CN210067544U - Prefabricated steel structure protective shed frame for railway business line - Google Patents
Prefabricated steel structure protective shed frame for railway business line Download PDFInfo
- Publication number
- CN210067544U CN210067544U CN201920516246.2U CN201920516246U CN210067544U CN 210067544 U CN210067544 U CN 210067544U CN 201920516246 U CN201920516246 U CN 201920516246U CN 210067544 U CN210067544 U CN 210067544U
- Authority
- CN
- China
- Prior art keywords
- concrete foundation
- shed frame
- steel structure
- protective shed
- reduced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
A prefabricated steel structure protective shed frame for a railway business line. The concrete foundation comprises a concrete foundation, embedded bolts, upright posts, cross beams, tie bars and a roof panel; the utility model discloses the advantage: the beam is made of H-shaped steel, so that the quality is ensured, and the cost of raw materials is reduced; the dead weight of the whole structure is reduced, the pressure of the upright post is reduced, and the strength of the whole structure is improved. The nodes are all designed to be connected through bolts without welding. Need not to use equipment such as electric welding in the installation, reduced the construction process, improved the work efficiency of construction in the skylight point, avoided safety risks such as high altitude welding, electric shock simultaneously. When in installation, the components can be assembled on the ground according to different parts and then integrally hoisted; the assembling process can be carried out outside the skylight points, so that the construction processes in the skylight points are reduced, and the working efficiency is improved. If later stage turnover, only need to demolish the bolt and can realize whole turnover, turnover efficiency, high quality avoid causing the unnecessary extravagant because of welding, the partial structure damage that the cutting caused.
Description
Technical Field
The utility model belongs to the technical field of railway construction protector, especially, relate to a railway business line is with prefabricated assembled steel construction protection rack.
Background
In the construction process of crossing six arches on a railway business line or crossing other railway bridges, due to uncontrollable construction process, materials, tools and waste materials often fall on the business line, so that accidents occur in railway driving, and therefore in the construction process of crossing railway bridge engineering, a railway protection shed frame needs to be installed between the business line and a construction main structure to protect the business line from being influenced by external construction conditions; the raw and other materials that traditional protection rack used are comparatively heavy, lead to the loaded down with trivial details, the engineering volume is great, construction period is long, inefficiency, can't effectively have enough to meet the need the use scheduling problem to appear the process in the installation.
Disclosure of Invention
In order to solve the problem, the utility model aims to provide a railway business line is with prefabricated assembled steel construction protection rack.
In order to achieve the purpose, the prefabricated steel structure protective shed frame for the railway business line comprises a concrete foundation, pre-buried bolts, stand columns, cross beams, tie bars and a roof panel; the concrete foundations are in a long-strip plate shape, and the two concrete foundations are arranged on roadbeds on two sides of a business line below the construction main body structure side by side; the lower parts of the embedded bolts are embedded in the concrete foundation, and a plurality of groups of embedded bolts are arranged on the concrete foundation at intervals along the length direction of the concrete foundation; the lower end of each upright post is connected to a concrete foundation by a group of embedded bolts and nuts; two ends of each cross beam are respectively connected with the upper ends of two corresponding upright posts; two ends of the tie bars are connected to two adjacent cross beams at intervals; the roof panel is laid on the outer sides of the cross beams and the tie bars and is fixed by nuts.
The prefabricated steel structure protective shed frame for the railway business line further comprises a cross brace connected between every two adjacent stand columns.
Each group of embedded bolts consists of 6 embedded bolts distributed in a shape like a Chinese character 'ri'.
The cross beam is made of H-shaped steel.
The utility model provides a railway business line is with prefabricated assembled steel construction protection rack has following advantage:
1. the beam is made of H-shaped steel, so that the quality is ensured, and the cost of raw materials is reduced; meanwhile, the dead weight of the whole structure is reduced, the pressure of the stand column is reduced, and the strength of the whole structure is improved.
2. The nodes are all designed to be connected through bolts without welding. Need not to use equipment such as electric welding in the installation, reduced the construction process, improved the work efficiency of construction in the skylight point, avoided safety risks such as high altitude welding, electric shock simultaneously.
