CN105129043A - 一种用于船闸通航的推船 - Google Patents

一种用于船闸通航的推船 Download PDF

Info

Publication number
CN105129043A
CN105129043A CN201510247305.7A CN201510247305A CN105129043A CN 105129043 A CN105129043 A CN 105129043A CN 201510247305 A CN201510247305 A CN 201510247305A CN 105129043 A CN105129043 A CN 105129043A
Authority
CN
China
Prior art keywords
push arm
casing shape
starboard
shape push
hull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510247305.7A
Other languages
English (en)
Other versions
CN105129043B (zh
Inventor
陈海泉
王生海
于光超
孙玉清
张金男
乔卫亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Maritime University
Original Assignee
Dalian Maritime University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Maritime University filed Critical Dalian Maritime University
Priority to CN201510247305.7A priority Critical patent/CN105129043B/zh
Publication of CN105129043A publication Critical patent/CN105129043A/zh
Application granted granted Critical
Publication of CN105129043B publication Critical patent/CN105129043B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Traffic Control Systems (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

本发明公开了一种用于船闸通航的推船,包括吊舱式推进器、船体、左舷箱体形推臂、右舷箱体形推臂、系缆桩、防撞垫块、加强筋,其特征在于:所述吊舱式推进器安装在推船尾部,所述左舷箱体形推臂位于左舷与船体固连,所述右舷箱体形推臂位于右舷与船体固连,所述左右两舷箱体形推臂通过加强筋连在一起,所述系缆桩、防撞垫块位于左右两舷箱体形推臂内侧表面。将需要过闸的多艘船舶装入推船,在锚泊区域完成系缆工作,然后由推船推着多艘船舶一起通过船闸,从而一次性完成多艘船舶的过闸作业,减少过闸的总时间,提高通航效率。

