CN105178861A - 钻进扩孔机构 - Google Patents
钻进扩孔机构 Download PDFInfo
- Publication number
- CN105178861A CN105178861A CN201510575208.0A CN201510575208A CN105178861A CN 105178861 A CN105178861 A CN 105178861A CN 201510575208 A CN201510575208 A CN 201510575208A CN 105178861 A CN105178861 A CN 105178861A
- Authority
- CN
- China
- Prior art keywords
- drill pipe
- double
- pile
- wall drill
- umbrella
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005553 drilling Methods 0.000 title abstract description 25
- 238000009434 installation Methods 0.000 abstract description 2
- 230000003068 static effect Effects 0.000 description 10
- 239000002689 soil Substances 0.000 description 5
- 238000013517 stratification Methods 0.000 description 5
- 238000012407 engineering method Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 230000004069 differentiation Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/28—Enlarging drilled holes, e.g. by counterboring
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/20—Placing by pressure or pulling power
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/26—Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers
- E21B10/32—Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers with expansible cutting tools
- E21B10/322—Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers with expansible cutting tools cutter shifted by fluid pressure
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Earth Drilling (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明提供一种钻进扩孔机构,包括双通道动力头、双壁钻杆及伞式钻头,所述双通道动力头连接所述双壁钻杆,所述双壁钻杆连接所述伞式钻头,所述双通道动力头在大梁上行走与旋转,并且所述双通道动力头使所述伞式钻头开启与收拢。本发明提出的一种钻进扩孔机构,通过在沉桩扩孔机上设置钻进扩孔机构,使得在压桩前先通过扩孔钻头扩孔再压桩,减少压桩困难,避免对地质层或压桩破坏,能够一次安装,运输免拆除,在不能直接压桩的情况下可以大大缩短压桩时间,提高了压桩工作效率,而且在同样单桩承重的情况下配重少,挤土少,噪音小,无污染。
Description
技术领域
本发明涉及静力压桩机扩孔沉桩技术领域,具体涉及一种沉桩扩孔机的钻进扩孔机构。
背景技术
现有的压桩机有静力压桩机、气锤式压桩机以及螺旋浇灌桩机,传统的静力压桩机对沙层、硬土层、分化层等地质层压桩困难,甚至在有些地质下,传统的静力压桩机无法进行压桩工作,而且静力压桩机对沙层、硬土层、分化层等地质层压桩的破坏度很高。螺旋浇灌所形成的桩也存在不少缺点,如:螺旋浇灌桩的强度、硬度都不够好,且螺旋浇灌桩形成周期长。
一般沉桩工法有以下三种:一,静力压桩工法,通过机械静压力或液压静压力作用,实现桩体压入土层的施工工法,其缺点是当遇到硬土层、沙层、分化层以及一些不易压桩的土层时,无法实现较大的穿透力,现有的静力压装机无法再进一步向下压桩;二,锤击式沉桩工法,通过机械锤如柴油锤对桩体的循环打击作用,实现桩体打入土层的施工工法,其缺点是产生较大噪音、振动,直接影响周围的建筑物;三,灌注式成桩工法,通过先钻孔、然后在孔内植入钢筋笼和混凝土的一种沉桩施工工法,其缺点是隐蔽工程,质量控制难度大,且产生大量的泥浆垃圾,处理难度大,对环保要求高,同时对现场道路的通行标准有要求。
因此,急需设计一种新型的桩工机械来克服上述问题。
发明内容
本发明要解决的技术问题是提供一种钻进扩孔机构,克服上述缺陷,通过在沉桩扩孔机上设置钻进扩孔机构,使得在压桩前先通过扩孔钻头扩孔再压桩,减少压桩困难,避免对地质层或压桩破坏。
为解决上述技术问题,本发明提供一种钻进扩孔机构,包括双通道动力头、双壁钻杆及伞式钻头,所述双通道动力头连接所述双壁钻杆,所述双壁钻杆连接所述伞式钻头,所述双通道动力头在大梁上行走与旋转,并且所述双通道动力头使所述伞式钻头开启与收拢。
作为本发明所述一种钻进扩孔机构的一种优选方案,所述钻进扩孔机构还包括链扣,所述双通道动力头的一端连接所述链扣,所述双壁钻杆的一端通过固定在所述链扣上而随所述双通道动力头上下滑动。
作为本发明所述一种钻进扩孔机构的一种优选方案,所述钻进扩孔机构还包括机械手,所述机械手将所述双壁钻杆固定在所述大梁上。
作为本发明所述一种钻进扩孔机构的一种优选方案,所述钻进扩孔机构还包括固定夹持器,所述固定夹持器固定在所述大梁上,所述固定夹持器用于固定所述双壁钻杆。
作为本发明所述一种钻进扩孔机构的一种优选方案,所述钻进扩孔机构还包括翻转夹持器,所述翻转夹持器固定在所述大梁上,所述翻转夹持器用于翻转所述双壁钻杆。
与现有技术相比,本发明提出的一种钻进扩孔机构,通过在沉桩扩孔机上设置钻进扩孔机构,使得在压桩前先通过扩孔钻头扩孔再压桩,减少压桩困难,避免对地质层或压桩破坏,能够一次安装,运输免拆除,在不能直接压桩的情况下可以大大缩短压桩时间,提高了压桩工作效率,而且在同样单桩承重的情况下配重少,挤土少,噪音小,无污染。
附图说明
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。其中,
图1为本发明的结构示意图。
图2为本发明中的双壁钻杆的结构示意图。
图3为本发明中的伞式钻头的结构示意图。
图中,包括大梁1、固定夹持器2、翻转夹持器3、机械手4、链扣5、双通道动力头6、双壁钻杆7、伞式钻头8。
具体实施方式
本发明所述的一种钻进扩孔机构,包括双通道动力头6、双壁钻杆7及伞式钻头8。
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合具体实施方式对本发明作进一步详细的说明。
首先,此处所称的“一个实施例”或“实施例”是指可包含于本发明至少一个实现方式中的特定特征、结构或特性。在本说明书中不同地方出现的“在一个实施例中”并非均指同一个实施例,也不是单独的或选择性的与其他实施例互相排斥的实施例。
其次,本发明利用结构示意图等进行详细描述,在详述本发明实施例时,为便于说明,表示钻进扩孔机构结构的示意图会不依一般比例作局部放大,而且所述示意图只是实例,其在此不应限制本发明保护的范围。此外,在实际制作中应包含长度、宽度及深度的三维空间。
请参阅图1-图3,所述钻进扩孔机构包括双通道动力头6、双壁钻杆7及伞式钻头8,所述双通道动力头6连接所述双壁钻杆7,所述双壁钻杆7连接所述伞式钻头8,所述双通道动力头6在大梁1上行走与旋转,并且通过往双通道动力头6注高压水或泥浆使所述伞式钻头8开启与收拢,使伞式钻头8钻孔与扩孔。
在实际钻孔和扩孔时,根据对孔的深度要求,所以有可能会需要多根钻杆,因此,为了更好的固定钻杆,所述钻进扩孔机构还包括链扣5,所述双通道动力头6的一端连接所述链扣5,所述双壁钻杆7的一端通过固定在所述链扣5上而随所述双通道动力头6上下滑动。
由于钻杆需要固定其方向并端住,所述钻进扩孔机构还包括机械手4,所述机械手4将所述双壁钻杆7固定在所述大梁1上。
为了方便安装多根钻杆,所述钻进扩孔机构还包括固定夹持器2,所述固定夹持器2固定在所述大梁1上,所述固定夹持器2用于固定所述双壁钻杆7。
为了方便翻转钻杆,所述钻进扩孔机构还包括翻转夹持器3,所述翻转夹持器3固定在所述大梁1上,所述翻转夹持器3用于翻转所述双壁钻杆7。
本发明的钻进扩孔机构的工作原理是:当所述静力压桩机无法压桩需要使用所述钻进扩孔机构时,所述变幅油缸7开始翻转使所述大梁2立起来,所述平台油缸10开始翻转使钻头对准桩孔的中心,根据长度的要求,选择所述钻杆的数量,如需多根钻杆,则所述钻杆之间运用所述链扣5连接,将所述动力头6向下位移动打开链扣5,将吊机吊起的钻杆人工扣进链扣5里,此时动力头6向上移动,第一根钻杆由重力作用自然垂直,此时机械手4抓紧所述第一根钻杆,所述动力头6主轴旋转使主轴扣上所述第一根钻杆,然后所述机械手4松开,所述动力头6向下推进同时齿轮箱主轴旋转,同样方法上第二根钻杆,接所述第二根钻杆时,所述夹持器3夹紧所述第一根钻杆达到接杆的目的,当向下到达需要钻孔的深度时,开始调节扩孔调节机构,扩孔完成后调节扩孔调节结构使钻头收回状态,所述动力头6向上回拖所述第二根钻杆,所述机械手4配合所述动力头6松扣,所述夹持器3夹住所述第一根钻杆进行卸扣,所述动力头6向下接住所述第一根钻杆,再将所述动力头6向上回拖直至取出所有钻杆,此时扩孔动作完成,所述静力压桩机开始工作。
所属领域内的普通技术人员应该能够理解的是,本发明的特点或目的之一在于:本发明的一种钻进扩孔机构,通过在沉桩扩孔机上设置钻进扩孔机构,使得在压桩前先通过扩孔钻头扩孔再压桩,减少压桩困难,避免对地质层或压桩破坏,能够一次安装,运输免拆除,在不能直接压桩的情况下可以大大缩短压桩时间,提高了压桩工作效率,而且在同样单桩承重的情况下配重少,挤土少,噪音小,无污染。
应说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的精神和范围,其均应涵盖在本发明的权利要求范围当中。
Claims (5)
1.一种钻进扩孔机构,其特征是:包括双通道动力头、双壁钻杆及伞式钻头,所述双通道动力头连接所述双壁钻杆,所述双壁钻杆连接所述伞式钻头,所述双通道动力头在大梁上行走与旋转,并且所述双通道动力头使所述伞式钻头开启与收拢。
2.按照权利要求1所述的钻进扩孔机构,其特征是:还包括链扣,所述双通道动力头的一端连接所述链扣,所述双壁钻杆的一端通过固定在所述链扣上而随所述双通道动力头上下滑动。
3.按照权利要求1所述的钻进扩孔机构,其特征是:还包括机械手,所述机械手将所述双壁钻杆固定在所述大梁上。
4.按照权利要求1所述的钻进扩孔机构,其特征是:还包括固定夹持器,所述固定夹持器固定在所述大梁上,所述固定夹持器用于固定所述双壁钻杆。
5.按照权利要求1所述的钻进扩孔机构,其特征是:还包括翻转夹持器,所述翻转夹持器固定在所述大梁上,所述翻转夹持器用于翻转所述双壁钻杆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510575208.0A CN105178861A (zh) | 2014-12-22 | 2015-09-11 | 钻进扩孔机构 |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410805016.XA CN104499945A (zh) | 2014-12-22 | 2014-12-22 | 一种静力压桩机扩孔沉桩整机 |
CN201410805016X | 2014-12-22 | ||
CN201510575208.0A CN105178861A (zh) | 2014-12-22 | 2015-09-11 | 钻进扩孔机构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105178861A true CN105178861A (zh) | 2015-12-23 |
Family
ID=52941386
Family Applications (7)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410805016.XA Pending CN104499945A (zh) | 2014-12-22 | 2014-12-22 | 一种静力压桩机扩孔沉桩整机 |
CN201510363355.1A Active CN104929123B (zh) | 2014-12-22 | 2015-06-26 | 一种沉桩扩孔机 |
CN201520449592.5U Withdrawn - After Issue CN204753589U (zh) | 2014-12-22 | 2015-06-26 | 一种扩孔植桩静力压桩机整机 |
CN201510361729.6A Active CN104912076B (zh) | 2014-12-22 | 2015-06-26 | 一种扩孔植桩静力压桩机整机 |
CN201510575208.0A Pending CN105178861A (zh) | 2014-12-22 | 2015-09-11 | 钻进扩孔机构 |
CN201520703601.9U Active CN205225081U (zh) | 2014-12-22 | 2015-09-11 | 钻头 |
CN201510579699.6A Pending CN105156034A (zh) | 2014-12-22 | 2015-09-11 | 钻头 |
Family Applications Before (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410805016.XA Pending CN104499945A (zh) | 2014-12-22 | 2014-12-22 | 一种静力压桩机扩孔沉桩整机 |
CN201510363355.1A Active CN104929123B (zh) | 2014-12-22 | 2015-06-26 | 一种沉桩扩孔机 |
CN201520449592.5U Withdrawn - After Issue CN204753589U (zh) | 2014-12-22 | 2015-06-26 | 一种扩孔植桩静力压桩机整机 |
CN201510361729.6A Active CN104912076B (zh) | 2014-12-22 | 2015-06-26 | 一种扩孔植桩静力压桩机整机 |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520703601.9U Active CN205225081U (zh) | 2014-12-22 | 2015-09-11 | 钻头 |
CN201510579699.6A Pending CN105156034A (zh) | 2014-12-22 | 2015-09-11 | 钻头 |
Country Status (1)
Country | Link |
---|---|
CN (7) | CN104499945A (zh) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104499945A (zh) * | 2014-12-22 | 2015-04-08 | 江苏谷登工程机械装备有限公司 | 一种静力压桩机扩孔沉桩整机 |
CN104912501A (zh) * | 2015-06-30 | 2015-09-16 | 江苏谷登工程机械装备有限公司 | 一种钻杆上杆机构 |
