CN203684061U - Steel pedestrian overcrossing fast to disassemble or assemble - Google Patents

Steel pedestrian overcrossing fast to disassemble or assemble Download PDF

Info

Publication number
CN203684061U
CN203684061U CN201420024198.2U CN201420024198U CN203684061U CN 203684061 U CN203684061 U CN 203684061U CN 201420024198 U CN201420024198 U CN 201420024198U CN 203684061 U CN203684061 U CN 203684061U
Authority
CN
China
Prior art keywords
hole
bridge
nut
bolt
iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420024198.2U
Other languages
Chinese (zh)
Inventor
田睿
宁晓骏
成耀华
李灿琼
付汝高
仝冰冰
钟炳波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Original Assignee
YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN KUNGANG STEEL STRUCTURE CO Ltd filed Critical YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Priority to CN201420024198.2U priority Critical patent/CN203684061U/en
Application granted granted Critical
Publication of CN203684061U publication Critical patent/CN203684061U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a steel pedestrian overcrossing fast to disassemble or assemble. The steel pedestrian overcrossing comprises a pier, a bridge arranged on the pier and provided with a bridge floor, steps arranged at the two ends of the bridge and guardrails arranged on the two sides of the bridge and the two sides of the steps and is characterized in that the bridge is composed of a connecting assembly and a plurality of H-shaped steel pieces with through holes, the connecting assembly comprises end plates arranged at the front ends and tail ends of the H-shaped steel pieces, clamping plates arranged in H-shaped steel grooves and connecting plates, the end plates are provided with through holes, the clamping plates are provided with through holes, the connecting plates are arranged between every two adjacent clamping plates and provided with through holes, and bolts and nuts are arranged in the through holes. Because the pedestrian overcrossing can be quickly and conveniently assembled or disassembled, building or disassembling time is greatly shortened, road traffic pressure is released, the disassembled pedestrian overcrossing can be repeatedly used, materials are greatly saved, and cost is greatly reduced; furthermore, due to the adoption of the assembly-type structure, batch production and assembled piece transport can be achieved, and large-scale intensive production, transport and installing are facilitated.