4. When in installation, the components can be assembled on the ground according to different parts and then integrally hoisted; the assembling process can be carried out outside the skylight points, so that the construction processes in the skylight points are reduced, and the working efficiency is improved. If later stage turnover, only need to demolish the bolt and can realize whole turnover, turnover efficiency, high quality avoid causing the unnecessary extravagant because of welding, the partial structure damage that the cutting caused.
5. Through the inspection and calculation of professional departments, the structural design completely meets the construction protection requirements of the railway business line.
Drawings
Fig. 1 is the utility model provides a railway business line is with prefabricated assembled steel construction protection canopy frame side view.
Fig. 2 is the utility model provides a railway business line is with prefabricated assembled steel construction protection rack main view.
Fig. 3 is the utility model provides a railway business line is with prefabricated assembled steel construction protection canopy frame top view.
Fig. 4 is the utility model provides a basic site structure enlargements in prefabricated assembled steel construction protection rack for railway business line.
Detailed Description
The following detailed description of the present invention will be made with reference to the accompanying drawings and specific embodiments.
As shown in fig. 1-4, the prefabricated steel structure protective shed for railway business lines provided by the utility model comprises a concrete foundation 1, a pre-embedded bolt 2, a column 3, a beam 4, a tie bar 5 and a roof panel 6; the concrete foundations 1 are long-strip plate-shaped, and the two concrete foundations 1 are arranged on roadbeds on two sides of a business line below a construction main body structure side by side; the lower parts of the embedded bolts 2 are embedded in the concrete foundation 1, and a plurality of groups of embedded bolts are arranged on the concrete foundation 1 at intervals along the length direction of the concrete foundation 1; the lower end of each upright post 3 is connected to a concrete foundation 1 by a group of embedded bolts 2 and nuts; two ends of each beam 4 are respectively connected with the upper ends of two corresponding upright posts 3; two ends of the tie bars 5 are connected to two adjacent cross beams 4 at intervals; the roof panel 6 is laid on the outer sides of the plurality of cross members 4 and the tie bars 5 and fixed by nuts.
The prefabricated steel structure protective shed frame for the railway business line further comprises a cross brace 7 connected between every two adjacent upright posts 3.
Each group of embedded bolts consists of 6 embedded bolts 2 distributed in a shape like a Chinese character 'ri'.
The cross beam 4 adopts H-shaped steel to reduce the weight, thereby reducing the load of the whole structure.
Will now the utility model provides a railway business line is with prefabricated assembled steel construction protection rack's construction method explains as follows:
1. firstly, a constructor manufactures two concrete foundations 1 on roadbeds at two sides of a business line below a construction main body structure and arranges embedded bolts 2;
2. according to the actual situation of a construction site, after the upright columns 3 are hoisted, the lower end of each upright column 3 is connected to the concrete foundation 1 by a group of embedded bolts and nuts; or two upright posts 3 and a cross beam 4 are assembled and then the upright posts 3 are hoisted and fixed;
3. connecting two ends of a plurality of tie bars 5 to two adjacent cross beams 4 at intervals; then, the roof panel 6 is laid on the outer sides of the plurality of cross beams 4 and the tie bars 5 and is fixed by nuts;
4. a cross brace 7 is arranged between two adjacent upright posts 3.
Claims (4)
1. The utility model provides a railway business line is with prefabricated assembled steel construction protection rack which characterized in that: the prefabricated steel structure protective shed frame comprises a concrete foundation (1), embedded bolts (2), upright posts (3), cross beams (4), tie bars (5) and a roof panel (6); the concrete foundations (1) are in a long-strip plate shape, and the two concrete foundations (1) are arranged on roadbeds on two sides of a business line below a construction main body structure side by side; the lower parts of the embedded bolts (2) are embedded in the concrete foundation (1), and a plurality of groups of embedded bolts are arranged on the concrete foundation (1) at intervals along the length direction of the concrete foundation (1); the lower end of each upright post (3) is connected to the concrete foundation (1) by a group of embedded bolts (2) and nuts; two ends of each cross beam (4) are respectively connected with the upper ends of two corresponding upright posts (3); two ends of the tie bars (5) are connected to two adjacent cross beams (4) at intervals; the roof panels (6) are laid on the outer sides of the cross beams (4) and the tie bars (5) and are fixed by nuts.
2. The prefabricated steel structure protective shed frame for railway business lines of claim 1, wherein: the prefabricated steel structure protective shed frame for the railway business line further comprises a cross brace (7) connected between every two adjacent upright posts (3).
