CN105201194A CN201510440489.9A CN201510440489A CN105201194A CN 105201194 A CN105201194 A CN 105201194A CN 201510440489 A CN201510440489 A CN 201510440489A CN 105201194 A CN105201194 A CN 105201194A
Authority
CN
China
Prior art keywords
support layer
buckle
horizontal support
gas chamber
anchors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510440489.9A
Other languages
Chinese (zh)
Other versions
CN105201194B (en
Inventor
张凤勇
李世嵩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai Mcc No13 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mcc No13 Construction Co Ltd filed Critical Shanghai Mcc No13 Construction Co Ltd
Priority to CN201510440489.9A priority Critical patent/CN105201194B/en
Publication of CN105201194A publication Critical patent/CN105201194A/en
Application granted granted Critical
Publication of CN105201194B publication Critical patent/CN105201194B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to the field of engineering building dismantling construction, in particular to a scaffold system for dismantling a large gas holder. The scaffold system comprises an operating area module. The scaffold system is characterized in that a wall pulling part is included and comprises a barrel, a seal cover, two anchor pieces, a rotating shaft and a coil spring; one end of the barrel is provided with notches, the anchor pieces are arranged in the notches, the rotating shaft penetrates through the side end of the barrel and rotatably connects the anchor pieces, the coil spring is arranged on the rotating shaft in a penetrating mode, and the two ends of the coil spring are connected with the anchor pieces respectively, so that the anchor pieces can be elastically and rotatably connected; the seal cover is arranged at an opening in the side end to limit the springback amplitude of the anchor pieces, and two overlapping steel pipes forming longitudinal and horizontal supporting are connected with the barrel through hoops. According to the scaffold system, by adopting the structural design, manufacturing is easy, installing is convenient, the pertinence is high, operating is easy, the construction efficiency of gas holder dismantling operation is improved, the engineering safety is guaranteed, and the engineering cost is lowered.

