁1的内端由转动轴2与连接在两层结构楼板9之间的层间钢支撑架8的底部外侧铰接,两根主横梁1的重心外侧分别固定有两个吊环6,上述吊环6与层间钢支撑架8的顶部内侧之间连接钢丝绳10。The inner end of the main beam 1 is hinged by the rotating
层间钢支撑架8是由四根钢管柱8.1、横撑8.2、底部型钢8.3和顶部型钢8.4固定连接而成,底部型钢的外端固定有用于连接防护底架的轴座8.5,顶部型钢的内侧固定有用于连接钢丝绳的栓座8.6。The interlayer steel support frame 8 is fixedly connected by four steel pipe columns 8.1, cross braces 8.2, bottom section steel 8.3 and top section steel 8.4. The inboard is fixed with the bolt seat 8.6 that is used to connect steel wire rope.
参见图2、图3所示,这人种可收放单元式水平硬防护的施工方法的步骤如下:Referring to Fig. 2 and Fig. 3, the steps of the construction method of the retractable unit type horizontal hard protection are as follows:
步骤1,加工可收放单元式水平硬防护,用主横梁、次横梁和横肋分片整体安装成防护底架,并在防护底架上铺设底板,将防护底架的外侧边与防护栏杆垂直连接,用转动轴将主横梁与连接在两层结构楼板之间的层间钢支撑架的底部外侧铰接,并在主横梁上固定吊环,在吊环与层间钢支撑架的顶部内侧之间连接钢丝绳;Step 1, process the retractable unit horizontal hard protection, install the main beam, the secondary beam and the ribs as a whole to form a protective chassis, and lay a bottom plate on the protective chassis, and connect the outer edge of the protective chassis with the protective chassis. The railings are vertically connected, and the main beam is hinged to the bottom outer side of the interstory steel support frame connected between the two-story structural floors with a rotating shaft, and the suspension ring is fixed on the main beam, and the top inner side of the suspension ring and the interstory steel support frame is connected. between connecting wire rope;
步骤2,将可收放单元式水平硬防护的主横梁设置为与结构楼板平行;
步骤3,在需要上下垂直运送材料时,通过转动轴将上述防护单元立起后,将钢丝绳的前端固定在层间钢支撑架上,末端固定在两个吊环上。Step 3, when the material needs to be transported vertically up and down, after the above-mentioned protective unit is erected through the rotating shaft, the front end of the steel wire rope is fixed on the interlayer steel support frame, and the end is fixed on the two suspension rings.
上述步骤1中,整个防护单元可在结构楼层内或地面拼装,拼装完成后分块安装,用钢管顶撑固定,在结构外侧周圈形成完整水平防护。In the above step 1, the entire protection unit can be assembled in the structure floor or on the ground, and after the assembly is completed, it is installed in blocks and fixed with steel pipe top braces to form a complete horizontal protection around the outer circumference of the structure.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNA2009103031814A CN101575914A (en) | 2009-06-11 | 2009-06-11 | Retractable unit horizontal hard protection |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNA2009103031814A CN101575914A (en) | 2009-06-11 | 2009-06-11 | Retractable unit horizontal hard protection |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN101575914A true CN101575914A (en) | 2009-11-11 |
Family
ID=41270969
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNA2009103031814A Pending CN101575914A (en) | 2009-06-11 | 2009-06-11 | Retractable unit horizontal hard protection |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101575914A (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102828609A (en) * | 2012-09-24 | 2012-12-19 | 中国建筑股份有限公司 | Overhanging-type mobile blanking platform for building construction |
| CN103635645A (en) * | 2011-04-11 | 2014-03-12 | 活动边缘Ip私人有限公司 | Adjustable safety barrier system |
| CN108301631A (en) * | 2018-03-27 | 2018-07-20 | 中铁十六局集团城市建设发展有限公司 | A kind of horizontal hard protection system of integrated form floor edge |
| CN108843025A (en) * | 2018-06-25 | 2018-11-20 | 江北建设有限公司 | A kind of steel platform for material unloading for building |
| CN110541554A (en) * | 2019-08-23 | 2019-12-06 | 江苏精享裕建工有限公司 | Single-double layer interconversion type assembled building external protection frame |
| CN111561171A (en) * | 2020-04-30 | 2020-08-21 | 中国五冶集团有限公司 | A kind of extrapolation portable edge protection structure and protection method for high-altitude plank road |
