CN203547124U - Control device for sliding mould protective layer - Google Patents

Control device for sliding mould protective layer Download PDF

Info

Publication number
CN203547124U
CN203547124U CN201320704987.6U CN201320704987U CN203547124U CN 203547124 U CN203547124 U CN 203547124U CN 201320704987 U CN201320704987 U CN 201320704987U CN 203547124 U CN203547124 U CN 203547124U
Authority
CN
China
Prior art keywords
protective layer
control device
sliding
thickness
straight section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320704987.6U
Other languages
Chinese (zh)
Inventor
杨刚
徐红官
浦长征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Branch Shanghai Civil Engineering Co ltdOf Crec
Shanghai Civil Engineering Co Ltd of CREC
Sixth Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Sixth Branch of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Sixth Branch of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201320704987.6U priority Critical patent/CN203547124U/en
Application granted granted Critical
Publication of CN203547124U publication Critical patent/CN203547124U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of construction work, in particular to a control device for a sliding mould protective layer. The diameter of round steel is equal to the thickness of a steel bar protective layer, the round steel is provided with a straight section and a bent section, the length of the straight section is two times the interval between horizontal bars of a steel bar net piece, the bending radius of the bent section is four times the thickness of the steel bar protective layer, the bending angle of the bent section is 60 degrees, and the straight section is further provided with a pothook. According to the control device for the sliding mould protective layer, a control part for the sliding mould protective layer is modified based on a common method, the control device for the sliding mould protective layer is easy to machine, can be used repeatedly once being input, control over the steel bar protective layer in the whole sliding section can be guaranteed after installation is in place in one time, a large number of process operations are avoided, the steel bar net piece enters a mould stably, the thickness of the protective layer is guaranteed, and the phenomenon that poured concrete is swung by steel bars at the upper layer and is disturbed or the protective layer is broken due to large swinging of the steel bars in an original method is avoided. The control device for the sliding mould protective layer is safe, reliable and high in practicability and popularization value.