Description

The steel structure footbridge of quickly dismantled
Technical field
The utility model relates to the steel structure footbridge of a kind of pedestrian overcrossing, particularly a kind of quickly dismantled, belongs to bridge construction design and manufacturing technology field.
Background technology
Pedestrian overcrossing is indispensable architectural construction in urban construction, and it can solve people, car mixes the current traffic safety problem existing.But because existing pedestrian overcrossing mostly is steel and concrete structure, while construction in the city many people, vehicle flowrate is large, understand because the time is long, take limited path resource, and bring adverse effect to urban highway traffic and people's trip.Meanwhile, this permanent bridge changes need to remove time in urban planning, not only time-consuming taking a lot of work, once and remove and again cannot utilize, cause waste of raw materials.Though also develop the pedestrian overcrossing of steel work at present, but still have Heavy Weight, welding procedure amount is large, dismounting inconvenience, volume is large, transports the problems such as difficulty.Therefore be necessary prior art to be improved.
Summary of the invention
For solving existing pedestrian overcrossing because adopting steel and concrete structure, and take path resource in the time building or remove, time-consuming taking a lot of work, can not reuse, or because adopting steel work to have Heavy Weight, the problems such as welding procedure amount is large, dismounting inconvenience, the utility model provides a kind of steel structure footbridge of quickly dismantled.
The utility model completes by following technical proposal: a kind of steel structure footbridge of quickly dismantled, comprise bridge pier, and be located at the bridge with bridge floor on bridge pier, with the ladder of being located at bridge two ends, be located at the guardrail of bridge and ladder both sides, it is characterized in that bridge is made up of several i iron and the coupling assembling of establishing through hole on it, many i iron are connected into bridge by coupling assembling.
Described coupling assembling comprises the end plate of establishing through hole on its that be located at i iron head and the tail two ends, and be located at the clamp of establishing through hole on its in i iron groove, and be located at the connecting plate of establishing through hole on its between clamp between two, in through hole, be provided with bolt and nut, to longitudinally connect i iron between two by end plate, thereby extend bridge length, more laterally connect i iron between two by clamp and connecting plate, increase bridge width, and fix by bolt and nut.
Described bridge floor comprises is located at the several piece panel of establishing through hole on its on bridge successively, is provided with bolt and nut in through hole, and this through hole is corresponding with the through hole on i iron, to connect panel on bridge by bolt and nut.
Described ladder comprises two cant beams arranged side by side, and be located at successively several grades of L-squares on two cant beams, wherein, each cant beam by i iron with and on establish through hole connection end plate form, in through hole, be provided with bolt and nut, to longitudinally connect i iron between two by connecting end plate, and be fixed by bolt and nut, thereby extend cant beam length.
The horizontal end face of described each L-square and the vertically two ends of end face are welded on respectively on two cant beams, to form multistage ladder.
Described bridge pier is made as several circles or ellipse or the rectangle column of different length, the top of each root post and bottom are respectively equipped with top board and the chassis with through hole, in through hole, be provided with bolt and nut, to pass through bolt and nut fixed underpan in underground reinforced concrete foundation, fix bridge, ladder on several bridge piers by bolt and nut again, thereby form the pedestrian overcrossing with ladder, bridge.
Described guardrail comprises vertical rod, is fixed on the cross bar between vertical rod, and the bottom of each vertical rod is provided with the base plate with through hole on it, is provided with bolt and nut in through hole, to connect guardrail in bridge and ladder both sides by bolt and nut.
The utlity model has following advantages and effect: adopt such scheme; can assemble quickly and easily or remove pedestrian overcrossing; greatly shortened the time of building or dismounting, alleviated road traffic pressure, and pedestrian overcrossing after removing is reusable; material and cost are greatly saved; in addition, owing to having adopted modular construction, can be mass, transport assembly; being conducive to scale, intensive production, transportation and installation, is a desirable pedestrian overcrossing in fact.
Accompanying drawing explanation
Fig. 1 is the front view of the utility model;
Fig. 2 is the top view of the utility model;
Fig. 3 is the A-A view of Fig. 1;
Fig. 4 is the bridge vertical structure figure of the utility model;
Fig. 5 is the B-B view of Fig. 4;
Fig. 6 is the cross-section of bridge structure chart of the utility model;
Fig. 7 is the structure chart of winning in succession of the utility model;
Fig. 8 is the deck structrue figure of the utility model;
Fig. 9 is the hierarchic structure figure of the utility model;
Figure 10 is the guard bar structure figure of the utility model;
Figure 11 is the bridge pier chassis structure figure of the utility model;
Figure 12 is the guardrail base arrangement figure of the utility model.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further.
The steel structure footbridge of the quickly dismantled that the utility model provides, comprise bridge pier 9, and be located at the bridge with bridge floor 81 on bridge pier 9, with the ladder 2 of being located at bridge 1 two ends, be located at the guardrail 3 of bridge 1 and ladder 2 both sides, bridge 1 is made up of several i iron 10 and the coupling assembling of establishing the first through hole 19 on it, coupling assembling comprises the end plate 11 of establishing the second through hole 12 on its that be located at i iron 10 head and the tail two ends, and be located at the clamp 14 of establishing third through-hole 13 on its in i iron 10 grooves, and be located at the connecting plate 15 of establishing fourth hole 16 on its between clamp 14 between two, the first through hole 19, the second through hole 12, in third through-hole 13, be equipped with bolt and nut, bridge floor 8 comprises is located at the several piece panel 17 of establishing fifth hole 18 on its on bridge 1 successively, in fifth hole 18, be provided with bolt and nut, this fifth hole 18 is corresponding with the first through hole 19 on i iron 10, fix with bolts and nuts to facilitate, ladder 2 comprises two cant beams 7 arranged side by side, and be located at successively the several piece L-square 21 on two cant beams 7, wherein each cant beam by i iron 20 with and on establish the second through hole 12 connection end plate 11 form, in the second through hole 12, be provided with bolt and nut, connect i iron 20 between two to facilitate, the horizontal end face of described each L-square 21 and the vertically two ends of end face are welded on respectively on two cant beams 7, to form multistage ladder, bridge pier 9 is made as several circular abutments of different length, the napex of each root circular abutment and bottom are respectively equipped with top board 22 and the chassis 23 with the 6th through hole 24, top board 22 and bridge 1, ladder 2 is connected, and fix by screw bolt and nut, chassis 23 is connected with underground concrete foundation, and fix by screw bolt and nut, guardrail 3 comprises vertical rod 6, be fixed on the cross bar 5 between vertical rod 6, the bottom of each vertical rod is provided with the base plate 4 with the 7th through hole 25 on it, in the 7th through hole 25, be provided with bolt and nut, so that nonfloating rail 3 is in bridge 1, ladder 2 both sides, as Fig. 1~Figure 12.

Claims (5)

1. the steel structure footbridge of a quickly dismantled, comprise bridge pier, and be located at the bridge with bridge floor on bridge pier, and be located at the ladder at bridge two ends, be located at the guardrail of bridge and ladder both sides, it is characterized in that bridge is made up of several i iron and the coupling assembling of establishing through hole on it; Described coupling assembling comprises on its that be located at i iron head and the tail two ends establishes the end plate of through hole, and is located on its in i iron groove and establishes the clamp of through hole, and is located at the connecting plate of establishing through hole on its between clamp between two, is provided with bolt and nut in through hole.
2. the steel structure footbridge of quickly dismantled according to claim 1, is characterized in that described bridge floor comprises to be located at successively the several piece panel of establishing through hole on its on bridge, in through hole, be provided with bolt and nut, this through hole is corresponding with the through hole on i iron.
3. the steel structure footbridge of quickly dismantled according to claim 1, it is characterized in that described ladder comprises two cant beams arranged side by side, and be located at successively several grades of L-squares on two cant beams, wherein, each cant beam by i iron with and on establish through hole connection end plate form, in through hole, be provided with bolt and nut.
4. the steel structure footbridge of quickly dismantled according to claim 1, it is characterized in that described bridge pier is made as several circles or ellipse or the rectangle column of different length, the top of each root post and bottom are respectively equipped with top board and the chassis with through hole, are provided with bolt and nut in through hole.
5. the steel structure footbridge of quickly dismantled according to claim 1, is characterized in that described guardrail comprises vertical rod, is fixed on the cross bar between vertical rod, and the bottom of each vertical rod is provided with the base plate with through hole on it, is provided with bolt and nut in through hole.
CN201420024198.2U 2014-01-15 2014-01-15 Steel pedestrian overcrossing fast to disassemble or assemble Expired - Fee Related CN203684061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420024198.2U CN203684061U (en) 2014-01-15 2014-01-15 Steel pedestrian overcrossing fast to disassemble or assemble

