CN105155547A - Construction method for deep foundation pit excavation on steep slope terrain - Google Patents

Construction method for deep foundation pit excavation on steep slope terrain Download PDF

Info

Publication number
CN105155547A
CN105155547A CN201510339905.6A CN201510339905A CN105155547A CN 105155547 A CN105155547 A CN 105155547A CN 201510339905 A CN201510339905 A CN 201510339905A CN 105155547 A CN105155547 A CN 105155547A
Authority
CN
China
Prior art keywords
slope
foundation pit
excavation
excavator
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510339905.6A
Other languages
Chinese (zh)
Inventor
陈国胜
石迎新
于长彬
李惠民
郭政东
徐纯治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201510339905.6A priority Critical patent/CN105155547A/en
Publication of CN105155547A publication Critical patent/CN105155547A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention relates to a construction method for deep foundation pit excavation on steep slope terrain. The method comprises: arranging a main detour to enter a base structure to construct, in a range of the main detour to the base structure, excavating a ballast collection platform; excavating a slope crest along the side slope on the upper side of the ballast collection platform upward to a design foundation pit, excavating a ballast sliding channel from the slope crest to the ballast collection platform; building a detour used for a mechanical device to enter the foundation pit on the proper position of a hillside toward the top of the foundation pit; excavating layer by layer from the side slope crest of the foundation pit from top to bottom, constructing slope protection in time, rock blasting using a left-right subdivision method; after an excavator accesses from a foundation pit top, the excavator going down layer by layer with excavation, until the excavator goes down to an elevation position of a mucking channel, the excavator going out from the mucking channel; the sliding ballast sliding to the ballast collection platform in the foundation pit along a ballast sliding slope being loaded in a handling vehicle by the excavator and being carried away from the mucking channel of the foundation pit. The method solves problems that a plurality of detours accessing and leaving the foundation pit cannot be arranged on a steep slope terrain, and a problem that ballast cannot slide down from a slope in foundation pit excavation is solved.