Description

一种用于船闸通航的推船
技术领域
本发明公开了一种用于船闸通航的推船,属于船舶技术领域。
背景技术
随着长江上游地区航运及经济社会的快速发展,三峡过闸货物通过量由2004年的3431万吨增加到2011年的1.003亿吨,年均增长16.7%,比原规划提前20年达到设计通过能力。随着过闸货运量的不断增加,船舶待闸时间大幅增长,部分工矿企业因原材料等生产物资不能及时运输,而出现限产、停产现象。三峡坝区船舶通过能力与不断增长的货物需求的矛盾已经逐步显现,三峡船闸通过能力不足已逐步成为制约长江航运发展的瓶颈,并将对经济发展带来重大影响。
三峡船闸设计每闸次通过一个万吨级船队,实际情况是船队已基本退出市场,每闸次通过4-6艘单船,多艘船舶依次进闸、移泊和系解缆,使得实际运行闸次不可能达到设计的闸次。目前,通航管理部门已经从优化船闸运行调度、推进过闸船型标准化等方面做出了努力,虽在一定程度提高了通航能力,但还是不能满足长江航运发展的需求。据相关统计,正常情况下,每天最多能安排160艘左右船舶过闸,船舶平均待闸时间约1-2天;高峰时段过闸需求超过200艘,船舶待闸时间约2-4天,最高达到5-7天。因此,如何降低船舶进闸、移泊和系解缆的时间是提高三峡船闸通航能力的关键。
发明内容
为了克服背景技术中的不足之处,本发明提出一种用于船闸通航的推船,将需要过闸的多艘船舶装入推船,在锚泊区域完成系缆工作,然后由推船推着多艘船舶一起通过船闸,从而减少过闸的总时间,提高通航效率。
为了达到上述目的,本发明采用的技术方案是:
一种用于船闸通航的推船,包括吊舱式推进器、船体、左舷箱体形推臂、右舷箱体形推臂、系缆桩、防撞垫块、加强筋,其特征在于:所述吊舱式推进器安装在推船尾部,所述左舷箱体形推臂位于左舷与船体固连,所述右舷箱体形推臂位于右舷与船体固连,所述左右两舷箱体形推臂通过加强筋连在一起,所述系缆桩、防撞垫块位于左右两舷箱体形推臂内侧表面。
所述左舷箱体形推臂、右舷箱体形推臂为沿船长方向的箱体结构,箱体内部布置压载舱及管系,箱体的一端固连于船体,另一端自由伸出,其内侧布置一定数量的系缆桩和防撞垫块。
所述加强筋为沿船宽方向的钢板,一端固连于左舷箱体形推臂底部,另一端固连于右舷箱体形推臂底部,加强筋距离水面以下的高度大于过闸船舶的吃水深度。
一种用于船闸通航的推船,其具体实现途径是:(1)在锚泊区域将需要过闸的多艘船舶驶入推船,并通过系缆桩绑扎到推船推臂上;(2)推船推着需要过闸的多艘船舶通过船闸;(3)通过船闸后,在锚泊区域将推船内的船舶解缆,将船舶驶出推船。
本发明与背景技术相比,具有有益的效果是:
(1)由推船推着多艘船舶过闸,过闸船舶在锚泊区域系解缆,且可同时进入船闸,可大大减小过闸的总时间;
(2)推船采用吊舱式推进器,可提高过闸时的机动性和操纵性能,提高通航效率。
附图说明
图1推船工作原理简图
图2推船结构图
图中:1、推船,2、过闸船舶,1.1、吊舱式推进器,1.2、船体,1.3、左舷箱体形推臂,1.4、右舷箱体形推臂,1.5、系缆桩,1.6、防撞垫块,1.7、加强筋。
具体实施方式
下面结合附图对本发明作进一步说明。图1为推船工作原理简图,图2为推船结构图。
一种用于船闸通航的推船,包括吊舱式推进器1.1、船体1.2、左舷箱体形推臂1.3、右舷箱体形推臂1.4、系缆桩1.5、防撞垫块1.6、加强筋1.7,其特征在于:所述吊舱式推进器1.1安装在推船尾部,所述左舷箱体形推臂1.3位于左舷与船体1.2固连,所述右舷箱体形推臂1.4位于右舷与船体1.2固连,所述左舷箱体形推臂1.3、右舷箱体形推臂1.4通过加强筋1.7连在一起,所述系缆桩1.5、防撞垫块1.6位于左舷箱体形推臂1.3和右舷箱体形推臂1.4内侧表面。
所述左舷箱体形推臂1.3和右舷箱体形推臂1.4为沿船长方向的箱体结构,箱体内部布置压载舱及管系,箱体的一端固连于船体1.2,另一端自由伸出,其内侧布置一定数量的系缆桩1.5和防撞垫块1.6。
所述加强筋1.7为沿船宽方向的钢板,一端固连于左舷箱体形推臂1.3底部,另一端固连于右舷箱体形推臂1.4底部,加强筋1.7距离水面以下的高度大于过闸船舶2的吃水深度。
一种用于船闸通航的推船,其具体实现途径是:(1)在锚泊区域将需要过闸的多艘船舶2驶入推船1,并通过系缆桩1.5绑扎到左舷箱体形推臂1.3或右舷箱体形推臂1.4上;(2)推船1推着需要过闸的多艘船舶2通过船闸;(3)通过船闸驶入锚泊水域后,解开系缆桩1.5上的缆绳,将过闸船舶2驶出推船1。

Claims (3)

1.一种用于船闸通航的推船,包括吊舱式推进器、船体、左舷箱体形推臂、右舷箱体形推臂、系缆桩、防撞垫块、加强筋,其特征在于:所述吊舱式推进器安装在推船尾部,所述左舷箱体形推臂位于左舷与船体固连,所述右舷箱体形推臂位于右舷与船体固连,所述左右两舷箱体形推臂通过加强筋连在一起,所述系缆桩、防撞垫块位于左右两舷箱体形推臂内侧表面。
2.根据权利要求1所述的一种用于船闸通航的推船,其特征在于:所述左舷箱体形推臂、右舷箱体形推臂为沿船长方向的箱体结构,箱体内部布置压载舱及管系,箱体的一端固连于船体,另一端自由伸出,其内侧布置一定数量的系缆桩和防撞垫块。
3.根据权利要求1所述的一种用于船闸通航的推船,其特征在于:所述加强筋为沿船宽方向的钢板,一端固连于左舷箱体形推臂底部,另一端固连于右舷箱体形推臂底部,加强筋距离水面以下的高度大于过闸船舶的吃水深度。
CN201510247305.7A 2015-05-10 2015-05-10 一种用于船闸通航的推船 Expired - Fee Related CN105129043B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510247305.7A CN105129043B (zh) 2015-05-10 2015-05-10 一种用于船闸通航的推船

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510247305.7A CN105129043B (zh) 2015-05-10 2015-05-10 一种用于船闸通航的推船

Publications (2)

Publication Number Publication Date
CN105129043A true CN105129043A (zh) 2015-12-09
CN105129043B CN105129043B (zh) 2017-10-03