| CN112412078A (en) * | 2020-10-12 | 2021-02-26 | 中国华冶科工集团有限公司 | Safety protection net device and construction method thereof |
| CN114382309A (en) * | 2022-02-21 | 2022-04-22 | 交铁检验认证实验室(成都)有限公司 | Protector is used to building engineering safety |
-
2009
- 2009-06-11 CN CNA2009103031814A patent/CN101575914A/en active Pending
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103635645A (en) * | 2011-04-11 | 2014-03-12 | 活动边缘Ip私人有限公司 | Adjustable safety barrier system |
| CN102828609A (en) * | 2012-09-24 | 2012-12-19 | 中国建筑股份有限公司 | Overhanging-type mobile blanking platform for building construction |
| CN108301631A (en) * | 2018-03-27 | 2018-07-20 | 中铁十六局集团城市建设发展有限公司 | A kind of horizontal hard protection system of integrated form floor edge |
| CN108843025A (en) * | 2018-06-25 | 2018-11-20 | 江北建设有限公司 | A kind of steel platform for material unloading for building |
| CN110541554A (en) * | 2019-08-23 | 2019-12-06 | 江苏精享裕建工有限公司 | Single-double layer interconversion type assembled building external protection frame |
| CN111561171A (en) * | 2020-04-30 | 2020-08-21 | 中国五冶集团有限公司 | A kind of extrapolation portable edge protection structure and protection method for high-altitude plank road |
| CN112412078A (en) * | 2020-10-12 | 2021-02-26 | 中国华冶科工集团有限公司 | Safety protection net device and construction method thereof |
| CN114382309A (en) * | 2022-02-21 | 2022-04-22 | 交铁检验认证实验室(成都)有限公司 | Protector is used to building engineering safety |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101575914A (en) | Retractable unit horizontal hard protection | |
| CN105452583B (en) | Manufacturing field | |
| CN201053200Y (en) | Assembled | |
| CN110374612B (en) | Shield machine receiving platform applied to near-empty state and construction process | |
| CN105003090A (en) | Temporary support frame for mounting assembly type steel structure | |
| CN106930531A (en) | A kind of pull-up manomelia is encorbelmented the construction method of heavy frame | |
| CN106437123A (en) | Supporting leg automatic turnover type overall lifting elevator well operation platform | |
| CN104790644B (en) | Extending and contracting sliding support frame for roof decorative bottom boards | |
| CN105952133A (en) | Suspended large-span reinforced concrete structure construction steel platform and construction method | |
| CN201420385Y (en) | Overhanging type unloading platform for building construction | |
| CN105350760A (en) | Edge-beam-supporting steel-rod-inclined-pulling and wire-rope-unloading overhanging scaffold construction method | |
| CN107700818A (en) | A kind of prefabricated concrete structure actuates adjustable pylon | |
| CN201343873Y (en) | Square tower type supporting bracket | |
| CN206581577U (en) | Using housing construction builder's jack | |
| CN205206284U (en) | Detachable assembly type elevator shaft operating platform | |
| CN204753397U (en) | Temporary mounting hanger for steel box bridge | |
| CN107237639B (en) | Tunnel lining trolley adopting split type double-side-wall pilot tunnel method | |
| CN210134344U (en) | Trolley for mounting bridge center joint drain pipe | |
| CN206722378U (en) | A kind of pull-up manomelia is encorbelmented heavy frame | |
| CN204876631U (en) | Assembled steel structure installation uses interim support frame | |
| CN109838055A (en) | High-altitude is installed by steel frame and light concrete face-board for room special mounting vehicle | |
| CN220377879U (en) | Construction operation platform for pipe truss high-altitude sectional assembly sliding | |
| CN207211196U (en) | A kind of mobile formwork system | |
| CN104806012A (en) | Large-scale high-altitude bearing cantilever beam device and construction method thereof | |
| CN111267064B (en) | Large-inclination hydroelectric penstock assembling and welding trolley |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Open date: 20091111 |