Description

The construction method of steep slope topography place deep pit digging
Technical field
The present invention relates to construction techniques, specifically the construction method of a kind of steep slope topography place deep pit digging.
Background technology
General excavation of foundation pit is all back down beginning stage excavation from foundation ditch, and limit excavation frontier defense is protected, excavation one-level protection shaping one-level.To the deep foundation ditch on steep slope topography, because environmental requirement does not allow to slip quarrel downwards, excavate step by step from the top down, need to build many horizontal sidewalks, for the turnover of muck removal and Work machine, and steep slope topography section does not possess and parallelly up and down builds many sidewalk conditions, one is dangerous, and two is basic units that lower floor's sidewalk can hollow out upper strata sidewalk.Therefore, on steep slope topography there is a difficult problem for turnover foundation ditch sidewalk layout in deep pit digging.
Summary of the invention
The present invention is intended to solve the problem, and provides the construction method of a kind of practicality, efficiently steep slope topography place deep pit digging.
The technical scheme that the present invention solves the employing of its technical problem is:
A construction method for steep slope topography place deep pit digging, carry out in the steps below:
(1) need and site contour according to construction, reasonable Arrangement enters the main sidewalk of foundation structure construction, repair within the scope of foundation structure at main sidewalk, by sidewalk construction and excavation mode, adopt light shot within the scope of excavation of foundation pit, excavate out the collection quarrel platform of a suitable size;
(2) along on collection quarrel platform upper side edge slope aspect to top, design excavation of foundation pit slope, adopt light shot mode to excavate out one and slip quarrel passage from top, slope to collection quarrel platform;
(3) build to foundation ditch top one enters foundation ditch sidewalk for plant equipment by appropriate location, hillside;
(4) by excavation slope top from upper and successively to excavate downwards, the earthwork adopts hierarchical layered to excavate step by step, slope construction protection in time, and rock blasting adopts left and right framing to carry out;
(5) the foundation pit earth cubic meter of stone adopts excavator excavation, after excavator is entered by foundation ditch jacking, successively declines until when arriving muck removal passage absolute altitude place, withdrawn from by muck removal passage with excavation; By on the upside of foundation ditch, along slipping, quarrel is domatic slips to the collection quarrel platform in foundation ditch, fills tipping truck transported by the muck removal passage of foundation ditch by excavator.
Adopt the present invention of technique scheme, compared with prior art, its beneficial effect is:
The present invention only need arrange two sidewalks at the bottom of foundation ditch top and foundation ditch, and the sidewalk led in foundation ditch is expanded to a collection quarrel platform, and construction equipment is entered by eminence sidewalk, and low level sidewalk goes out foundation ditch; Press design grade stage excavation from top to bottom, utilize the quarrel passage that slips be shaped to slip quarrel to collection quarrel platform, then by collection quarrel platform muck removal, after excavator, hidden hole drilling are entered by foundation ditch jacking, with excavation successively decline until withdraw to during foundation structure pioneer road absolute altitude.The present invention is for the larger excavation of foundation pit of steep slope topography place slope height, the difficult problem that steep slope topography place cannot arrange many turnover foundation ditch sidewalks can be solved well, collection quarrel platform solves again excavation of foundation pit well must not from the domatic difficult problem be cut of slipping downwards, there is extraordinary compliance, great popularization under similar engineering condition.
Detailed description of the invention
Set forth the present invention further below in conjunction with embodiment, but embodiment does not form any restriction to the present invention.
What the present embodiment related to is span is the excavation of the abut foundation ditch of 416m stiff skeleton reinforced concrete arch bridge, and abut planar dimension 48mx24m, high 29m, be positioned on 58 degree of abrupt slopes, abut excavation of foundation pit height 94 meters, earth excavation amount 120,000 side.
Overall sequence of construction is: preparation of construction → plant equipment, material in place → construction line setting → construction foundation pit side slope gutter → by main sidewalk is extended to collection quarrel platform → from collection quarrel platform to foundation ditch top and repaiies and slip that quarrel groove → stage excavation from top to bottom → applying preventive works carries out slope protection → the work items inspection, examination → apply platform and catchwater within the scope of main arch seat, and circulation is until at the bottom of foundation ditch successively.
In line with the principle organizing construction of going along with sb. to guard him in advance, draining is excavated in advance, step by step, side slope protection is closelyed follow, guarantee is safe, concrete steps are as follows:
(1) according to the form of structure of site contour condition and abut, choose the sidewalk entering main arch seat, especially the absolute altitude entering sidewalk during abut is low as much as possible when not affecting abut structure construction in the future, to adopt tipping truck muck removal when excavating bottom foundation ditch, after reserving the absolute altitude of foundation ditch place sidewalk, carry out planning and designing to the vertical gradient of on-the-spot sidewalk, sidewalk adopts flat slope within the scope of 50-100 rice near near coal-mine as far as possible, to prevent vehicle slipping by slope near near coal-mine, there is security incident;
(2) sidewalk leading to foundation ditch top excavator and enter is chosen, consider to be mainly excavator, hammer drill near coal-mine top to what enter foundation ditch, therefore the slope requirement needed for excavator driving sidewalk can be built, the gradient can suitably suddenly a bit, to reduce workload, air compressor machine can nearby be deposited appropriate location, with high-pressure air hose to hammer drill air feed in foundation ditch;
(3) sidewalk entering main arch seat is extended to collection quarrel platform within the scope of excavation of foundation pit to massif side; Explosion when adopting sidewalk to excavate and excavation method, first sidewalk is drawn logical to foundation ditch far-end, recycle the passage fixed and be extended to collection quarrel platform to massif side, collection quarrel platform should make shape at the bottom of the bowl that outside is high, inner side is low, prevents the quarrel soil slipped from upper strata from routing up foundation ditch;
(4) the foundation ditch top that will be extended to collection quarrel platform to design foundation ditch top brush slope kerve, as slipping the passage of quarrel from top to lower floor.
(5) outside design foundation ditch top, twice passive protection net is established at 15 meters, interval, stone under interception flies accidentally, ensure the safety of operating personnel in foundation ditch, on the downside of foundation ditch, twice passive protection net is established at 15 meters, interval, stone under interception flies accidentally, ensures downside pedestrian and vehicle safety;
(6) in foundation ditch, bursting work adopts left and right framing blasting in groups operation, is beneficial to dodging of Work machine in foundation ditch, carries out necessary blocking protection before each bursting work to Work machine in foundation ditch.
The foregoing is only the better feasible embodiment of the present invention, not thereby limit to interest field of the present invention, the equivalence change that all utilizations description of the present invention is done, be all contained within interest field of the present invention.

Claims (1)

1. a construction method for steep slope topography place deep pit digging, is characterized in that, carries out in the steps below:
(1) need and site contour according to construction, reasonable Arrangement enters the main sidewalk of foundation structure construction, repair within the scope of foundation structure at main sidewalk, by sidewalk construction and excavation mode, adopt light shot within the scope of excavation of foundation pit, excavate out the collection quarrel platform of a suitable size;
(2) along on collection quarrel platform upper side edge slope aspect to top, design excavation of foundation pit slope, adopt light shot mode to excavate out one and slip quarrel passage from top, slope to collection quarrel platform;
(3) build to foundation ditch top one enters foundation ditch sidewalk for plant equipment by appropriate location, hillside;
(4) by excavation slope top from upper and successively to excavate downwards, the earthwork adopts hierarchical layered to excavate step by step, slope construction protection in time, and rock blasting adopts left and right framing to carry out;
(5) the foundation pit earth cubic meter of stone adopts excavator excavation, after excavator is entered by foundation ditch jacking, successively declines until when arriving muck removal passage absolute altitude place, withdrawn from by muck removal passage with excavation; By on the upside of foundation ditch, along slipping, quarrel is domatic slips to the collection quarrel platform in foundation ditch, fills tipping truck transported by the muck removal passage of foundation ditch by excavator.
CN201510339905.6A 2015-06-18 2015-06-18 Construction method for deep foundation pit excavation on steep slope terrain Pending CN105155547A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510339905.6A CN105155547A (en) 2015-06-18 2015-06-18 Construction method for deep foundation pit excavation on steep slope terrain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510339905.6A CN105155547A (en) 2015-06-18 2015-06-18 Construction method for deep foundation pit excavation on steep slope terrain