Description

A kind of sliding formwork topping control device
[technical field]
The utility model relates to construction works technical field, specifically a kind of sliding formwork topping control device.
[background technology]
Slip form work technology is that China's Cast-in-situ Concrete Structural Engineering construction machinery degree is high, speed of application is fast, on-the-spot place takies less, structural integrity is strong, anti-seismic performance good, safety work is secure, environment and the significant a kind of construction technology of economical synthesis benefit, conventionally referred to as " sliding formwork ".In the slding form operation of prior art, conventionally can occur reinforcement cover control inaccurate, easily come off; reinforced mesh swings larger; and then affect concreting quality; even cause lower floor initial set concrete there is the situation of topping cracking, the construction quality on engineering and progress etc. have caused impact.
[utility model content]
The purpose of this utility model is exactly problem and the defects such as reinforcement cover control is inaccurate when solving in prior art slding form operation, provides a kind of novel structure, safe and reliable, the sliding formwork topping control device of reinforced mesh state in the time of can effectively guaranteeing sliding formwork.
For achieving the above object, a kind of sliding formwork topping control device is provided, comprise round steel, sliding formwork topping control device is located on slip form construction device, described slip form construction device comprises sliding punching block, hoisting frame, operating platform, support bar, jack and lifting appliance, it is characterized in that described round steel diameter equates with thickness of protection tier, round steel has a straight section 12 and a curved segment 11, the length of straight section is 2 times of described reinforced mesh horizontal bar spacing, the bend radius of described curved segment is 4 times of thickness of protection tier, the angle of bend of described curved segment is 60 °, on described straight tube, also there is a hook 13.
Between described hook and sliding punching block, by spot welding, be connected.
Described straight section, curved segment and hook is integral type structure.
The utility model compared with the existing technology; its advantage is that it is that the round steel of protective layer thickness processes that this device is mainly selected diameter; first the control length of topping control device is lengthened to the twice of reinforced mesh horizontal bar spacing by conventional 10-15cm; to guarantee in sliding process topping control device, control the position of twice horizontal reinforcement at least simultaneously; both avoided reinforced mesh to occur large inclination because losing suddenly lateral support power; guarantee that again reinforced mesh is controlled under plumbness all the time, there will not be swing.With this, reach reinforced mesh and steadily enter mould, guaranteeing also to have avoided in protective layer thickness concreting can not swung by top reinforcement, occur disturbance situation.Bending 60 degree in guiding position, this control device upper end, bend radius is 4 times of protective layer thickness, with this, guarantees that upper strata horizontal reinforcement enters in the control range of topping device smoothly.This device adopts hook to be attached on punching block simultaneously, and it is connected with punching block spot welding, to guarantee its verticality and fastness.In addition, the processing of this device is simple, once drops into, and can reuse, and once mounting can guarantee the control of whole sliding stage reinforcement cover after putting in place simultaneously, has avoided a large amount of process operations, reliable in quality.Also avoid in original way reinforcing bar to swing larger simultaneously, to lower floor initial set concrete disturbance, even occurred the generation of topping cracking situation, there is very high practicality and promotional value.
[accompanying drawing explanation]
Fig. 1 is primary structure schematic diagram of the present utility model;
Fig. 2 is embodiment schematic diagram of the present utility model;
As shown in the figure, in figure: 1. the sliding punching block 10. of sliding formwork topping control device 2. reinforced mesh horizontal bar 3. reinforced mesh stud 4. jack 5. support bar 6. operating platform 7. guardrail 8. hoisting frame 9. has been built concrete 11. curved segment 12. straight sections 13. and linked up with a. reinforced mesh horizontal bar space D. thickness of protection tier h. sliding formwork topping control device straight section length R. boot section bend radius;
Specifying Fig. 2 is Figure of abstract of the present utility model.
[specific embodiment]
Below in conjunction with accompanying drawing, the utility model is described in further detail, and the structure of this device and principle are very clearly concerning this professional people.Should be appreciated that instantiation described herein is only in order to explain the utility model, and be not used in restriction the utility model.
The utility model is the control device that is applied to reinforcement cover in concrete structure form construction technology, on the basis of original conventional way, sliding formwork topping control member is improved.Sliding formwork topping control device is located on slip form construction device.Slip form construction device comprises the reinforced mesh horizontal bar of sliding punching block, reinforcement cover, two or more equidistant settings, two or more reinforced mesh stud, jack etc.Round steel diameter equates with thickness of protection tier D, and round steel has a straight section and a curved segment, and curved segment part, for guiding position, can guarantee that upper strata horizontal reinforcement enters in the control range of topping device smoothly.The length h of straight tube is 2 times of reinforced mesh horizontal bar spacing a; to guarantee in sliding process topping control device, control the position of twice horizontal reinforcement at least simultaneously; both avoided reinforced mesh to occur large inclination because losing suddenly lateral support power; guarantee that again reinforced mesh is controlled under plumbness all the time, there will not be swing.With this, reach reinforced mesh and steadily enter mould, guaranteeing also to have avoided in protective layer thickness concreting can not swung by top reinforcement, occur disturbance situation.The radius of curvature R of bend pipe is 4 times of thickness of protection tier, and the end face of bend pipe and horizontal plane angle guide position angle of bend is 60 °, with this, guarantees that upper strata horizontal reinforcement enters in the control range of topping device smoothly.On straight tube, also have a hook, this device adopts hook to be attached on punching block, and vertical to itself and the punching block reliable spot welding of spinulose tree fern is connected, to guarantee its verticality and fastness.The utility model is in embodiment construction experiment process, and technician, according to the specific requirement of topping control, utilizes sliding formwork topping control device coordinative construction of the present utility model, and effect is ideal, has also reached the set goal.

Claims (3)

1. a sliding formwork topping control device, comprise round steel, sliding formwork topping control device is located on slip form construction device, described slip form construction device also comprises sliding punching block, reinforcement cover control device, hoisting frame, operating platform, support bar, jack and lifting appliance, it is characterized in that described round steel diameter equates with thickness of protection tier, round steel has a straight section (12) and a curved segment (11), the length of straight section is 2 times of described reinforced mesh horizontal bar spacing, the bend radius of described curved segment is 4 times of thickness of protection tier, the angle of bend of described curved segment is 60 °, on described straight tube, also there is a hook (13).
2. a kind of sliding formwork topping control device as claimed in claim 1, is characterized in that by spot welding, being connected between described hook and sliding punching block.
3. a kind of sliding formwork topping control device as claimed in claim 1, is characterized in that described straight section, curved segment and hook are integral type structure.
CN201320704987.6U 2013-11-08 2013-11-08 Control device for sliding mould protective layer Expired - Lifetime CN203547124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320704987.6U CN203547124U (en) 2013-11-08 2013-11-08 Control device for sliding mould protective layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320704987.6U CN203547124U (en) 2013-11-08 2013-11-08 Control device for sliding mould protective layer

Publications (1)

Publication Number Publication Date
CN203547124U true CN203547124U (en) 2014-04-16

Family

ID=50465258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320704987.6U Expired - Lifetime CN203547124U (en) 2013-11-08 2013-11-08 Control device for sliding mould protective layer

Country Status (1)