Description

For removing the connection system for guide rail of large-scale gas chamber
Technical field
The present invention relates to engineering works Demolition Construction field, specifically for removing the connection system for guide rail of large-scale gas chamber.
Background technology
In the Demolition Construction of large-scale gas chamber, there is no special connection system for guide rail, common scaffold is only used to be arranged on the external surface of gas chamber, because traditional pin hand cradle is inconvenient on arranging, the construction speed of removing operation can be affected, therefore eliminate the step of installation foot hand cradle compared with multiple-project, and then make the safety of operating personnel be difficult to be guaranteed; Meanwhile, a large amount of fiery slag can be produced when cutting large-scale gas chamber, unifying if do not carried out to collect, then also there is a large amount of hidden fire-fighting danger.
Summary of the invention
The object of the invention is to, provide a kind of installation, easy to use, the connection system for guide rail that can have enough to meet the need use, it can improve gas chamber and removes efficiency of operation and improve the safety of removing operation.
In order to achieve the above object, the present invention is achieved in that
For removing a connection system for guide rail for large-scale gas chamber, it comprises the multilayer planar supporting layer that level is laid from top to bottom and tiltedly chooses layer with for what be connected by levels horizontal support layer; Connect with vertically disposed joint steel pipe between each planar support layer; Planar support layer comprises top horizontal support layer and is positioned at all the other horizontal support layer below it, and top horizontal support layer comprises the plane longitudinal bracing that two steel pipes overlap, and all the other horizontal support layer comprise the plane longitudinal bracing that single steel pipe is formed; Wherein, be fixed on the two ends of an anchor tube respectively by steel tube fastener as two steel pipes of top horizontal support layer plane longitudinal bracing, this anchor tube is vertically arranged on the sash rib of gas chamber outer wall; The single steel pipe forming all the other horizontal support layer plane longitudinal bracings to be connected with a wall draw piece by steel tube fastener thus to realize the connection with gas chamber external surface; Described wall draw piece comprises cylindrical shell, capping, two panels anchors, rotating shaft and coil spring, the upper and lower symmetry in cylindrical shell one end has two notches, two panels anchors is located in described notch, rotating shaft runs through this side end of cylindrical shell and two panels anchors is rotationally connected, coil spring is also arranged in rotating shaft and the two ends of coil spring and is connected with two panels anchors respectively, thus make between two panels anchors, to realize elastic rotation connection, the resilience amplitude of this side end opening part of cylindrical shell and then restriction anchors is located in capping; Top horizontal support layer and all the other horizontal support layer each are equipped with buckle.
The described connection system for guide rail for removing large-scale gas chamber, also comprises fiery slag collecting vessel, and this fiery slag collecting vessel comprises staving, magnet and handle, staving open top and lateral wall is provided with handle, and magnet is located on the inwall of staving inside wall; The inside wall of staving is the circular arc of indent, and it is for the external surface of gas chamber of fitting, and whole fiery slag collecting vessel is adsorbed on the external surface of gas chamber by magnetic force by magnet.
The described connection system for guide rail for removing large-scale gas chamber, the buckle be laid on top horizontal support layer and all the other horizontal support layer each comprises longitudinal buckle of horizontal buckle and several horizontal continuous layings, described horizontal buckle, longitudinal buckle is by symmetrically arranged pull bar and to be layed between two pull bars and brace for being connected by two pull bars is formed, described pull bar is direct rod shape, its both ends bend downwards, when buckle is laid on supporting layer, the kink at pull bar both ends forms drag hook, thus buckle is held on the steel pipe of formation supporting layer, operating surface is formed after horizontal buckle and supporting layer fastening, longitudinal buckle continuous transverse lay and with supporting layer fastening after form work plane.
This connection system for guide rail adopts said structure design, and it makes easily, easy for installation, with strong points, simple to operate, improves gas chamber and removes the efficiency of construction of operation and ensure that engineering safety, reduce engineering cost.
Accompanying drawing explanation
Fig. 1 is the lateral view of this connection system for guide rail.
Fig. 2 is the top view of this connection system for guide rail.
Fig. 3 is the structural representation of wall draw piece.
Fig. 4 is the installation steps schematic diagram of wall draw piece.
Fig. 5 is the lateral view of buckle.
Fig. 6 is the top view of buckle.
Fig. 7 is the structural representation of fiery slag collecting vessel.
Detailed description of the invention
The present invention is further illustrated below by way of specific embodiment.
For removing a connection system for guide rail for large-scale gas chamber, as shown in Figure 1 and Figure 2, it comprises the multilayer planar supporting layer that level from top to bottom lays and tiltedly chooses layer 5 with for what be connected by levels horizontal support layer, connect with vertically disposed joint steel pipe between each planar support layer, all the other horizontal support layer 4 that planar support layer comprises top horizontal support layer 3 and is positioned at below it, top horizontal support layer 3 comprises the plane longitudinal bracing that two steel pipes overlap, and all the other horizontal support layer 4 comprise the plane longitudinal bracing that single steel pipe is formed, wherein, be fixed on the two ends of an anchor tube respectively by steel tube fastener as two steel pipes of top horizontal support layer 3 plane longitudinal bracing, this anchor tube is vertically arranged on the sash rib 2 of gas chamber 1 outer wall, the single steel pipe forming all the other horizontal support layer 4 plane longitudinal bracings to be connected with a wall draw piece by steel tube fastener thus to realize the connection with gas chamber 1 external surface, as Fig. 3, described in 4, wall draw piece comprises cylindrical shell 10, capping 11, two panels anchors 12, 13, rotating shaft 14 and coil spring 15, the upper and lower symmetry in cylindrical shell 10 1 end has two notches, two panels anchors 12, 13 are located in described notch, rotating shaft 14 runs through this side end of cylindrical shell 10 and by two panels anchors 12, 13 are rotationally connected, coil spring 15 be also arranged in the rotating shaft 14 and two ends of coil spring 15 respectively with two panels anchors 12, 13 connect, thus make two panels anchors 12, realize elastic rotation between 13 to connect, this side end opening part of cylindrical shell 10 and then restriction anchors 12 are located in capping 11, the resilience amplitude of 13, top horizontal support layer 3 and all the other horizontal support layer 4 each are equipped with buckle.
As shown in Figure 7, the described connection system for guide rail for removing large-scale gas chamber, also comprises fiery slag collecting vessel, and this fiery slag collecting vessel comprises staving 19, magnet 21 and handle 20, staving 19 open top and lateral wall is provided with handle 20, magnet 21 is located on the inwall of staving 19 inside wall; The inside wall of staving 19 is the circular arc of indent, and it is for the external surface of gas chamber 1 of fitting, and whole fiery slag collecting vessel is adsorbed on the external surface of gas chamber 1 by magnetic force by magnet 21.
As shown in Figure 2, the described connection system for guide rail for removing large-scale gas chamber, the buckle be laid on top horizontal support layer 3 and all the other horizontal support layer 4 each comprises longitudinal buckle 6 of horizontal buckle 7 and several horizontal continuous layings, as Fig. 5, shown in 6, described horizontal buckle 7, longitudinal buckle 6 is by symmetrically arranged pull bar 8 and to be layed between two pull bars 8 and brace 9 for being connected by two pull bars 8 is formed, described pull bar 8 is in direct rod shape, its both ends bend downwards, when buckle is laid on supporting layer, the kink at pull bar 8 both ends forms drag hook, thus buckle is held on the steel pipe of formation supporting layer, operating surface is formed after horizontal buckle 7 and supporting layer fastening, longitudinal buckle 6 continuous transverse lay and with supporting layer fastening after form work plane.
As shown in Figure 4, the mounting method of wall draw piece is:
1, punch at gas chamber steel wall;
2, wall draw piece to be imported in hole with the end of anchors and anchors is opened, whole wall draw piece being anchored on gas chamber 1 steel wall;
3, the single steel pipe forming all the other horizontal support layer 4 plane longitudinal bracings is locked jail by steel tube fastener and wall draw piece.
This connection system for guide rail adopts said structure design, and it makes easily, easy for installation, with strong points, simple to operate, improves gas chamber and removes the efficiency of construction of operation and ensure that engineering safety, reduce engineering cost.

Claims (3)

1. for removing a connection system for guide rail for large-scale gas chamber, it is characterized in that: it comprises the multilayer planar supporting layer that level is laid from top to bottom and tiltedly chooses layer with for what be connected by levels horizontal support layer; Connect with vertically disposed joint steel pipe between each planar support layer; Planar support layer comprises top horizontal support layer and is positioned at all the other horizontal support layer below it, and top horizontal support layer comprises the plane longitudinal bracing that two steel pipes overlap, and all the other horizontal support layer comprise the plane longitudinal bracing that single steel pipe is formed; Wherein, be fixed on the two ends of an anchor tube respectively by steel tube fastener as two steel pipes of top horizontal support layer plane longitudinal bracing, this anchor tube is vertically arranged on the sash rib of gas chamber outer wall; The single steel pipe forming all the other horizontal support layer plane longitudinal bracings to be connected with a wall draw piece by steel tube fastener thus to realize the connection with gas chamber external surface; Described wall draw piece comprises cylindrical shell, capping, two panels anchors, rotating shaft and coil spring, the upper and lower symmetry in cylindrical shell one end has two notches, two panels anchors is located in described notch, rotating shaft runs through this side end of cylindrical shell and two panels anchors is rotationally connected, coil spring is also arranged in rotating shaft and the two ends of coil spring and is connected with two panels anchors respectively, thus make between two panels anchors, to realize elastic rotation connection, the resilience amplitude of this side end opening part of cylindrical shell and then restriction anchors is located in capping; Top horizontal support layer and all the other horizontal support layer each are equipped with buckle.
2. the connection system for guide rail for removing large-scale gas chamber according to claim 1, it is characterized in that: also comprise fiery slag collecting vessel, this fiery slag collecting vessel comprises staving, magnet and handle, staving open top and lateral wall is provided with handle, and magnet is located on the inwall of staving inside wall; The inside wall of staving is the circular arc of indent, and it is for the external surface of gas chamber of fitting, and whole fiery slag collecting vessel is adsorbed on the external surface of gas chamber by magnetic force by magnet.
3. the connection system for guide rail for removing large-scale gas chamber according to claim 1, it is characterized in that: the buckle be laid on top horizontal support layer and all the other horizontal support layer each comprises longitudinal buckle of horizontal buckle and several horizontal continuous layings, described horizontal buckle, longitudinal buckle is by symmetrically arranged pull bar and to be layed between two pull bars and brace for being connected by two pull bars is formed, described pull bar is direct rod shape, its both ends bend downwards, when buckle is laid on supporting layer, the kink at pull bar both ends forms drag hook, thus buckle is held on the steel pipe of formation supporting layer, operating surface is formed after horizontal buckle and supporting layer fastening, longitudinal buckle continuous transverse lay and with supporting layer fastening after form work plane.
CN201510440489.9A 2015-07-24 2015-07-24 Connection system for guide rail for removing large-scale gas chamber Active CN105201194B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510440489.9A CN105201194B (en) 2015-07-24 2015-07-24 Connection system for guide rail for removing large-scale gas chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510440489.9A CN105201194B (en) 2015-07-24 2015-07-24 Connection system for guide rail for removing large-scale gas chamber

Publications (2)

Publication Number Publication Date
CN105201194A true CN105201194A (en) 2015-12-30
CN105201194B CN105201194B (en) 2017-08-25

Family

ID=54949120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510440489.9A Active CN105201194B (en) 2015-07-24 2015-07-24 Connection system for guide rail for removing large-scale gas chamber

Country Status (1)