Publications (1)

Publication Number Publication Date
CN105155547A true CN105155547A (en) 2015-12-16

Family

ID=54796565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510339905.6A Pending CN105155547A (en) 2015-06-18 2015-06-18 Construction method for deep foundation pit excavation on steep slope terrain

Country Status (1)

Country Link
CN (1) CN105155547A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926631A (en) * 2016-05-06 2016-09-07 中铁大桥局集团第五工程有限公司 Construction method for excavating bridge foundation pit in steep rock surface
CN106595410A (en) * 2016-12-24 2017-04-26 中铁十八局集团有限公司 Deep foundation pit earth pressure controlled blasting method
CN106638658A (en) * 2016-10-29 2017-05-10 中国十七冶集团有限公司 Construction method for building road to foundation bottom of fan
CN108035359A (en) * 2017-12-27 2018-05-15 中国电建集团中南勘测设计研究院有限公司 A kind of slope excavating method
CN108385757A (en) * 2018-05-27 2018-08-10 辽宁科技学院 A kind of Extended chemotherapy excavation of foundation pit device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5677431A (en) * 1979-11-26 1981-06-25 Taisei Corp Excavation work for steep slope
CN102691300A (en) * 2012-04-18 2012-09-26 浙江省建工集团有限责任公司 Construction method of foundation pit earthwork

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5677431A (en) * 1979-11-26 1981-06-25 Taisei Corp Excavation work for steep slope
CN102691300A (en) * 2012-04-18 2012-09-26 浙江省建工集团有限责任公司 Construction method of foundation pit earthwork

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PXY720915: "陡坡地形深基坑爆破方案", 《百度文库》 *
邵东辉: "南盘江特大桥设计要点及主要施工方案初步研究", 《四川建材》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926631A (en) * 2016-05-06 2016-09-07 中铁大桥局集团第五工程有限公司 Construction method for excavating bridge foundation pit in steep rock surface
CN106638658A (en) * 2016-10-29 2017-05-10 中国十七冶集团有限公司 Construction method for building road to foundation bottom of fan
CN106595410A (en) * 2016-12-24 2017-04-26 中铁十八局集团有限公司 Deep foundation pit earth pressure controlled blasting method
CN108035359A (en) * 2017-12-27 2018-05-15 中国电建集团中南勘测设计研究院有限公司 A kind of slope excavating method
CN108385757A (en) * 2018-05-27 2018-08-10 辽宁科技学院 A kind of Extended chemotherapy excavation of foundation pit device
CN108385757B (en) * 2018-05-27 2023-08-22 辽宁科技学院 Excavation device for expanding foundation pit

Similar Documents

Publication Publication Date Title
CN105155547A (en) Construction method for deep foundation pit excavation on steep slope terrain
CN101539008B (en) Ground stereoscopic discharge and mining method of coal bed methane
CN204253054U (en) Mountain tunnel stake arch cap excavation method comprehensive support structure
CN102748040B (en) Main structure for metro long-span station and pillar arching construction method thereof
RU2405109C1 (en) Method of developing thick ore deposits by underground mining with interchamber pillars support
CN103938617A (en) Super-deep underground continuous wall and construction method thereof
CN104847355A (en) Continuous mining method for hollow ground of medium-thickness steeply inclined ore body
CN1837506A (en) Construction method for excavating box-shape structure over an operating tunnel
CN103410152B (en) A kind of construction method for long and narrow deep foundation pit earthwork digging
CN104141311A (en) Mechanical holing method for protecting wall and structure formed with method
CN110593753A (en) Mechanical rapid hole forming construction method for rectangular slide-resistant pile
CN104727324B (en) Irregular basement construction method for supporting
CN116043858A (en) Layered excavation method for arch foundation pit
CN108547628B (en) Quick construction method for pipe-jacking working well in upper-soft and lower-hard stratum
CN204283438U (en) Portal supporting and protection structure
CN105089043B (en) Spatial isolation type runway pavement underlying goaf treatment method
Zhu et al. Surface water control for mining thick, relatively shallow coal seams in the loess area of western China
CN108086981B (en) construction method of high slope with zero distance to national road and more than 100m
RU2425220C1 (en) Method for formation of steeply inclined transport access track
RU2367793C1 (en) Recovery method of minerals
RU2471988C1 (en) Method for combined mining of fields
Balasubramanian Tunnels-types and importance
RU2611750C1 (en) Method for recovery of exhausted open pits for construction of cemetry
CN109611114A (en) Crouch the Underground Space Excavation method of existing tunnel under a kind of soil rock compound stratum
CN113123791B (en) Stripping construction method for high-steep slope area of surface mine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151216