Country Link
CN (1) CN203547124U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938642A (en) * 2014-05-12 2014-07-23 葛洲坝集团第五工程有限公司 Adjusting device of pile foundation steel bar protective layer
CN105239775A (en) * 2015-09-08 2016-01-13 广州市恒盛建设工程有限公司 Rebar mounting quality dynamic control method used for silo slip-form construction
CN107642200A (en) * 2016-07-22 2018-01-30 五冶集团上海有限公司 One kind is used for slding form operation thickness control of protection cover of rebar device
CN108166751A (en) * 2018-01-08 2018-06-15 广西壮族自治区冶金建设公司 It is used to ensure the locating rod of barrel thickness of protection tier in a kind of slding form operation
CN109025070A (en) * 2018-08-01 2018-12-18 宁国市挚友合金钢材料有限公司 A kind of large-section beam beam bottom cover to reinforcement support device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938642A (en) * 2014-05-12 2014-07-23 葛洲坝集团第五工程有限公司 Adjusting device of pile foundation steel bar protective layer
CN103938642B (en) * 2014-05-12 2015-08-12 葛洲坝集团第五工程有限公司 A kind of pile foundation reinforcement cover adjusting device
CN105239775A (en) * 2015-09-08 2016-01-13 广州市恒盛建设工程有限公司 Rebar mounting quality dynamic control method used for silo slip-form construction
CN107642200A (en) * 2016-07-22 2018-01-30 五冶集团上海有限公司 One kind is used for slding form operation thickness control of protection cover of rebar device
CN108166751A (en) * 2018-01-08 2018-06-15 广西壮族自治区冶金建设公司 It is used to ensure the locating rod of barrel thickness of protection tier in a kind of slding form operation
CN109025070A (en) * 2018-08-01 2018-12-18 宁国市挚友合金钢材料有限公司 A kind of large-section beam beam bottom cover to reinforcement support device

Similar Documents

Publication Publication Date Title
CN203547124U (en) Control device for sliding mould protective layer
CN106368245A (en) Construction method for post-cast strip supporting formwork easy to clean
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN203374008U (en) Elevator shaft inclined plane protective structure
CN203113793U (en) Large formwork installation system of oblique structure
CN103046743B (en) A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method
CN204266133U (en) A kind of pier stud reinforcing cage whole lifting structure
CN104164882B (en) Side slope builds construction method and the structure on supporting and protection structure beam basis
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN202090577U (en) Template supporting construction platform for lift wells in high-rise buildings
CN203200719U (en) Hanging type slope pouring template device
CN203730011U (en) Formwork limiting device
CN204941571U (en) A kind of railway tunnel supporting and protection structure of improvement
CN104018657A (en) Method for constructing high and large cornice through horizontal sliding platform
CN204212302U (en) A kind of hollowcore slab light pipe float Structure
CN211850811U (en) Reinforcing bar protection device in synovial membrane construction
CN203394035U (en) Plugging reinforcing device for reserved hole formworks of concrete platforms
CN204715216U (en) A kind of Arch Bridge Construction platform structure
CN203188125U (en) Side-sliding system of cable crane towers
CN202990395U (en) Rotating horizontal protection tool for climbing scaffold
CN204418710U (en) A kind of presstressed reinforcing steel blocks and puts a device
CN205224425U (en) Supporting bracket of reinforcing -bar protective layer
CN205990768U (en) A kind of glomeration building prefabricated construction wall piece wears muscle instrument
CN205742960U (en) A kind of vertical scaffold reinforcement assembly across Bars In Poured Concrete Slab
CN202073238U (en) Hooping cage at crossing part of frame beam column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: THE SIXTH CIVIL ENGINEERING CO., LTD. OF CREC SHAN

Free format text: FORMER OWNER: SIXTH BRANCH SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

Effective date: 20140430

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

Free format text: FORMER NAME: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

CP03 Change of name, title or address

Address after: 200436 Shanghai Road, Zhabei District, No. three, No. 278

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee after: Sixth Branch, Shanghai Civil Engineering Co.,Ltd.of CREC

Address before: 200436 Shanghai, Zhabei District River Road, No. 272, No. three, layer 278, 10

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee before: Sixth Branch, Shanghai Civil Engineering Co.,Ltd.of CREC

TR01 Transfer of patent right

Effective date of registration: 20140430

Address after: 200436 Shanghai Road, Zhabei District, No. three, No. 278

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee after: SHANGHAI CIVIL ENGINEERING GROUP SIXTH CO.,LTD.

Address before: 200436 Shanghai Road, Zhabei District, No. three, No. 278

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee before: Sixth Branch, Shanghai Civil Engineering Co.,Ltd.of CREC

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140416