3. The prefabricated steel structure protective shed frame for railway business lines of claim 1, wherein: each group of embedded bolts consists of 6 embedded bolts (2) distributed in a shape like a Chinese character 'ri'.
4. The prefabricated steel structure protective shed frame for railway business lines of claim 1, wherein: the cross beam (4) is made of H-shaped steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920516246.2U CN210067544U (en) | 2019-04-11 | 2019-04-11 | Prefabricated steel structure protective shed frame for railway business line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920516246.2U CN210067544U (en) | 2019-04-11 | 2019-04-11 | Prefabricated steel structure protective shed frame for railway business line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210067544U true CN210067544U (en) | 2020-02-14 |
Family
ID=69437052
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920516246.2U Active CN210067544U (en) | 2019-04-11 | 2019-04-11 | Prefabricated steel structure protective shed frame for railway business line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210067544U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287498A (en) * | 2020-02-22 | 2020-06-16 | 浙江大学宁波理工学院 | Protective shed frame for construction of overhead bridge box girder crossing railway and erection method |
CN111485479A (en) * | 2020-04-24 | 2020-08-04 | 中铁十局集团第八工程有限公司 | Traffic channel beam device for crossing railway business line and construction method |
CN113431394A (en) * | 2021-08-11 | 2021-09-24 | 中建八局第四建设有限公司 | Protective shed for electronic box |
CN114233028A (en) * | 2021-12-31 | 2022-03-25 | 中铁五局集团有限公司 | Construction method of movable protective shed during construction of steel structure main body of traffic junction station platform |
-
2019
- 2019-04-11 CN CN201920516246.2U patent/CN210067544U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287498A (en) * | 2020-02-22 | 2020-06-16 | 浙江大学宁波理工学院 | Protective shed frame for construction of overhead bridge box girder crossing railway and erection method |
CN111485479A (en) * | 2020-04-24 | 2020-08-04 | 中铁十局集团第八工程有限公司 | Traffic channel beam device for crossing railway business line and construction method |
CN113431394A (en) * | 2021-08-11 | 2021-09-24 | 中建八局第四建设有限公司 | Protective shed for electronic box |
CN114233028A (en) * | 2021-12-31 | 2022-03-25 | 中铁五局集团有限公司 | Construction method of movable protective shed during construction of steel structure main body of traffic junction station platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210067544U (en) | Prefabricated steel structure protective shed frame for railway business line | |
CN102758499A (en) | Precast prestressed steel girder with post-seismic restorable function | |
CN203347251U (en) | Movable protective canopy for road-spanning construction | |
CN102433888B (en) | Assembled steel bushing box | |
CN205775852U (en) | A kind of active force conversion support for steel structure support moulding bed top | |
CN103758024B (en) | The steel structure footbridge of quickly dismantled | |
CN206873307U (en) | Movable type bridge justifies pier stud work high above the ground operating platform | |
CN113585075A (en) | Cast-in-place bridge deck formwork for steel-concrete composite beam | |
CN202755370U (en) | Structure for improving rigidity and stability of foundation pit steel support | |
CN102261043A (en) | Assembled steel pipe upright post system | |
CN203684061U (en) | Steel pedestrian overcrossing fast to disassemble or assemble | |
CN104775572A (en) | Pre-stressed precast canopy plate for railway platform | |
CN209907211U (en) | Girder steel beam device that falls | |
CN202215006U (en) | Tool-type fixed ladder for construction | |
CN207905104U (en) | A kind of assembled architecture truss structure | |
CN202152442U (en) | Assembling type steel tube-vertical post system | |
CN210027398U (en) | Be applied to safety isolation protection shed structure in subway station rail line area | |
CN107217685A (en) | A kind of Portable piping lane side wall formwork jumbo | |
CN208965579U (en) | A kind of non-console mode lattice tower crane platform | |
CN102913007A (en) | Steel reinforcement processing shed and construction method therefor | |
CN203213022U (en) | Mobile temporary prestress tensioning anchor block | |
CN207794690U (en) | The assembled steel reinforced machining shed that can be had enough to meet the need | |
CN219773700U (en) | Station construction is with protection canopy | |
CN215164753U (en) | A assembled guardrail for high mound top construction | |
CN217839706U (en) | Steel truss girder stiffening chord member connecting operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |