Prior art keywords
cage
reinforcement cage
steel reinforcement
steel
super
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610027336.6A
Other languages
English (en)
Other versions
CN105544551A (zh
Inventor
高春雷
王晓曙
涂伟
王自忠
许利东
苏雄斌
徐宇光
吴俊鹏
普树荣
赵磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih Foundation Engineering Co ltd
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction Investment Foundation Engineering Co Ltd
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Foundation Engineering Co Ltd, Yunnan Construction and Investment Holding Group Co Ltd filed Critical Yunnan Construction Investment Foundation Engineering Co Ltd
Priority to CN201610027336.6A priority Critical patent/CN105544551B/zh
Publication of CN105544551A publication Critical patent/CN105544551A/zh
Application granted granted Critical
Publication of CN105544551B publication Critical patent/CN105544551B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

一种超长灌注桩快速下放钢筋笼的施工方法,是先在超长灌注桩桩位以外用桩机(1)在地面钻空孔(2),然后用履带吊(3)将钢护筒(4)放入空孔内;将钢筋笼底笼(5)放入钢护筒中,再将钢筋笼顶笼(6)吊至钢筋笼底笼上方位于钢护筒孔口处,将钢筋笼底笼与钢筋笼顶笼焊接成一个整体钢筋笼(7)待用;之后在超长灌注桩桩位处钻桩孔(8),最后将整体钢筋笼(7)起吊下放至桩孔(8)中。本发明解决了传统超长灌注桩施工中钢筋笼下放时间较长的问题,解决了对于承压水水头在灌注桩工作面以上、软弱土层较厚及沉渣厚度难以控制的难题。

Description

一种超长灌注桩快速下放钢筋笼的施工方法
技术领域
本发明属于建筑桩基施工方法技术领域,尤其是超长灌注桩的施工方法。
背景技术
在常规超长灌注桩施工中,钢筋笼下放是在桩孔内分节下放,在孔口采用电弧焊对接,形成整体钢筋笼后,再下放至桩孔内。因钢筋笼主筋数量及直径不同对接所需时间不同,需耗费1个小时至数小时的时间,对项目工期产生较大的影响。对于承压水水头在灌注桩工作面以上、软弱土层较厚及沉渣厚度难以控制的项目,钢筋对接的数小时内,桩孔内泥浆稀释、孔壁塌孔、沉渣沉积等现象都会影响成桩质量。
发明内容
本发明的目的为了解决现有技术存在的不足,提供一种可大大缩短超长灌注桩施工中钢筋笼下放时间,提高成桩质量的施工方法。
本发明的目的通过如下技术方案实现:
一种超长灌注桩快速下放钢筋笼的施工方法,方法步骤如下:
a.在超长灌注桩桩位以外用桩机在地面钻空孔;
b.用履带吊将钢护筒放入空孔内;
c.用履带吊将钢筋笼底笼放入钢护筒中,再将钢筋笼顶笼吊至钢筋笼底笼上方位于钢护筒孔口处,将钢筋笼底笼与钢筋笼顶笼焊接成一个整体钢筋笼待用;
或者用履带吊将钢筋笼底笼放入钢护筒中,在钢筋笼底笼最上面的一圈加劲箍筋下横插钢管并横担在钢护筒上,将钢筋笼底笼悬挂在钢护筒内并且上端伸出钢护筒外一段高度,将钢筋笼中笼吊至钢筋笼底笼上方,与钢筋笼底笼焊接为一体后,取开横插的钢管,将焊接为一体的钢筋笼中笼和钢筋笼底笼下放至钢筋笼中笼上方位于钢护筒孔口处,再将钢筋笼顶笼吊至钢筋笼中笼上方,将钢筋笼顶笼与钢筋笼中笼焊接构成一个整体钢筋笼待用;
d.在超长灌注桩桩位处用桩机钻桩孔;
e.用履带吊将整体钢筋笼下放至桩孔中。
采用本发明方法,可以预先将钢筋笼底笼与钢筋笼顶笼焊接成一个整体钢筋笼待用,在进行超长灌注桩施工时,将整体钢筋笼直接起吊并下放至桩孔中,省去了在桩孔中分节下放和焊接拖延的时间,解决了对于承压水水头在灌注桩工作面以上、软弱土层较厚及沉渣厚度难以控制的难题,确保成桩质量。本发明方法施工简便,施工效率高。
附图说明
图1是用桩机钻空孔的示意图;
图2是用履带吊下放钢护筒的示意图;
图3是用履带吊下放钢筋笼底笼的示意图;
图4是用履带吊吊装钢筋笼顶笼与底笼对接的示意图;
图5是用履带吊将整体钢筋笼起吊的示意图;
图6是将整体钢筋笼下放至桩孔内的示意图。
具体实施方式
如图1、图2、图3、图4、图5、图6所示,本发明所述超长灌注桩快速下放钢筋的施工方法的施工步骤如下:
a.在超长灌注桩施工桩位以外用桩机1在地面钻空孔2;
b.用履带吊3将钢护筒4放入空孔2内;所述钢护筒4可由多段钢管焊接而成,钢护筒外径较空孔稍小,内径较钢筋笼底笼5稍大;
c.用履带吊3将钢筋笼底笼5放入钢护筒4中,再将钢筋笼顶笼6吊至钢筋笼底笼5上方使钢筋笼顶笼底端位于钢护筒4孔口上方,之后将钢筋笼底笼5与钢筋笼顶笼6焊接成一个整体钢筋笼7待用;
所述整体钢筋笼7可以由钢筋笼底笼5与钢筋笼顶笼6两节组成,也可以由三节或更多节组成,当由三节组成时,用履带吊3将钢筋笼底笼5放入钢护筒4中,在钢筋笼底笼最上面的一圈加劲箍筋下横插钢管并横担在钢护筒上,将钢筋笼底笼悬挂在钢护筒内并且上端伸出钢护筒外外露1米左右,将钢筋笼中笼吊至钢筋笼底笼上方,与钢筋笼底笼焊接为一体后,取开横插的钢管,将焊接为一体的钢筋笼中笼和钢筋笼底笼下放至钢筋笼中笼上方位于钢护筒孔口处,再将钢筋笼顶笼吊至钢筋笼中笼上方,将钢筋笼顶笼与钢筋笼中笼焊接构成一个整体钢筋笼7待用;
如果是更多节钢筋笼,采用上述三节结构钢筋笼的施工方法,将钢筋笼逐节焊接成一个整体钢筋笼;
d.在超长灌注桩桩位处用桩机1钻桩孔8;
e用履带吊3将整体钢筋笼7下放至桩孔8中。
本发明方法主要用于工期较紧的超长灌注桩施工中,同时用于解决存在承压水、软弱质土层较厚、沉渣厚度难以控制的超长灌注桩施工技术难题。

Claims (1)

1.一种超长灌注桩快速下放钢筋笼的施工方法,其特征在于,方法步骤如下:
a.在超长灌注桩桩位以外用桩机(1)在地面钻空孔(2);
b.用履带吊(3)将钢护筒(4)放入空孔(2)内;
c.用履带吊(3)将钢筋笼底笼(5)放入钢护筒(4)中,再将钢筋笼顶笼(6)吊至钢筋笼底笼(5)上方位于钢护筒(4)孔口处,将钢筋笼底笼(5)与钢筋笼顶笼(6)焊接成一个整体钢筋笼(7)待用;
或者用履带吊(3)将钢筋笼底笼(5)放入钢护筒(4)中,在钢筋笼底笼最上面的一圈加劲箍筋下横插钢管并横担在钢护筒上,将钢筋笼底笼悬挂在钢护筒内并且上端伸出钢护筒外一段高度,将钢筋笼中笼吊至钢筋笼底笼上方,与钢筋笼底笼焊接为一体后,取开横插的钢管,将焊接为一体的钢筋笼中笼和钢筋笼底笼下放至钢筋笼中笼上方位于钢护筒孔口处,再将钢筋笼顶笼吊至钢筋笼中笼上方,将钢筋笼顶笼与钢筋笼中笼焊接构成一个整体钢筋笼(7)待用;
d.在超长灌注桩桩位处用桩机(1)钻桩孔(8);
e.用履带吊(3)将整体钢筋笼(7)下放至桩孔(8)中。
CN201610027336.6A 2016-01-16 2016-01-16 一种超长灌注桩快速下放钢筋笼的施工方法 Active CN105544551B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610027336.6A CN105544551B (zh) 2016-01-16 2016-01-16 一种超长灌注桩快速下放钢筋笼的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610027336.6A CN105544551B (zh) 2016-01-16 2016-01-16 一种超长灌注桩快速下放钢筋笼的施工方法

Publications (2)

Publication Number Publication Date
CN105544551A CN105544551A (zh) 2016-05-04
CN105544551B true CN105544551B (zh) 2017-07-14

Family

ID=55824072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610027336.6A Active CN105544551B (zh) 2016-01-16 2016-01-16 一种超长灌注桩快速下放钢筋笼的施工方法

Country Status (1)

Country Link
CN (1) CN105544551B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237322B (zh) * 2017-07-18 2019-01-29 北京中润宝成工程技术有限公司 一种长螺旋钻孔后插笼灌注桩高效插入振动管的方法
CN111705789A (zh) * 2020-06-29 2020-09-25 江西省地质工程(集团)公司 一种长螺旋桩空孔段处理施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200988963Y (zh) * 2006-07-10 2007-12-12 杨修霞 振捣插筋钻孔压灌桩用耐振钢筋笼
CN102888839A (zh) * 2012-10-16 2013-01-23 深圳市金泰建设工程有限公司 静压套管旋挖灌注桩施工方法
CN103233466A (zh) * 2013-04-23 2013-08-07 罗海军 穿越深厚碎石层大直径钻孔灌注桩施工方法
CN103850251A (zh) * 2014-03-20 2014-06-11 南昌永祺科技发展有限公司 一种机械钻孔灌注桩
CN104818712A (zh) * 2015-04-07 2015-08-05 浙江大华建设集团有限公司 一种适用于溶洞地质的冲击成孔灌注桩的施工方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001020454A (ja) * 1999-07-12 2001-01-23 Housing & Urban Development Corp 基礎杭等の構築物における非溶着による鉄筋籠及びその鉄筋籠の製作方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200988963Y (zh) * 2006-07-10 2007-12-12 杨修霞 振捣插筋钻孔压灌桩用耐振钢筋笼
CN102888839A (zh) * 2012-10-16 2013-01-23 深圳市金泰建设工程有限公司 静压套管旋挖灌注桩施工方法
CN103233466A (zh) * 2013-04-23 2013-08-07 罗海军 穿越深厚碎石层大直径钻孔灌注桩施工方法
CN103850251A (zh) * 2014-03-20 2014-06-11 南昌永祺科技发展有限公司 一种机械钻孔灌注桩
CN104818712A (zh) * 2015-04-07 2015-08-05 浙江大华建设集团有限公司 一种适用于溶洞地质的冲击成孔灌注桩的施工方法

Also Published As

Publication number Publication date
CN105544551A (zh) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105569560B (zh) 全套管式长螺旋钻孔桩机及利用该桩机施工的方法
CN109024651B (zh) 一种钢管混凝土混合桩基及施工方法
CN104929123B (zh) 一种沉桩扩孔机
CN205712137U (zh) 基坑支护结构
CN102852141A (zh) 一种桩芯灌注混凝土桩侧静压注浆的嵌岩管桩基础及其施工方法
CN104805831A (zh) 一种大直径硬岩基桩成孔方法
CN105464122A (zh) 大直径空心沉桩基础的施工方法
CN204753628U (zh) 一种可周转的逆作法钢管柱调垂导向装置
CN102808407B (zh) 软土地基钢筋混凝土灌注桩施工方法
CN104563147A (zh) 适用于岩溶区的组合结构桩基础及其施工方法
CN105544551B (zh) 一种超长灌注桩快速下放钢筋笼的施工方法
CN103243740A (zh) 旋挖、长螺旋组合钻孔压灌混凝土咬合桩连续墙施工方法
CN107740427A (zh) 一种内插混凝土预制方桩基坑围护结构的施工方法
CN104264679B (zh) 一种输电铁塔基础大口径水下灌注桩施工方法
CN106088123A (zh) 一种砂土地质钢管井降水位装置及其施工方法
CN108625388A (zh) 一种适用于浅基岩地质条件的套筒组合式大直径单桩基础及其施工方法
CN105672309A (zh) 岩溶地区嵌岩桩成孔可回收超长钢护筒护壁方法
CN207004431U (zh) 软土地基激振打井装置
CN207944455U (zh) 去泥皮装置
CN106836215B (zh) 内外水压自动平衡钢护筒
CN202706971U (zh) 钻头打捞器
CN109403326A (zh) 基于钻孔桩发生严重塌孔取出钢筋笼方法
CN205894063U (zh) 全套管长螺旋钻孔灌注桩压笼器
CN107476293A (zh) 一种软土地基灌注桩快速接长结构配置及其接长方法
CN208996732U (zh) 一种适用于防止超深竖井井颈段位移沉降的结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB02 Change of applicant information

Address after: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Applicant after: YCIH FOUNDATION ENGINEERING CO.,LTD.

Applicant after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Applicant before: YUNNAN CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING CO.,LTD.

Applicant before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161205

Address after: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Applicant after: YCIH FOUNDATION ENGINEERING CO.,LTD.

Applicant after: Yunnan Construction Investment Holding Group Co., Ltd.

Address before: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Applicant before: YCIH FOUNDATION ENGINEERING CO.,LTD.

Applicant before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

GR01 Patent grant
GR01 Patent grant