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420024198.2U CN203684061U (en) 2014-01-15 2014-01-15 Steel pedestrian overcrossing fast to disassemble or assemble

Publications (1)

Publication Number Publication Date
CN203684061U true CN203684061U (en) 2014-07-02

Family

ID=51005984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420024198.2U Expired - Fee Related CN203684061U (en) 2014-01-15 2014-01-15 Steel pedestrian overcrossing fast to disassemble or assemble

Country Status (1)

Country Link
CN (1) CN203684061U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758024A (en) * 2014-01-15 2014-04-30 云南昆钢钢结构有限公司 Quick assembling and disassembling steel-structure pedestrian overpass
CN104452568A (en) * 2014-11-28 2015-03-25 林同棪国际工程咨询(中国)有限公司 Steel plate girder pedestrian overbridge
CN105862611A (en) * 2015-01-20 2016-08-17 任丘市永基建筑安装工程有限公司 Secondary utilization technique for steel arch bridge
CN111254796A (en) * 2020-01-20 2020-06-09 中铁三局集团建筑安装工程有限公司 Single-side integral hoisting long-span overbridge for multiple railway business lines and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758024A (en) * 2014-01-15 2014-04-30 云南昆钢钢结构有限公司 Quick assembling and disassembling steel-structure pedestrian overpass
CN103758024B (en) * 2014-01-15 2015-12-30 云南昆钢钢结构有限公司 The steel structure footbridge of quickly dismantled
CN104452568A (en) * 2014-11-28 2015-03-25 林同棪国际工程咨询(中国)有限公司 Steel plate girder pedestrian overbridge
CN105862611A (en) * 2015-01-20 2016-08-17 任丘市永基建筑安装工程有限公司 Secondary utilization technique for steel arch bridge
CN111254796A (en) * 2020-01-20 2020-06-09 中铁三局集团建筑安装工程有限公司 Single-side integral hoisting long-span overbridge for multiple railway business lines and construction method

Similar Documents

Publication Publication Date Title
CN103758024B (en) The steel structure footbridge of quickly dismantled
KR101391637B1 (en) Constrution methoed for Prestressed Composite Truss girder using steel truss member
CN203684061U (en) Steel pedestrian overcrossing fast to disassemble or assemble
CN207829599U (en) A kind of ecological enclosure wall that construction site can be recycled
JP2016008406A (en) Temporary bearing method for main girder in floor slab replacement work with composite girder, floor slab replacement method with composite girder, and temporary bearing structure for main girder in floor slab replacement work with composite girder
CN210067544U (en) Prefabricated steel structure protective shed frame for railway business line
CN106758741B (en) Modular box type plate beam structure and pontic erection method based on box type plate beam structure
CN210066504U (en) Large-span cantilever truss type bent cap support system
CN204849604U (en) Section closure was with rear -mounted strength nature skeleton concrete arch rib festival
CN102864746A (en) Bearing frame for bridge construction
CN202430823U (en) Detachable steel bar processing protective shed
CN202577162U (en) Combined-type steel pipe bracket
CN202152442U (en) Assembling type steel tube-vertical post system
CN110374018B (en) Method for reinforcing combined steel large cross beam erected multi-span temporary beam line
CN201351262Y (en) Light self-balancing assembly car platform bridge
CN203639814U (en) Assembled monolithic hollow slab bridge
CN108316119B (en) Steel construction overpass convenient to installation
CN106592434A (en) Modular box-type beam-slab structure and bridge erection method based on box-type beam-slab structure
CN202347665U (en) Connection node constructional member of reinforced concrete beam and steel beam
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction
CN202248510U (en) Transversely arranged brace rod type bailey
CN206360079U (en) A kind of frame structure
CN205399827U (en) Concrete column, roof beam, board handing -over department are with prefabricated unit -installment reinforced frame
CN205036162U (en) Basis is kept off to prefabricated enclosing of repeatedly usable
CN215366840U (en) Railway bridge lower blocking ballast and water intercepting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20190115

CF01 Termination of patent right due to non-payment of annual fee