Family

ID=54714734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510247305.7A Expired - Fee Related CN105129043B (zh) 2015-05-10 2015-05-10 一种用于船闸通航的推船

Country Status (1)

Country Link
CN (1) CN105129043B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105539748A (zh) * 2016-01-14 2016-05-04 许可 提高船闸通航能力的方法及厢式船
CN105756030A (zh) * 2016-02-24 2016-07-13 许昌义 提高船闸通航效率的方法及滚动船

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH146168A (de) * 1929-08-08 1931-03-31 Donle Ludwig Dr Von Verfahren zur Bildung von Schiffsschubzügen.
US3307513A (en) * 1965-10-20 1967-03-07 Joseph H Engleman Multiple compartment scow
DE1531724A1 (de) * 1967-11-04 1970-01-22 Buludoza Koji Kabushi Kaisha Seetuechtiger Leichter mit Antriebsschiff
US3605675A (en) * 1970-01-13 1971-09-20 Interstate Oil Transport Co Vertically adjustable and articulated coupling for push tug and barge combinations
CN2238199Y (zh) * 1995-12-28 1996-10-23 谢刚正 多功能工蜂集装箱顶推船
CN1191194A (zh) * 1998-03-03 1998-08-26 李国衡 微型无人推船推驳船队
CN204713383U (zh) * 2015-05-10 2015-10-21 大连海事大学 一种用于船闸通航的推船

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH146168A (de) * 1929-08-08 1931-03-31 Donle Ludwig Dr Von Verfahren zur Bildung von Schiffsschubzügen.
US3307513A (en) * 1965-10-20 1967-03-07 Joseph H Engleman Multiple compartment scow
DE1531724A1 (de) * 1967-11-04 1970-01-22 Buludoza Koji Kabushi Kaisha Seetuechtiger Leichter mit Antriebsschiff
US3605675A (en) * 1970-01-13 1971-09-20 Interstate Oil Transport Co Vertically adjustable and articulated coupling for push tug and barge combinations
CN2238199Y (zh) * 1995-12-28 1996-10-23 谢刚正 多功能工蜂集装箱顶推船
CN1191194A (zh) * 1998-03-03 1998-08-26 李国衡 微型无人推船推驳船队
CN204713383U (zh) * 2015-05-10 2015-10-21 大连海事大学 一种用于船闸通航的推船

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105539748A (zh) * 2016-01-14 2016-05-04 许可 提高船闸通航能力的方法及厢式船
CN105756030A (zh) * 2016-02-24 2016-07-13 许昌义 提高船闸通航效率的方法及滚动船

Also Published As

Publication number Publication date
CN105129043B (zh) 2017-10-03

Similar Documents

Publication Publication Date Title
CN106043610B (zh) 一种采用半潜船运输船舶的方法
CN104229099B (zh) 一种海洋工程船舶接载下水的系统及方法
KR101771359B1 (ko) 플로터 고정형 연안 생산 저장 하역 설비
CN101508327A (zh) 一种客滚船舶倾斜试验的方法
CN204713383U (zh) 一种用于船闸通航的推船
WO2014186875A1 (en) Air cavity cushion vessel
CN103754325B (zh) 橡胶轮胎式推轮-推驳联接装置
CN207045637U (zh) 一种浮式客船码头
CN201520956U (zh) 码头系泊系统
CN105129043A (zh) 一种用于船闸通航的推船
CN101941510A (zh) 一种提高集装箱(或散杂货)船舶装卸效率的方法及设备
CN203358816U (zh) 一种渔船码头泊位系统
CN101876167B (zh) 码头系泊系统的系缆方法
CN202642027U (zh) 一种浮式舾装装置
CN203228917U (zh) 一种高效的定位顶推式开体驳船
CN102424101A (zh) 船舶利用气囊下水的工艺
CN107558435A (zh) 全天候码头及该结构下的船舶靠离泊作业方式
Bačkalov Impact of contemporary ship stability regulations on safety of shallow-draught inland container vessels
CN111017130A (zh) 提高船闸通航能力的方法
CN207120845U (zh) 一种长江干线节能船体型线和集装箱船
CN107244383B (zh) 一种多用途船的船体结构
CN101157379A (zh) 底纤船舶
Abramowski et al. Preliminary design considerations for a ship to mine polymetallic nodules in the Clarion-Clipperton zone
CN205916302U (zh) 一种船舶和钻井平台助浮系统
CN110827579B (zh) 优化军港舰艇驻泊的控制方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171003

Termination date: 20200510

CF01 Termination of patent right due to non-payment of annual fee