CN104989275A (zh) * | 2015-07-10 | 2015-10-21 | 无锡中地钻探装备有限公司 | 双钻杆水平定向钻机 |
CN105714824B (zh) * | 2016-02-04 | 2017-12-01 | 江苏谷登工程机械装备有限公司 | 一种压桩机及其压桩方法 |
CN105756060A (zh) * | 2016-04-08 | 2016-07-13 | 徐玉杰 | 一种自动接钻杆式搅拌桩机 |
CN106337660B (zh) * | 2016-11-01 | 2019-12-31 | 周兆弟 | 双抱压动力下置打桩机 |
CN107605416A (zh) * | 2017-10-30 | 2018-01-19 | 江苏谷登工程机械装备有限公司 | 一种旋转式机械手 |
CN112942346B (zh) * | 2021-02-03 | 2022-05-24 | 江西中恒地下空间科技有限公司 | 一种斜桩施工装置 |
CN113006693A (zh) * | 2021-04-06 | 2021-06-22 | 北京中科中电电力工程管理有限公司 | 非开挖定向钻铺管设备及其施工工艺 |
CN116971719B (zh) * | 2023-07-31 | 2024-05-17 | 海南卓典高科技开发有限公司 | 门式桩机及灌注桩施工工法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4595059A (en) * | 1983-10-18 | 1986-06-17 | Japan Metals & Chemicals Co., Ltd. | Method of providing a conductor pipe to an opening portion of a well |
CN102561946A (zh) * | 2012-02-01 | 2012-07-11 | 山河智能装备股份有限公司 | 一种随钻跟管钻机及随钻跟管桩施工方法 |
CN103061673A (zh) * | 2013-02-06 | 2013-04-24 | 湖南优力特重工有限公司 | 多功能微桩钻机 |
CN103277044A (zh) * | 2013-06-17 | 2013-09-04 | 邵金安 | Sdl桩工掘进方法及专用于实施该方法的桩工钻机 |
CN103758453A (zh) * | 2014-01-23 | 2014-04-30 | 长沙精拓工程机械有限公司 | 智能化微型钻机 |
CN104929522A (zh) * | 2015-06-26 | 2015-09-23 | 江苏谷登工程机械装备有限公司 | 钻进扩孔机构 |
CN205154023U (zh) * | 2015-09-11 | 2016-04-13 | 江苏谷登工程机械装备有限公司 | 钻进扩孔机构 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5233306A (en) * | 1975-09-09 | 1977-03-14 | Kumagai Gumi Co Ltd | Static pile driving method in use of water jet |
CN201943072U (zh) * | 2011-01-28 | 2011-08-24 | 中南大学 | 立柱可折叠式液压静力压桩机 |
CN103233687B (zh) * | 2013-05-07 | 2015-04-22 | 江苏谷登工程机械装备有限公司 | 非开挖水平定向钻机自动装卸钻杆机构 |
CN203716150U (zh) * | 2014-01-15 | 2014-07-16 | 恒天九五重工有限公司 | 一种钻孔压桩组合式桩机 |
CN104499945A (zh) * | 2014-12-22 | 2015-04-08 | 江苏谷登工程机械装备有限公司 | 一种静力压桩机扩孔沉桩整机 |
CN104499946B (zh) * | 2014-12-22 | 2016-09-14 | 江苏谷登工程机械装备有限公司 | 伞式扩孔钻头 |
CN104948113A (zh) * | 2015-06-26 | 2015-09-30 | 江苏谷登工程机械装备有限公司 | 钻头 |
CN204849765U (zh) * | 2015-06-26 | 2015-12-09 | 江苏谷登工程机械装备有限公司 | 一种沉桩扩孔机 |
-
2014
- 2014-12-22 CN CN201410805016.XA patent/CN104499945A/zh active Pending
-
2015
- 2015-06-26 CN CN201510363355.1A patent/CN104929123B/zh active Active
- 2015-06-26 CN CN201520449592.5U patent/CN204753589U/zh not_active Withdrawn - After Issue
- 2015-06-26 CN CN201510361729.6A patent/CN104912076B/zh active Active
- 2015-09-11 CN CN201510575208.0A patent/CN105178861A/zh active Pending