Country Link
CN (1) CN105201194B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113369A (en) * 2018-10-04 2019-01-01 司风兵 A kind of safe method for dismounting for cylinder-shaped building manual demolition
CN109372260A (en) * 2018-11-16 2019-02-22 中国二十二冶集团有限公司 Chimney reinforces scaffold connection construction method
CN111502221A (en) * 2020-04-24 2020-08-07 付祖伟 Dismounting-free scaffold for construction of building external wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0821083A (en) * 1994-07-07 1996-01-23 Kawasaki Heavy Ind Ltd Spherical tank internal scaffold device
CN1313923A (en) * 1999-07-28 2001-09-19 汇隆棚业有限公司 Scaffolding
GB2419372A (en) * 2004-10-21 2006-04-26 Alun Willis A scaffolding tie
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN103243900A (en) * 2013-05-13 2013-08-14 蒙理明 Wall connecting assembly of steel pipe scaffold
CN203846750U (en) * 2014-05-21 2014-09-24 云南建工安装股份有限公司 Buoyancy lift and turnover type external scaffolding tooling device special for installation of gas holder
CN205116682U (en) * 2015-07-24 2016-03-30 上海十三冶建设有限公司 A scaffold system for removing large -scale gas chamber

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0821083A (en) * 1994-07-07 1996-01-23 Kawasaki Heavy Ind Ltd Spherical tank internal scaffold device
CN1313923A (en) * 1999-07-28 2001-09-19 汇隆棚业有限公司 Scaffolding
GB2419372A (en) * 2004-10-21 2006-04-26 Alun Willis A scaffolding tie
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN103243900A (en) * 2013-05-13 2013-08-14 蒙理明 Wall connecting assembly of steel pipe scaffold
CN203846750U (en) * 2014-05-21 2014-09-24 云南建工安装股份有限公司 Buoyancy lift and turnover type external scaffolding tooling device special for installation of gas holder
CN205116682U (en) * 2015-07-24 2016-03-30 上海十三冶建设有限公司 A scaffold system for removing large -scale gas chamber

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113369A (en) * 2018-10-04 2019-01-01 司风兵 A kind of safe method for dismounting for cylinder-shaped building manual demolition
CN109113369B (en) * 2018-10-04 2020-07-31 司风兵 Safe demolition method for manual demolition of cylindrical building
CN109372260A (en) * 2018-11-16 2019-02-22 中国二十二冶集团有限公司 Chimney reinforces scaffold connection construction method
CN111502221A (en) * 2020-04-24 2020-08-07 付祖伟 Dismounting-free scaffold for construction of building external wall

Also Published As

Publication number Publication date
CN105201194B (en) 2017-08-25

Similar Documents

Publication Publication Date Title
CN105201194A (en) Scaffold system for dismantling large gas holder
CN203547124U (en) Control device for sliding mould protective layer
CN205116682U (en) A scaffold system for removing large -scale gas chamber
CN209012595U (en) A kind of effective connection structure of plastic coated composite steel
CN203081472U (en) Device for installing anchoring agent in anchor drill hole
CN202530444U (en) Bayonet pin type pile foundation reinforcing cage positioning lock
JP3158383U (en) Body reinforcement assembly jig
CN205063316U (en) Device for connecting scaffold and door and window entrance to a cave
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN204298820U (en) A kind of single sleeve pile pulling device
CN203373971U (en) Foldable embedded sleeve device
CN106869135B (en) Ground-connecting-wall goes along with sb. to guard him the construction method of foundation pit steel pipe support structure
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device
CN205224596U (en) A reserve sleeve pipe for floor reservation hole
CN204783057U (en) Vertical connecting device of U -shaped of tunnel steel bow member
CN204139323U (en) A kind of punching block shell mounting structures
CN205531288U (en) A hanging flower basket guide rail bearing structure for karst area
CN203284780U (en) Foundation apparatus for installing outdoor facilities and construction mounting rack
CN205689897U (en) A kind of detachable cable support
CN203594051U (en) Steel pipe pillar positioner supporting frame device used for cover and cut top-down method
CN201924585U (en) Fixed device for reinforcing bottom of upright rod of suspension scaffold for building
CN205421332U (en) Contrary coincide underground continuous wall that does of a core section of thick bamboo
CN102094523B (en) Loose spelling template reverse positioning construction method
CN206001106U (en) A kind of attachment means between underground engineering jacking construction combined type jacking steel pipe
CN204385760U (en) Tower crane lattice column posting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Fengyong

Inventor after: Duan Rongzong

Inventor after: Li Shisong

Inventor before: Zhang Fengyong

Inventor before: Li Shisong

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 2469, Baoshan District iron road, Shanghai, Shanghai

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: No. 2469, Baoshan District iron road, Shanghai, Shanghai

Patentee before: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190730

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: China Twenty Metallurgical Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: Shanghai twenty Metallurgical Construction Co., Ltd.