- 2015-09-11 CN CN201520703601.9U patent/CN205225081U/zh active Active
- 2015-09-11 CN CN201510579699.6A patent/CN105156034A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4595059A (en) * | 1983-10-18 | 1986-06-17 | Japan Metals & Chemicals Co., Ltd. | Method of providing a conductor pipe to an opening portion of a well |
CN102561946A (zh) * | 2012-02-01 | 2012-07-11 | 山河智能装备股份有限公司 | 一种随钻跟管钻机及随钻跟管桩施工方法 |
CN103061673A (zh) * | 2013-02-06 | 2013-04-24 | 湖南优力特重工有限公司 | 多功能微桩钻机 |
CN103277044A (zh) * | 2013-06-17 | 2013-09-04 | 邵金安 | Sdl桩工掘进方法及专用于实施该方法的桩工钻机 |
CN103758453A (zh) * | 2014-01-23 | 2014-04-30 | 长沙精拓工程机械有限公司 | 智能化微型钻机 |
CN104929522A (zh) * | 2015-06-26 | 2015-09-23 | 江苏谷登工程机械装备有限公司 | 钻进扩孔机构 |
CN205154023U (zh) * | 2015-09-11 | 2016-04-13 | 江苏谷登工程机械装备有限公司 | 钻进扩孔机构 |
Also Published As
Publication number | Publication date |
---|---|
CN105156034A (zh) | 2015-12-16 |
CN205225081U (zh) | 2016-05-11 |
CN204753589U (zh) | 2015-11-11 |
CN104929123B (zh) | 2016-11-16 |
CN104912076B (zh) | 2016-10-26 |
CN104912076A (zh) | 2015-09-16 |
CN104929123A (zh) | 2015-09-23 |
CN104499945A (zh) | 2015-04-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929123B (zh) | 一种沉桩扩孔机 | |
CN107142929A (zh) | 海上非打入型大直径单桩基础结构及其施工方法 | |
CN102383431B (zh) | 中掘预应力离心管桩沉桩装置及其沉桩法 | |
CN104947654A (zh) | 一种复杂水域倾斜岩面大直径钻孔灌注桩及施工方法 | |
WO2009049470A1 (fr) | Machine à percussion et injection pour forage | |
CN102121251A (zh) | 一种在深水倾斜河床上浇筑桥梁主塔墩基础的施工方法 | |
CN107558488A (zh) | 一种海上风电嵌岩单桩及其施工系统和施工方法 | |
CN207176723U (zh) | 一种海上风电嵌岩单桩及其施工系统 | |
CN210288383U (zh) | 旋钻打桩一体机 | |
CN103572770B (zh) | 一种桩箱水工结构物及其建造方法 | |
CN104563147A (zh) | 适用于岩溶区的组合结构桩基础及其施工方法 | |
CN101914915A (zh) | 一种抗浮锚杆的施工方法及专用长螺旋钻机 | |
CN105862862A (zh) | 一种大直径桩埋锤打捞方法 | |
CN105714832B (zh) | 一种深基坑大尺寸预制围护结构及施工方法 | |
CN205576957U (zh) | 桩底桩结构 | |
CN105672329B (zh) | 深基坑大尺寸预制围护结构及施工方法 | |
CN205154023U (zh) | 钻进扩孔机构 | |
CN104372793A (zh) | 采用旋喷桩法预应力锚索用于既有地下室抗浮的方法 | |
CN204849765U (zh) | 一种沉桩扩孔机 | |
CN206956713U (zh) | 海上非打入型大直径单桩基础结构 | |
CN104929522A (zh) | 钻进扩孔机构 | |
CN102758434B (zh) | 中掘预应力离心管桩沉桩装置及其沉桩法 | |
CN105544551B (zh) | 一种超长灌注桩快速下放钢筋笼的施工方法 | |
CN104895058B (zh) | 全液压静压双管复合扩底桩机及其施工方法 | |
CN205188971U (zh) | 一种旋挖静压植入装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151223 |
|
RJ01 | Rejection of invention patent application after publication |